APPENDIX I

FORM 1

Basic Information

Sr No. Item Details 1 Name of the project/s Proposed Residential and Commercial project at S.No.86 at Ravet, Haveli Taluka, by Jeswani Associates

2. S. No. in the schedule 8(a) Building and Construction project.

Proposed Area of Plot :20700 Sq m 3. capacity/area/length/tonnage Total FSI Area:32379.19 Sq m handled/command area/lease Non FSI Area : 17782.01 Sq m area/number wells to be drilled Total Built up area (FSI + Non FSI):50161.2Sq m New/proposed/Modernization New Building and Construction Project 4.  Existing Capacity/Area etc. Existing BUA - Nil

 Category of Project. e.' A' or 'B' Project category B2; Activity under Item 8 (a) of the EIA Notification dated 14th September 2006 as amended on 1st December , 2009 does not require scoping and public consultation  Does it attract general conditions? Not Applicable If yes, please Specify  Does it attract specific condition? Not Applicable If 'yes, please Specify  Location 18° 39’ 14.13”N 73°44’ 22.60”E Ravet, Pune Refer: Appendix 1 Location Map

Plot/Survey/Khasra No. S.No.86

Village Ravet Tehsil Haveli District Pune

State  Nearest railway station/airport (Approximate. Distance along with distance in km. 2.66 km) Pune International Airport (Approximate distance of 20.8 km)

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 1 Sr No. Item Details  Nearest Town, city, District Municipal Corporation Headquarters along with distance (Approximate. Distance 5.5 km) in kms.  Village Panchayats, Zilla Parishad Pimpri Chinchwad Municipal Corporation Municipal Corporation, Local body (complete postal addresses with telephone nos. to be given)  Name of the applicant Mr. Neeraj Jeswani Jeswani Associates

 Registered Address Jeswani Villa, near Royale World School, Vaibhavnagar Road, Pimpri, Pune

 Address of correspondence Jeswani Villa, near Royale World School, Vaibhavnagar Road, Pimpri, Pune

Name Mr. Neeraj Jeswani Designation(Owner/Partner/CEO) Owner

Address Jeswani Villa, near Royale World School, Vaibhavnagar Road, Pimpri, Pune

Pin Code 411 017 E-mail [email protected]

Telephone No. 9527717717 Fax No. -  Details of Alternative Sites No alternative options have been examined. examined if any. Location of these sites should be shown on a toposheet.  Interlinked Projects Not Applicable  Whether separate application of Not Applicable interlinked project has been submitted  If yes, date of submission Not Applicable  If no, reason ------ Whether the proposal involves approval/ clearance under: if yes, details of the same and their status to be given:

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 2 Sr No. Item Details (a) The Forest (Conservation) Not Applicable Act – 1980? (b) The Wildlife (Protection) act – Not Applicable 1972? (c) The C.R.Z. Notification, Not Applicable 1991?  Whether there is any government No order/ policy relevant/ relating to the site?  Forest land involved (hectare) No forest land involved  Whether there is any litigation pending against the project and /or the land in which the project is Not Applicable proposed to be set up? (a)Name of the Court (b)Case No. (c) Orders/directions of the Court, if any and its relevance with the proposed project

Activity 1. Construction, operation or decommissioning of the Project involving actions, which will cause physical changes in the locality (topography, land use, changes in water bodies, etc.) S. No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.1 Permanent or temporary The proposed development consists of 7 residential change in land use, land NO buildings having 452 flats and one MHADA having cover or topography including increase in 56 nos.of flats of 1BHK and 2 BHK with 25 intensity of land use convenient shops. (with respect to local land use plan) Building Configuration

Building Configuration No.of flats

A 1P+ 12 floors 66 B 2P+ 11 floors 64 C 2P+ 11 floors 64 D 2P+ 11 floors 64 E 2P+ 11 floors 64 F 2P+ 11 floors 64 G 1P+ 12 floors 66 H(MHADA) 1P+ 10 floors 56

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 3 S. No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data No change in land-use or land-use intensity.

1.2 Clearance of existing NO The proposed development does not involve land, vegetation and clearance of vegetation and existing land. Few trees buildings? exist at site.

1.3 Creation of new land NO The proposed project is a residential and commercial uses? Project. The land is zoned as Residential and no change shall be created in the land use. 1.4 Pre-construction YES Soil testing will be carried out. investigations e.g. bore houses, soil testing? 1.5 Construction works? YES General civil construction, construction of apartments, common utilities & amenities.

