World Bank Document

Total Page:16

File Type:pdf, Size:1020Kb

World Bank Document The World Bank Report No: ISR14997 Implementation Status & Results China Wenchuan Earthquake Recovery (P114107) Operation Name: Wenchuan Earthquake Recovery (P114107) Project Stage: Implementation Seq.No: 6 Status: ARCHIVED Archive Date: 21-Jun-2014 Country: China Approval FY: 2009 Public Disclosure Authorized Product Line:IBRD/IDA Region: EAST ASIA AND PACIFIC Lending Instrument: Emergency Recovery Loan Implementing Agency(ies): Gansu Provincial PMO, Sichuan Provincial Construction Commission Key Dates Board Approval Date 12-Feb-2009 Original Closing Date 30-Jun-2014 Planned Mid Term Review Date 14-May-2012 Last Archived ISR Date 21-Dec-2013 Public Disclosure Copy Effectiveness Date 17-Jun-2009 Revised Closing Date 30-Jun-2014 Actual Mid Term Review Date 28-May-2012 Project Development Objectives Project Development Objective (from Project Appraisal Document) To restore essential infrastructure, health, and education services to at least levels existing prior to the Wenchuan Earthquake, and where appropriate, to provide for expansion of services, while reducing the vulnerability to seismic and flood hazards and building capacity of local governments to manage the recovery program. Has the Project Development Objective been changed since Board Approval of the Project? Yes No Public Disclosure Authorized Component(s) Component Name Component Cost 1.1 Infrastructure Sichuan 432.40 1.2 Health Sichuan 57.60 1.3 Project Support Sichuan 20.00 2.1 Infrastructure Gansu 130.30 2.2 Health Gansu 32.30 2.3 Education Gansu 33.40 2.4 Project Support Gansu 4.00 Public Disclosure Authorized Overall Ratings Previous Rating Current Rating Progress towards achievement of PDO Moderately Unsatisfactory Moderately Unsatisfactory Overall Implementation Progress (IP) Moderately Unsatisfactory Moderately Unsatisfactory Overall Risk Rating Public Disclosure Copy Implementation Status Overview Page 1 of 9 Public Disclosure Authorized The World Bank Report No: ISR14997 In Sichuan, restoration of essential infrastructure is largely satisfactory with 100% of water supply services completed and 90% of roads, with only one key bridge to be completed after the original closing date. Health facilities have also been 100% restored. The client has requested an extension of the Loan closing date in view of the fact that the Infrastructure Component has accrued US$ 40 million in loan savings for which complementary works are being prepared. The new works should improve traffic flow and improve safety for pedestrians and cyclists. To foster sustainability, the Sichuan Provincial Health Bureau will also conduct additional training and install additional medical equipment in the second half of 2014. In Gansu, restoration of essential water infrastructure has reached 70% with the hold-up related to slow progress at the Moba Gorge Dam and ancillary water supply facilities. Full restoration of roads has reached 50% pending completion of works in Wudu District and Cheng County. Progress has been rather slow due to unresolved resettlement issues and coordination issues between the project implementing unit (PIU) and contractors. About 85% of schools have been substantially completed, but finishing and cleanliness of the buildings need to be addressed. The construction of health facilities is substantially completed, although, again, issues with cleanliness and quality of finishing remain. The proposed extension of the Loan closing date will allow for full completion of these works and will allow additional time to rectify outstanding quality problems. Public Disclosure Copy Locations Country First Administrative Division Location Planned Actual China Sichuan Sheng Zitong Xian China Sichuan Sheng Zhongxing China Sichuan Sheng Zhongjiang Xian China Sichuan Sheng Yunxi China Sichuan Sheng Yanting Xian China Sichuan Sheng Xinmian China Gansu Sheng Xihe Xian China Gansu Sheng Wudu China Gansu Sheng