Projects List By: EEDC

Total Page:16

File Type:pdf, Size:1020Kb

Projects List By: EEDC THE INVESTMENT OPPORTUNITIES THAT WILL BE PRESENTED DURING THE CONFERENCE (50 PROJECTS) ARE BROKEN DOWN AS FOLLOWS: • Government-led projects to be offered to private sector with Investment Banks (“IB”) involvement (30 projects) − 20 non-housing projects − 10 housing projects • PPP projects (8 projects) • Private projects (7 projects) • Flagship / concept public-led projects (5 projects) 1 PROJECTS TO BE SHOWCASED AT THE PROJECTS TO BE SHOWCASED AT C ONFERENCE 1- GOVERNMENT-LED PROJECTS TO BE OFFERED TO PRIVATE SECTOR WITH INVESTMENT BANK INVOLVEMENT • 30 projects − 20 non-housing projects CAPEX PROJECT DESCRIPTION SECTOR PROJECT OWNER ($M) Agricultural Project to collect and Ministry of Waste Recycling Agriculture 160 recycle agricultural waste Environment Project Land for sale for a Special Economic manufacturing/industry Zone North West project (5sqkm) in Industry & Ministry of n.a Gulf of Suez a special economic manufacturing Investment (SEZone) zone offering tax and investment incentives 10th of Ramadan One of 6 tech parks City Tech & ICT MCIT 505 in 6 governorates Science Park Borg Al Arab One of 6 tech parks Tech & Science ICT MCIT 161 in 6 governorates Park Round of oil and gas Upstream Bid Oil, Gas & Ministry of licences awards for n.a. Rounds Mining Petroleum exploration El Wady Phosphate and fertilizer Oil, Gas & Misr Phosphate 1,100 Phosphate Project plant Mining Petrochemical complex Assiut producing middle Oil, Gas & Hydro-cracker distillate of low sulfur ASORC 2,100 Mining Project content, LPG, Naphta, gas oil and jet oil Assiut – Sohag Pipeline connecting Oil, Gas & Petroleum Pipeline 34.5 LPG Pipeline refineries Mining Company Sohag – Aswan Pipeline connecting Oil, Gas & Petroleum Pipeline 205 Product Pipeline refineries Mining Company Bio-Ethanol from Plant producing Oil, Gas & ECHEM 135 Molasses Project* bioethanol from molasses Mining Bio-Ethanol Plant producing Oil, Gas & from Rice Straw bio-ethanol from ECHEM 227 Mining Project* agricultural waste Lubrification Production of lube oils Oil, Gas & SOPC 500 Processing Unit* and gas oil Mining 750MW El Siouf Ministry of Gas-fired power plant Power 644 CCGT Electricity Grain Logistics Grain terminals and Ministry of Supply Retail 2,100 Hub in Damietta logistics hub in Damietta and Internal Trade Ministry of 6th of October Land for sale for touristic Tourism Housing and 2,000 Touristic City development Utilities Gamsha Bay Land for sale for touristic Ministry of Tourism n.a. Leisure Complex development Tourism/TDA Marsa Wazar Land for sale for touristic Ministry of Tourist Tourism n.a. development Tourism/TDA Center – Red Sea n.a. 580 for phase I; 750 Port Said East by 2025 Transportation Ministry of Container n.a. when the & Logistics Transport Terminal 2 (CT2) terminal reaches its full capacity Connecting Sokhna Ain Sokhna – Port with South Cairo Helwan Single (Helwan) to cover Greater Transportation Ministry of 338 Track Freight Cairo Area as well as & Logistics Transport Railway the industrial zones in Helwan and Tebeen Land development 13,000 3 Cairo Airport City for cargo terminal Transportation Ministry of Civil over a – Aerocity and commercial and & Logistics Aviation 25-year exhibition areas period PROJECTS TO BE SHOWCASED AT THE PROJECTS TO BE SHOWCASED AT * Will not have a dedicated workshop presentation C ONFERENCE − 10 housing projects (all presented during the workshop) CAPEX PROJECT DESCRIPTION SECTOR PROJECT OWNER ($M) Ministry of West Cairo City Land for sale for real Housing & Housing and n.a. Center Project estate development Utilities Utilities Ministry of 3,000 North Cost South Land for sale for real Housing & Housing and - Marina estate development Utilities Utilities 4,000 Ministry of Zayed Central Land for sale for real Housing & Housing and 400 Park estate development Utilities Utilities Sheikh Zayed Ministry of 1,200 Integrated Land for sale for real Housing & Housing and - Residential estate development Utilities Utilities 1,400 Project October Oasis Ministry of Mega Urban Land for sale for real Housing & Housing and 20,000 Development estate development