The proposed development consists of 7 residential buildings having 452 flats and one MHADA having 56 nos.of flats of 1BHK and 2 BHK with 25 convenient shops.

Total proposed BUA: 50161.2 Sq m (FSI+ Non FSI area)

Type of Construction = RCC work & Brick work

Refer Appendix 2 Area Statement and Appendix 3 Master Layout 1 .6 Demolition works? NO No demolition works involved.

1.7 Temporary sites used YES Total No. of temporary workers = 150 No.s for construction works or housing of Temporary labour camps shall be provided for the construction workers? construction workers.

1.8 Above ground Yes The proposed development consists of 7 residential buildings, structures or buildings having 452 flats and one MHADA having earthworks including linear structures, cut 56nos.of flats of 1BHK and 2 BHK with 25 and fill or excavations convenient shops. Building configuration :

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 4 S. No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data

Building Configuration No.of flats

A 1P+ 12 floors 66 B 2P+ 11 floors 64 C 2P+ 11 floors 64 D 2P+ 11 floors 64 E 2P+ 11 floors 64 F 2P+ 11 floors 64 G 1P+ 12 floors 66 H(MHADA) 1P+ 10 floors 56

The top soil layer of 200 mm shall be recovered during excavation work and shall be used for landscaping.

Excavated material shall be used for backfilling, road leveling, and filling during site development.

1.9 Underground works NO The proposed development work does not include including mining or any mining or tunneling. tunneling? 1.10 Reclamation works? NO Not applicable

1.11 Dredging? NO Not applicable

1.12 Offshore structures? NO Not applicable

1.13 Production and NO Not applicable manufacturing processes? 1.14 Facilities for storage of NO During construction the building materials will be goods or materials? temporarily stored within site premises.

Covered storage shall be provided for materials susceptible to fugitive dust emissions. 1.15 Facilities for treatment YES Construction Phase: or disposal of solid Solid wastes such as empty bags, packaging waste or liquid effluents material, will be properly segregated and will be sent to authorized recyclers.

Operation Phase: The solid waste generated will be treated through on site organic waste converter system. Sewage will be treated through onsite sewage treatment plant.

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 5 S. No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data 1.16 Facilities for long term NO The proposed development shall have temporary housing of operational workers during construction phase only. workers? 1.17 New road, rail or sea YES There will be some increase in road traffic: traffic during Construction phase: Trucks and JCB may commute construction or once or twice a day. operation? Operation phase: The development will not have major impact on traffic pattern. Internal roads will be well constructed to manage internal traffic. 1.18 New road, rail, air NO Not Applicable. waterborne or other transport infrastructure including new or altered routes and stations, ports, airports etc? 1.19 Closure or diversion of NO Not Applicable. existing transport routes or infrastructure leading to changes in traffic movements? 1.20 New or diverted NO Not Applicable. transmission lines or pipelines? 1.21 Impoundment, NO Not Applicable damming, culverting, realignment or other changes to the hydrology of watercourses or aquifers? 1.22 Stream crossings? NO Not Applicable

1.23 Abstraction or transfers NO No ground water extraction of water from ground or surface waters? Water requirement in the construction phase will be supplied from tanker.

Source of water for occupants during operational phase: Pimpri Chinchwad Municipal Corporation 1.24 Changes in water NO No change in the water bodies or the land use bodies or the land surface affecting natural drainage ways. surface affecting drainage or run-off? 1.25 Transport of personnel YES Road traffic of the area will increase temporary or materials for during construction and permanently during construction, operation operation phase.

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 6 S. No Information/Checklist Yes/ Details thereof (with approximate quantities confirmation No /rates, wherever possible) with source of information data or decommissioning? Construction Phase: Transportation of material will be undertaken within the site through lorries/dumpers

Transportation of labor will be undertaken on the site through transport vehicles.

Operational Phase: Residents or commuters during the operation phase will use self-owned/ public transportation facilities. Parking will be provided as per Town Planning DC Rules. 1.26 Long-term dismantling NO Not Applicable or decommissioning or restoration works? 1.27 Ongoing activity during NO Not applicable decommissioning which could have an impact on the environment? 1.28 Influx of people to an YES There will be temporary influx of labors during the area in either construction phase and permanent influx of temporarily or occupants during the operational phase. permanently?