Wen Xian China Sichuan Sheng Wenchang China Sichuan Sheng Weicheng China Sichuan Sheng Wangcang Xian China Sichuan Sheng Tongchuan China Sichuan Sheng Shimian Xian China Sichuan Sheng Santai Xian China Sichuan Sheng Nanjiang Xian Public Disclosure Copy China Sichuan Sheng Lushan Xian Page 2 of 9 The World Bank Report No: ISR14997 Country First Administrative Division Location Planned Actual China Sichuan Sheng Lingjiang China Sichuan Sheng Lingguan China Gansu Sheng Liangdang Xian China Sichuan Sheng Langzhong Shi China Gansu Sheng Kang Xian China Sichuan Sheng Jiangyou Shi Public Disclosure Copy China Gansu Sheng Hui Xian China Sichuan Sheng Hongyan China Sichuan Sheng Donghe China Sichuan Sheng Guanghan Xian China Sichuan Sheng Fenggu China Sichuan Sheng Jingyang Qu China Sichuan Sheng Dayi Xian China Gansu Sheng Cheng Xian China Sichuan Sheng Cangxi Xian China Sichuan Sheng Baoxing Xian China Sichuan Sheng Muping China Sichuan Sheng Baolun China Sichuan Sheng Yangmu China Sichuan Sheng Chaotian Qu China Sichuan Sheng Yuanba Qu China Sichuan Sheng Youxian Qu China Sichuan Sheng Fucheng Qu Public Disclosure Copy China Sichuan Sheng Luojiang Xian China Sichuan Sheng Guangyuan Shi Page 3 of 9 The World Bank Report No: ISR14997 China Sichuan Sheng Nanjiang China Sichuan Sheng Beiba China Sichuan Sheng Qinglian China Sichuan Sheng Shima China Sichuan Sheng Xinqiao China Sichuan Sheng Songya China Sichuan Sheng Longmen Public Disclosure Copy China Sichuan Sheng Qingyi China Sichuan Sheng Xinzao China Sichuan Sheng Sanjiang China Sichuan Sheng Mumen Results Project Development Objective Indicators Indicator Name Core Unit of Measure Baseline Current End Target Roads rehabilitated, Non-rural Kilometers Value 0.00 180.00 200.00 Date 01-Jan-2010 30-May-2014 30-Jun-2014 Comments The physical progress on the remaining roads has been reasonable, but the pending resettlement issues are hampering the completion of these roads. Health facilities constructed, renovated, and/or Number Value 0.00 65.00 68.00 equipped (number) Date 01-Jan-2010 30-May-2014 30-Jun-2014 Comments Most facilities have been constructed, but interiors are still being finished and operation rooms installed. Sichuan - Percentage of project roads with Percentage Value 0.00 60.30 100.00 Public Disclosure Copy traffic restored to pre-earthquake levels Date 12-May-2008 30-May-2014 30-Jun-2014 Page 4 of 9 The World Bank Report No: ISR14997 Comments All Batch I road are completed and fully operational. The roads are much improved compared to pre-quake levels. All Batch II contracts have been signed and are progressing well, only one bridge cannot be finished by the end of June 2014. Sichuan - Percentage of county towns with Percentage Value 0.00 100.00 100.00 water supply services that are at a minimum Date 12-May-2008 30-May-2014 30-Jun-2014 restored to pre-earthquake levels Comments Public Disclosure Copy All services have been fully restored in affected counties, and the Bank is now financing further improvements and expansions underBatch II. Sichuan - Percentage of reconstructed (a) Percentage Value 0.00 100.00 100.00 county health facilities and (b) township health Date 12-May-2008 30-May-2014 30-Jun-2014 facilities that reach bed occupancy rates not below 2007 levels Comments All facilities have finalized construction and started operations. Some specialized equipment is still being installed. Gansu - Percentage of project roads with traffic Percentage Value 0.00 50.00 100.00 restored to pre-earthquake levels Date 12-May-2008 30-May-2014 30-Jun-2014 Comments Progress has been reasonable, but the resettlement issues have delayed the full completion of these roads. Gansu - Percentage of county towns with water Percentage Value 0.00 70.00 100.00 supply services that are at a minimum restored Date 12-May-2008 30-May-2014 30-Jun-2014 to pre-earthquake levels Comments The progress has been remarkable and only Cheng County WTP has not been completed since it needs the Moba Gorge