Utilities Utilities Project Marabet Ministry of Equestrian & Land for sale for real Housing & Housing and 655 Sport Facilities estate development Utilities Utilities Complex Ministry of Zaid Crystal Land for sale for real Housing & Housing and 1,600 Spark estate development Utilities Utilities Ministry of 6th of October Land for sale for real Housing & Housing and 3,100 Urban Oasis City estate development Utilities Utilities 10th of Ramadan Ministry of Land for sale for real Housing & Knowledge Housing and 1,600 estate development Utilities Village Utilities Mokattam Residential & Land for sale for real Housing & Ministry of n.a. Commercial estate development Utilities Investment Complex 2- PPP PROJECTS • 8 projects (all presented during the workshops) CAPEX PROJECT DESCRIPTION SECTOR PROJECT OWNER ($M) Maadi Technological park open ICT MCIT/PPP Unit 420 Technology Park for investment Automation of Automation of the Notarization ICT MCIT/PPP Unit 100 Notarization Offices Offices Helwan Wastewater treatment Housing & Wastewater PPP Unit 140 plant Utilities Treatment Plant Hurghada Desalination plant in Housing & Desalination PPP Unit 52 Hurghada Utilities Plant Sharm El Sheikh Desalination plant in Housing & Desalination PPP Unit 30 Sharm El Sheikh Utilities Plant Safaga Industrial Phosphate and grain port Industry & PPP Unit 523 Port to be tendered manufacturing Total area of 400 feddans allocated to the project. 6th of October Initial phase of 100 Transportation Ministry of 80 Dry Port feddans. Plan to link & Logistics Transport to railways Wahat - 6th 5 October line. PROJECTS TO BE SHOWCASED AT THE PROJECTS TO BE SHOWCASED AT Cairo General Nile River Bus Passenger transport Transportation Transportation 78 Ferry system by ferry & Logistics Authority / Cairo Governorate C ONFERENCE 3- PRIVATE PROJECTS • 7 projects (6 presented during the workshops) CAPEX PROJECT DESCRIPTION SECTOR PROJECT OWNER ($M) Al Ismaelia Urban Revamp of old residential Housing & Revitalization buildings in Old Town Ismailia (private) n.a. Utilities Project Cairo Start-up incubator + Information & Sawari Ventures venture capital fund Sawari Ventures Communication n.a. Fund I developed by Sawari (private) Technologies Ventures Tahrir Petrochemical plant Oil, Gas & Carbon Holdings Petrochemicals in need of equity n.a. Mining (private) Project (TPC) investement Papyrus Private Private Equity Fund Papyrus Fund Equity Tourism investing in revamping Tourism 1,000 (private) Fund touristic assets Private touristic project in development in Marsa Port Ghalib Al Kharafi Alam and related facilities Tourism 1,250 Projects (private) (medical tourism facilities, wind farm) Mixed use (residential, commercial, recreational) Waterfront Egyptian Resorts development in Sahl Festival World Tourism Company / 450 Hasheesh, fully integrated Complex Akanar (private) flagship touristic development on Red Sea Egyptian Tourism Land development Development Egyptian Tourism opportunity, ETDCO Company Development seeking a co-investor to Tourism (private) / Export n.a. Company develop remaining area Development (ETDCO)* of land Bank of Egypt (EBE) * Will not have a dedicated workshop presentation 4- FLAGSHIP / CONCEPT PUBLIC-LED PROJECTS • 6 projects (all presented during the workshops) CAPEX PROJECT DESCRIPTION SECTOR PROJECT OWNER ($M) World Bank-led project to develop irrigation Ministry of Land Reclamation and market access Agriculture Agriculture n.a. Project infrastructure for smaller / Ministry of scale farming sector and Irrigation producers Installation of smart Smart meters ICT MCIT 3,000 meters in households Wonder World Ministry of Supply Retail and commercial city Retail 4,500 Commercial City and Internal Trade BRT Line 31.8 km linking New Cairo and Rehab to Bus Rapid Transit Ring Road and to Nasr Transportation Ministry of Line Linking New 350 City Autostrad Road. Two & Logistics Transport Cairo to Nasr City fully segregated bus lines with Transit Signal Priority Light Rail Line Linking Ramses LRT Ramsis Transportation Ministry of 450 Square to Alf Heliopolis & Alf Maskan & Logistics Transport Maskan 7 PROJECTS TO BE SHOWCASED AT THE PROJECTS TO BE SHOWCASED AT C ONFERENCE .
