The New Administrative Capital in Egypt

Total Page:16

File Type:pdf, Size:1020Kb

The New Administrative Capital in Egypt FOCUS 66 Introduction On 13 March 2015, the Egyptian govern- The New Administrative Capital in ment announced to the public at the Egypt: The Political Economy of the Economic Development Conference in Sharm al-Sheikh the breathtaking mega- Production of Urban Spaces in Cairo project of the New Administrative Capital (or NAC for short)1. Envisioned to be inhabited by 5 to 6.5 million people and built from scratch in the vast territory of the Eastern Desert 40km east of the Cairo agglomeration, the project is intended to host a new government quarter, including the parliament, ministries, the supreme council, diplomatic missions, and a new president’s palace. Skyscrapers up to 450m tall were depicted, as well as 30 sub- projects, one of them being an airport larger than London Heathrow and another an amusement park four times the size of Patrick Loewert, Christian Steiner Disneyland. The total investment is esti- mated at up to 500 billion US dollars. On The New Administrative Capital reshapes demonstrates that state institutions com- display boards, the mega-project was Egypt’s urban landscape thoroughly. pete for control over it, providing the defined as Madīnat al-Jamīʿa, a City for Nevertheless, empirical research on its military with new rent sources. The loca- Everyone. political economy and spatial imaginaries tion and size of the new palace indicates is lacking. Building on a political geogra- a lack of democratic conviction, and citi- The project is remarkable in various ways. phy framework and extensive qualitative zen participation is largely missing. It absorbs enormous resources in terms of fieldwork, we aim at contrasting official planning efforts, space, and money. The constructions of space with an analysis of Keywords: New Administrative Capital, latter is especially noteworthy, since Egypt the hidden interests, actions, and power Egypt, Urban Development, Mega has faced severe economic problems in struggles among its main stakeholders. Projects, Political Economy, Power the aftermath of the 2011 Egyptian revolu- Whereas foreign and private investors are Struggle tion against Mubarak and the 2013 coup officially key to the project, our analysis d’état against president Mursi. Second, Middle East – Topics & Arguments # 12 –2019 FOCUS 67 the history of the project is very colorful, geography framework about the strategic structions of space and their underlying since it has been promoted by three very construction of space, we therefore ana- logics are presented to the addressees as different presidential administrations. lyze examples of the actions and argu- quasi-objective presentations of reality, mentations of central stakeholders con- whereas they are primarily intended to However, even though many international cerning three central elements of the back the actor’s position in the power visitors at the 2015 conference welcomed NAC: first the role of foreign investors, struggle over the production of space the project as a symbol of new investment second the disavowal of responsibilities (Reuber, Politische Geographie 127). Of opportunities, there was also widespread for project funding, and third locating of course, an actor can use different strategic criticism. Critics pointed to its high invest- the presidential palace. This analysis constructions of space in from one ment costs and size and fueled doubts enables a deeper understanding of how addressee to another. Their analysis allows about the social responsibility of the proj- and why the project developed the way it an interpretative reconstruction of the hid- ect that some said is meant to host only did and provides insights into the quality den agendas and aims of the actors the richest members of the society and to and extent of citizen participation. (Reuber, Politische Geographie 127). serve the government’s interests (e.g. Therefore, building on such a perspective Tadamun; Egyptian Streets; Mohie). On Theoretical and Methodological helps to understand the actions and argu- the other side, the President and ministers Background mentations of project stakeholders. pointed out several times that the NAC will Theoretically, this article advocates a polit- encourage foreign investments, deepen ical geography perspective referring to Of course, organizations do not always act international collaborations (e.g. CNN), Paul Reuber’s idea of strategic construc- coherently. Individual interests often com- and will not cause any burdens for the tions of space (Reuber, Konflikte). Reuber pete within organizations.2 Since our Egyptian taxpayer, but instead will make a argues that every actor selectively gathers paper focuses on the power struggles profit for the Egyptian treasury (NUCA; information about his or her environment among actors, it nevertheless seems via- Ghanīm and ʿAmāra). in order to develop clear objectives of ble to concentrate on the outcome of the future actions. At the same time, actors analyzed actions of stakeholders and to Against this background, the lack of aim at enforcing their point of view in a largely