5700 Cancross Court Mississauga, Ontario

Total Page:16

File Type:pdf, Size:1020Kb

5700 Cancross Court Mississauga, Ontario 5700 CANCROSS COURT MISSISSAUGA, ONTARIO FOR LEASE Parking Ratio: OFFICE & WAREHOUSE SPACE 4.0 per 1,000 sq. ft. For More Information, Please Contact: Gary L. Williamson* Carley Williamson CBRE Limited Senior Vice President Sales Representative 2005 Sheppard Ave E T +1 416 495 6247 T +1 416 798 6276 Suite 800 [email protected] [email protected] Toronto, ON M2J 5B4 www.cbre.ca 5700 CANCROSS COURT MISSISSAUGA, ONTARIO OFFICE & WAREHOUSE SPACE FOR LEASE AVAILABILITY (AVAILABLE MAY 2020) SUITE 1 3,305 sq. ft. SUITE 2 3,580 sq. ft. WAREHOUSE 3,574 sq. ft. SUITE 1 & WAREHOUSE 6,879 sq. ft. SUITE 2 & WAREHOUSE 7,154 sq. ft. SUITES 1 & 2 & WAREHOUSE 10,459 sq. ft. PROPERTY DETAILS NET RENT $11.00 per sq. ft. per annum ADDITIONAL RENT $13.11 per sq. ft. per annum (2020 estimate)1 Warehouse Space Has 1 Dock Door Bell, Rogers, Telus Available in Building 1Taxes are estimated based on 2020 assessment and 2020 Mississauga CT rates FLOOR PLAN SUITE 1 WAREHOUSE SUITE 2 3,305 sq. ft. 3,574 sq. ft. 3,3580 sq. ft. 5700 CANCROSS COURT MISSISSAUGA, ONTARIO PROPERTYPROPERTY LOCATION LOCATION Route 19: Hurontario & 407 Park & Ride Platform (NB) to Port Credit Go Station Platform (SB) Route 43: Commerce Blvd at Renforth Station (EB) to Meadowvale Town Centre Drop Off (WB) Route 70: Islington Subway Bus Terminal Platform (EB) to Matheson Blvd W of Hurontario St (WB) Gary L. Williamson* Carley Williamson CBRE Limited Senior Vice President Sales Representative 2005 Sheppard Ave E T +1 416 495 6247 T +1 416 798 6276 Suite 800 [email protected] [email protected] Toronto, ON M2J 5B4 www.cbre.ca *Sales Representative February 2020.This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verified by CBRE, and CBRE does not represent, warrant or guarantee the accuracy, correctness and completeness of the Information. CBRE does not accept or assume any responsibility or liability, direct or consequential, for the Information or the recipient’s reliance upon the Information. The recipient of the Information should take such steps as the recipient may deem necessary to verify the Information prior to placing any reliance upon the Information. The Information may change and any property described in the Information may be withdrawn from the market at any time without notice or obligation to the recipient from CBRE. CBRE and the CBRE logo are the service marks of CBRE Limited and/or its affiliated or related companies in other countries. All other marks displayed on this document are the property of their respective owners. All Rights Reserved. Mapping Sources: Canadian Mapping Services [email protected]; MapPoint, DMTI Spatial, Environics Analytics, Microsoft Bing, Google Earth © 2020 CBRE Limited. Data © TeleAtlas, Google, AerialExpress, DigitalGlobe, Landiscor, USGS, i-cubed. The information contained herein (the “Information”) is intended for informational purposes only and should not be relied upon by recipients hereof. Although the Information is believed to be correct, its accuracy, correctness or completeness cannot be guaranteed and has not been verified by either CBRE Limited or any of its affiliates (CBRE Limited and its affiliates are collectively referred to herein as “CBRE”). CBRE neither guarantees, warrants nor assumes any responsibility or liability of any kind with respect to the accuracy, correctness, completeness, or suitability of, or decisions based upon or in connection with, the Information. The recipient of the Information should take such steps as the recipient may deem appropriate with respect to using the Information. The Information may change and any property described herein may be withdrawn from the market at any time without notice or obligation of any kind on the part of CBRE. The Information is protected by copyright and shall be fully enforced. Layout ID: P17 MapId: 7007539.