reservoir as the source of water. Public Disclosure Copy Page 5 of 9 The World Bank Report No: ISR14997 Gansu - Percentage of reconstructed (a) Percentage Value 0.00 0.00 100.00 county health facilities and (b) township health Date 12-May-2008 30-May-2014 30-Jun-2014 facilities that reach bed occupancy rates not below 2007 levels Comments Hospitals have just been completed and data will start to be collected. Gansu - Percentage of reconstruction (a) Percentage Value 0.00 85.00 100.00 primary and (b) secondary schools that reach Date 12-May-2008 30-May-2014 30-Jun-2014 enrollment rates of (a) 99% and (b) 80% respectively Comments All schools have been built, only Cheng County still has some major work on ancillary structures. Public Disclosure Copy Intermediate Results Indicators Indicator Name Core Unit of Measure Baseline Current End Target Infrastructure Sichuan - Percentage of total Percentage Value 0.00 60.00 100.00 project assets (measured by sector with Date 12-May-2008 30-May-2014 30-Jun-2014 appropriate indicators) built to applicable governmentstandards that Comments All Batch I investments (around 60%) have been completed and Batch II are almost completed. Update will be provided by June 30, 2014. Health Sichuan - Percentage of total number of Percentage Value 0.00 100.00 100.00 project health facilities built to applicable Date 12-May-2008 30-May-2014 30-Jun-2014 government standards that address flood and seismic hazards Comments All hospitals have been completed and are operational. Health Sichuan - Perentage of restored project Percentage Value 0.00 100.00 100.00 facilities that are fully equipped according to Date 12-May-2009 30-May-2014
Recommended publications
  • Lanzhou-Chongqing Railway Development – Resettlement Action Plan Monitoring Report No
    Resettlement Monitoring Report Project Number: 35354 April 2010 PRC: Lanzhou-Chongqing Railway Development – Resettlement Action Plan Monitoring Report No. 1 Prepared by: CIECC Overseas Consulting Co., Ltd Beijing, PRC For: Ministry of Railways This report has been submitted to ADB by the Ministry of Railways and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. The People’s Republic of China ADB Loan Lanzhou—Chongqing RAILWAY PROJECT EXTERNAL MONITORING & EVALUATION OF RESETTLEMENT ACTION PLAN Report No.1 Prepared by CIECC OVERSEAS CONSULTING CO.,LTD April 2010 Beijing 10 ADB LOAN EXTERNAL Monitoring Report– No. 1 TABLE OF CONTENTS PREFACE 4 OVERVIEW..................................................................................................................................................... 5 1. PROJECT BRIEF DESCRIPTION .......................................................................................................................7 2. PROJECT AND RESETTLEMENT PROGRESS ................................................................................................10 2.1 PROJECT PROGRESS ...............................................................................................................................10 2.2 LAND ACQUISITION, HOUSE DEMOLITION AND RESETTLEMENT PROGRESS..................................................10 3. MONITORING AND EVALUATION .................................................................................................................14
    [Show full text]
  • Table of Codes for Each Court of Each Level
    Table of Codes for Each Court of Each Level Corresponding Type Chinese Court Region Court Name Administrative Name Code Code Area Supreme People’s Court 最高人民法院 最高法 Higher People's Court of 北京市高级人民 Beijing 京 110000 1 Beijing Municipality 法院 Municipality No. 1 Intermediate People's 北京市第一中级 京 01 2 Court of Beijing Municipality 人民法院 Shijingshan Shijingshan District People’s 北京市石景山区 京 0107 110107 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Haidian District of Haidian District People’s 北京市海淀区人 京 0108 110108 Beijing 1 Court of Beijing Municipality 民法院 Municipality Mentougou Mentougou District People’s 