Metro Is Making More Service Changes
Total Page:16
File Type:pdf, Size:1020Kb

Load more
Recommended publications
-
Joint Development Program
POTENTIAL JOINT DEVELOPMENT SITES North Hollywood: 17.40 Acres Universal City: 12.00 Acres Metro Orange Line Sepulveda Station: 12.48 Acres Chatsworth Metrolink Station: 12.00 Acres Metro Gold Line Eastern Extension: Various Parcels Taylor Yard: 23.00 Acres Blue Line Artesia Station 6.4 acres Bus Divisions (Div. 7; El Monte) Metro Orange Line Balboa Station 2.2 acres Vermont/Beverly 0.5 acre Vermont/Sunset 0.7 acre North Hollywood Station Metro Red Line Site Description The project site consists of two separate parcels adjacent to Metro Red Line North Hollywood Station: • Parcel 1 is located east of Lankershim Boulevard and bounded by Cumpston Street on the north, South Chandler Boulevard on the south and Fair Avenue on the east. It consists of approximately 10.45 acres and is currently used for the North Hollywood Station entrance, a 14-bay bus layover site and a 1,101-space auto parking surface lot. •Parcel 2 is located west of Lankershim Boulevard and bounded by South Chandler Boulevard on the north, Bakman Avenue on the west and Weddington Avenue on the south. It is approximately 1.8 acres and currently serves Metro construction-related uses. Though not directly connected to Metro Red Line, this parcel can be directly linked to the station through an existing knockout panel. North Hollywood Station Metro Red Line Zoning • Parcel 1: C2-2D-CA • Parcel 2: C4-2D-CA • Parcel 3: PF • Parcel 4: C21a Area Context Located in the North Hollywood Redevelopment Project Area Major projects in the area include: • NoHo Academy completed in 1991 - a mixed-use project including an eight-story office and retail building, the Academy of Television Arts and Sciences entertainment complex, and a 250-unit multi-family residential project • NoHo Commons - a 23-acre mixed-use project consisting of approximately 1.2 million square feet (sf) including 810 residential units, 228,000 s.f. -
Gold Line Bridge the Art O F Desi Gn
GOLD LINE BRIDGE the Art o F desi Gn Metro Gold Line Foothill Extension Construction Authority 406 E. Huntington Drive, Suite 202 Monrovia, CA 91016 (626) 471-9050 www.foothillextension.org A Metro Gold line Foothill extension ConstrUCtion AUthoritY PROJeCt The mother art is architecture. Without an architecture of our own we have no soul of our own civilization. Frank Lloyd Wright The Gold Line Bridge ProJeCt detAils “The bridge he Gold Line Bridge is a 584-foot bridge that spans the eastbound I-210 Freeway in Arcadia, California. The $18.6 million dual-track bridge is the evokes The greaT T first completed element of the 11.5-mile Metro Gold Line Foothill Extension infrasTrucTure light rail project from Pasadena to Azusa, providing a connection between the designs of The 1930s existing Sierra Madre Villa Station in Pasadena and the future Arcadia Station. Works Progress The Foothill Extension is overseen by the Metro Gold Line Foothill Extension adminisTraTion and Construction Authority, an independent transportation agency responsible for the project’s planning, design, and construction. signals a neW era of the Gold line BridGe: stAtistiCs The Construction Authority, with the involvement of award-winning public arTisT involvemenT artist Andrew Leicester, envisioned the Gold Line Bridge as a vivid expression l ength: (end-to-end): 584 feet in major Public of the community, past and present. This pioneering collaboration resulted in Width: 115 feet between centerlines of the two signature support columns iniTiaTives of our the creation of a sculptural bridge built for the same cost originally estimated for a more conventional structure of its size. -
Claremont Traffic and Transportation Commission