ignore their internal power strug- empirical research on the political econ- way that argumentatively secures their gles, especially since most of them are omy and spatial imaginaries of the project objectives in relation to competing actors quite hierarchically organized. We investi- is astonishing. Therefore, we aim at con- and/or the public. Thereby, they con- gated the publicly oriented actions and trasting the officially created images of the sciously create subjective, selective, and argumentations that bring the strategic project with an analysis of the underlying condensed images of reality, which constructions of space of distinct actors and partially hidden interests of the main Reuber calls “strategic constructions of into life by using publically available jour- actors and the power struggles among the space” (Konflikte 22-44; Politische nalistic media sources, speeches, docu- main stakeholders. Building on a political Geographie 116-129). These specific con- mentations, and advertisements. The pro- Middle East – Topics & Arguments # 12 –2019 FOCUS 68 cesses within and among the collective back to the City of Revolution under 1. Six so-called Wadian, isolated, green, actors are, however, hard to grasp, espe- President Nasser in the 1950s. Under his and high-rent residential quarters with at cially because many stakeholders see successors, presidents Sadat and least 25,000 units each, including social withholding (even public) information Mubarak, new endeavors to relocate state infrastructure and the supply of shops and about such a project as a question of institutions were made in the deserts west services such as malls, libraries, mosques national security. Additionally, the involved and east of Cairo, but they all failed due to and churches, social care centers, gas sta- institutions in Egypt are notorious for pro- a lack of funds, the resistance of state tions, schools, kindergartens, hospitals, tecting their turf and in general do not employees, and political circumstances banks, police stations, citizens’ service publish sufficient data (Sims 140, 245, 281; (Stewart; Feiler 302-303). Finally, in 2014, centers,and club houses. Wahdan 10, 60). For this reason, a 14-month President Sisi’s government resumed the 2. A park complex covering 23 square kilo- ethnographic field research project was plans of a new capital, which subsequently meters in the first phase and 30 square carried out, including professional activity became one of the top priority projects of kilometers in total. Its serpentine shape in the NAC project. During this time, 36 the national development strategy Egypt intends to imitate the course of the River qualitative interviews were conducted 2030 (MPMAR 51-61). Its priority is high- Nile. with various project participants whose lighted by the surprising progress the 3. The governmental quarter, containing identity will remain anonymous, given the project has made in the past few years, the parliament, ministries, the supreme sensitivity of the topic. With few excep- considering the unsuccessful earlier council, diplomatic missions, and other tions, the time horizon covers the period attempts to relocate the governmental government- related and international from spring 2015 to early 2018. The inter- capital. The motifs of the importance of a entities. views were transcribed and a content new capital and the revival of the idea are 4. The presidential palace analysis has been made. Afterward, the open to speculation, but most interlocu- information based on interviews, field tors agree that among the reasons are the In the West and Northwest, the project research, working experience, and public need for a big vision to legitimize presi- area borders on the easternmost quarters sources was triangulated. Since the gath- dential rule and the intention to evacuate of Cairo proper (see fig. 1). Thus, unlike the ered information was partially contradic- governmental institutions from the center name suggests, the NAC will be part of a tory, it underwent an interpretative analy- of turmoil that waned only shortly before. contiguous urbanized area and a mere sis to reconstruct as well as possible the The overall size of the mega-project was extension of the urban expansion of Cairo processes that took place in the field. set at 753 square kilometers, of which 126 agglomeration. This spatial continuity is square kilometers were developed in the made clear by the fact that the mega-proj- Pathways to and Basic Components of the first phase until 2018. The area to be devel- ect will not have its own governorate, but New Administrative Capital oped in this first project phase can be instead will be under the administrative The history of attempts to relocate the divided into four large zones (as at responsibility of the governorate of Cairo governmental center to the desert reaches February 2018): (Hasan, “ʿA ṣima”). Middle East – Topics & Arguments # 12 –2019 FOCUS 69 TOANENDFORTHETIMEBEING/FlCIALLY THE 05 km involvement of the foreign businessman El Obour came to a halt because he refused to City N involve his UAE-based company Emaar as i ElE ShoroukShoro S le Al Marj City a guarantor of loans.
