Copy of Copy of PMW Tutong District (Press Release) Memo21
Total Page:16
File Type:pdf, Size:1020Kb
English Section Listed below are the designated areas for the planned maintenance work as for September, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday Kampong Lubuk Pulau, A part of Kampong Lubuk Pulau and surrounding 1 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. 10th Sept 2018 MukimTanjong Maya , Tutong. areas. Monday 8.00 am to 11.30 am Kampong Pengkalan Piasau and Kampong A part of Kampong Pangkalan Piasau , Kampong 2 Wayleave clearing for overhead lines 10th Sept 2018 2.00pm to 4.30 pm Ukong, Mukim Ukong Ukong and surrounding areas. Wednesday Kampong Benutan, A part of Kampong Benutan and surrounding 3 8.30 am to 03.30 pm Replacement of Distribution Transformer 12th Sept 2018 Mukim Rambai, Tutong. areas. Wednesday Mahad Islamic college, Mahad Islamic college, Tutong and surrounding 4 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. 12th Sept 2018 Mukim Pekan Tutong. areas Wednesday 8.00 am to 11.30 am Kampong Pengkalan Piasau and Kampong A part of Kampong Pangkalan Piasau , Kampong 5 Wayleave clearing for overhead lines 12th Sept 2018 2.00pm to 4.30 pm Ukong, Mukim Ukong Ukong and surrounding areas. Thursday Kampong Bekiau, 6 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. A part of Kampong Bekiau and surrounding area. 13th Sept 2018 Mukim Kiudang,Tutong. Thursday 8.00 am to 11.30 am Kampong Pengkalan Piasau and Kampong A part of Kampong Pangkalan Piasau , Kampong 7 Wayleave clearing for overhead lines 13th Sept 2018 2.00pm to 4.30 pm Ukong, Mukim Ukong Ukong and surrounding areas. Saturday Sayyidina Othman Secondary School, Sayyidina Othman Secondary School, Bukit 8 8.30 am to 03.30 pm Maintenance works for Distribution Transformer. 15th Sept 2018 Bukit Beruang, Tutong. Beruang, Tutong. Saturday 8.00 am to 11.30 am Kampong Ukong, 9 Wayleave clearing for overhead lines Spg 545 Kampong Ukong and surrounding areas. 15hb Sept 2018 2.00pm to 4.30 pm Mukim Ukong. Saturday 8.00 am to 11.30 am Kampong Ukong, 10 Wayleave clearing for overhead lines A part of Kampong Ukong and surrounding areas. 15th Sept 2018 2.00pm to 4.30 pm Mukim Ukong Monday Kampong Birau, Jln Kecil Kampong Birau and a part of kampong 11 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. 17th Sept 2018 Mukim Kiudang, Tutong. Birau and surrounding areas Monday Kampong Kuala Ungar, Maintenance works for low voltage overhead A part of kampong Kuala Ungar and surrounding 12 8.30 am to 04.30 pm 17th Sept 2018 Mukim Rambai,Tutong. lines. areas. Tuesday Kampong Kuala Ungar, Maintenance works for low voltage overhead A part of kampong Kuala Ungar and surrounding 13 8.30 am to 04.30 pm 18th Sept 2018 Mukim Rambai,Tutong. lines. areas. Tuesday Hj Hassbolah Building, 14 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. Hj Hassbolah Building, Kg Petani. 18th Sept 2018 Kg Petani, Mukim Pekan Tutong Jln Nong Janang and Jln Kecil Bukit Kukob, Wednesday Kampong Bukit Udal, Kampong 15 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. 19th Sept 2018 Mukim Tanjong Maya, Tutong Bukit Udal and A part of Kg sg Damit and surrounding areas Saturday Kampong Biong, 16 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. A part of Kampong Biong and surrounding areas. 