A Feasibility Study on Integrated Community Based Flood Disaster

Total Page:16

File Type:pdf, Size:1020Kb

A Feasibility Study on Integrated Community Based Flood Disaster Technical Note of PWRI No. 4122 A Feasibility Study on Integrated Community Based Flood Disaster Management of Banke District, Nepal Phase 1(a): Baseline Study by Rabindra Osti Synopsis: The present comprehensive study is a joint research study by ICHARM/PWRI and NDRI, Nepal aimed at investigating the root causes of flood disasters in West Rapti river basin in Nepal and devising strategy to manage flood with community-based approach by targeting improvement in the resilience of the community within the broader framework of enhancing livelihood options and poverty alleviation. This phase i.e. first phase of the study has focused on the investigation of socio-economic impact of flood in the lower part of the basin. It has been found that the anthropogenic factors like construction of poorly designed infrastructures, river training works on an ad-hoc basis, and control of river flow through construction of barrage, levees etc are the culprits for the increasing flood extent in the study area. As a consequence, huge amount of agricultural land has been damaged due to the deposition of sand and bank cutting. This leads to affect greatly the livelihood of local people, who are based on agriculture. The nexus between poverty and the increased flood risk in the study area is clearly seen. Currently, local people are using their beliefs, local knowledge and practices for forecasting of heavy storms, early warning and emergency management; however the efficiency of traditional flood management practices is now being questioned especially in changing environment. It is important to develop the current level of awareness while enhancing traditionally accepted system. This is possible by integrating scientific knowledge in to the existing system with consensus and understandings by local people as well as other stakeholders. The integrated community based flood hazard map was developed by the community and it was cross-checked with the map that produced through hydrological modelling. Key Words: Community-based flood hazard mapping, vulnerability, disaster risk reduction, West Rapti River basin, Nepal Acknowledgements The International Centre for Water Hazard and Risk Management (ICHARM) of the Public Works Research Institute (PWRI) of Japan has presented this technical report. It is a study conducted in close collaboration with the Nepal Development Research Institute (NDRI). I am very grateful for being given a chance to carry this research task with NDRI researchers under the framework of "Localism," which has been promoted by ICHARM/PWRI as one of its priority working principles. On behalf of the research team members and in the capacity of the coordinator for this research at ICHARM/PWRI, I would like to thank NDRI officials, especially Dr. Nawa Raj Khatiwada, director of NDRI, and Dr. Mahesh Raj Gautam, coordinator of the research at NDRI, for their interest and firm support through out the time. I would also like to extend my sincere thank to Dr. Krishna Pahari and Dr. Tara Nidhi Bhattarai for their generous support and guidance in formulating a research methodology and executing research activities. I thank a group of NDRI researchers, Mr. Man Bahadur Chetri, Mr. Dhurba Gautam, and Mr. Samir Dhakal, for helping us in conducting field surveys and flood vulnerability mapping activities in the field. I owe this work to the inspiration from all participants in the series of consultation meetings that we held at local and national levels in Nepal on different dates. The study team has learnt many things from flood‐affected people. The information provided by them was extremely valuable. My team and I are particularly indebted to community members of the two Village Development Committees (VDCs) of the Banke district, Nepal, for their patience, cooperation and good understanding. Without their support, it would not have been possible to complete this study. I hope the outcomes of this research will help to formulate a long‐term strategy for flood mitigation and poverty alleviation in the basin. The know‐how can be disseminated to other parts of the country and region or even beyond, where the flood risk characteristics are similar to the West Rapti River basin. Rabindra Osti ICHARM/PWRI I EXECUTIVE SUMMARY Water induced disaster including flood accounts over 30 % of total losses of lives due to natural disaster in Nepal. On one hand, spatial variation on geography over short reach, young and complex geology, and uneven temporal distribution of rainfall contribute significantly to the occurrences of such water induced hazards, exposure to such hazards and vulnerabilities of people mainly due to poverty, and lack of well preparedness explain the escalating loss of lives and property. The present comprehensive study is a joint research study by Nepal Development Research Institute (NDRI), Nepal and International Center for Water Hazard and Risk Management (ICHARM), Japan aimed at investigating the flood disaster problem for finding