Recommended publications
  • Cairo ATM Address
    Cairo ATM Address 1/ CITY STARS 1 Nasr city, Food Court, Phase 1 2/ CITY STARS 2 Nasr city, Food Court, Phase 2 3/ ARABELLA CLUB Arabella Country Club, 5th District, New Cairo 4/ KATTAMEYA HEIGHTS Kattameya heights, 5th District, New Cairo 5/ REHAB CITY Opened Food Court Area El Rehab City 6/ CARREFOUR MAADI City Center – Ring Road, Maadi 7/ ARKEDIA MALL Ramlet Boulak, Corniche El Nile, 4th Floor, Shoubra 8/ CFCC French Cultural Center, El Mounira 9/ SHEPHEARD HOTEL Garden City, Cornish El Nile 10/ SMG (Private) Mohandessin 11/ CRYSTAL ASFOUR 1 (Private) Industrial Zone, Shoubra El Kheima 12/ CRYSTAL ASFOUR 2 (Private) Industrial Zone, Shoubra El Kheima 13/ CRYSTAL ASFOUR 3 (Private) Industrial Zone, Shoubra El Kheima 14/ UNIVERSAL FACTORY (Private) Industrial Zone, 6th of October City 15/ ALPHA CERAMICA (Private) Industrial Zone, 6th of October City 16/ BADDAR COMPANY 63 Beginning of Cairo Ismailia Road 17/ ABOU GAHLY MOTORS (Private) Kilo 28 Cairo Ismailia Road 18/ EGYPT GOLD Industrial Zone Area A block 3/13013, Obour City 19/ AMOUN PHARMA CO. (Private) Industrial Zone, Obour City 20/ KANDIL GALVA METAL (Private) Industrial Zone, Area 5, Block 13035, El Oubour City 21/ EL AHRAM BEVERAGE CO. Idustrial Zone "A"part 24-11block number -12003, Obour City 22/ MOBICA CO. (Private) Abou Rawash, Cairo Alexandria Desert Road, After Dandy Mall to the right. 23/ COCA COLA (Pivate) Abou El Ghyet, Al kanatr Al Khayreya Road, Kaliuob Alexandria ATM Address 1/ PHARCO PHARM 1 Alexandria Cairo Desert Road, Pharco Pharmaceutical Company 2/ CARREFOUR ALEXANDRIA City Center- Alexandria 3/ SAN STEFANO MALL El Amria, Alexandria 4/ ALEXANDRIA PORT Alexandria 5/ DEKHILA PORT El Dekhila, Alexandria 6/ ABOU QUIER FERTLIZER Eltabia, Rasheed Line, Alexandria 7/ PIRELLI CO.