Recommended publications
  • Please Sign in So We Can Provide Updates and Information on Future Events
    HURONTARIO LIGHT RAIL TRANSIT PROJECT Welcome Please sign in so we can provide updates and information on future events. metrolinx.com/HurontarioLRT [email protected] @HurontarioLRT WHAT IS THE HURONTARIO LRT PROJECT? The Hurontario Light Rail Transit (LRT) Project will bring 20 kilometres of fast, reliable, rapid transit to the cities of Mississauga and Brampton along the Hurontario corridor. New, modern light rail vehicles will travel in a dedicated right-of-way and serve 22 stops with connections to GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, Brampton Züm, and the Mississauga Transitway. Metrolinx is working in coordination with the cities of Mississauga and Brampton and the Region of Peel to advance the Hurontario LRT project. Preparatory construction is underway. The project is expected to be completed at the end of 2022. The Hurontario LRT project is funded through a $1.4 billion commitment from the Province of Ontario as part of the Moving Ontario Forward plan. Allandale LAKE SIMCOE Waterfront OUR RAPID TRANSIT NETWORK Barrie South Innisfil SIMCOE Bradford East Gwillimbury Newmarket NewmarketSouthlakeHuron Heights Leslie TODAY AND TOMORROW GO Bus Terminal Hwy 404 Eagle LEGEND Mulock Main Mulock Savage Longford Aurora Lincolnville Every train, subway and bus helps to keep us moving, connecting us to the people and places Bloomington King City Stouffville GO Rail that matter most. As our region grows, our transit system is growing too. Working with 19th- Gamble Bernard Gormley municipalities across the Greater Toronto and Hamilton Area, and beyond, we’re delivering Kirby Elgin Mills Mount Joy Crosby Centennial new transit projects,making it easier, better, and faster for you to get around.
    [Show full text]
  • Peel Sustainable Transportation Strategy
    Background Documents Sustainable Transportation Strategy February 2018 Region of Peel Sustainable Transportation Strategy Online Consultation Survey Summary Shaping the Vision for Sustainable Transportation in the Region of Peel Prepared for Region of Peel by IBI Group May 19, 2017 IBI GROUP REGION OF PEEL SUSTAINABLE TRANSPORTATION STRATEGY ONLINE CONSULTATION SURVEY SUMMARY Prepared for Region of Peel Table of Contents List of Exhibits .............................................................................................................................. 1 1 Survey Objective and Design ............................................................................................ 2 1.1 Objectives ................................................................................................................ 2 1.2 Design ...................................................................................................................... 2 1.3 Promotion ................................................................................................................. 3 2 Survey Responses .............................................................................................................. 3 3 Respondent Demographics ............................................................................................... 4 3.1 Priority Ranking ........................................................................................................ 8 4 Strategy Rating ..................................................................................................................
    [Show full text]
  • 2018 ONTARIO Budget for General Inquiries Regarding 2018 Ontario Budget: Budget Papers, Please Call
    2018 ONTARIO BUDGE 2018 ONTARIO A PLAN FOR CARE AND OPPORTUNITY RX C. Lee RX T THE HONOURABLE CHARLES SOUSA MINISTER OF FINANCE 2018 ONTARIO BUDGET BUDGET PAPERS For general inquiries regarding 2018 Ontario Budget: Budget Papers, please call: Toll-free English and French inquiries: 1-800-337-7222 Teletypewriter (TTY): 1-800-263-7776 For electronic copies of this document, visit our website at www.ontario.ca/budget A printed copy of this publication can be ordered: Online: www.serviceontario.ca/publications By phone: ServiceOntario Contact Centre (Monday to Friday, 8:30 AM to 5:00 PM) Telephone: 416-326-5300 TTY: 416-325-3408 Toll-free across Canada: 1-800-668-9938 TTY Toll-free across Ontario: 1-800-268-7095 © Queen’s Printer for Ontario, 2018 ISBN 978-1-4868-1883-9 (Print) ISBN 978-1-4868-1884-6 (HTML) ISBN 978-1-4868-1885-3 (PDF) Ce document est disponible en français sous le titre : Budget de l’Ontario 2018 – Documents budgétaires Foreword A Plan for Care and Opportunity Ontario’s economy is performing well. This is largely due to the businesses and entrepreneurs who create jobs and to the women and men who get up each morning to go to the plant, or the office, or another place of work to make Ontario a more prosperous province. At the same time, the government has made strategic investments to support growth. Enhanced education, skills and training, new infrastructure, a competitive business environment and support for startups and small businesses are helping create good jobs. On the surface, the numbers tell a positive story: Our economy has outperformed those of all G7 nations since 2014; Our unemployment rate, at 5.5 per cent, is the lowest it has been in almost 20 years; and Last year alone, 500 net new jobs were created, on average, each day in Ontario, and they were mostly full‐time.