the root causes and devising strategy to manage flood with community‐ based approach by targeting improvement in the resilience of the community within the broader framework of enhancing livelihood options and poverty alleviation with Matehiya and Gangapur VDCs of Banke District in West Rapti River Basin as a case. The objectives of the study are to assess the situation, the history, the causes, aggravating factors, extent and effects of the flood, to document hazard and vulnerability, and various capacities of the community; to study the local knowledge, practices and beliefs in the community; to formulate community based plans for flood mitigation and flood disaster risk reduction. Findings of this phase of study is aimed to be input to second phase when a broader framework of community based disaster management targeting poverty alleviation and improved livelihood options is planned to be prepared. The report is the outcome of number of methods used for the study purpose. To understand the study context review of relevant literature was supplement by consultation meetings and workshops. A highly effective consultation workshop of stakeholders at district level comprising of politicians, line agencies, domestic and international Non‐Governmental Organizations, key donor organizations working in the region, and representatives from four flood affected VDCs was held at Nepalgunj (district headquarter of Banke District) for stakeholder analysis, cause‐and‐effects analysis of flood, and for discussion on the research agenda. Similarly a central level consultation meeting with representatives from relevant stakeholders from government and non‐government organizations, donors, and academicians was successfully held at Kathmandu to discuss the outcome of Nepalgunjj workshop, the research framework and objectives of the present study, and to form a research‐interest‐team to discuss and monitor the progress of the research. Reconnaissance field visits and meeting with stakeholders at district was made before the detailed social and technical field survey. As part of the technical field survey, GPS survey along West Rapti River Bank sides for tracking the river bank location, and rapid assessment of bank condition was made. This provided a quick and rough approach for bank cutting hazard mapping along the West Rapti from Indo‐ Nepal boarder to Sikta. Simlarly, the GPS survey provided data of present river bank situation of West Rapti River which when overlaid over 1997 topographic map showed the extent of migration towards west. Over last 10 years, the channel has migrated over 1.8 Km near the southern boarder. Such migration of river channel has created huge loss of agricultural land and settlement areas on Nepalese side besides creating fear and threat to more settlements near Indo‐Nepal boarder. II Flood inundation mapping based on HEC‐RAS (US Army Corps of Engineer, 2002) was used to simulate various scenarios of flooding (2, 5,10,25,50,100 years) and to assess the impact of Kalkaluwa bandh(dyke). Based on the gradually varied steady flow analysis a number of inundation maps were prepared for various return period floods, and the settlements under high hazard zones were identified. Similarly, the effect of kalkaluwa bandh was clearly evaluated as resulting into the increased depth of flood water in the Nepalese side and decreased flood extent on India. Before conducting detailed social survey using participatory tools and techniques, a participatory workshop involving the key stakeholders of the VDCs was conducted at the VDC level. Participatory flood hazard and physical vulnerability maps, and risk map of the settlements and infrastructures which are under imminent threat were prepared. In addition, the causes and effects of hazards were identified, the local knowledge, beliefs and practices related to flood forecasting, early warning and flood management at various stages were documented, and community action plans for flood mitigation were prepared towards the end of the fieldwork. The recent flood of 2006 and 2007 provided an opportunity to investigate the flood situation in the study area and institutional arrangement in the district. The people living in the study area are continuously distressed from the flood of Rapti River and flash flood of small torrents flowing from churia range. In order to systematize the study in detail, these VDCs were further divided in to four clusters. Similar types of flood issues, severity and frequency of flood events, extent of damage and scale of casualties for last five‐year trends were taken as basis for the selection of the clusters. The total households and population in the study area are 2,028 and 13,256 respectively. Female slightly outnumber the males and the people of Terai origin are the major ethnic group in the study area. The composition of caste and ethnic groups in the study area consists of Brahmin, Chhetri, Dalit, Tharu, Rana Magar, Terai Non Dalit, Terai Dalit and Muslim. The main source of livelihood in the study area is agriculture (85%). Other sources include: on and off farm seasonal labor (13%), service (1%) and business (1%).