    [Show full text]
  • Cairo Traffic Congestion Study Phase 1
    Cairo Traffic Congestion Study Phase 1 Final Report November 2010 This report was prepared by ECORYS Nederland BV and SETS Lebanon for the World Bank and the Government of Egypt, with funding provided by the Dutch - Egypt Public Expenditure Review Trust Fund. The project was managed by a World Bank team including Messrs. Ziad Nakat, Transport Specialist and Team Leader, and Santiago Herrera, Lead Country Economist. i Table of Content Executive Summary xi Study motivation xi Study area xi Data collection xi Observed Modal Split xii Identification of Causes, Types and Locations of Traffic Congestion xii Estimation of Direct Economic Costs of Traffic Congestion in Cairo xiv 1 Introduction 17 1.1 Background 17 1.2 Objective of the Study 18 1.3 Structure of this report 18 2 Assessment of Information Needs and Collection of Additional Data 19 2.1 Introduction 19 2.2 Task Description/Objectives 22 2.3 Study area 22 2.4 Assessment of Data and Information Needs 24 2.5 Floating Car Survey and Traffic Counts 25 2.5.1 Data Collection Objectives 25 2.5.2 Data Collection Techniques 25 2.5.3 Technical Plan Development Methodology 25 2.5.4 Development of Data Collection Technical Plan 29 2.5.5 Data Collection Operational Plan 32 2.6 Peak Hours 35 2.7 Traffic Composition in the Corridors 36 2.8 Modal Split in the Corridors 36 2.9 Daily Traffic Volume 45 2.10 Traffic Survey Results 49 2.11 Trend Analysis of Travel Characteristics (2005-2010) 62 2.11.1 Changes in Modal Split 62 2.11.2 Changes in Traffic Patterns 66 2.11.3 Changes in Peak Hours 71 2.12 Overview
    [Show full text]
  • 5.3 FUTURE ROAD SYSTEM PLANNING 5.3.1 Issues
    CREATS Phase I Final Report Vol. III: Transport Master Plan Chapter 5: URBAN ROAD SYSTEM 5.3 FUTURE ROAD SYSTEM PLANNING 5.3.1 Issues (1) Regional Highway Network The Completion and Extension of the Ring Road Network At the end of July 2002, the Ring Road is basically complete except for the closing of the ring in southwest Giza. It has been a major struggle for the MHUUC how to close the Ring Road since its early days of construction. The alignment of the Ring Road in the southwest link shows that it has been critically difficult to close the link at the Haram area. The MHUUC was planning to extend the Ring Road from Interchange IC22 (see Figure 5.3.1) to the 6th of October Road, however, it was finally cancelled due to the international pressure for protecting the cultural heritage preservation area. The Ministry is now planning to extend the road from IC01 to the 6th of October Road by the plan shown in Figure 5.3.1. It also has a branch link to westward to bypass the traffic from the Ring Road (IC01) to Alexandria Desert Road. Source: JICA Study Team based on the information from GOPP Figure 5.3.1 The Ring Road Extension Plans One of the major functions of the Ring Road, to facilitate the connection to the 6th of October City with the existing urban area, can be achieved with this extension. However, unclosed Ring Road will still remain a problem in the network since 5 - 21 CREATS Phase I Final Report Vol.
    [Show full text]
  • Cairo Traffic Congestion Study Executive Note May 2014
    CAIRO TRAFFIC CONGESTION STUDY EXECUTIVE NOTE MAY 2014 The World Bank Group The World Bank Group Acknowledgments This study was undertaken by a World Bank team led by Ziad Nakat (Transport Specialist) and including Santiago Herrera (Lead Economist) and Yassine Cherkaoui (Infrastructure Specialist), and it was executed by Ecorys in collaboration with Sets and Cambridge Systematics. Funding for the study was generously provided by the Government of Netherlands; the Multi Donor Trust Fund “Addressing Climate Change in the Middle East and North Africa (MENA) Region” supported by Italy’s Ministry of Foreign Affairs and the European Commission; the Energy Sector Management Assistance Program and the World Bank. 1 Cairo Traffic Congestion Study I Executive Note I. Introduction The Greater Cairo Metropolitan Area (GCMA), with more than 19 million inhabitants, is host to more than one-fifth of Egypt’s population. The GCMA is also an important contributor to the Egyptian economy in terms of GDP and jobs. The population of the GCMA is expected to further increase to 24 million by 2027, and correspondingly its importance to the economy will also increase. Traffic congestion is a serious problem in the GCMA with large and adverse effects on both the quality of life and the economy. In addition to the time wasted standing still in traffic, time that could be put to more productive uses, congestion results in unnecessary fuel consumption, causes additional wear and tear on vehicles, increases harmful emissions lowering air quality, increases the costs of transport for business, and makes the GCMA an unattractive location for businesses and industry.