Recommended publications
  • Cairo ATM Address
    Cairo ATM Address 1/ CITY STARS 1 Nasr city, Food Court, Phase 1 2/ CITY STARS 2 Nasr city, Food Court, Phase 2 3/ ARABELLA CLUB Arabella Country Club, 5th District, New Cairo 4/ KATTAMEYA HEIGHTS Kattameya heights, 5th District, New Cairo 5/ REHAB CITY Opened Food Court Area El Rehab City 6/ CARREFOUR MAADI City Center – Ring Road, Maadi 7/ ARKEDIA MALL Ramlet Boulak, Corniche El Nile, 4th Floor, Shoubra 8/ CFCC French Cultural Center, El Mounira 9/ SHEPHEARD HOTEL Garden City, Cornish El Nile 10/ SMG (Private) Mohandessin 11/ CRYSTAL ASFOUR 1 (Private) Industrial Zone, Shoubra El Kheima 12/ CRYSTAL ASFOUR 2 (Private) Industrial Zone, Shoubra El Kheima 13/ CRYSTAL ASFOUR 3 (Private) Industrial Zone, Shoubra El Kheima 14/ UNIVERSAL FACTORY (Private) Industrial Zone, 6th of October City 15/ ALPHA CERAMICA (Private) Industrial Zone, 6th of October City 16/ BADDAR COMPANY 63 Beginning of Cairo Ismailia Road 17/ ABOU GAHLY MOTORS (Private) Kilo 28 Cairo Ismailia Road 18/ EGYPT GOLD Industrial Zone Area A block 3/13013, Obour City 19/ AMOUN PHARMA CO. (Private) Industrial Zone, Obour City 20/ KANDIL GALVA METAL (Private) Industrial Zone, Area 5, Block 13035, El Oubour City 21/ EL AHRAM BEVERAGE CO. Idustrial Zone "A"part 24-11block number -12003, Obour City 22/ MOBICA CO. (Private) Abou Rawash, Cairo Alexandria Desert Road, After Dandy Mall to the right. 23/ COCA COLA (Pivate) Abou El Ghyet, Al kanatr Al Khayreya Road, Kaliuob Alexandria ATM Address 1/ PHARCO PHARM 1 Alexandria Cairo Desert Road, Pharco Pharmaceutical Company 2/ CARREFOUR ALEXANDRIA City Center- Alexandria 3/ SAN STEFANO MALL El Amria, Alexandria 4/ ALEXANDRIA PORT Alexandria 5/ DEKHILA PORT El Dekhila, Alexandria 6/ ABOU QUIER FERTLIZER Eltabia, Rasheed Line, Alexandria 7/ PIRELLI CO.
