ACHIEVING THE GOALS FOR SUSTAINABLE DEVELOPMENT BY CONSIDERATION OF NUCLEAR OPTIONS IN ENERGY SYSTEM EXPANSION PLANS ARMENIAN CASE
Vahan Sargsyan Energy Strategy Center of Scientific Research Institute of Energy Ministry of Energy Infrastructures and Natural Resources Armenia
IAEA International Atomic Energy Agency Country Overview
2 Regional Location
3 Country Overview
Territory – 29.8 thousand km2 ~40 % – 2 500 m above the sea level
Population – 3.0046 million inhabitants ~ 63.6% – urban, including 1.07 million peoples in Yerevan
4 Country Overview
Main macroeconomic indicators (2015 / 2014)
GDP, million $ 10 530/ 10 893 GDP per capita, $ 3 505/ 3 611 GDP growth, % 3.0 / 5.9 Unemployment rate, % 18.5 / 17.6
5 Energy System Overview
6 Main TPES Indicators (as of 31.12.2015)
1000 ktoe Production 0.43 Energy import 2.93 Energy export -0.12 Total Primary Energy Supply 3.24 TPES per capita (toe/cap.) 1.08
7 Armenian Power System: Main Indicators (as of 31.12.2015)
Total installed/available capacities, MW 3 152/2695
Nuclear 14% Armenian NPP (VVER-440) 440 / 385 Thermal (Gas fired) 38% Hrazdan TPP 810 / 370 Hrazdan unit 5 480 /440 Yerevan CCPP 242 /220 Hydro 36% Sevan-Hrazdan Cascade of HPPs 561 / 561 Vorotan cascade of HPPs 404 / 404 Rnewables 12% Small HPPs (<30 MW) 312 / 312 Wind Farm 2.6 / 2.6
8 Armenian Power System: Main Indicators (as of 31.12.2015)
Shares of electricity production
Nuclear, Natural Gas, 2787.7, 2254.5, 31% 38% Total generation mix
Wind, Small HPP, 836.5, 12% Hydro, 1369.3, 19%
Nuclear, Natural Gas, 2787.7, 48% 830.5, 14% Generation for domestic use
Wind, Small HPP, Hydro, 1369.3, 836.5, 14% 24% 9 Armenian Power System: Main Indicators (as of 31.12.2015)
2014 Small HPPs and Wind 2012 Armenian NPP 2010 2008 Yerevan CHP 2006 Yerevan CCHP 2004 Hrazdan TPP 2002 Hrazdan 5 2000 Sevan-Hrazdan Cascade of HPPs 1998 Vorotan Cascade of HPPs 1996 1988 0 2 4 6 8 10 12 14 16 bln. kWh
10 RA Government
USAID/LEDS/Tetra Tech, USAID/SRIE
“Long-term (up to 2036) Development
Pathways of Armenian Energy System” Objectives
• Preparation of least-cost energy development program till 2036, considering the following: . Ensuring reasonable level of energy security and independence of the country . Reliable supply of energy carriers to the local market consumers at the lowest price possible . Realization of energy efficiency and renewable energy potential . Expansion of regional cooperation – Generation and consumption technologies available in the market – Infrastructural and technological restrictions • Sensitivity analysis Macroeconomic data
Macroeconomic indicators
Annual growth 2015 2018 2021 2024 2027 2030 2033 2036 Source
GDP 5.70% 5.70% 5.70% 5.70% 3.00% 3.00% 3.00% 3.00% World Bank
Population 0.175% 0.024% 0.024% -0.215% -0.215% -0.215% -0.275% -0.275% GoA
Useful energy demand growth for whole planning period PJ 100.00 • 90.00 Residential 203% (3.0%) 80.00 • Commercial 201% (2.9%) 70.00 Agriculture • Industry 245% (3.8%) 60.00 Industry 50.00 Commercial • Agriculture 173% (2.3%) 40.00 Residential • Transport 30.00 20.00 Passenger161% (2.0%) 10.00 Freight 254% (4.0%) 0.00 2012 2015 2018 2021 2024 2027 2030 2033 2036 Change in Household conditions during planning period (24 years) • Number of persons per dwelling -14% (3.76 –> 3.24) • Number of dwellings +12% Technical/Technological Data
Iran – Armenia Electricity - gas swap Swap levels 2015 2018 2021 2024 2027 2030 2033 2036 Electricity export (GWh) 1,200 6,000 6,900 6,900 6,900 6,900 6,900 6,900 Natural gas import (mln. cm) 405 2,000 2,300 2,300 2,300 2,300 2,300 2,300