    [Show full text]
  • Authority to Waive the City's Right to a Hearing of Necessity in Connection
    12.12 Date: July 16, 2020 Originator’s files: To: Chair and Members of Council From: Geoff Wright, P.Eng, MBA, Commissioner of Meeting date: Transportation and Works July 22, 2020 Subject Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5) Recommendations 1. That the Corporate Report titled “Authority to Waive the City’s Right to a Hearing of Necessity in Connection with Metrolinx’s Expropriation of City Interests in Land for the Purpose of the Eglinton Crosstown West Extension Project (Ward 5)” dated July 16, 2020 from the Commissioner of Transportation and Works, be received. 2. That the Legal Services Section of the City Manager’s Office be given authority to waive the City’s right to a Hearing of Necessity as provided pursuant to Section 6 (2) of the Expropriations Act, RSO. Background Under cover of letters dated April 21, 2020, the City of Mississauga received four (4) Notices of Application for Approval to Expropriate (the “Notices”) from Metrolinx for the following interests in property required in connection with Metrolinx’s Eglinton Crosstown West Extension Project: 1. City’s easement interest in PIN132970628 2. City’s easement interest in PIN132970627 3. Fee simple interest in the City-owned lands identified as PIN74240245 4. Fee simple interest in the City-owned lands identified as PIN132970624. The location of these properties is illustrated in Appendix 1. 12.12 Council
    [Show full text]
  • (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016
    Bolton Residential Expansion Study (BRES) and Successful Integration of Transit-Oriented Development (TOD) May 24, 2016 The purpose of this memorandum is to review the professional literature pertaining to the potential develop- ment of a Transit-Oriented Development (TOD) in the Bolton Residential Expansion Study area, in response to the Region of Peel’s recent release of the Discussion Paper. The Discussion Paper includes the establishment of evaluation themes and criteria, which are based on provincial and regional polices, stakeholder and public comments. It should be noted that while the Discussion Paper and the Region’s development of criteria does not specifi- cally advocate for TOD, it is the intent of this memorandum to illustrate that TOD-centric planning will not only adequately address such criteria, but will also complement and enhance the Region’s planning principles, key points and/or themes found in stakeholder and public comments. In the following are research findings related to TOD generally, and specifically, theMetrolinx Mobility Hub Guidelines For The Greater Toronto and Hamilton Area (September 2011) objectives. Additionally, following a review and assessment of the “Response to Comments Submitted on the Bolton Residential Expansion Study ROPA” submission prepared by SGL Planning & Design Inc. (March 15, 2016), this memorandum evaluates some of the key arguments and assumptions made in this submission relative to the TOD research findings. Planning for Transit-Oriented Developments TOD policy and programs can result in catalytic development that creates walkable, livable neighborhoods around transit providing economic, livability and equitable benefits. The body of research on TODs in the United States has shown that TODs are more likely to succeed when project planning takes place in conjunction with transit system expansion.
    [Show full text]
  • Appendix a – Summary of Responses to Stakeholder and Community Input
    APPENDIX A. Summary of Responses to Stakeholder and Community Input 69 Port Credit GO Station Southeast Area Master Plan Study Appendix A. Summary of How the Port Credit GO Station Southeast Area Master Plan Addresses Stakeholder and Community Questions, Comments and Concerns As part of the Port Credit GO Station Southeast Area Master Plan, the Study Team consulted with stakeholders and the general public through: • Individual landowner meetings; • Master Plan Study Advisory Panel meetings; • City of Mississauga Interdepartmental meetings; • Public Open House (question and answer period and comment forms); and • A presentation to the City of Mississauga Urban Design Panel. Through the study consultation processes, a range of comments, questions and concerns were raised. The following provides a summary of the input received and how it was addressed by the Port Credit GO Station Southeast Area Master Plan. Full meeting minutes and comment form submissions can be found on the City’s website: www.mississauga.ca/portal/residents/pcgomasterplan. Stakeholder and Community How the Master Plan Addresses Stakeholder and Community Input Input Reference / Recommendation Section Additional GO Transit Parking • Why are 400 additional parking Customer surveys and monitoring show a current 3 & 4 spaces required at Port Credit shortage of parking at the Port Credit GO Station. Some GO Station for GO Transit customers are using parking lots at local community customers? facilities, which are not intended for such purposes. A 26% • Do not build a GO Transit increase in the number of Lakeshore West line customers parking structure / do not provide who use the Port Credit GO Station is expected by 2031, any more GO Transit parking.