    [Show full text]
  • Cairo Traffic Congestion Study Phase 1
    Cairo Traffic Congestion Study Phase 1 Final Report November 2010 This report was prepared by ECORYS Nederland BV and SETS Lebanon for the World Bank and the Government of Egypt, with funding provided by the Dutch - Egypt Public Expenditure Review Trust Fund. The project was managed by a World Bank team including Messrs. Ziad Nakat, Transport Specialist and Team Leader, and Santiago Herrera, Lead Country Economist. i Table of Content Executive Summary xi Study motivation xi Study area xi Data collection xi Observed Modal Split xii Identification of Causes, Types and Locations of Traffic Congestion xii Estimation of Direct Economic Costs of Traffic Congestion in Cairo xiv 1 Introduction 17 1.1 Background 17 1.2 Objective of the Study 18 1.3 Structure of this report 18 2 Assessment of Information Needs and Collection of Additional Data 19 2.1 Introduction 19 2.2 Task Description/Objectives 22 2.3 Study area 22 2.4 Assessment of Data and Information Needs 24 2.5 Floating Car Survey and Traffic Counts 25 2.5.1 Data Collection Objectives 25 2.5.2 Data Collection Techniques 25 2.5.3 Technical Plan Development Methodology 25 2.5.4 Development of Data Collection Technical Plan 29 2.5.5 Data Collection Operational Plan 32 2.6 Peak Hours 35 2.7 Traffic Composition in the Corridors 36 2.8 Modal Split in the Corridors 36 2.9 Daily Traffic Volume 45 2.10 Traffic Survey Results 49 2.11 Trend Analysis of Travel Characteristics (2005-2010) 62 2.11.1 Changes in Modal Split 62 2.11.2 Changes in Traffic Patterns 66 2.11.3 Changes in Peak Hours 71 2.12 Overview
    [Show full text]
  • 5.3 FUTURE ROAD SYSTEM PLANNING 5.3.1 Issues
    CREATS Phase I Final Report Vol. III: Transport Master Plan Chapter 5: URBAN ROAD SYSTEM 5.3 FUTURE ROAD SYSTEM PLANNING 5.3.1 Issues (1) Regional Highway Network The Completion and Extension of the Ring Road Network At the end of July 2002, the Ring Road is basically complete except for the closing of the ring in southwest Giza. It has been a major struggle for the MHUUC how to close the Ring Road since its early days of construction. The alignment of the Ring Road in the southwest link shows that it has been critically difficult to close the link at the Haram area. The MHUUC was planning to extend the Ring Road from Interchange IC22 (see Figure 5.3.1) to the 6th of October Road, however, it was finally cancelled due to the international pressure for protecting the cultural heritage preservation area. The Ministry is now planning to extend the road from IC01 to the 6th of October Road by the plan shown in Figure 5.3.1. It also has a branch link to westward to bypass the traffic from the Ring Road (IC01) to Alexandria Desert Road. Source: JICA Study Team based on the information from GOPP Figure 5.3.1 The Ring Road Extension Plans One of the major functions of the Ring Road, to facilitate the connection to the 6th of October City with the existing urban area, can be achieved with this extension. However, unclosed Ring Road will still remain a problem in the network since 5 - 21 CREATS Phase I Final Report Vol.
    [Show full text]
  • Cairo Traffic Congestion Study Executive Note May 2014
    CAIRO TRAFFIC CONGESTION STUDY EXECUTIVE NOTE MAY 2014 The World Bank Group The World Bank Group Acknowledgments This study was undertaken by a World Bank team led by Ziad Nakat (Transport Specialist) and including Santiago Herrera (Lead Economist) and Yassine Cherkaoui (Infrastructure Specialist), and it was executed by Ecorys in collaboration with Sets and Cambridge Systematics. Funding for the study was generously provided by the Government of Netherlands; the Multi Donor Trust Fund “Addressing Climate Change in the Middle East and North Africa (MENA) Region” supported by Italy’s Ministry of Foreign Affairs and the European Commission; the Energy Sector Management Assistance Program and the World Bank. 1 Cairo Traffic Congestion Study I Executive Note I. Introduction The Greater Cairo Metropolitan Area (GCMA), with more than 19 million inhabitants, is host to more than one-fifth of Egypt’s population. The GCMA is also an important contributor to the Egyptian economy in terms of GDP and jobs. The population of the GCMA is expected to further increase to 24 million by 2027, and correspondingly its importance to the economy will also increase. Traffic congestion is a serious problem in the GCMA with large and adverse effects on both the quality of life and the economy. In addition to the time wasted standing still in traffic, time that could be put to more productive uses, congestion results in unnecessary fuel consumption, causes additional wear and tear on vehicles, increases harmful emissions lowering air quality, increases the costs of transport for business, and makes the GCMA an unattractive location for businesses and industry.