1.29 Introduction of alien NO The proposed landscape trees are all indigenous in species? nature.

1.30 Loss of native species NO Few trees exist at project site. or genetic diversity? Proposed landscape includes native and local flora- this will enhance local biodiversity

1.31 Any other actions? NO Not applicable

2. Use of Natural resources for construction or operation of the Project (such as land, water, materials or energy, especially any resources which are non-renewable or in short supply):

Details there of (with approximate quantities /rates, S.No. Information/chec Yes/ wherever possible) with source of information data klist confirmation No 2.1 Land especially YES Proposed site does not fall under Agriculture or Non- undeveloped or Development Zone. agricultural land (ha) Area of Plot : 20700 Sq.m

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 7 Details there of (with approximate quantities /rates, S.No. Information/chec Yes/ wherever possible) with source of information data klist confirmation No Total BUA: 50161.2 Sq.m

2.2 Water (expected YES Construction Phase source & competing users) Source: Authorized private water tankers. unit: KLD Total water requirement for construction activity = 4.2 KLD Labour water consumption = 6.7 KLD

Operational Phase Source: Pimpri Chinchwad Municipal Corporation • Fresh water including swimming pool: 238.75 m3/day •Waste water generation : 325.22 m3/day • Treated water from STP: 308.95 m3/day • Total Water Requirement: 377.55 m3/day including landscaping and swimming pool •Fresh Water requirement for swimming pool volume make up: 4 m3/day Treated waste water from STP shall be used for landscaping & flushing.

Refer Appendix 4 Water Balance Chart 2.3 Minerals (MT) NO Not Applicable

2.4 YES Construction materials such as cement, steel, metal sand and Construction bricks will be procured from authorized dealers. material stone, aggregates, sand / soil (expected source – MT)

2.5 Forests and timber NO Not Applicable (source – MT) 2.6 Energy including YES Backup power electricity and fuels Construction phase (source, competing Total Load :– 30 KW users) Unit: fuel D.G. Set :– 40 KVA x 1 No. (MT), energy Fuel Requirement :- 6.5 Litres / Hour (MW) Operation phase: DG sets (during emergency): 1 no 200 KVA and 1 no 50 KVA DG sets will be provided Type of fuel used: HSD Total Demand :- 1136 KW Total Maximum Demand :– 1009.78 KVA Source : - Maharashtra State Electricity Distribution Company Limited (MSEDCL)

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 8 Details there of (with approximate quantities /rates, S.No. Information/chec Yes/ wherever possible) with source of information data klist confirmation No 2.7 Any other natural NO No other natural resources will be used for the construction resources (use purpose. appropriate standard units)

3. Use, storage, transport, handling or production of substances or materials, which could be harmful to human health or the environment or raise concerns about actual or perceived risks to human health.

S.No. Information/Checklist Yes/ Details thereof (with approximate confirmation No quantities/rates, wherever possible) with source of information data 3.1 Use of substances or NO Not Applicable. materials, which are hazardous (as per MSIHC rules) to human health or the environment (flora, fauna, and water supplies) 3.2 Changes in occurrence NO All the waste generated will be managed properly of disease or affect and no conditions will prevail to affect disease vectors (e.g. epidemiology. insect or water borne diseases) 3.3 Affect the welfare of YES There will be economic growth and improved people e.g. by changing quality of life with additional employment. The living conditions? project will not have any negative impact on human welfare. Amenities will get better developed due to this kind of development. 3.4 Vulnerable groups of NO Not Applicable people who could be affected by the project e.g. hospital patients, children, the elderly etc., 3.5 Any other causes NO No such activity or use of material will be done which will affect the environment or human health.

4. Production of solid wastes during construction or operation or decommissioning S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.1 Spoil, overburden or NO No mine waste involved as this is Residential mine wastes project. Excavated material shall be reused for backfilling purposes on site.

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 9 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 4.2 Municipal waste YES Construction Phase (domestic and or commercial wastes) Total expected labor = 150

Total Municipal Solid Waste Generation = 30 kg/ day Operational Phase:

Total generation of Municipal Solid Waste including residential and commercial : 1161.75 kg/day

Organic : 813.23 kg/day Inorganic: 348.53 kg/day

Refer Appendix 5 Solid Waste Management Plan.