    [Show full text]
  • Eglinton Crosstown West Extension Initial Business Case February 2020
    Eglinton Crosstown West Extension Initial Business Case February 2020 Eglinton Crosstown West Extension Initial Business Case February 2020 Contents Executive Summary 1 Scope 1 Method of Analysis 1 Findings 3 Strategic Case 3 Economic Case 3 Financial Case 4 Deliverability and Operations Case 4 Summary 4 Introduction 7 Background 8 Business Case Overview 10 Problem Statement 13 Case for Change 14 Problem Statement 14 Opportunity for Change 15 Key Drivers 16 Strategic Value 18 iv Investment Options 24 Introduction 25 Study Area 25 Options Development 25 Options for Analysis 27 Assumptions for Analysis and Travel Demand Modelling 33 Strategic Case 34 Introduction 35 Strategic Objective 1 – Connect More Places with Better Frequent Rapid Transit 38 Criterion 1: To provide high quality transit to more people in more places 38 Criterion 2: To address the connectivity gap between Eglinton Crosstown LRT and Transitway BRT 40 Strategic Objective 2 – Improve Transit’s Convenience and Attractiveness 42 Criterion 2: To provide more reliable, safe and enjoyable travel experience 42 Criterion 2: To boost transit use and attractiveness among local residents and workers 45 Strategic Objective 3 – Promote Healthier and More Sustainable Travel Behaviours 52 Criterion 1: To improve liveability through reduction in traffic delays, auto dependency and air pollution 52 Criterion 2: To encourage use of active modes to access stations 53 v Strategic Objective 4 – Encourage Transit-Supportive Development 57 Criterion 1: Compatibility with Existing Neighbourhood
    [Show full text]
  • VIVA Port Credit White Paper, May 27, 2008
    VIVA Port Credit White Paper re: Port Credit District Policies Review May 27, 2008 1 » Table of Contents Port Credit: An Urban Village for the 21 st Century A Model Community for the World www. VIVA PortCredit.ca VIVA Port Credit White Paper re: Port Credit District Policies Review May 27, 2008 2 TABLE OF CONTENTS PAGE 1. MASTHEAD ………………………………………………………………………………………………..…. 3 2. VIVA Port Credit …………………………………………………………………………………………….... 6 3. EXECUTIVE SUMMARY …………………………………………………………………………….……… 7 4. INTRODUCTION ………………………………………………………………………………….…………. 8 5. VISION OF PORT CREDIT ……………..………………………………………………………….……….. 9 6. THEMES 6.1 Waterfront …………………………………………………………………………...………….10 6.2 Heritage …………………………………………………………………………………………11 6.3 Public Open Spaces ……………………………………………………………..…………… 12 6.4 Main Streetscape ………………………………………………………………………………13 6.5 Neighbourhoods ……………………………………………………………………….……… 14 6.6 Density ……………………………………………………………………………….………… 15 6.7 Motorized Transportation ………………………………………………………………………16 6.8 Parking ………………………………………………………………………………….……… 17 6.9 Walking and Biking (Active Transportation)....…………………………………….…………18 6.10 Environment …….………………………………………………………………………………19 6.11 Built Form ………………………………………………………………………………….……20 6.12 Built Function ……………………………………………………………………………..…… 21 6.13 Social Matrix …………………………………………………………………………………… 22 6.14 Economic Development ……………………………………………………………………… 23 7. SPECIAL SITES (Place Making) 7.1 Lakeshore Corridor Concepts ……………………………………………………………...... 24 7.1A Lakeshore Corridor Compendium ……………………………………………………….….. 25
    [Show full text]
  • Relief Line South Environmental Project Report, Section 5 Existing and Future Conditions