CLAREMONT TRAFFIC AND TRANSPORTATION COMMISSION MEETING AGENDA “We are a vibrant, livable, and inclusive community dedicated to quality services, safety, financial strength, sustainability, preservation, and progress with equal representation for our community.” City Council Chamber Thursday 225 Second Street July 22, 2021 Claremont, CA 91711 7:00 PM COMMISSIONERS JUSTINE GARCIA CHAIR JACK BLAIR GLORIA HERNANDEZ-LOOFBOURROW JOHN MARLER JULIE MEDERO BRIAN MCCABE SONJA STUMP Pursuant to the local emergency concerning the COVID-19 virus declared by the City Council of the City of Claremont on March 19, 2020, the Los Angeles County Department of Health’s “Safer at Home Order” issued March 19, 2020, and Executive Order N-29-20 issued by Governor Gavin Newsom on March 18, 2020, the following protocols will apply to public participation for the duration of the emergency: Members of the public will not be permitted to be physically present at meetings. To allow for public participation, the Traffic and Transportation Commission will conduct its meeting through Zoom Video Communications. To participate in the meeting from the comfort of your own home or office, download Zoom on any phone or computer device and copy and paste the following link into your web browser to access and participate in the live Commission meeting at 7:00 p.m.: https://zoom.us/j/97473747561 or to only listen from the phone dial (213)338-8477, Web ID: 974 7374 7561. Members of the public who wish to address the Traffic and Transportation Commission on any matter listed on the agenda or a subject matter within the jurisdiction of the Commission may utilize the following methods. -
Transit Service Plan
Attachment A 1 Core Network Key spines in the network Highest investment in customer and operations infrastructure 53% of today’s bus riders use one of these top 25 corridors 2 81% of Metro’s bus riders use a Tier 1 or 2 Convenience corridor Network Completes the spontaneous-use network Focuses on network continuity High investment in customer and operations infrastructure 28% of today’s bus riders use one of the 19 Tier 2 corridors 3 Connectivity Network Completes the frequent network Moderate investment in customer and operations infrastructure 4 Community Network Focuses on community travel in areas with lower demand; also includes Expresses Minimal investment in customer and operations infrastructure 5 Full Network The full network complements Muni lines, Metro Rail, & Metrolink services 6 Attachment A NextGen Transit First Service Change Proposals by Line Existing Weekday Frequency Proposed Weekday Frequency Existing Saturday Frequency Proposed Saturday Frequency Existing Sunday Frequency Proposed Sunday Frequency Service Change ProposalLine AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late AM PM Late Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl Peak Midday Peak Evening Night Owl R2New Line 2: Merge Lines 2 and 302 on Sunset Bl with Line 200 (Alvarado/Hoover): 15 15 15 20 30 60 7.5 12 7.5 15 30 60 12 15 15 20 30 60 12 12 12 15 30 60 20 20 20 30 30 60 12 12 12 15 30 60 •E Ğǁ >ŝŶĞϮǁ ŽƵůĚĨŽůůŽǁ ĞdžŝƐƟŶŐ>ŝŶĞƐϮΘϯϬϮƌŽƵƚĞƐŽŶ^ƵŶƐĞƚůďĞƚǁ -
Los Angeles Orange Line
Metro Orange Line BRT Project Evaluation OCTOBER 2011 FTA Report No. 0004 Federal Transit Administration PREPARED BY Jennifer Flynn, Research Associate Cheryl Thole, Research Associate Victoria Perk, Senior Research Associate Joseph Samus, Graduate Research Assistant Caleb Van Nostrand, Graduate Research Assistant National Bus Rapid Transit Institute Center for Urban Transportation Research University of South Florida CCOOVVEERR PPHHOTOOTO LLooss AAnnggeelleess CCoouunnttyy MMeettrrooppololiittanan TTransransppoorrttaattioionn AAuutthhoorriittyy DDIISCSCLLAAIIMMEERR TThhiis ds dooccuumemennt it is is inntteennddeed ad as a ts teecchhnniiccaal al assssiissttaanncce pe prroodduucctt. I. It it is dsiiss ssdeemmiinnaatteed udnn ddueer tr thhe sepp oosnnssoorrsshhiip opf tf tohhe Ue..SS U.. DDeeppaarrttmemennt ot of Tf Trraannssppoorrttaattiioon in in tn thhe ie inntteerreesst ot of if innffoorrmamattiioon enxxcc ehhaannggee. T. Thhe Uenn iittUeed Sdttaa Sttees Gsoo vvGeerrnnmemennt atss ssauumemes nso nlo liiaabbiilliittyy ffoor ir itts cs coonntteenntts os or ur usse te thheerreeooff. T. Thhe Ue Unniitteed Sd Sttaattees Gs Goovveerrnnmemennt dtoo eeds nsoo tn et ennddoorrsse perroo pdduucctts osf mfo aa