北京市门头沟区 京 0109 110109 District of Beijing 1 Court of Beijing Municipality 人民法院 Municipality Changping Changping District People’s 北京市昌平区人 京 0114 110114 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Yanqing County People’s 延庆县人民法院 京 0229 110229 Yanqing County 1 Court No. 2 Intermediate People's 北京市第二中级 京 02 2 Court of Beijing Municipality 人民法院 Dongcheng Dongcheng District People’s 北京市东城区人 京 0101 110101 District of Beijing 1 Court of Beijing Municipality 民法院 Municipality Xicheng District Xicheng District People’s 北京市西城区人 京 0102 110102 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Fengtai District of Fengtai District People’s 北京市丰台区人 京 0106 110106 Beijing 1 Court of Beijing Municipality 民法院 Municipality 1 Fangshan District Fangshan District People’s 北京市房山区人 京 0111 110111 of Beijing 1 Court of Beijing Municipality 民法院 Municipality Daxing District of Daxing District People’s 北京市大兴区人 京 0115
    [Show full text]
  • Technical Assistance to the People's Republic of China for Preparing The
    Technical Assistance TAR: PRC 38174 Technical Assistance to the People’s Republic of China for Preparing the Western Roads Development Project August 2005 CURRENCY EQUIVALENTS (as of 14 August 2005) Currency Unit – yuan (CNY) CNY1.00 = $0.1233 $1.00 = CNY8.108 ABBREVIATIONS ADB – Asian Development Bank EA – executing agency EIA – environmental impact assessment EIRR – economic internal rate of return FIRR – financial internal rate of return FYP – five-year plan GDP – gross domestic product GPCD – Gansu Provincial Communications Department IPSA – initial poverty and social assessment O&M – operation and maintenance PRC – People’s Republic of China REA – rapid environmental assessment RP – resettlement plan SPCD – Sichuan Provincial Communications Department TA – technical assistance VOC – vehicle operating cost TECHNICAL ASSISTANCE CLASSIFICATION Targeting Classification – General intervention Sector – Transport and communications Subsector – Roads and highways Theme – Sustainable economic growth Subthemes – Promoting economic efficiency and enabling markets, and Fostering physical infrastructure development NOTE In this report, “$” refers to US dollars. This report was prepared by the project team comprising M. Ojiro (team leader), S. Ferguson, S. Noda, and X. Yang. I. INTRODUCTION 1. During the 2005 Country Programming Mission for the People's Republic of China (PRC), the Government confirmed its request for technical assistance (TA) to prepare integrated roads development projects in Gansu Province and Sichuan Province.1 The Asian Development Bank (ADB) Fact-Finding Mission visited the PRC in June 2005; traveled to the project areas; carried out an initial poverty and social assessment (IPSA) and rapid environmental assessment (REA); and discussed economic, social development, and project-specific issues with officials of the central and local governments.
    [Show full text]
  • World Bank Document
    The World Bank Loan Project Public Disclosure Authorized The World Bank Loan Natural Heritage Protection and Development II Project Social Assessment Report on Construction of Yangba Tea Culture Scenic Spot in Kang County Public Disclosure Authorized Public Disclosure Authorized Public Disclosure Authorized Gansu Huigu Science &Technology Consulting Co. Ltd. April 2020 Social assessment Report for Sub-project of Yangba Tea Culture Scenic Spot in Kang County Report Editing Team Educational No. Name Major Position Background Environmental 1 Ding Wenguang Doctor of Science Director, Professor sociology 2 Jiang Xuehua Bachelor Social work General Manger 3 Gao Xuelian Master Social Security Project official 4 Yang Xiaoai Master Social Security Project official 5 Tang Yaping Bachelor Social work Project official Business 6 Shi Liuyan Bachelor Project official English 7 Li Weili Master Social Security Technician I Contents Abstract .................................................................Error! Bookmark not defined. Positive Impacts of the Project ............................................................................1 Negative Impacts of the Project ..........................................................................1 Potential Social Risks of the Project....................................................................2 Suggestions and Mitigation Measures: ................................................................2 1. Summary of Social Impact Assessment .......................................................5 1.1