    [Show full text]
  • Transportation Research Record No. 1441, Nonmotorized Transportation
    TRANSPORTATION RESEARCH RECORD 1441 127 Urban Transport Strategy for Cairo: Advice and Dissent SLOBODAN MITRIC Greater Cairo, Egypt, in the early 1980s suffered from severe traffic GREATER CAIRO URBAN TRANSPORT PROBLEMS congestion, polluted air, and high accident rates. Its population was AND PROPOSALS 10 YEARS AGO growing at the high annual rate of 4 percent, and car ownership was growing at 17 percent, but the great majority of daily trips (63 per­ cent) were by public transport. The road system was only 60 percent In 1981 greater Cairo already had about 8.5 million people­ paved and consisted mainly of ordinary streets with poor traffic con­ possibly more-and was growing at an alarming rate of 4 percent trol. Public transport vehicles, operated by Cairo Transport Author­ a year (J). Much of the growth was the result of migration from ity, were the main victims of traffic congestion, in addition to other, internal sources of inefficiency. In response, an unusual urban trans­ rural areas where the population increase exceeded the capacity port program was initiated at that time, partially financed by the of the local economy to create jobs. The average gross population World Bank. It consisted of low-cost measures, for example, im­ density was high at 40,000 people per square kilometer reaching proved traffic management, selected road improvements, and greater 100,000 in some older Cairo districts. Egypt's gross national prod­ productivity and cost recovery in public transport. A review of uct was about $750 per capita, placing Egypt among the better­ Cairo's experience since the mid-1980s reveals that the actions ac­ off of the low-income countries.
    [Show full text]
  • Fragmenting a Metropolis Sustainable Suburban Communities from Resettlement Ghettoes to Gated Utopias
    OPEN ACCESS http://www.sciforum.net/conference/wsf3 Article Fragmenting a Metropolis Sustainable Suburban Communities from Resettlement Ghettoes to Gated Utopias Wael Salah Fahmi1,* 1 Department of Architecture, University of Helwan, 34, Abdel Hamid Lofti Street, Giza, 12311, Egypt; E-Mail: [email protected] * Author to whom correspondence should be addressed; E-Mail: [email protected]; Tel.: +2 02 33370485 ; Fax: + 2- 02- 3335 1630 Received: 23 September 2013 / Accepted: 28 October 2013 / Published: 01 November 2013 Abstract: The paper examines the impact of the Greater Cairo Master Plan and New Towns Policy on urban housing crisis through some case studies focusing especially on New Cairo City, to the east of downtown Cairo. The empirical research attempts to qualitatively examine the complex reasons for the failure of various policies and implementations in meeting housing needs of middle and low-income people. This has resulted in the emergence of nearly empty new towns, and the increasing fortification of the affluent nouveaux riche within exclusive desert condominiums and gated communities, a phenomenon which aggravated social injustice and housing inequality. These communities’ global architectural styles and marketing strategies are linked to neo-liberal economic policies and private entrepreneurial urban governance related to individualised rights of seclusion, privacy and consumption. Influenced by expatriates in the Gulf monarchies, these desert enclaves are located in Greater Cairo's western desert (6th October City: Dream Land, Gardenia and Beverly Hills) and in the eastern suburbs (New Cairo City: Katameya Heights, Golf City, Al Rehab City, Mirage City, Arabella). Surrounded by golf courses, recreational and commercial facilities, these luxurious residential districts tend to be exterritorial with their construction, maintenance and economies, being largely controlled by international property development firms, whilst locally underlining the ever- sharper social disparity between rich and poor.