Recommended publications
  • Achham, Banke, Chitwan, and Pachthar Districts
    Technical Assistance Consultant’s Report Project Number: 44168-012 Capacity Development Technical Assistance (CDTA) October 2013 Nepal: Mainstreaming Climate Change Risk Management in Development (Financed by the Strategic Climate Fund) District Baseline Reports: Department of Roads (DOR) Achham, Banke, Chitwan, and Pachthar Districts Prepared by ICEM – International Centre for Environmental Management This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. MOSTE | Mainstreaming climate change risk management in development | DoR District Baseline TA – 7984 NEP October, 2013 Mainstreaming Climate Change Risk Management in Development 1 Main Consultancy Package (44768-012) ACHHAM DISTRICT BASELINE: DEPARTMENT OF ROADS (DOR) Prepared by ICEM – International Centre for Environmental Management METCON Consultants APTEC Consulting Prepared for Ministry of Science, Technology and Environment, Government of Nepal Environment Natural Resources and Agriculture Department, South Asia Department, Asian Development Bank Version B i MOSTE | Mainstreaming climate change risk management in development | DoR District Baseline TABLE OF CONTENTS 1 ACHHAM DISTRICT ........................................................................................................... 1 1.1 District Sector Master Plan ............................................................................................
    [Show full text]
  • Achhame, Banke, Chitwan, Kathmandu, and Panchthar Districts
    Technical Assistance Consultant’s Report Project Number: 44168-012 Capacity Development Technical Assistance (CDTA) October 2013 Nepal: Mainstreaming Climate Change Risk Management in Development (Financed by the Strategic Climate Fund) District Baseline Reports: Department of Local Infrastructure Development and Agricultural Roads (DOLIDAR) Achhame, Banke, Chitwan, Kathmandu, and Panchthar Districts Prepared by ICEM – International Centre for Environmental Management This consultant’s report does not necessarily reflect the views of ADB or the Government concerned, and ADB and the Government cannot be held liable for its contents. (For project preparatory technical assistance: All the views expressed herein may not be incorporated into the proposed project’s design. MOSTE | Mainstreaming climate change risk management in development | DoLIDAR District Baseline TA – 7984 NEP October, 2013 Mainstreaming Climate Change Risk Management in Development 1 Main Consultancy Package (44768-012) ACHHAM DISTRICT BASELINE: DEPARTMENT OF LOCAL INFRASTRUCTURE DEVELOPMENT & AGRICULTURAL ROADS (DOLIDAR) Prepared by ICEM – International Centre for Environmental Management METCON Consultants APTEC Consulting Prepared for Ministry of Science, Technology and Environment, Government of Nepal Environment Natural Resources and Agriculture Department, South Asia Department, Asian Development Bank Version B 1 MOSTE | Mainstreaming climate change risk management in development | DoLIDAR District Baseline TABLE OF CONTENTS 1 ACHHAM DISTRICT ..........................................................................................................