    [Show full text]
  • Lanzhou-Chongqing Railway Development – Social Action Plan Monitoring Report No
    Social Monitoring Report Project Number: 35354 April 2010 PRC: Lanzhou-Chongqing Railway Development – Social Action Plan Monitoring Report No. 1 Prepared by: CIECC Overseas Consulting Co., Ltd Beijing, PRC For: Ministry of Railways This report has been submitted to ADB by the Ministry of Railways and is made publicly available in accordance with ADB’s public communications policy (2005). It does not necessarily reflect the views of ADB. ADB LOAN Social External Monitoring Report –No.1 The People’s Republic of China ADB Loan LANZHOU –CHONGQING RAILWAY PROJECT EXTERNAL MONITORING & EVALUATION OF SOCIAL DEVELOPMENT ACTION PLAN Report No.1 Prepared by CIECC OVERSEAS CONSULTING CO.,LTD April 2010 Beijing 1 CIECC OVERSEAS CONSULTING CO.,LTD TABLE OF CONTENTS 1. MONITORING AND EVALUATING OUTLINE……………………….………………………3 1.1 THE PROJECT PROMOTED SOCIAL DEVDLOPMENT ALONG THE RAILWAY OBVIOUSLY…………………………………………………..………….…3 1.2 THE PROJECT PROMOTED THE POOR PEOPLE’S INCOME AND REDUCED POVERTY……………………………………………………………...………………….5 2. PROJECT CONSTRUCTION AND SOCIAL DEVELOPMENT..……………………….6 2.1 MACRO-BENEFIT OF THE PROJECT………………...…………………………….7 2.2 THE EXTENT OF LAND ACQUISITION AND RESETTLEMENT OF PROJECT AND RESETTLEMENT RESULTS…………………………………………………....8 2.3 INFLUENCE AND PROMOTION OF PROJECT CONSTRUCTION AND LOCAL ECONOMICDEVELOPMENT………………………………………………………10 2.4 JOB OPPORTUNITY FROM THE PROJECT…………………………………… 14 2.5 PURCHASING LOCAL BUILDING MATERIALS……………………………… 16 2.6 “GREEN LONG PASSAGE” PROJECT IN PROCESS..………………………… 16 3. SAFETY MANAGEMENT IN CONSTRUCTION
    [Show full text]
  • History, Distribution, and Potential of the Olive Industry in China: a Review
    sustainability Review History, Distribution, and Potential of the Olive Industry in China: A Review ChunJiang Su 1, Junfeng Sun 2,3,* ID , Wanze Zhu 2 and Li Peng 1 ID 1 Institute of Mountain Hazards and Environment, Chinese Academy of Sciences, # 9, Block 4, Renminnan Road, Chengdu 610041, China; [email protected] (C.S.), [email protected] (L.P.) 2 University of Chinese Academy of Sciences, #19A Yuquan Road, Beijing 100049, China; [email protected] 3 School of Tourism, History, and Culture, South West Minzu University, # 16, South Section, 1st Ring Road, Chengdu 610041, China * Correspondence: [email protected]; Tel.: +86-28-8522-5378 Received: 7 April 2018; Accepted: 2 May 2018; Published: 4 May 2018 Abstract: China, as a non-Mediterranean country with non-Mediterranean climate, is taking olive cultivation as an important part of its agricultural development. In order to highlight some important facts about the history, status, distribution, and trends of the olive industry in China, we performed analyses based on Internet databases, online GIS software, and scientific papers. Results show that the olive industries have been concentrated in several key areas in Gansu, Sichuan, Yunnan, Chongqing, and Hubei. However, the business scope of olive enterprises is still narrow, the scale of enterprises is generally small, and individual or family management of farmers plays an important role. Thus, increased investment and policies are needed to enhance their capacities of R&D and production, and Chinese investigators should carry out socio-economic studies at the microcosmic level and take the initiative to innovate the products by cooperating with people in the same professions worldwide.
