Foothill Gold Line Update Briefing

July 14, 2014 Pasadena to Azusa: On Time; On Budget Pasadena-Azusa

• Fully funded by Measure R • Three design-build contracts, totaling more than $550 million • Construction overseen by the Metro Gold Line Foothill Extension Construction Authority (Foothill Gold Line) • Construction completion anticipated - September 2015; Turn-over to Metro • Building six new light rail stations in five cities; all with parking

2 Pasadena to Azusa Major Milestones • DB1: Gold Line Bridge Complete – December 2012

• DB2: Alignment Contract – On Schedule/On Budget >70% Complete  Freight track realignment complete  All 14 at-grade street crossings complete or underway  All 24 bridge structures complete or underway  Drainage – >70% complete  Retaining walls – >70% complete  Soundwalls – >40% complete  OCS foundations – >70% complete  Light rail track installation underway  Design – All Packages are AFC

• DB3/Parking: Construction underway on Arcadia, Monrovia Irwindale and Azusa Structures

3 Station Construction Status Under Construction Under Construction Under Construction

Arcadia Monrovia Duarte/City of Hope Under Construction Under Construction Under Construction

Irwindale Azusa-Downtown APU/Citrus College

4 Progress

Future Arcadia Station

Station Area Today

5 Progress

Future Monrovia Station

Station Area Today Duarte/City of Hope Station Progress

Future Duarte/City of Hope Station

Station Area Today Progress

Future Irwindale Station

Station Area Today

8 Azusa-Downtown Station Progress

Future Downtown Azusa Station

Station Area Today APU/Citrus College Station Progress

Future APU/Citrus College Station

Station Area Today Station Parking Status All stations have parking (# of spaces): • Arcadia – 300 • Monrovia – 350 • Irwindale – 350 • APU/Citrus College – 200 • Duarte/City of Hope – 125 • Azusa Downtown – 200*

Arcadia Parking Structure

Monrovia Parking Structure

*Gold Line parking will be integrated into multi-use structure with City and 11 11 of 14 At 11of Arcadia Arcadia -GradeCrossings Complete

1st & Santa Clara

Monrovia Mayflower Magnolia Myrtle Mountain Duarte Buena Vista In Progress Highland Irwindale Yet Start to

Completed

Virginia San Gabriel Azusa Azusa

12 Alameda

Dalton Pasadena At-Grade Crossings - Vehicles Typical At-Grade Crossing Configuration

Metro Gold Line trains will cross streets at street level (referred to as “at-grade”)

Equipment Prevents Vehicle “Drive-Arounds”: • Exit Gates (Quad Gates) • Train-Coming-LED signals • Raised Medians

13 At-Grade Crossings - Pedestrians

Pedestrian Warning Devices: • Pedestrian Gates (Physical Barrier), Swing Gates, Bells • ADA approved Tactile strips, Signs

14 Shared Corridor – Future Condition

Light Rail Shared-Use Corridor Only (Light Rail and Freight)

• Shared use corridor east of San Gabriel River (light rail and freight share right- of-way, but use separate tracks) • Must keep freight line operational through construction

15 Construction Activities – Shared Corridor

Freight Track Realignment – Complete San Gabriel River through Glendora city limit

16 Nearly All 24 Structures Complete

In Progress Completed Yet to Start

Gold Line Bridge – Prep for Track San Gabriel River Bridge – Concrete Placement Installation

17 Bridge Structure Highlights

Palm Drive Bridges San Gabriel River Bridge Foothill Bridge

Sa