    [Show full text]
  • Study Report on "Comminity Based Organizations(Cbos): Landscape
    Community Based Organizations (CBOs): Landscape, Capacity Assessment and Strengthening Strategy Study Report Prepared for PLAN Nepal Lalitpur, Nepal July, 2005 Democratizing civil society at grassroots SAGUN P.O. Box 7802, Kathmandu, Nepal Phone: 977 4247920, Fax: 9771 4229544 Email: [email protected] Community Based Organizations (CBOs): Landscape, Capacity Assessment and Strengthening Strategy Mukta S. Lama Suresh Dhakal Lagan Rai Study Report Prepared for PLAN Nepal Lalitpur, Nepal July, 2005 SAGUN P.O. Box 7802, Kathmandu, Nepal Phone: 977 4247920, Fax: 9771 4229544 Email: [email protected] ii Acknowledgements This report is a result of contribution of many people in multiple ways. Foremost, we extend our deepest and heartfelt gratitude to members of Community Based Organizations across the districts for sharing us with their time, insight and experiences. The study benefited greatly from support and cooperation of the Plan field staff and partner agencies in Sunsari, Morang, Makwanpur, Rautahat, Bara, and Banke districts and the Regional Operational Support Unit teams. We would like to thank Ms. Chhing Lamu Sherpa, Mr. Kalbhan Rai, Dr. Chandra K. Sen, Mr. R. P. Gupta and Krishna Ghimire for their valuable inputs on the study. Dr. Chandi Chapagai, Plan Nepal Country Training Coordinator deserves special thanks for coordinating the whole exercise. We would like to express our deep appreciation to Shobhakar Vaidhya for his keen interest, insightful comments and his enthusiasm for incorporating the learning into the institutional policies and procedures. Thanks are also due to the Ms. Minty Pande, Country Director for her encouragement and comments. Similarly we very much appreciate the support of Mr.
    [Show full text]
  • Food Insecurity and Undernutrition in Nepal
    SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics SMALL AREA ESTIMATION OF FOOD INSECURITY AND UNDERNUTRITION IN NEPAL GOVERNMENT OF NEPAL National Planning Commission Secretariat Central Bureau of Statistics Acknowledgements The completion of both this and the earlier feasibility report follows extensive consultation with the National Planning Commission, Central Bureau of Statistics (CBS), World Food Programme (WFP), UNICEF, World Bank, and New ERA, together with members of the Statistics and Evidence for Policy, Planning and Results (SEPPR) working group from the International Development Partners Group (IDPG) and made up of people from Asian Development Bank (ADB), Department for International Development (DFID), United Nations Development Programme (UNDP), UNICEF and United States Agency for International Development (USAID), WFP, and the World Bank. WFP, UNICEF and the World Bank commissioned this research. The statistical analysis has been undertaken by Professor Stephen Haslett, Systemetrics Research Associates and Institute of Fundamental Sciences, Massey University, New Zealand and Associate Prof Geoffrey Jones, Dr. Maris Isidro and Alison Sefton of the Institute of Fundamental Sciences - Statistics, Massey University, New Zealand. We gratefully acknowledge the considerable assistance provided at all stages by the Central Bureau of Statistics. Special thanks to Bikash Bista, Rudra Suwal, Dilli Raj Joshi, Devendra Karanjit, Bed Dhakal, Lok Khatri and Pushpa Raj Paudel. See Appendix E for the full list of people consulted. First published: December 2014 Design and processed by: Print Communication, 4241355 ISBN: 978-9937-3000-976 Suggested citation: Haslett, S., Jones, G., Isidro, M., and Sefton, A. (2014) Small Area Estimation of Food Insecurity and Undernutrition in Nepal, Central Bureau of Statistics, National Planning Commissions Secretariat, World Food Programme, UNICEF and World Bank, Kathmandu, Nepal, December 2014.
    [Show full text]
  • Nepal's 9 Minimum Characteristics of a Disaster Resilient Community
    Flagship 4 Handbook Nepal’s 9 Minimum Characteristics of a Disaster Resilient Community Published July 2013 Flagship 4: Integrated Community Based Disaster Risk Reduction/Management Flagship 4 is led by Government of Nepal’s Ministry of Federal Affairs and Local Development in partnership with the International Federation of Red Cross and Red Crescent Societies Flagship 4 is part of the Nepal Risk Reduction Consortium. An electronic version of this handbook can be downloaded from www.flagship4.nrrc.org.np The handbook is available in both English and Nepali Copies of the handbook and other documents can be obtained from IFRC’s Flagship 4 coordinator i Nepal’s 9 Minimum Characteristics Nepal’s 9 Minimum Characteristics of a Disaster Resilient Community of a Disaster Resilient Community About This Handbook Glossary of Terms Community Based Disaster Risk Reduction / Management Since the inception of the 9 minimum Handbook contents CBDRR/M characteristics of a disaster resilient community CDMC Community Disaster Management Committee in Nepal, there have been many questions Case studies by Government, implementing agencies, One attempt to provide guidance on DDC District Development Committee researchers, and community members on how operationalising the characteristics has DDMC District Disaster Management Committee to operationalise these characteristics. These been to collect a number of case studies questions have led to the formation of this from implementing agencies in Nepal. DDRC District Disaster Response Committee handbook which contains more information Each case study corresponds to a specific DEECC District Energy, Environment and Climate Change Division about each characteristic and examples of how characteristic and outlines how the they can be applied in interventions.