    [Show full text]
  • Mission China Legal Assistance and Law Offices
    MISSION CHINA LEGAL ASSISTANCE AND LAW OFFICES (Last edited on April 27, 2020) The following is a list of law offices in China, which includes private and quasi-private Chinese law firms as well as private American law firms with a presence in the Consular district. Most of the firms listed specialize in commercial law, but many are qualified to offer advice on a full range of legal issues. Some will provide assistance with adoptions in China. Note: China Country Code is +86, if you are calling a law firm in Beijing from The U.S., you need to dial 011-86-10- XXXXXXXX; if you are calling from China but outside Beijing, you need to dial 010-XXXXXXXX. Please note: The Department of State assumes no responsibility or liability for the professional ability or reputation of, or the quality of services provided by, the entities or individuals whose names appear on the following lists. Inclusion on this list is in no way an endorsement by the Department or the U.S. government. Names are listed alphabetically, and the order in which they appear has no other significance. The information on the list is provided directly by the local service providers; the Department is not in a position to vouch for such information. BEIJING CONSULAR DISTRICT 北京领区 ....................................................................................................................................... 3 BEIJING 北京市 ..................................................................................................................................................................................
    [Show full text]
  • The Overall Planning for Post Wenchuan Earthquake
    Supplementary Appendix A 1 The Overall Planning for Post-Wenchuan Earthquake Restoration and Reconstruction Compilation Basis: Law of the People’s Republic of China on Protecting against and Mitigating Earthquake Disasters Regulations on Post-Wenchuan Earthquake Restoration and Reconstruction (the State Council No. 526) Guiding Opinions of the State Council on Post-Wenchuan Earthquake Restoration and Reconstruction (NDRC [2008] No.22) Compiling Units: Planning Group of Post-Wenchuan Earthquake Restoration and Reconstruction of the Earthquake Relief Headquarters under the Sate Council Group Leader: National Development and Reform Committee (NDRC) Co-leader: The People’s Government of Sichuan Province, Ministry of Housing and Urban-Rural Development (MOHURD) Group Members: The People’s Government of Shaanxi Province, People’s Government of Gansu Province, Ministry of Education, Ministry of Science and Technology, Ministry of Industry and Information Technology, State Ethnic Affairs Commission, Ministry of Public Security, Ministry of Civil Affairs, Ministry of Finance, Ministry of Human Resources and Social Security, Ministry of Land and Resources, Ministry of Environmental Protection, Ministry of Transport, Ministry of Railways, Ministry of Water Resources, Ministry of Agriculture, Ministry of Commerce, Ministry of Culture, Ministry of Health, National Population and Family Planning Commission, People’s Bank of China, State-owned Assets Supervision and Administration Commission, State Administration of Taxation, State Administration of
    [Show full text]
  • Minimum Wage Standards in China August 11, 2020
    Minimum Wage Standards in China August 11, 2020 Contents Heilongjiang ................................................................................................................................................. 3 Jilin ............................................................................................................................................................... 3 Liaoning ........................................................................................................................................................ 4 Inner Mongolia Autonomous Region ........................................................................................................... 7 Beijing......................................................................................................................................................... 10 Hebei ........................................................................................................................................................... 11 Henan .......................................................................................................................................................... 13 Shandong .................................................................................................................................................... 14 Shanxi ......................................................................................................................................................... 16 Shaanxi ......................................................................................................................................................