4.3 Hazardous wastes (as NO Not Applicable per Hazardous Waste Management Rules) 4.4 Other industrial NO Not Applicable process wastes

4.5 Surplus product NO Not Applicable

4.6 Sewage sludge or other YES Sludge generated from STP will be used as manure sludge from effluent on site. Sludge drying beds shall be provided on site. treatment 4.7 Construction or YES Construction wastes will be generated and demolition wastes appropriately disposed. No waste shall be generated from demolition as no demolition work is involved. No work has been initiated as of now. 4.8 Redundant machinery NO Not Applicable or equipment 4.9 Contaminated soils or NO Not Applicable other materials 4.10 Agricultural wastes NO Not Applicable

4.11 Other solid wastes NO Not Applicable

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 10 5. Release of pollutants or any hazardous, toxic or noxious substances to air (Kg/hr)

S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data 5.1 Emissions from YES Vehicular movement and DG sets will be point combustion of fossil sources of air pollution. fuels from stationary or mobile sources It will be managed appropriately during construction phase & operational phase. 5.2 Emissions from NO Not Applicable production processes 5.3 Emissions from NO Not applicable. The material transport, storage & materials handling handling will be undertaken in an appropriate including storage or manner; avoiding air, water and soil pollution. transport 5.4 Emissions from YES Dust will be generated from excavation and other construction activities construction activities. Measures will be taken to including plant and reduce/ control the emissions. equipment 5.5 Dust or odours from YES Dust will be generated during transport and handling of materials Handling of material. Measures will be taken to including construction reduce/ control the emissions. materials, sewage and waste 5.6 Emissions from NO No incineration activities are involved in the incineration of waste proposed development.

5.7 Emissions from burning NO No material will be burnt within the project of waste in open air premises. (e.g. slash materials, construction debris) 5.8 Emissions from any NO Not Applicable. No other activities apart from other sources construction & transportation are involved which would generate emissions.

6. Generation of Noise and Vibration, and Emissions of Light and Heat: S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data 6.1 From operation of YES Construction phase equipment e.g. engines, The machinery, equipments and vehicles used ventilation plant, during construction activities will generate noise. crushers Appropriate control measures will be undertaken to reduce the noise during construction phase.

Operation phase This phase will involve noise generation due to the

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 11 S.No. Information/Checklist Yes/No Details thereof (with approximate confirmation quantities/rates, wherever possible) with source of information data with source of information data use of mechanical equipment, vehicular traffic and DG sets.

Appropriate control measures will be undertaken to reduce the noise during construction and operation phase.

6.2 From industrial or NO Not applicable similar process’s 6.3 From construction or YES No demolition activities involved. For Noise demolition generation during construction activity - Measures will be taken to minimize the impacts of the noise.

6.4 From blasting or YES There will be temporary and intermittent noise piling generation from drilling activity during foundation.

6.5 From construction or YES Temporary noise influx during construction phase operational traffic due to vehicles like trucks, tractors, lorries etc and during construction activities.

Permanent marginal noise disturbance due to traffic during operational phase. 6.6 From lighting or NO Not applicable cooling systems 6.7 From any other sources NO Not applicable

7. Risks of contamination of land or water from releases of pollutants into the ground or into sewers, surface waters, groundwater, coastal waters or the sea:

S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data 7.1 From handling, storage, NO Not Applicable use or spillage of hazardous materials 7.2 From discharge of NO Sewage generated within the project will be treated sewage or other within the project premises. The recycled water will be effluents to water or the reused for landscaping and flushing. land (expected mode and place of discharge) Proposed (Residential, Commercial and MHADA) Expected waste water from proposed Project =325.22 m3/day

Total waste water recovered for reuse from proposed

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 12 S.No. Information/Checklist Yes/ Details thereof (with approximate quantities/rates, confirmation No wherever possible) with source of information data buildings = 308.95 m3/day (@ 90% STP treatment efficiency)

Treatment of the waste water generated – One STP of Proposed of 330 kld is proposed.

Use of treated water for flushing purpose in proposed project = 126.60 m3/day

Use of treated water for landscaping purpose = 12.17 m3/day Quantity of treated waste water to be disposed of to municipal sewer drains = 182.35 m3/day

Refer Appendix 4 Water Balance Chart 7.3 By deposition of NO Not Applicable pollutants emitted to air into the land or into water 7.4 From any other NO Not applicable sources 7.5 Is there a risk of long NO Not applicable term build up of pollutants in the environment from these sources?

8. Risk of accidents during construction or operation of the Project, which could affect human health or the environment

S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 8.1 From explosions, NO No use of explosives and hazardous material during spillages, fires etc from construction / operational phase. storage, handling, use or production of hazardous substances 8.2 From any other causes NO Not applicable

8.3 Could the project be NO The project area falls under Zone III as per Map affected by natural showing Seismic Zones of . Zone III is of disasters causing moderate Seismic Intensity. The building design environmental damage has been planned accordingly. (e.g. floods, earthquakes, landslides, cloudburst etc)?