22th Sept 2018 Mukim Lamunin, Tutong Page 1 Monday Kampong Long Mayan, A part of Kampong Long Mayan and surrounding 17 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. 24th Sept 2018 Mukim Ukong , Tutong areas Monday Kampong Merimbun, A part of Kampong Merimbun and surrounding 18 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. 24th Sept 2018 Mukim Rambai, Tutong areas Monday 8.00 am to 11.30 am Kampong Lubuk Ubar, Maintenance works for low voltage overhead A part of Kampong Lubuk Ubar and surrounding 19 24th Sept 2018 2.00pm to 4.30 pm Jln Kuru-Benutan, Mukim Rambai, Tutong lines. areas. Tuesday 8.00 am to 11.30 am Kampong Lubuk Ubar, Maintenance works for low voltage overhead A part of Kampong Lubuk Ubar and surronding 20 25th Sept 2018 2.00pm to 4.30 pm Jln Kuru-Benutan, Mukim Rambai, Tutong lines. areas. Kampong Pak Bidang, Tuesday A part of kampong Pak Bidang, Kampong Talad 21 8.30 am to 04.30 pm Kampong Talad and Kampong Rampou, Maintenance works for Distribution Transformer. 25th Sept 2018 Kampong Rampou and surrounding areas. Mukim Ukong, Tutong. Wednesday Kampong Sg Jambu and Sg Paku, Mukim A part of kampong Sg Jambu and Kampong Sg 22 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. 26th Sept 2018 Telisai, Tutong. Paku, Telisai and surrounding areas. Wednesday 8.00 am to 11.30 am Kampung Sengkuang, Jln Benutan, Mukim Maintenance works for low voltage overhead A part of Kampong Sengkuang, Jln Benutan and 23 26th Sept 2018 2.00pm to 4.30 pm Rambai, Tutong. lines. surrounding areas. Thursday 8.00 am to 11.30 am Kampung Sengkuang, Jln Benutan, Mukim Maintenance works for low voltage overhead A part of Kampong Sengkuang, Jln Benutan and 24 27th Sep 2019 2.00pm to 4.30 pm Rambai, Tutong. lines. surrounding areas. Saturday Kampong Sg Paku, 25 8.30 am to 04.30 pm Maintenance works for Distribution Transformer. Aquaculture Research centre, Sg Paku. 29th Sept 2018 Mukim Telisai, Tutong Page 2 Bahasa Melayu Tersenarai di bawah adalah kawasan yang ditetapkan untuk kerja-kerja penyelenggaraan yang dirancang untuk bulan September , 2018: Kawasan Yang Terjejas Gangguan Bekalan Bil Hari & Tarikh Masa Lokasi Keterangan Kerja Elektrik Isnin Kampong Lubuk Pulau, Sebahagian Kampong Lubuk Pulau dan kawasan 1 8.30 pagi hingga 03.30 petang Penyelenggaraan "Distribution Transformer". 10hb Sept 2018 MukimTanjong Maya , Tutong. sekitarnya. Isnin 8.00 pagi hingga 11.30 pagi Kampong Pengkalan Piasau dan Kampong Sebahagian Kampong pengkalan Piasau, 2 Pembersihan laluan rangkaian kawat atas. 10th Sept 2018 2.00 petang hingga 4.30 petang Ukong, Mukim Ukong. Kampong Ukong dan kawasan sekitarnya. Rabu Kampong Benutan, Sebahagian Kampong Benutan dan kawasan 3 8.30 pagi hingga 03.30 petang Penggantian Distribution Transformer. 12hb Sept 2018 Mukim Rambai, Tutong. sekitarnya. Rabu Mahad Islam, Tutong 4 8.30 pagi hingga 03.30 petang Penyelenggaraan "Distribution Transformer". Mahad Islam, Tutong dan kawasan sekitarnya. 