Copy of PMW Tutong District (Press Release) Memo21

Total Page:16

File Type:pdf, Size:1020Kb

Copy of PMW Tutong District (Press Release) Memo21 English Section Listed below are the designated areas for the planned maintenance work as for September, 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 1 Replacement of ovehead lines. 26th September 2019 1.30 pm to 4.30 pm Mukim Rambai areas. Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 2 Replacement of ovehead lines. 26th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Saturday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 3 Replacement of ovehead lines. 28th September 2019 1.30 pm to 4.30 pm Mukim Rambai areas. Saturday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 4 Replacement of ovehead lines. 28th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 5 Replacement of ovehead lines. 30th September 2019 1.30 pm to 4.30 pm Mukim Rambai areas. Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 6 Replacement of ovehead lines. 30th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Rambai, 7 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 01st October 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 8 Replacement of ovehead lines. 01st October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Replacement of Ring Main Unit (RMU) at Wednesday 8.00 am to 11.30 am Kampong Pangkalan Tangsi, A part of Kampong Pangkalan Tangsi and its 9 substation Kg Pangkalan Tangsi 02nd October 2019 1.30 pm to 4.30 pm Mukim Lamunin surrounding areas. substation. Wednesday 8.00 am to 11.30 am Kampong Rambai, 10 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 02th October 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 11 Replacement of ovehead lines. 02th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 12 Replacememt of ovehead lines. 03th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Page 1 Thursday 8.00 am to 11.30 am Kampong Rambai, 13 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 03th October 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 14 Replacement of ovehead lines. 05th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Saturday 8.00 am to 11.30 am Kampong Rambai, 15 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 05th October 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 16 Replacement of ovehead lines. 07th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Rambai, 17 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 07th October 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 18 Replacement of ovehead lines. 08th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Rambai, 19 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 08th October 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 20 Replacement of ovehead lines. 09th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Rambai, 21 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 09th October 2019 1.30 pm to 4.30 pm Mukim Rambai Replacement of Ring Main Unit (RMU) at Wednesday 8.00 am to 11.30 am Kampong Bukit Sulang, 22 substation Flat Quarter, Ampangan Flat Quarter, Department of Forestry 09th October 2019 1.30 pm to 4.30 pm Mukim Lamunin Benutan Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 23 Replacement of ovehead lines. 10th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Thursday 8.00 am to 11.30 am Kampong Rambai, 24 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 10th October 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 25 Replacement of ovehead lines. 12th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Page 2 Saturday 8.00 am to 11.30 am Kampong Rambai, 26 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 12th October 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 27 Replacement of ovehead lines. 14th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Rambai, 28 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 14th October 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.00 am to 11.30 am Kampong Rambai, 29 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 15th October 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 30 Replacement of ovehead lines. 15th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Rambai, 31 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 16th October 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 32 Replacement of ovehead lines. 16th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Petani, Replacement of Ring Main Unit at 33 Yeo shop Building and its surroundings areas. 16th October 2019 1.30 pm to 4.30 pm Mukim Pekan Tutong substation Yeo Shop Building Thursday 8.00 am to 11.30 am Kampong Rambai, 34 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 17th October 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 35 Replacement of ovehead lines. 17th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Saturday 8.00 am to 11.30 am Kampong Rambai, 36 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 19th October 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 37 Replacement of ovehead lines. 19th October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Rambai, 38 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 21st October 2019 1.30 pm to 4.30 pm Mukim Rambai Page 3 Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 39 Replacement of ovehead lines. 21st October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Rambai, 40 Replacement of ovehead lines. A part of Rambai and its surroundings areas. 22nd October 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 41 Replacement of ovehead lines. 22nd October 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas.