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 13 9. Factors which should be considered (such as consequential development) which could lead to environmental effects or the potential for cumulative impacts with other existing or planned activities in the locality S. Information/Checklist Yes/No Details thereof (with approximate No. confirmation quantities/rates, wherever possible) with source of information data 9.1 Lead to development of YES Proposed project is a residential development supporting utilities, conducive to the land use. ancillary development or development Infrastructure that accompanies proposed stimulated by the project development include: which could have impact on the environment e.g.: . STP for treatment and recycling of waste water generated on site. • Supporting . Provision for treatment of organic waste infrastructure (roads, generated on site by OWC. power supply, waste or . Common amenity areas, landscaping and green waste water treatment, belt development. etc.) . Rainwater harvesting system • Housing development . Solar Water Heaters, use of Renewable energy and DG Sets for backup. • Extractive industries The proposed supporting infrastructure would lead • Supply industries to development of sustainable habitat. • Other

9.2 Lead to after-use of the NO Not applicable site, which could have an impact on the environment 9.3 Set a precedent for later NO Not Applicable. developments 9.4 Have cumulative effects NO Not Applicable due to proximity to other existing or planned projects with similar effects

(III) Environmental Sensitivity S.No. Areas Name/ Aerial distance Identity (within 15 km.) Proposed project location boundary

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 14 S.No. Areas Name/ Aerial distance Identity (within 15 km.) Proposed project location boundary 1 Areas protected under NONE Not Applicable international conventions, national or local legislation for their ecological, landscape, cultural or other related value 2 Areas which are NONE Not Applicable important or sensitive for ecological reasons - Wetlands, watercourses or other water bodies, coastal zone, biospheres, mountains, forests 3 Areas used by NONE No protected, important protected, important or or sensitive species of sensitive species of flora & fauna has been flora or fauna for observed during the breeding, nesting, ecological survey. foraging, resting, over wintering, migration 4 Inland, coastal, marine NO Not applicable or underground waters 5 State, National NO Not applicable boundaries 6 Routes or facilities NO Not applicable used by the public for access to recreation or other tourist, pilgrim areas 7 Defence installations NO Not applicable 8 Densely populated or NO The site is not located built-up area in densely populated or built-up area. 9 Areas occupied by Hospitals: sensitive man-made land uses (hospitals, Varad Hospital 1.2 km W schools, places of worship, community Aastha Hospital 1.8 km E facilities) Ojas Multispeciality Hospital 1.9 km E

Dhanwantari Hospital 3.1 km E

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 15 S.No. Areas Name/ Aerial distance Identity (within 15 km.) Proposed project location boundary Lokmanya Hospital 3.5 km E

Akurdi Hospital 4.4 km E

Aditya Birla Memorial Hospital 4.8 km E

Primary Schools:

S. B Patil Public School 0.6 km E

Hello Kids Explorer 1.9 km E

Rainbow International School 2.1 km W

CES Prerana Primary School 2.6 km E

CMS English Medium School 3.3 km E

Bondawe Primary School 3.3 km S

Ashwini International School 4.6 km S

Wisdom World School 7.6 km S

Schools and Colleges:

Pimpri Chinchwad College of 2.3 km E Engineering

Pratibha Institute of Business 5.4 km E Management

Kamalnayan Bajaj Higher 6.1 km E Secondary School

S. N.B.P Law College 7.2 km E

Jai Hind College 7.4 km S

Smt. S. S Junior College 7.5 km E

Place of Worship

Buddha Vihar,Ravet 1.51 Km E

Sai Baba Mandir 2.76 Km E

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 16 S.No. Areas Name/ Aerial distance Identity (within 15 km.) Proposed project location boundary Shri Anandpur Satsang Ashram 5.29 Km E 10 Areas containing important, high quality 0.8 km S or scarce resources (ground water resources, surface resources, forestry, agriculture, fisheries, tourism, minerals) 11 Areas already subjected NO Not applicable to pollution or environmental damage. (those where existing legal environmental standards are exceeded) 12 Areas susceptible to NO Earth Quake Zone III natural hazard which could cause the Therefore, all relevant project to present design parameters as environmental per zone III have been problems considered for RCC (earthquakes, design of the buildings. subsidence, landslides, erosion, flooding or extreme or adverse climatic conditions)

Form 1- 'Proposed Residential and Commercial project at S. No. 86, Ravet by Jeswani Associates 17