    Relief Line South Environmental Project Report Section 5 - Existing and Future Conditions The study area is unique in that it is served by most transit modes that make up the Greater 5 Existing and Future Conditions Toronto Area’s (GTA’s) transit network, including: The description of the existing and future environment within the study area is presented in this • TTC Subway – High-speed, high-capacity rapid transit serving both long distance and local section to establish an inventory of the baseline conditions against which the potential impacts travel. of the project are being considered as part of the Transit Project Assessment Process (TPAP). • TTC Streetcar – Low-speed surface routes operating on fixed rail in mixed traffic lanes (with Existing transportation, natural, social-economic, cultural, and utility conditions are outlined some exceptions), mostly serving shorter-distance trips into the downtown core and feeding within this section. More detailed findings for each of the disciplines have been documented in to / from the subway system. the corresponding memoranda provided in the appendices. • TTC Conventional Bus – Low-speed surface routes operating in mixed traffic, mostly 5.1 Transportation serving local travel and feeding subway and GO stations. • TTC Express Bus – Higher-speed surface routes with less-frequent stops operating in An inventory of the existing local and regional transit, vehicular, cycling and pedestrian mixed traffic on high-capacity arterial roads, connecting neighbourhoods with poor access transportation networks in the study area is outlined below. to rapid transit to downtown. 5.1.1 Existing Transit Network • GO Rail - Interregional rapid transit primarily serving long-distance commuter travel to the downtown core (converging at Union Station).
    [Show full text]
  • 14 Bus Time Schedule & Line Route
    14 bus time schedule & line map 14 Eastbound View In Website Mode The 14 bus line (Eastbound) has 2 routes. For regular weekdays, their operation hours are: (1) Eastbound: 5:10 AM - 10:36 PM (2) Westbound: 5:01 AM - 10:15 PM Use the Moovit App to ƒnd the closest 14 bus station near you and ƒnd out when is the next 14 bus arriving. Direction: Eastbound 14 bus Time Schedule 32 stops Eastbound Route Timetable: VIEW LINE SCHEDULE Sunday Not Operational Monday 5:10 AM - 10:36 PM Clarkson Go Station Platform 6 1110 Southdown Road, Peel Tuesday 5:10 AM - 10:36 PM Southdown Rd at Hartland Dr Wednesday 5:10 AM - 10:36 PM 2020 Hartland Drive, Peel Thursday 5:10 AM - 10:36 PM Southdown Rd at Wiseman Crt Friday 5:10 AM - 10:36 PM 2105 Wiseman Court, Peel Saturday Not Operational Southdown Rd at Truscott Dr 1405 Southdown Road, Mississauga Truscott Dr at Davebrook Rd 2104 Truscott Drive, Mississauga 14 bus Info Direction: Eastbound Truscott Dr at Robillard Rd Stops: 32 1914 Truscott Drive, Mississauga Trip Duration: 18 min Line Summary: Clarkson Go Station Platform 6, Truscott Dr at Delaney Dr Southdown Rd at Hartland Dr, Southdown Rd at 1836 Truscott Drive, Mississauga Wiseman Crt, Southdown Rd at Truscott Dr, Truscott Dr at Davebrook Rd, Truscott Dr at Robillard Rd, Truscott Dr at Clarkson Rd Truscott Dr at Delaney Dr, Truscott Dr at Clarkson Rd, 1780 Truscott Drive, Mississauga Truscott Dr at Mazo Cres, Truscott Dr at Merrow Rd, Truscott Dr at Elite Rd, Truscott Dr at Chasehurst Dr, Truscott Dr at Mazo Cres Truscott Dr at Lorne Park Rd, Lorne Park
    [Show full text]
  • PLANNING JUSTIFICATION REPORT 30 EGLINTON AVENUE WEST | AUGUST 2020 Sajecki Planning Inc