    [Show full text]
  • Transportation Research Record No. 1441, Nonmotorized Transportation
    TRANSPORTATION RESEARCH RECORD 1441 127 Urban Transport Strategy for Cairo: Advice and Dissent SLOBODAN MITRIC Greater Cairo, Egypt, in the early 1980s suffered from severe traffic GREATER CAIRO URBAN TRANSPORT PROBLEMS congestion, polluted air, and high accident rates. Its population was AND PROPOSALS 10 YEARS AGO growing at the high annual rate of 4 percent, and car ownership was growing at 17 percent, but the great majority of daily trips (63 per­ cent) were by public transport. The road system was only 60 percent In 1981 greater Cairo already had about 8.5 million people­ paved and consisted mainly of ordinary streets with poor traffic con­ possibly more-and was growing at an alarming rate of 4 percent trol. Public transport vehicles, operated by Cairo Transport Author­ a year (J). Much of the growth was the result of migration from ity, were the main victims of traffic congestion, in addition to other, internal sources of inefficiency. In response, an unusual urban trans­ rural areas where the population increase exceeded the capacity port program was initiated at that time, partially financed by the of the local economy to create jobs. The average gross population World Bank. It consisted of low-cost measures, for example, im­ density was high at 40,000 people per square kilometer reaching proved traffic management, selected road improvements, and greater 100,000 in some older Cairo districts. Egypt's gross national prod­ productivity and cost recovery in public transport. A review of uct was about $750 per capita, placing Egypt among the better­ Cairo's experience since the mid-1980s reveals that the actions ac­ off of the low-income countries.
    [Show full text]
  • Fragmenting a Metropolis Sustainable Suburban Communities from Resettlement Ghettoes to Gated Utopias
    OPEN ACCESS http://www.sciforum.net/conference/wsf3 Article Fragmenting a Metropolis Sustainable Suburban Communities from Resettlement Ghettoes to Gated Utopias Wael Salah Fahmi1,* 1 Department of Architecture, University of Helwan, 34, Abdel Hamid Lofti Street, Giza, 12311, Egypt; E-Mail: [email protected] * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel.: +2 02 33370485 ; Fax: + 2- 02- 3335 1630 Received: 23 September 2013 / Accepted: 28 October 2013 / Published: 01 November 2013 Abstract: The paper examines the impact of the Greater Cairo Master Plan and New Towns Policy on urban housing crisis through some case studies focusing especially on New Cairo City, to the east of downtown Cairo. The empirical research attempts to qualitatively examine the complex reasons for the failure of various policies and implementations in meeting housing needs of middle and low-income people. This has resulted in the emergence of nearly empty new towns, and the increasing fortification of the affluent nouveaux riche within exclusive desert condominiums and gated communities, a phenomenon which aggravated social injustice and housing inequality. These communities’ global architectural styles and marketing strategies are linked to neo-liberal economic policies and private entrepreneurial urban governance related to individualised rights of seclusion, privacy and consumption. Influenced by expatriates in the Gulf monarchies, these desert enclaves are located in Greater Cairo's western desert (6th October City: Dream Land, Gardenia and Beverly Hills) and in the eastern suburbs (New Cairo City: Katameya Heights, Golf City, Al Rehab City, Mirage City, Arabella). Surrounded by golf courses, recreational and commercial facilities, these luxurious residential districts tend to be exterritorial with their construction, maintenance and economies, being largely controlled by international property development firms, whilst locally underlining the ever- sharper social disparity between rich and poor.