• European gas prices are Natural Gas Import Prices, $/1000 cub.m based on World energy 600 495 508 471 481 outlook 2013 500 460
400 355 324 335 • Russian gas price stated 297 315 274 according to Russian- 300 243 European 189 189 189 Russian Armenian Intergovernmental 200 Agreement, which assumes 65% Russian wholesale gas 100 price, and 35% CPI-U 0 2012 2015 2018 2021 2024 2027 2030 2033 2036 Capacities of gas pipelines of RA
Gas pipeline Daily maximum capacity, mln. cm Annual maximum capacity, bln. cm North-South pipeline 10 3.65 Iran-Armenia pipeline 8 2.30 Total 18 5.95 Domestic Energy Sources: Renewables only
TOTAL New: 714 MW, ~2480 million kWh/year Solar PV: 40 MW, 58 million kWh/year up to 2020 30 MW, 48 million kWh up to 2038 Wind Farms: 150 MW, 395 million kWh up to 2027 50 MW, 85 million kWh up to 2040 Geothermal PP: 30 MW, 194 million kWh in 2021 Small HPPs: 148 MW, 495 million kWh up to 2021 Shnokh HPP: 70 MW, 270 million kWh in 2021 Loriberd HPP: 66 MW, 212 million kWh in 2021 Meghri HPP: 130 MW, 720 million kWh in 2032
15 Technical/Technological Data
Hydro technologies Meghri Loriberd Shnokh Indicator Small HPPs HPP HPP HPP Capacity, MW 130 66 70 148 Efficiency 0.88 0.88 0.875 0.9
Specific investment cost, €/kW 0 1,620 1,810 910 (1,137 after 2021)
18.87 (23.59 after Specific fixed cost, €/kW/year 28.32 12.52 15.03 2021) Variable cost, €/MWh 0.57 0.433 0.433 0.2 Construction period, years 5 4 4 2
Annual maximum generation, 800 212 270 527 GWh/year
Investment, Million € 0 106.9 126.7 134.7 - 168.2 Technical/Technological Data
Alternative technologies Indicator Geothermal Solar PV Wind
Maximum capacity, MW 30 up to 70 up to 200
2,037 1,960 Specific investment cost per kW, €/kW 2,335 [1,000] [1,400]
Specific fixed cost per kW, €/kW/year 194 29 40
Variable O&M cost, €/MWh 1.2 0 0
Annual maximum generation, GWh/year 194 145 527
Investment, Million € 70.1 153.6 392 Technical/Technological Data
Nuclear technologies
Indicator PWR-1000 CANDU-6 SMR ANPP life extension
Investment, Million € 4,073.19 1,622.21 1,633.20 227.38
Efficiency 0.342 0.332 0.340 0.300
Fixed O&M cost, Million €/year 54.70 38.46 24.83 25.44
Fresh fuel cost, €/MWh 5.23 2.21 5.88 8.97
Spent fuel cost, €/MWh 1.34 4.05 0.78 0.52
Variable O&M cost, €/MWh 0.51 0.55 0.66 0.43
Total variable O&M cost, €/MWh 1.85 4.60 1.44 0.94
Unit capacity, MW 1028 670 360 385
Specific investment cost per kW, €/kW 3,962.24 2,421.21 4,536.68 590.59
Specific fixed cost per kW, €/kW/year 53.21 57.41 68.97 66.08 Annual maximum generation, GWh/year 8,105 5,282 2,838 2,277
Construction period, years 6 6 4 1 Technical/Technological Data
Thermal technologies
Indicator Natural gas CCGT
Unit capacity, MW 220/400 Efficiency 0.49 Specific investment cost per kW, €/kW 780
Specific fixed cost per kW, €/kW/year 30
Variable O&M cost, €/MWh 1.53
Annual maximum generation, GWh/year 1,760/3,200 Investment, Million € 171.6/312 Scenario Options
20 Scenario Results
21 Nuclear Scenarios Analysis
35,500 35,179
35,000 34,734
34,500 34,229
34,000
2012MEuro 33,666
33,500
33,000
32,500 Reference No ANPP No New No New life NPP NPP and no extension ANPP life extension
22 Total Energy System Cost
23 Electricity Generation Cost
24 Level of Energy Independence by Scenarios
25 Level of Energy Independence by Scenarios
Goal 7: Ensure access to affordable, reliable, sustainable and modern 02 September 2016 energy for all 26 Thank you
27