    [Show full text]
  • Draft IEE: Nepal
    Draft Initial Environmental Examination September 2011 NEP: Integrated Urban Development Project- Nepalganj Municipality Prepared by the Government of Nepal, Ministry of Physical Planning and Works for the Asian Development Bank. CURRENCY EQUIVALENTS (as of 5 August 2011) Currency unit – Nepalese rupee (NRs/NRe) NRs1.00 = $0.01391 $1.00 = NRs 71.874 ABBREVIATIONS ADB - Asian Development Bank AIDS - Acquired Immune Deficiency Syndrome CITES - Convention on International Trade in Endangered Species of Wild Fauna and Flora DOR - Department of Roads DSC - Design and Supervision Consultants DSWSS - Department of Water Supply and Sewerage DUDBC - Department of Urban Development and Building Construction DWEC - District Wage Evaluation Committee EARF - Environmental Assessment and Review Framework EIA - Environmental Impact Assessments EIA - environmental impact assessment EMEP - Environmental Mitigation Execution Plan EMP - Environmental Management Plan EPA - Environment Protection Act EPR - Environment Protection Rules GRC - Grievance Redress Mechanism HIV - Human Immunodeficiency Virus IEE - Initial Environmental Examination MLD - Ministry of Local Development MOE - Ministry of Environment MOE - Ministry of Environment MOF - Ministry of Finance MPMC - Municipal Project Management Committee MPPW - Ministry of Physical Planning and Works NDWQS - National Drinking Water Quality Standards NGO - Non-Government Oranization NTFP - non-timber forest products NWSC - Nepal Water Supply Corporation OHS - Occupational Health and Safety PCO - project coordination
    [Show full text]
  • Hariyo Ban Program Ii Threats and Vulnerabilities
    HARIYO BAN PROGRAM II (2016-2021) THREATS AND VULNERABILITIES ASSESSMENT OF PARKS AND CORRIDORS OF TERAI ARC LANDSCAPE Prepared by: WWF in partnership with CARE, FECOFUN and NTNC P.O. Box 7660 Kathmandu, Nepal 21 April 2017 © WWF 2017 All rights reserved Any reproduction of this publication in full or in part must mention the title and credit WWF. Published by WWF Nepal PO Box: 7660 Baluwatar, Kathmandu, Nepal T: +977 1 4434820, F: +977 1 4438458 [email protected] , www.wwfnepal.org/hariyobanprogram Disclaimer This Threats and Vulnerabilities Assessment of Parks and Corridors in Terai Arc Landscape is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents are the responsibility of the authors and do not necessarily reflect the views of USAID or the United States Government. Contents INTRODUCTION ........................................................................................................................................................5 METHODOLOGY ........................................................................................................................................................6 Chitwan National Park and Buffer Zone ...................................................................................................................7 Threat Ratings of Chitwan National Park and Buffer Zone...................................................................................8 Barandabhar Corridor ...........................................................................................................................................