    PLANNING JUSTIFICATION REPORT 30 EGLINTON AVENUE WEST | AUGUST 2020 Sajecki Planning Inc. TABLE OF CONTENTS 1.0 INTRODUCTION 4 2.0 SITE AND SURROUNDINGS 6 2.1 SUBJECT PROPERTY 7 2.2 PLANNING HISTORY 7 2.3 SURROUNDING LAND USES 9 2.4 SURROUNDING DEVELOPMENT APPLICATIONS 11 2.5 TRANSPORTATION NETWORK 11 3.0 PROPOSAL 16 3.1 DEVELOPMENT OVERVIEW 17 3.2 REQUIRED APPROVALS 27 3.3 PUBLIC CONSULTATION 27 4.0 POLICY AND REGULATORY CONTEXT 28 4.1 OVERVIEW 29 4.2 PLANNING ACT 29 4.3 PROVINCIAL POLICY STATEMENT 29 4.4 GROWTH PLAN FOR THE GREATER GOLDEN HORSESHOE 31 4.5 REGION OF PEEL OFFICIAL PLAN 34 4.6 CITY OF MISSISSAUGA OFFICIAL PLAN 37 4.7 CITY OF MISSISSAUGA ZONING BY-LAW 46 4.8 ADDITIONAL CONSIDERATION 46 5.0 SUPPORTING STUDIES AND REPORTS 50 5.1 TRAFFIC IMPACT STUDY 51 5.2 URBAN DESIGN STUDY 51 5.3 WIND STUDY 52 5.4 NOISE AND VIBRATION IMPACT STUDY 53 5.5 SHADOW STUDY 53 5.6 TREE INVENTORY AND PRESERVATION PLAN / ARBORIST REPORT 54 5.7 FUNCTIONAL SERVICING AND STORMWATER REPORT 54 5.8 PHASE 1 ENVIRONMENTAL SITE ASSESSMENT 55 5.9 HERITAGE IMPACT ASSESSMENT 55 5.10 HOUSING REPORT 56 6.0 PLANNING ANALYSIS 58 6.1 COMPLETE COMMUNITY 59 6.2 BUILT FORM AND DESIGN 59 6.3 HEIGHT AND DENSITY 60 7.0 CONCLUSION 62 APPENDICES APPENDIX A - SUBMISSION CHECKLIST APPENDIX B - ZONING BY-LAW AMENDMENT 1.0 INTRODUCTION Planning Justification Report: 30 Eglinton Avenue West Plaza Partners and Crown Realty Partners have On October 23, 2019 a pre-consultation meeting with retained Sajecki Planning Inc.
    [Show full text]
  • Transportation
    Transportation AMO Conference 2018 Ministry of Transportation Topics: Hurontario Light Rail Transit & Extension Mobility Hubs Regional Express Rail (RER) & High Speed Rail (HSR) Hwy 407/410 Connections to Brampton “Uptown” GTA West Corridor Transportation AMO Conference 2018 Transit & Regional Connections - Overview Connecting Brampton to the GTHA and Beyond Building on the strength of existing local and regional transportation networks, the City is working towards a seamless integration of all transportation networks connecting Brampton with the Greater Toronto and Hamilton Area (GTHA) and beyond. Ongoing projects that improve and enhance transit and active transportation connectivity include: Queen Street Rapid Transit Master Plan study, Hurontario LRT Extension Environmental Assessment (EA), and an Active Transportation Master Plan study. Brampton Transit Brampton Transit is one of the fastest growing transit systems in Ontario with ridership outpacing population growth: o In 2017, annual transit ridership increased to 27.4 million riders, an astonishing 18.4% increase over 2016 o Second fastest growing city in Canada, with the lowest average age of 36.5 Brampton Transit Ridership Growth Transportation AMO Conference 2018 Hurontario LRT & Extension Our Ask: Metrolinx partner with the City of Brampton to advance the Light Rail Transit Extension Environmental Assessment study, connecting transit to Downtown Brampton. The Hurontario LRT (HuLRT) will make connections to Brampton Transit including Brampton Züm as well as GO Transit’s Milton and Lakeshore West rail lines, Mississauga MiWay, and the Mississauga Transitway along Highway 403. Why is the Hurontario LRT (HuLRT) important to Brampton? The Hurontario LRT (HuLRT) will bring 20 kilometres of fast, reliable, rapid transit to the Hurontario corridor between the Brampton Gateway Terminal at Steeles Avenue and the Port Credit GO station in Mississauga.
    [Show full text]