    [Show full text]
  • Curriculum Vitae
    Curriculum Vitae Name: Hossam Eldin M. A. Abouserie, PhD. Rank: Associate Professor of Library & Information Sciences. Current Position: Associate Professor, Library and Information Science Department, Faculty of Arts, Helwan University, Cairo, Egypt Previous Administrative Positions: Head of Libraries, Community College of Qatar, Doha, Qatar. University Library Supervisor, Prince Sattam Bin Abdulaziz University, Riyadh, Saudi Arabia. Date of Birth: March, 10, 1974 Emails: [email protected] [email protected] Mobile: 00201004954917 & 002/23959674 Profile Dr. Hossam is an Associate Professor of Library and Information Science. He obtained five academic degrees in Library and Information Sciences fields from The United States of America and Egypt. He has a long experience in directing and supervising Academic libraries in Saudi Arabia and Qatar, as he was the university library supervisor in Sattam Bin Abdulaziz University for 7 years and Library Director in Community College of Qatar (January 2016- 2017). He has over 20 years of experience in teaching, research and service at several academic institutions in various countries, such as Egypt, United States of America, Qatar, and Kingdom of Saudi Arabia. He received several honor certifications from various academic institutions in various occasions. Dr. Hossam has a wide range of Interests from basic theories to the practice of implementing technologies in action. Beside teaching main courses in Library & Information Science, he gives special considerations to the following topics: Library Administration and Supervision, Library Management System (Symphony and Sierra - Innovative), Advertising and marketing, Information seeking, Knowledge theories, Information laws, Communication behaviors, E-learning, Information technology, Web designing, Web 2.0, Digital media, Telecommunication, Electronic journals, Electronic publishing, Scholarly communication, Culture and Society, Personality types, Research ethics, Research methods, Social networks, Arabic heritage and sources, etc.
    [Show full text]
  • Ain Al-Sira Site Analysis
    2013 Ehsan AbushadiEhsan Sira Site Analysis - Ain al Site Analysis of Ain al-Sira, for the design of a sustainable school for AENG 453. The site analysis looks at the history of the area, the topography, the water bodies and the situation today. The American University in Cairo Ehsan Abushadi 900092053 Aeng 453 A b u s h a d i P a g e | 2 Contents Table of Figures ........................................................................................... 3 Social Aspects .................................................................................... 27 Ain al-Sira General Overview ...................................................................... 5 Plot #3 ................................................................................................... 28 North Fustat and the Fustat Plateau ....................................................... 5 Physical Response ............................................................................. 28 Ain al-Sira, the Lake................................................................................. 5 Environmental Aspects ..................................................................... 28 Babylon (Qasr al-Sham)......................................................................... 11 Social Aspects .................................................................................... 28 Fustat, the city ...................................................................................... 11 Plot #4 ..................................................................................................
    [Show full text]
  • Chapter 5 Outline Design (Phase 2)
    CHAPTER 5 OUTLINE DESIGN (PHASE 2) JICA PREPARATORY SURVEY ON GREATER CAIRO METRO LINE NO. 4 CHAPTER 5 OUTLINE DESIGN (PHASE 2) The study of the Phase 2 Northern Route section between El Malek El Saleh and Ring Road Exit #18 via El Sawaha Square along Port Said Street was carried out at the level of an outline design. The train operating plan and required rolling stock number for the Phase 2 section was presented in Chapter 4, Section 4.2. Basic design concepts/criteria for Metro Line 4 Phase 2 are the same as for the Phase 1 section. These are presented in Chapter 4, Section 4.4. 5.1 Alignment Plan According to the result of route selection, the JICA Study Team considers an alignment and station location for the northern route. 5.1.1 Design criteria (1) Outline of Proposed Design Specifications Table 5-1 Key Features for Alignment Planning (Phase 2) Items Proposed Specification 1 Design speed Tunnel section: 100 km/hr Viaduct and At-grade section: 120 km/hr 2 Minimum horizontal Main line: 250 m curve radius Main line turnout curve: 160 m Workshop/Depot line: 160 m W/D line turnout curve: 120 m Platform section: 1000 m 3 Minimum vertical Over 600 m horizontal radius 3,000 m curve radius Less than 600 m horizontal radius 4,000 m 4 Maximum gradient Main line: 4% Platform section: 0.2% Stabling line: 0.2% Turnout section: 0% 5 Platform length Total: 170 m Source: JICA Study Team All the design criteria are same as in Phase 1.