    [Show full text]
  • Nepal EGRP-RFP-FY19-P006
    Request for Proposal (RFP) - Nepal EGRP-RFP-FY19-P006 Amendment #1 Commodity/Service Required: Endline Assessment of Early Grade Reading Program (EGRP) Type of Procurement: One Time Purchase Order Type of Contract: Firm Fixed Price Term of Contract: December 01, 2019- April 15, 2020 Contract Funding: AID-367-TO-15-00002 This Procurement supports: USAID’s Early Grade Reading Program (EGRP) Submit Proposal to: The Selection Committee RTI- USAID Early Grade Reading Program House no. 46/64, Uttar Dhoka, Lazimpat, Kathmandu, Nepal Original Date of Issue of RFP: Tuesday, July 23, 2019 Date Questions from Supplier Due: Wednesday, July 31, 2019 11:00 a.m. Nepal Standard Time email [email protected] Note:- Q&A will be posted on RTI website Pre-submission conference on RFP Thursday, August 01, 2019, 10:00 to 11:00 AM at EGRP meeting hall, Lazimpat. Date Proposal Due: Thursday, August 22, 2019, 11:00 a.m. Nepal Standard Time Approximate Purchase Order effective date to December 01, 2019 Successful Bidder(s): Method of Submittal: Hard Copy of proposal along with the soft copy in a CD or pen drive. Proposal documents should be submitted in a closed envelope with wax seal (laah chhap) and clearly marked with the solicitation number to the following address: The Selection Committee RTI-USAID Early Grade Reading Program House no. 46/64, Uttar Dhoka, Lazimpat, Kathmandu, Nepal. Bidder’s quote must be printed on the organization’s letterhead, signed, stamped, dated and must include all items and/or services. In addition, each and every pages of the proposal documents needs to be signed and stamped by the authorized person in order to be considered for evaluation.
    [Show full text]
  • Saath-Saath Project
    Saath-Saath Project Saath-Saath Project THIRD ANNUAL REPORT August 2013 – July 2014 September 2014 0 Submitted by Saath-Saath Project Gopal Bhawan, Anamika Galli Baluwatar – 4, Kathmandu Nepal T: +977-1-4437173 F: +977-1-4417475 E: [email protected] FHI 360 Nepal USAID Cooperative Agreement # AID-367-A-11-00005 USAID/Nepal Country Assistance Objective Intermediate Result 1 & 4 1 Table of Contents List of Acronyms .................................................................................................................................................i Executive Summary ............................................................................................................................................ 1 I. Introduction ........................................................................................................................................... 4 II. Program Management ........................................................................................................................... 6 III. Technical Program Elements (Program by Outputs) .............................................................................. 6 Outcome 1: Decreased HIV prevalence among selected MARPs ...................................................................... 6 Outcome 2: Increased use of Family Planning (FP) services among MARPs ................................................... 9 Outcome 3: Increased GON capacity to plan, commission and use SI ............................................................ 14 Outcome
    [Show full text]
  • Facility Based Assessment for Reproductive Health Commodities and Services
    Facility Based Assessment for Reproductive Health Commodities and Services FINAL REPORT United Nations Population Fund (UNFPA) Shanta Bhawan Road, Jhamsikhel Lalitpur, Nepal Submitted By Nepal Development Research Institute Shree Durbar Tole, Pulchowk, Lalitpur, Nepal Submission date: 16th March 2015 i This report is a product of research on "Facility Based Assessment for Reproductive Health Commodities and Services “carried out by Nepal Development Research Institute with the financial support of United Nations Population Fund (UNFPA) from October 2014 to January 2015 Study Team • Dr. Basu Dev Pandey, Team Leader • Prof. Naveen Shrestha, Senior Consultant Expert • Dr. Jaya Kumar Gurung, Project Coordinator • Dr. Rabita Mulmi, Field Survey Coordinator • Ms. Saruna Ghimire, Consultant Expert • Ms. Sona Shakya , Senior Research Associate Report By: Nepal Development Research Institute Shree Durbar Tole, Pulchowk, Lalitpur www.ndri.org.np ii Acknowledgement It is a great pleasure for Nepal Development Research Institute (NDRI) to accomplish this research in collaboration with concern departments of Government of Nepal and UNFPA/Nepal. We thank UNFPA for entrusting NDRI and making congenial environment for this research work. It's immense pleasure to acknowledge the representatives of Nepal Government's agencies particularly Dr. Senendra Raj Upreti, Director General , Department of Health services, Dr. Bhim Singh Tinkari, Director of Logistic Management Division (LMD), Dr. Pushpa Chaudhari, Director, Family Health Division (FHD), Bhogendra Raj Dotel, Senior Public Health Administrator, Mr. Gyan Bahadur BC, Planning Officer (LMD), Krishna Ghimire, Joint Secretary (LMD), Upendra Dhungana (LMD) for their invaluable cooperation into various ways; valuable inputs in the inception phase of project, important contribution in training to field researchers, arranging the district and regional level health facilities for their cooperation, and providing suggestions in the draft report.