nnmuuffaaccttuurreerrss. T. Trraadde oerr o mamannuuffaaccttuurreerrss’ n’ naamemes as appppeeaar her herreeiin sn soolleelly by beeccaauusse te thheey ayrre a ceoo nncssiiddeerreed edssss eeennttiiaal tl to tohh et oebb jjeeoccttiivve oef tf tohhiis rs reeppoorrtt.. Metro Orange Line BRT Project Evaluation OCTOBER 2011 FTA Report No. 0004 PREPARED BY Jennifer Flynn, Research Associate Cheryl Thole, Research Associate Victoria Perk, Senior Research Associate Joseph Samus, Graduate Research Assistant Caleb Van Nostrand, Graduate Research Assistant National Bus Rapid Transit Institute Center for Urban Transportation Research University of South Florida 4202 E. Fowler Avenue, CUT100 Tampa, FL 33620 SPONSORED BY Federal Transit Administration Office of Research, Demonstration and Innovation U.S. -
Lines 487/489 (06/23/19) -- Metro Local and Express
Monday through Friday Effective Jun 23 2019 487/489 Westbound (Approximate Times) EL MONTE ARCADIA PASADENA SAN MARINO TEMPLE CITY SAN GABRIEL LOS ANGELES 10 2 3 4 5 6 7 83 9 01 El Monte Station Santa Anita & Oak Live Villa Madre Sierra Gold Line Station San Gabriel & Huntington & Rosemead Huntington Del Mar & Marshall Cal State LA Station B Station Union (El Monte Busway & Alameda) B Wilshire & Figueroa B & Westlake Wilshire Route 487 — — 5:34A 5:43A — 6:07A 6:15A 6:23A 6:36A 6:43A 487 — — 5:47 5:56 — 6:20 6:28 6:37 6:50 6:58 489 — — — — 6:08A 6:27 6:35 6:44 6:57 7:05 487 5:24A 5:35A 6:07 6:17 — 6:41 6:49 6:58 7:11 7:19 489 — — — — 6:26 6:49 6:57 7:06 7:19 7:27 487 — — 6:25 6:35 — 6:59 7:07 7:16 7:29 7:37 489 — — — — 6:46 7:09 7:17 7:26 7:39 7:47 489 — — — — 6:56 7:19 7:28 7:37 7:50 7:58 487 6:00 6:13 6:49 7:00 — 7:28 7:37 7:47 8:00 8:08 489 — — — — 7:07 7:31 7:40 7:50 8:03 8:11 487 6:18 6:31 7:07 7:18 — 7:47 7:56 8:06 8:19 8:27 489 — — — — 7:23 7:51 8:00 8:10 8:23 8:31 487 6:35 6:48 7:26 7:38 — 8:07 8:16 8:26 8:39 8:47 489 — — — — 7:42 8:11 8:20 8:30 8:43 8:51 487 6:52 7:06 7:45 7:57 — 8:26 8:35 8:45 8:58 9:06 489 — — — — 8:02 8:31 8:40 8:50 9:03 9:11 487 7:30 7:46 8:26 8:38 — 9:05 9:14 9:23 9:36 9:44 487 8:16 8:32 9:12 9:24 — 9:50 9:58 10:06 10:19 10:27 487 9:02 9:17 9:56 10:08 — 10:35 10:42 10:49 11:02 11:10 487 9:48 10:03 10:41 10:53 — 11:20 11:27 11:34 11:47 11:54 487 10:33 10:48 11:26 11:38 — 12:05P 12:12P 12:19P 12:32P 12:39P 487 11:19 11:34 12:11P 12:23P — 12:50 12:57 1:04 1:17 1:24 487 11:59 12:15P 12:55 1:07 — 1:35 1:42 1:49 -
January 2015
metro.net Metro Orange Line Connections h s a W h s a a Hansen Dam n DEVONSHIRE ST DEVONSHIRE ST DEVONSHIRE ST 5 a W s u r S Chatsworth Station u a lb t i ARLETA AVG Metro Rapid Stop n 405 W W O a Chatsworth Station L S O D METROLINK GLENOAKS BL O E LAUREL CYN BL D Metro Rapid Line TOPANGA CYN BL CYN TOPANGA TOPANGA CYN BL CYN TOPANGA N M LASSEN ST LASSEN ST LASSEN ST A N S Metro Orange Line T SAN FERNANDO RD CHATSWORTH A A T Station VA V E TAMPA AV TAMPA Sepulveda Metro Orange Line CORBIN AV ZELZAH AV F WILBUR AV RESEDA BL RESEDA PLUMMER ST PLUMMER ST PLUMMER BL BALBOA ST PLUMMER ST ARLETA W DE SOTO AV DE SOTO WOODLEY AV WOODLEY Y WINNETKA AV SEPULVEDA BL SEPULVEDA Metro Rail Station VINCENNES ST TERRA BELLA ST Northridge East CanyonARLETA Channel AV SUN AMTRAK/METROLINK 27 Fashion CSUN NORTH HILLS VALLEY Metro Red Line Center NORTHRIDGE NORDHOFF ST AV DARBY NORDHOFF ST NORDHOFF ST OSBORNE ST Transfers SAN DIEGO FWY Nordhoff Station Metrolink h SHELDON ST NORDHOFF ST Northridge Station s a PANORAMA W Amtrak 5 Bull Creek BRANFORD ST PARTHENIA ST PARTHENIA ST PARTHENIA ST CITY Parking a 15-0989 ©2014 LACMTA m H WEST HILLS i o CHASE ST O DEC 2014 Subject to Change c L a L P ROSCOE BL Roscoe Station ROSCOE BL ROSCOE BL Y W TUXFORD ST O O Sun Valley Station METROLINK D Aliso Canyon Wash Aliso Canyon SAN FERNANDO RD STRATHERN ST STRATHERN ST F STRATHERN ST W Y DE SOTO AV DE SOTO Van Nuys Station Tujunga Wash FlyAway WHITSETT AV Bus Terminal NUYS BL VAN WHITE OAK AV WHITE OAK TAMPA AV TAMPA VARIEL AV VARIEL WOODLAKE AV WOODLAKE WOODLAKE AV -
Metro Public Hearing Pamphlet