    [Show full text]
  • Curriculum Vitae
    Curriculum Vitae Name: Hossam Eldin M. A. Abouserie, PhD. Rank: Associate Professor of Library & Information Sciences. Current Position: Associate Professor, Library and Information Science Department, Faculty of Arts, Helwan University, Cairo, Egypt Previous Administrative Positions: Head of Libraries, Community College of Qatar, Doha, Qatar. University Library Supervisor, Prince Sattam Bin Abdulaziz University, Riyadh, Saudi Arabia. Date of Birth: March, 10, 1974 Emails: [email protected] [email protected] Mobile: 00201004954917 & 002/23959674 Profile Dr. Hossam is an Associate Professor of Library and Information Science. He obtained five academic degrees in Library and Information Sciences fields from The United States of America and Egypt. He has a long experience in directing and supervising Academic libraries in Saudi Arabia and Qatar, as he was the university library supervisor in Sattam Bin Abdulaziz University for 7 years and Library Director in Community College of Qatar (January 2016- 2017). He has over 20 years of experience in teaching, research and service at several academic institutions in various countries, such as Egypt, United States of America, Qatar, and Kingdom of Saudi Arabia. He received several honor certifications from various academic institutions in various occasions. Dr. Hossam has a wide range of Interests from basic theories to the practice of implementing technologies in action. Beside teaching main courses in Library & Information Science, he gives special considerations to the following topics: Library Administration and Supervision, Library Management System (Symphony and Sierra - Innovative), Advertising and marketing, Information seeking, Knowledge theories, Information laws, Communication behaviors, E-learning, Information technology, Web designing, Web 2.0, Digital media, Telecommunication, Electronic journals, Electronic publishing, Scholarly communication, Culture and Society, Personality types, Research ethics, Research methods, Social networks, Arabic heritage and sources, etc.
    [Show full text]
  • Ain Al-Sira Site Analysis
    2013 Ehsan AbushadiEhsan Sira Site Analysis - Ain al Site Analysis of Ain al-Sira, for the design of a sustainable school for AENG 453. The site analysis looks at the history of the area, the topography, the water bodies and the situation today. The American University in Cairo Ehsan Abushadi 900092053 Aeng 453 A b u s h a d i P a g e | 2 Contents Table of Figures ........................................................................................... 3 Social Aspects .................................................................................... 27 Ain al-Sira General Overview ...................................................................... 5 Plot #3 ................................................................................................... 28 North Fustat and the Fustat Plateau ....................................................... 5 Physical Response ............................................................................. 28 Ain al-Sira, the Lake................................................................................. 5 Environmental Aspects ..................................................................... 28 Babylon (Qasr al-Sham)......................................................................... 11 Social Aspects .................................................................................... 28 Fustat, the city ...................................................................................... 11 Plot #4 ..................................................................................................
    [Show full text]
  • Chapter 5 Outline Design (Phase 2)
    CHAPTER 5 OUTLINE DESIGN (PHASE 2) JICA PREPARATORY SURVEY ON GREATER CAIRO METRO LINE NO. 4 CHAPTER 5 OUTLINE DESIGN (PHASE 2) The study of the Phase 2 Northern Route section between El Malek El Saleh and Ring Road Exit #18 via El Sawaha Square along Port Said Street was carried out at the level of an outline design. The train operating plan and required rolling stock number for the Phase 2 section was presented in Chapter 4, Section 4.2. Basic design concepts/criteria for Metro Line 4 Phase 2 are the same as for the Phase 1 section. These are presented in Chapter 4, Section 4.4. 5.1 Alignment Plan According to the result of route selection, the JICA Study Team considers an alignment and station location for the northern route. 5.1.1 Design criteria (1) Outline of Proposed Design Specifications Table 5-1 Key Features for Alignment Planning (Phase 2) Items Proposed Specification 1 Design speed Tunnel section: 100 km/hr Viaduct and At-grade section: 120 km/hr 2 Minimum horizontal Main line: 250 m curve radius Main line turnout curve: 160 m Workshop/Depot line: 160 m W/D line turnout curve: 120 m Platform section: 1000 m 3 Minimum vertical Over 600 m horizontal radius 3,000 m curve radius Less than 600 m horizontal radius 4,000 m 4 Maximum gradient Main line: 4% Platform section: 0.2% Stabling line: 0.2% Turnout section: 0% 5 Platform length Total: 170 m Source: JICA Study Team All the design criteria are same as in Phase 1.