12hb Sept 2018 Mukim Pekan Tutong. Rabu 8.00 pagi hingga 11.30 pagi Kampong Pengkalan Piasau and Kampong Sebahagian Kampong Pangkalan Piasau, 5 Pembersihan laluan rangkaian kawat atas. 12hb Sept 2018 2.00 petang hingga 4.30 petang Ukong, Mukim Ukong Kampong Ukong dan kawasan sekitarnya. Khamis Kampong Bekiau, Mukim Sebahagian Kampong Bekiau dan kawasan 6 8.30 pagi hingga 03.30 petang Penyelenggaraan "Distribution Transformer". 13hb Sept 2018 Kiudang,Tutong. sekitarnya. Khamis 8.00 pagi hingga 11.30 pagi Kampong Pengkalan Piasau and Kampong Sebahagian Kampong Pangkalan Piasau, 7 Pembersihan laluan rangkaian kawat atas. 13hb Sept 2018 2.00 petang hingga 4.30 petang Ukong, Mukim Ukong Kampong Ukong dan kawasan sekitarnya. Sabtu Sekolah Menengah Sayyidina Othman, Sekolah Menengah Sayyidina Othman, Bukit 8 8.30 pagi hingga 03.30 petang Penyelenggaraan "Distribution Transformer". 15hb Sept 2018 Bukit Beruang, Tutong. Beruang, Tutong. Sabtu 8.00 pagi hingga 11.30 pagi Kampong Ukong, Spg 545 Kampong Ukong dan kawasan 9 Pembersihan laluan rangkaian kawat atas. 15hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Ukong. sekitarnya. Sabtu 8.00 pagi hingga 11.30 pagi Kampong Ukong, Sebahagian Kampong Ukong dan kawasan 10 Pembersihan laluan rangkaian kawat atas. 15hb Sept 2018 2.00 petang hingga 4.30 petang Mukim Ukong sekitarnya. Isnin Kampong Birau, Jln Kecil Kampong Birau, sebahagian kampong 11 8.30 pagi hingga 04.30 petang. Penyelenggaraan "Distribution Transformer". 17hb Sept 2018 Mukim Kiudang, Tutong. Birau dan kawasan sekitarnya. Isnin Kampong Kuala Ungar, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian kampong Kuala Ungar dan kawasan 12 8.30 pagi hingga 04.30 petang. 17hb Sept 2018 Mukim Rambai,Tutong. rendah. sekitarnya. Selasa Kampong Kuala Ungar, Penyelenggaraan rangkaian Kawat atas voltan Sebahagian kampong Kuala Ungar dan kawasan 13 8.30 pagi hingga 04.30 petang. 18hb Sept 2018 Mukim Rambai,Tutong. rendah. sekitarnya. Selasa Hj Hassbolah Building, 14 8.30 pagi hingga 04.30 petang. Penyelenggaraan "Distribution Transformer". Hj Hassbolah Building, Kg Petani. 18hb Sept 2018 Kg Petani, Mukim Pekan Tutong Page 3 Jln Nong Janang and Jln Kecil Bukit Kukob, Rabu Kampong Bukit Udal, 15 8.30 pagi hingga 04.30 petang. Penyelenggaraan "Distribution Transformer". Kampong Bukit Udal and A part of Kg sg Damit 19hb Sept 2018 Mukim Tanjong Maya, Tutong dan kawasan sekitarnya. Sabtu Kampong Biong, Sebahagian Kampong Biong dan kawasan 16 8.30 pagi hingga 04.30 petang. Penyelenggaraan "Distribution Transformer". 22hb Sept 2018 Mukim Lamunin, Tutong sekitarnya. Isnin Kampong Long Mayan, Sebahagian Kampong Long Mayan dan kawasan 17 8.30 pagi hingga 04.30 petang. Penyelenggaraan "Distribution Transformer". 24hb Sept 2018 Mukim Ukong , Tutong sekitarnya. Isnin Kampong Merimbun, Sebahagian Kampong Merimbun dan kawasan 18 8.30 pagi hingga 04.30 petang. Penyelenggaraan "Distribution Transformer". 24hb Sept 2018 Mukim Rambai, Tutong sekitarnya. Kampong Lubuk Ubar, Isnin 8.00 pagi hingga 11.30 pagi Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Lubuk Ubar dan kawasan 19 Jln Kuru-Benutan, 24hb Sept 2018 2.00 petang hingga 4.30 petang rendah. sekitarnya. Mukim Rambai, Tutong Kampong Lubuk Ubar, Selasa 8.00 pagi hingga 11.30 pagi Penyelenggaraan rangkaian Kawat atas voltan Sebahagian Kampong Lubuk Ubar dan kawasan 20 Jln Kuru-Benutan, 25hb Sept 2018 2.00 petang hingga 4.30 petang rendah.