Proposed Service Changes Metro will hold a series of six virtual on proposed major service changes to public hearings beginning Wednesday, Metro’s bus service. Approved changes August 19 through Thursday, August 27, will become effective December 2020 2020 to receive community input or later. How to Participate By Phone: Other Ways to Comment: Members of the public can call Comments sent via U.S Mail should be addressed to: 877.422.8614 Metro Service Planning & Development and enter the corresponding extension to listen Attn: NextGen Bus Plan Proposed to the proceedings or to submit comments by phone in their preferred language (from the time Service Changes each hearing starts until it concludes). Audio and 1 Gateway Plaza, 99-7-1 comment lines with live translations in Mandarin, Los Angeles, CA 90012-2932 Spanish, and Russian will be available as listed. Callers to the comment line will be able to listen Comments must be postmarked by midnight, to the proceedings while they wait for their turn Thursday, August 27, 2020. Only comments to submit comments via phone. Audio lines received via the comment links in the agendas are available to listen to the hearings without will be read during each hearing. being called on to provide live public comment Comments via e-mail should be addressed to: via phone. [email protected] Online: Attn: “NextGen Bus Plan Submit your comments online via the Public Proposed Service Changes” Hearing Agendas. Agendas will be posted at metro.net/about/board/agenda Facsimiles should be addressed as above and sent to: at least 72 hours in advance of each hearing. -
I've Travelled a Lot on Amtrak Over the Years. At
I’ve travelled a lot on Amtrak over the years. At one time or another I’d taken most of the major trains that head west: the California Zephyr, the Southwest Chief, and the Empire Builder. There was one branch of the Amtrak map, though, that I’d never taken. That was the Sunset Limited, the once grand old train that runs across the bottom of the country on the old Southern Pacific tracks. I’ve always wanted to take that train, and the wish would finally be granted on this trip. My main vacation in 2016 would take me to Los Angeles. I haven’t been to that city in a decade, yet when I stepped off the train platform at Union Station it seemed like I’d just been there yesterday. Everything was wonderfully familiar. L.A. is not a city I know really well (like Chicago), but it’s still a place that feels like home. It was good to get back there—to return to some old favorite places and to check out some things I hadn’t seen before. While our trip wouldn’t officially begin until tomorrow, I’m starting my re-cap today. My sister Margaret, who would accompany me on this vacation, came over to my place around 1:30pm. The bulk of the day was spent working with her laptop computer. She wanted to install Windows 10 on the machine before the free upgrade offer expired. When I upgraded my two computers a year ago, all the necessary programs downloaded in the background for days or weeks prior to the changeover. -
Appendix E Detailed Case Studies
Guidelines for Providing Access to Public Transportation Stations APPENDIX E DETAILED CASE STUDIES Revised Final Report 2011 Page E-1 Detailed Case Studies Guidelines for Providing Access to Public Transportation Stations TABLE OF CONTENTS Case Study Summary ............................................................................................................................... E-3 Bay Area Rapid Transit (BART) .............................................................................................................. E-7 Los Angeles County Metropolitan Transportation Authority (Metro) ........................................... E-21 Metropolitan Atlanta Rapid Transit Authority (MARTA) ................................................................ E-33 Massachusetts Bay Transportation Authority (MBTA) ..................................................................... E-41 Metro-North Railroad ............................................................................................................................. E-57 New Jersey Transit (NJT) ....................................................................................................................... E-67 OC Transpo .............................................................................................................................................. E-81 Regional Transit District Denver (RTD) ............................................................................................... E-93 Sound Transit ........................................................................................................................................ -