Recommended publications
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • Persidangan Dewan Majlis
    PAGI HARI KHAMIS, 2 RABIULAKHIR 1431 / 18 MAC 2010 206 DEWAN MAJLIS Khamis, 2 Rabiulakhir 1431 / 18 Mac 2010 YANG DI-PERTUA Duli Yang Teramat Mulia DAN AHLI-AHLI MAJLIS Paduka Seri Pengiran Muda Mahkota MESYUARAT NEGARA Pengiran Muda Haji Al-Muhtadee Billah ibni Kebawah Duli Yang Maha Mulia Paduka Seri HADIR: Baginda Sultan Haji Hassanal Bolkiah Mu’izzaddin Waddaulah, DKMB., DPKT., YANG DI-PERTUA: King Abdul Aziz Ribbon, First Class (Saudi Arabia), The Order of the Renaissance (First Yang Amat Mulia Degree) (Jordan), Medal of Honour (Lao), Pengiran Indera Mahkota Pengiran Anak DSO (Singapore), Order of Lakandula with (Dr.) Kemaludin Al-Haj ibni Al-Marhum the Rank of Grand Cross (Philippines), DSO Pengiran Bendahara Pengiran Anak Haji (Military) (Singapore), PHBS., Mohd. Yassin, PSLJ., SPMB., POAS., Menteri Kanan di Jabatan Perdana Menteri, PHBS., PBLI., PJK., PKL., Negara Brunei Darussalam. Yang Di-Pertua , Negara Brunei Darussalam. Duli Yang Teramat Mulia Paduka Seri Pengiran Perdana Wazir AHLI-AHLI RASMI KERANA JAWATAN Sahibul Himmah Wal-Waqar Pengiran (PERDANA MENTERI DAN MENTERI- Muda Mohamed Bolkiah ibni Al-Marhum MENTERI): Sultan Haji Omar ‘Ali Saifuddien Sa’adul Khairi Waddien, DKMB., DK., PHBS., PBLI., Kebawah Duli Yang Maha Mulia PJK., Paduka Seri Baginda Sultan Haji Hassanal Menteri Hal Ehwal Luar Negeri dan Bolkiah Mu’izzaddin Waddaulah ibni Perdagangan, Negara Brunei Darussalam. Al-Marhum Sultan Haji Omar ‘Ali Saifuddien Sa’adul Khairi Waddien, Sultan dan Yang Yang Berhormat Di-Pertuan Negara Brunei Darussalam, Pehin Orang Kaya Seri Lela Dato Seri Setia Perdana Menteri, Menteri Pertahanan dan Haji Awang Abdul Rahman bin Dato Setia Menteri Kewangan, Negara Brunei Haji Mohamed Taib, PSNB., SLJ., PHBS., Darussalam.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Copy of PMW Tutong District (Press Release) Ogos Sept18
    English Section Listed below are the designated areas for the planned maintenance work as for August and September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Thursday 08.30 am to 02.30 pm Kampong Kiudang, Mukim Kiudang, Maintenance works for Low voltage overhead Spg 860 Kg Kiudang, Mukim Kiudang 1 02nd August 2018 Tutong lines and surrounding area. Saturday 08.30 am to 12.30 pm Maintenance works for Low voltage overhead Spg 1166-2 Kg Sungai Kelugos, Mukim Keriam, Tutong and 2 Kampong Sg Kelugos, Keriam, Tutong 04th August 2018 lines surrounding areas Monday Maintenance works for Low voltage overhead 3 08.30 am to 4.00 pm Kampong Birau, Mukim Kiudang, Tutong Jln Kecil Kg Birau , Mukim Kiudang and surrounding areas 06th August 2018 lines Tuesday 08.30 am to 4.00 pm Kampong Kupang, Mukim Keriam, Maintenance works for Low voltage overhead 4 Spg 554 Kg Kupang, Mukim Keriam and surrounding areas 07th August 2018 Tutong. lines Wednesday Kampong Lamunin, Mukim Lamunin, Maintenance works for Low voltage overhead 5 08.30 am to 12.00 noon A part of kampong Lamunin, Tutong. 08th August 2018 Tutong lines Thursday 08.30 am to 4.00 pm Maintenance works for Low voltage overhead 6 Kampong Telamba, Mukim Telisai, Tutong A part of Kampong Telamba, Mukim Telisai,Tutong. 09th August 2018 lines Monday 08.30 am to 4.30 pm Maintenance works for Low voltage overhead 7 Kampong Rambai, Mukim Rambai, Tutong Spg 1038, Kampong Rambai and surrounding areas 13th August 2018 lines Tuesday 08.30 am to 4.30 pm Maintenance works for Low
    [Show full text]
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 Kampong Padnunuk, Mukim Kiudang, Tutong A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. 08th Oct 2018 2.00 pm to 4.30 pm lines. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 8.30 am to 4.30 pm A part of Hospital Building and the surrrounding area. 08th Oct 2018 Haji Al-Muhtadee Billah, Tutong Transformer#3. Monday 8.00 am to 12.00 noon 3 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 08th Oct 2018 2.00pm to 4.30 pm Tuesday Maintenance works for Distribution 4 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. Earth satellite Building and the surrounding area. 09th Oct 2018 Transformer#1. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 Kampong Padnunuk, Mukim Kiudang, Tutong, Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. 09th Oct 2018 2.00pm to 4.30 pm lines. Tuesday 8.00 am to 12.00 noon 6 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 09th Oct 2018 2.00 pm to 4.30 pm Wednesday Maintenance works for Distribution 7 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
    3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers.