    [Show full text]
  • Egypt's Mega Projects
    MEGAPROJECTS IN EGYPT FLANDERS INVESTMENT & TRADE MARKET SURVEY Market Study /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// EGYPT’S MEGA PROJECTS 1.12.2018 //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// www.flandersinvestmentandtrade.com TABLE OF CONTENTS Introduction .............................................................................................................................................................................................. 3 1. Construction Projects ............................................................................................................................................................... 4 1.1 The New Administrative Capital 4 1.2 Al Galala City and Tourist Compound 5 1.3 Development of 10th of Ramadan City 6 1.4 The Northwest Coast Development Project 6 1.5 Damietta Furniture City 7 1.6 The Golden Triangle 7 1.7 The Grand Egyptian Museum 8 2. National power projects ........................................................................................................................................................ 9 2.1 El Dabaa Nuclear Power Plant 9 2.2 Jabal al-Zeit Wind Station 9 2.3 El Burullus Power Plant 10 2.4 Benban 1 Solar Plant 10 2.5 Beni Suef Combined Cycle Power Plant 11 2.6 New Capital Power Plant 11 2.7 New Assiut Barrage 12 2.8 Coal-Fired Power
    [Show full text]
  • Accessibility Impact Analysis of New Public Transit Projects in Cairo, Egypt
    Accessibility Impact Analysis of New Public Transit Projects in Cairo, Egypt By Adham Kalila B.Eng in Civil Engineering McGill University Montreal, Canada (2012) Master of Science in Transportation Massachusetts Institute of Technology Cambridge, Massachusetts (2018) Submitted to the Department of Urban Studies and Planning in partial fulfillment of the requirements for the degree of Master of Science in Urban Planning at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY June 2019 © 2019 Adham Kalila. All Rights Reserved The author hereby grants to MIT the permission to reproduce and to distribute publicly paper and electronic copies of the thesis document in whole or in part in any medium now known or hereafter created. Author________________________________________________________________________ Department of Urban Studies and Planning 05/21/2019 Certified by____________________________________________________________________ Professor Sarah Williams Department of Urban Studies and Planning Thesis Supervisor Accepted by___________________________________________________________________ Professor of the Practice, Caesar McDowell Co-Chair, MCP Committee Department of Urban Studies and Planning Accessibility Impact Analysis of New Public Transit Projects in Cairo, Egypt By Adham Kalila Submitted to the Department of Urban Studies and Planning on May 21, 2019 in Partial Fulfillment of the Requirements for the Degree of Master of Science in Urban Planning Abstract The New Urban Communities (NUC), built around Cairo, developed to relieve congestion
    [Show full text]
  • Chapter 4 Urban Transportation Plan
    THE STRATEGIC URBAN DEVELOPMENT MASTER PLAN STUDY FOR A SUSTAINABLE DEVELOPMENT OF THE GREATER CAIRO REGION IN THE ARAB REPUBLIC OF EGYPT Final Report (Volume 2) CHAPTER 4 URBAN TRANSPORTATION PLAN 4.1 General Conditions of Urban Transportation 4.1.1 Existing Transportation Facilities (1) Railway 1) Metro The present urban railway network and urban railway transport services in the Greater Cairo area is shown in Figure 4.1.1 and Figure 4.1.2, respectively. The routes of Metro Line 1 and Metro Line 2 are also shown in Figure 4.1.1 and Figure 4.1.2. The location of the Metro Line 1 and Metro Line 2 stations is shown in Figure 4.1.1. Source: Edited based on Egyptian National Railways (hereafter ENR in this Chapter) data Figure 4.1.1 Urban Railway Network General Organization for Physical Planning Japan International Cooperation Agency Greater Cairo Region Urban Planning Center Nippon Koei Co., Ltd. Katahira & Engineers International 4-1 THE STRATEGIC URBAN DEVELOPMENT MASTER PLAN STUDY FOR A SUSTAINABLE DEVELOPMENT OF THE GREATER CAIRO REGION IN THE ARAB REPUBLIC OF EGYPT Final Report (Volume 2) Source: JICA Study Team, based on ENR data. Landsat image courtesy of USGS. Figure 4.1.2 Urban Railway Transport Service According to the recent data submitted by the Cairo Metro Organization (CMO) (hereafter referred to as CMO in this Chapter), as shown in Table 4.1.1, the average number of passengers per day between 05:15-24:15 amounted to 1.217 million on Metro Line 1 and 0.73 million on Metro Line 2 in 2005/2006.
    [Show full text]