    [Show full text]
  • 52195-001: Priority River Basins Flood Risk Management Project
    Priority River Basins Flood Risk Management Project (RRP NEP 52195) Social Safeguards Due Diligence Report Project Number: 52195-001 June 2020 Nepal: Priority River Basins Flood Risk Management Project Prepared by Department of Water Resources and Irrigation, and the Department of Hydrology and Meteorology, Ministry of Energy, Water Resources and Irrigation for the Asian Development Bank. This social safeguards due diligence report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Your attention is directed to the “terms of use” section of this website. In preparing any country program or strategy, financing any project, or by making any designation of or reference to a particular territory or geographic area in this document, the Asian Development Bank does not intend to make any judgments as to the legal or other status of any territory or area. CURRENCY EQUIVALENTS (as of 11 June 2020) Currency unit – Nepalese Rupee (NRe) NRe1.00 = $ 0.0082658291 $1.00 = NRe120.98 ABBREVIATIONS ADB - Asian Development Bank AP - Affected person CBDRM - Community-Based Disaster Risk Management CBS - Central Bureau of Statistics CDMC - Community Disaster Management Committee DWRI - Department of Water Resources and Irrigation FFEW - Flood Forecasting and Early Warning GIS - Geographic Information System GoN - Government of Nepal GRC - Grievance Redress Committee HH - Household IP - Indigenous people IR - Involuntary Resettlement MoU - Memorandum of Understanding NGO - non-governmental organization PIU - Project Implementation Unit PMU - Project Management Unit PRBFRMP - Priority River Basins Flood Risk Management Project PRTW - Proposed River Training Works SPS - ADB’s Safeguard Policy Statement TA - Technical Assistance VDC - Village Development Council VDLUR - Voluntary Donation of Land Use Rights WEIGHTS AND MEASURES 1ha (hectare) – Is equivalent to 29.58 katthas km – Kilometre Table of Contents Executive Summary i I.
    [Show full text]
  • Assessment of Poaching and Illegal Wildlife Trafficking in Banke- Kamdi Complex
    Assessment of Poaching and Illegal Wildlife Trafficking in Banke- Kamdi Complex Submitted to: Hariyo Ban Program Baluwatar, Kathmandu, Nepal Submitted by: People’s Help Group (PHG) Kathmandu, Nepal July, 2017 © WWF Nepal 2017 All rights reserved Disclaimer: This report is made possible by the generous support of the American people through the United States Agency for International Development (USAID). The contents of this report are the responsibility of People’s Help Group (PHG) and do not necessarily reflect the views of USAID or the United States Government. Executive Summary Wildlife crime is a serious issue in conservation particularly of the threatened species of wild flora and fauna globally. Several endangered species such as Asian big cats, elephants and rhinoceros are at the verge of extinction if the current trend of wildlife crime is not retarded. The illegal wildlife trade is among the leading causes for rapid wildlife species decline worldwide (McMurray, 2008). Similarly, Nepal cannot be exception to this situation; the country has been known as transit for illegal wildlife trade and a source for some of the illegally traded species such as rhino horns, tiger and leopard pelts and pangolin scales. Despite various efforts to control wildlife crime, such crime still exists sporadically and in low volume in the country. The Banke-Kamdi complex is located in the (Mid-western region, State No.6) and covers part of Banke, Dang and Salyan districts. This Complex comprises of Banke National Park (BaNP), its Buffer Zone and Kamdi forest corridor. At present, Kamdi Corridor is under the Banke District Forest and is one of the most important biological corridors of Tarai Arc Landscape.
    [Show full text]