Orange Line Transit Neighborhood Plans Community Workshop & Initial Concepts: Summary of Comments November and December 2017
ORANGE LINE TRANSIT NEIGHBORHOOD PLANS COMMUNITY WORKSHOP & INITIAL CONCEPTS: SUMMARY OF COMMENTS NOVEMBER AND DECEMBER 2017 Executive Summary The Orange Line Transit Neighborhood Plans (TNP) project aims to develop land use, zoning, and design regulations for the neighborhoods surrounding five Metro Orange Line stations in the south San Fernando Valley: North Hollywood, Van Nuys, Sepulveda, Reseda, and Sherman Way. The study area generally includes the corridors and some residential areas within a 15-minute walk or ½-mile radius of each station. During the first phase of the public planning process, in the first half of 2016, the Los Angeles Department of City Planning hosted four community workshops to identify opportunities to enhance neighborhoods surrounding transit stations, as well as several other small focus groups with specific stakeholder groups. Staff gathered input from the general public, including community residents, business owners, employees, transit users, and other participants about their thoughts, ideas, and concerns for the future of their neighborhood as it develops around transit, summarized here. Using the comments received through the first phase of outreach, in combination with station area context, existing City plans and policies, demographic analysis, and planning best practices, staff developed initial land use and zoning concepts for targeted changes in development rights and design regulations. These initial concepts were presented at two community workshops, on November 2, 2017 from 6-8:30 p.m.at the San Fernando Valley Arts & Cultural Center in Tarzana, and on November 15, 2017 from 6-8:30 p.m. at Van Nuys City Hall. Following these meetings, materials were made available online and staff solicited additional comments through the end of December. -
Framework of Sustainable Transit Communities
FRAMEWORK OF SUSTAINABLE TRANSIT COMMUNITIES OFFICE OF THE MAYOR, CITY OF LOS ANGELES FEBRUARY 2011 This is a project for the City of Los Angeles (City) with funding provided by the Southern California Association of Governments’ (SCAG) Compass Blueprint Program. Compass Blueprint assists Southern California cities and other organizations in evaluating planning options and stimulating development consistent with the region’s goals. Compass Blueprint tools support visioning efforts, infill analyses, and marketing and communications programs. The preparation of this report has been financed in part through grant(s) from the Federal Highway Administration (FHWA) and Federal Transit Administration (FTA), U.S. Department of Transportation (DOT) in accordance with the provision under the Metropolitan Planning Program as set forth in Section 104(f) of Title 23 of the U.S. Code. The contents of this report reflect the views of the author, who is responsible for the facts and accuracy of the data presented herein. The contents do not necessarily reflect the official views or policies of SCAG, DOT, or the State of California. This report does not constitute a standard, specification, or regulation. SCAG shall not be responsible for the City’s future use or adaptation of the report. FRAMEWORK OF SUSTAINABLE TRANSIT COMMUNITIES OFFICE OF THE MAYOR, CITY OF LOS ANGELES FEBRUARY 2011 TABLE OF CONTENTS 1 INTRODUCTION 3 OVERVIEW OF THE FRAMEWORK 4 Mix and Vitality of Uses 9 Well-Defined Sense of Place 11 Walkability and the Pedestrian Realm 14 Multimodal