    [Show full text]
  • Egypt's Mega Projects
    MEGAPROJECTS IN EGYPT FLANDERS INVESTMENT & TRADE MARKET SURVEY Market Study /////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// EGYPT’S MEGA PROJECTS 1.12.2018 //////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////////// www.flandersinvestmentandtrade.com TABLE OF CONTENTS Introduction .............................................................................................................................................................................................. 3 1. Construction Projects ............................................................................................................................................................... 4 1.1 The New Administrative Capital 4 1.2 Al Galala City and Tourist Compound 5 1.3 Development of 10th of Ramadan City 6 1.4 The Northwest Coast Development Project 6 1.5 Damietta Furniture City 7 1.6 The Golden Triangle 7 1.7 The Grand Egyptian Museum 8 2. National power projects ........................................................................................................................................................ 9 2.1 El Dabaa Nuclear Power Plant 9 2.2 Jabal al-Zeit Wind Station 9 2.3 El Burullus Power Plant 10 2.4 Benban 1 Solar Plant 10 2.5 Beni Suef Combined Cycle Power Plant 11 2.6 New Capital Power Plant 11 2.7 New Assiut Barrage 12 2.8 Coal-Fired Power
    [Show full text]
  • Accessibility Impact Analysis of New Public Transit Projects in Cairo, Egypt
    Accessibility Impact Analysis of New Public Transit Projects in Cairo, Egypt By Adham Kalila B.Eng in Civil Engineering McGill University Montreal, Canada (2012) Master of Science in Transportation Massachusetts Institute of Technology Cambridge, Massachusetts (2018) Submitted to the Department of Urban Studies and Planning in partial fulfillment of the requirements for the degree of Master of Science in Urban Planning at the MASSACHUSETTS INSTITUTE OF TECHNOLOGY June 2019 © 2019 Adham Kalila. All Rights Reserved The author hereby grants to MIT the permission to reproduce and to distribute publicly paper and electronic copies of the thesis document in whole or in part in any medium now known or hereafter created. Author________________________________________________________________________ Department of Urban Studies and Planning 05/21/2019 Certified by____________________________________________________________________ Professor Sarah Williams Department of Urban Studies and Planning Thesis Supervisor Accepted by___________________________________________________________________ Professor of the Practice, Caesar McDowell Co-Chair, MCP Committee Department of Urban Studies and Planning Accessibility Impact Analysis of New Public Transit Projects in Cairo, Egypt By Adham Kalila Submitted to the Department of Urban Studies and Planning on May 21, 2019 in Partial Fulfillment of the Requirements for the Degree of Master of Science in Urban Planning Abstract The New Urban Communities (NUC), built around Cairo, developed to relieve congestion
    [Show full text]
  • Chapter 4 Urban Transportation Plan
    THE STRATEGIC URBAN DEVELOPMENT MASTER PLAN STUDY FOR A SUSTAINABLE DEVELOPMENT OF THE GREATER CAIRO REGION IN THE ARAB REPUBLIC OF EGYPT Final Report (Volume 2) CHAPTER 4 URBAN TRANSPORTATION PLAN 4.1 General Conditions of Urban Transportation 4.1.1 Existing Transportation Facilities (1) Railway 1) Metro The present urban railway network and urban railway transport services in the Greater Cairo area is shown in Figure 4.1.1 and Figure 4.1.2, respectively. The routes of Metro Line 1 and Metro Line 2 are also shown in Figure 4.1.1 and Figure 4.1.2. The location of the Metro Line 1 and Metro Line 2 stations is shown in Figure 4.1.1. Source: Edited based on Egyptian National Railways (hereafter ENR in this Chapter) data Figure 4.1.1 Urban Railway Network General Organization for Physical Planning Japan International Cooperation Agency Greater Cairo Region Urban Planning Center Nippon Koei Co., Ltd. Katahira & Engineers International 4-1 THE STRATEGIC URBAN DEVELOPMENT MASTER PLAN STUDY FOR A SUSTAINABLE DEVELOPMENT OF THE GREATER CAIRO REGION IN THE ARAB REPUBLIC OF EGYPT Final Report (Volume 2) Source: JICA Study Team, based on ENR data. Landsat image courtesy of USGS. Figure 4.1.2 Urban Railway Transport Service According to the recent data submitted by the Cairo Metro Organization (CMO) (hereafter referred to as CMO in this Chapter), as shown in Table 4.1.1, the average number of passengers per day between 05:15-24:15 amounted to 1.217 million on Metro Line 1 and 0.73 million on Metro Line 2 in 2005/2006.
    [Show full text]