    [Show full text]
  • Copy of MEMO 028 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) Memo22
    English Section Listed below are the designated areas for the planned maintenance work as for September and October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday Maintenance works for low voltage overhead 1 18th Sept 2018 8.30 am to 04.30 pm Kampong Kuala Ungar, Mukim Rambai,Tutong. lines. A part of kampong Kuala Ungar and surrounding area. Tuesday Hj Hassbolah Building, 2 18th Sept 2018 8.30 am to 04.30 pm Kg Petani, Mukim Pekan Tutong Maintenance works for Distribution Transformer. Hj Hassbolah Building, Kg Petani. Wednesday Kampong Bukit Udal, Jln Nong Janang and Jln Kecil Bukit Kukob, Bukit Udal and A part 3 19th Sept 2018 8.30 am to 04.30 pm Mukim Tanjong Maya, Tutong Maintenance works for Distribution Transformer. of Kg sg Damit and surrounding areas Saturday Kampong Biong, 4 22th Sept 2018 8.30 am to 04.30 pm Mukim Lamunin, Tutong Maintenance works for Distribution Transformer. A part of Kampong Biong and surrounding area Monday 5 24th Sept 2018 8.30 am to 04.30 pm Kampong Long Mayan, Mukim Ukong , Tutong Maintenance works for Distribution Transformer. A part of Kampong Long Mayan and surrounding area Monday Kampong Merimbun, 6 24th Sept 2018 8.30 am to 04.30 pm Mukim Rambai, Tutong Maintenance works for Distribution Transformer. A part of Kampong Merimbun and surrounding area Kampong Lubuk Ubar, Monday 8.00 am to 11.30 am Jln Kuru-Benutan, Maintenance works for low voltage overhead 7 24th Sept 2018 2.00pm to 4.30 pm Mukim Rambai, Tutong lines.
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) 4Wk July18
    English Section Listed below are the designated areas for the planned maintenance work as for July and August, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.30 am to 02.00 pm Saturday Kampong Bukit Panggal, Mukim Keriam, Replacement of Distribution Feeder Pillar Spg 8, 1 Spg 8, Kampong Bukit Panggal , Mukim Keriam, Tutong. 21th July 2018 Tutong. Kampong Bukit Panggal , Tutong. 08.30 am to 11.30 am Tuesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 2 1.30 pm to 05.00pm 24th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Wednesday Kampong Sengkarai, Mukim Pekan Maintenance works for Low voltage overhead Spg 28, Jln Pengasing, Kampong Sengkarai, Mukim Pekan 3 1.30 pm to 05.00pm 25th July 2018 Tutong. lines Tutong. 08.30 am to 11.30 am Kampong Keranching, Kampong Wednesday Belaban, Kampong Benutan and Replacement of Ring Main Unit at substation Kampong Keranching, Kampong Belaban, Kampong Benutan and 4 1.30 pm to 05.00pm 25th July 2018 (For info: Department of Electrical Service will supply temporary electricity Kampong Lubuk Ubar, Mukim Rambai, Benutan #1, Tutong. apart of Kampong Lubuk Ubar, Mukim Rambai, Tutong. to the affected areas through mobile generator service at the substation) Tutong. Thursday 08.30 am to 02.00 pm Kampong Suran dan Kampong Panchor Replacement of Distribution Feeder Pillar at Kampong Suran and apart of kampong Panchor Dulit, Mukim 5 26th July 2018 Dulit, Mukim Pekan Tutong. Kampong Suran.
    [Show full text]
  • SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh
    SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 1 3A & COMPANY KPN-6055 I B01 [email protected] 05 Apr 2021 4 Apr 2024 Tel No: Fax: 8242518 No 1 Lot 1 Perpindahan Mata-mata No 1 Lot 1 Perpindahan Mata-mata Gadong BE 1918 Gadong BE 1918 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0043/2021 2 A.J. CONSTRUCTION AND TRADING KPN-6133 I KA01, B01 [email protected] 26 Jun 2021 25 Jun 2024 COMPANY Tel No: Fax: 8977362, No 30 Simpang 766 No 30 Simpang 766 8767838 Kampong Sungai Lalit Kampong Sungai Lalit Lumut Kuala Belait KC 2935 Lumut Kuala Belait KC 2935 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0224/2021 3 A.LEEZIQ CONTRACTOR KPN-5686 I KA01, B01 a.leeziq.contractor@gmail. 24 Jun 2019 23 Jun 2022 com Tel No: Fax: 7134374 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0238/2019 4 A.MALI CONTRACTOR KPN-5150 I B01, KPB04, S02, S03 19 Aug 2018 18 Aug 2021 Tel No: Fax: 8909149 No 6 Kampong Rimba Gadong No 6 Kampong Rimba Gadong Jalan 60 Simpang 64-6 Jalan 60 Simpang 64-6 Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0438/2018 Kontraktor & Pembekal, Kementerian Pembangunan Muka surat..1 7 Jul 2021 SENARAI PENDAFTARAN KONTRAKTOR YANG BERDAFTAR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Email: Berdaftar Mansuh 5 A'R YANA CONSTRUCTION KPN-5902 I B01 julaihi.othman @outlook.com 08 Jul 2019 7 Jul 2022 Tel No: Fax: 8801295 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Kiudang Tutong Kiudang Tutong Negara Brunei Darussalam Negara Brunei Darussalam No Siri sijil SK/0333/2019 6 ABU FAMILY'S ENTERPRISE KPN-5759 I KA01, B01, M03, abufamilysenterprises@gmail.
    [Show full text]