    [Show full text]
  • SMR: PRC: Southern Gansu Roads Development Project
    Social Monitoring Report #1 Semi-Annual Report February 2010 PRC: Southern Gansu Roads Development Project Prepared by School of Economics and Management, Tongji University for the Gansu Provincial Department of Transport and the Asian Development Bank. This resettlement monitoring and evaluation report is a document of the borrower. The views expressed herein do not necessarily represent those of ADB's Board of Directors, Management, or staff, and may be preliminary in nature. Southern Gansu Roads Development Project PPME Report No.1 People’s Republic of China Southern Gansu Roads Development Project Asian Development Bank Loan No. 2295-PRC Resettlement Monitoring and Evaluation Report February, 2010 2 Southern Gansu Roads Development Project PPME Report No.1 People’s Republic of China Southern Gansu Roads Development Project Asian Development Bank Loan No. 2295-PRC Resettlement Monitoring and Evaluation Report (No.1) School of Economics and Management Tongji University February, 2010 Report Director: Wu Zongfa School of Economics and Management Tongji University Report Co-compiler: Wu Zongfa, Hu Chuangrong, Liu Zhen, Chen Zhuoya, He Yonglang E-mail: [email protected] 1 Southern Gansu Roads Development Project PPME Report No.1 CONTENTS 1 PROJECT DESCRIPTION .................................................................................................................. 1 2 RESETTLEMENT ................................................................................................................................ 2 3 PROJECT IMPACT ........................................................................................................................
    [Show full text]
  • Download Article (PDF)
    Advances in Social Science, Education and Humanities Research, volume 480 Proceedings of the 2020 5th International Conference on Modern Management and Education Technology (MMET 2020) Coupling Vulnerability of Ecosystem and Poverty Occurrence—A Case Study of Poverty-Stricken Areas of Longnan in Qinba Mountain Li Jie1, Song Xiaoyu2,*, Wu Na3, 1Northwest Normal University, Lanzhou, Gansu, 730070; China 2Northwest Institute of Eco- Environment and Resources, CAS, Lanzhou, Gansu, 730030, China 3Northwest Normal University, Lanzhou, Gansu, 730070, China *Corresponding author. Email: [email protected] ABSTRACT Our study was based on the division of the contiguously poverty-stricken areas of Qinba Mountain in China. To find the sustainable path of regional development, we used INVEST model to calculate the amount of ecosystem services in 27 areas of Longnan, to structure an index evaluation system, and to simulate the distribution space of regional ecosystem vulnerability. Coupling and coordinating model were also used to analyze the results of simulation and the incidence of poverty, and the coupling types and spatial distribution patterns were accurately to reach the following conclusions: The incidence of poverty in each area of Longnan was quite different, and the vulnerability of the poverty-stricken areas shows a spatial differentiation pattern, most of them are in the state of "high exposure" or "double stress". The relationship between vulnerability and poverty degree was obvious, the higher the vulnerability, the higher the risk of poverty. The coupling degree of vulnerability with poverty was spatially decreasing from north to south, and most areas have a high degree of coupling and coordinating, mainly in the south and middle of the study areas.
    [Show full text]
  • Improved Logistics Put Pepper in the Fast Lane
    CHINA DAILY | HONG KONG EDITION Tuesday, August 11, 2020 | 7 CHINA Survey collects data on avian accidents By LI HONGYANG near a glass barrier on a tourist Academy of Sciences’ Institute of [email protected] trail in a park in Taiyuan, Shanxi Zoology, mainly works on public province. According to the inves- service activities and nature edu- Two bird lovers from Chengdu, tigation, they all died after crash- cation courses. Sichuan province, are conduct- ing into the barrier. The survey will end soon, but ing a nationwide survey to prove “Birds can’t recognize glass Zhu said it will only result in a pre- that collisions with windows, ahead of them so the people who liminary conclusion and further which can be fatal for birds, are built the barrier should have surveys will be carried out. not a rare event. been aware this may hurt birds “Every year, many birds die from They started the one-year survey and should redesign it to be envi- collisions, so we want to generate a in September and by early last ronmentally friendly,” Zhu said. data set as quickly as possible to month had received more than 250 “The solution can be a lot eas- raise public attention and maybe reports of birds hitting windows or ier if the problem is highlighted. inspire other researchers to come other glass-clad structures from 24 What people need to do, for up with more valuable ideas,” he provinces and regions. example, is just to close a gauze said. Zhu Lei, who came up with the curtain during the day to blur the Zhu said that when he idea for the survey, said ordinary glass.” searched the China National people should and could do some- Zhu, who has a doctorate in Information Infrastructure, the thing to protect birds.
    [Show full text]