SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for RO-RO jetty for Maharashtra Maritime Board (MMB) at Rewas General Information: 1.Name of Project Construction of new RO-RO jetty for Maharashtra Maritime Board (MMB) at Rewas 2.Type of institution Government 3.Name of Project Proponent Maharashtra Maritime Board (MMB) 4.Name of Consultant Ultra-tech Environmental Consultancy and Laboratory 5.Type of project Construction of new RO-RO jetty for Maharashtra Maritime Board (MMB) 6.New project/expansion in existing project/modernization/diversification New in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project located on the Revas Creek at latitude 18°49'17.89"N and longitude 72°56'48.21"E in Alibaug 8.Location of the project Tehsil of Raigad District, Maharashtra 9.Taluka 10.Village Mumbai 11.Area of the project MMB Municipal Corporation of Greater Mumbai 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Municipal Corporation of Greater Mumbai Approval Number Approved Built-up Area: 13.Note on the initiated work (If Not applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 300000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Passenger transport is envisaged users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 1 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Local body Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 2 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) Source of water Local body Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Fresh water 0 100 100 0 20 20 0 80 80 requireme nt Domestic 0 90 90 0 0 0 0 90 90 Gardening 0 10 10 0 0 0 0 0 0

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) SEIAA-AGENDA-0000000001Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : Budgetary allocation Not applicable (O & M cost) : Details of UGT tanks Not applicable if any :

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 3 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Sewage generation 170 in KLD: STP technology: Septic tank Capacity of STP 0 (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Rs. 1 Lakh (Capital cost): Budgetary allocation Rs. 20,000 per annum (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: 12.5 Kg/day the Pre Construction Disposal of the and Construction construction waste Landfilling phase: debris: Dry waste: 18 Kg/day Wet waste: 8Kg/day Hazardous waste: Negligible Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry 25 Kg/day sludge): Others if any: Not applicable Dry waste: Authorized agency Wet waste: Authorized agency Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Authorized agency sludge): Others if any: Not applicable SEIAA-AGENDA-0000000001Location(s): Not applicable Area Area for the storage of waste & other Not applicable requirement: material: Area for machinery: Not applicable Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 4 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 250kVA 41 Kg/Hr 1 3 250 180 degree celsius 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 HSD Not applicable HSD Not applicable 41.Source of Fuel Authorized agency 42.Mode of Transportation of fuel to site by road

Total RG area : Not applicable No of trees to be cut Not applicable : Number of trees to Not applicable 43.Green Belt be planted : Development List of proposed Given native trees : Timeline for completion of 6 months plantation : 44.NumberSEIAA-AGENDA-0000000001 and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 Mangifera Indica mango 5 fruit bearing tree 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 5 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) 47.Energy Source of power MSEDCL supply : During Construction Phase: (Demand 40 kVA Load) DG set as Power back-up during 40 kVA construction phase During Operation phase (Connected 250kVA load): Power During Operation requirement: phase (Demand -- load): Transformer: Not applicable DG set as Power back-up during 250kVA operation phase: Fuel used: HSD Details of high tension line passing Not any through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed DG 0 250 kVA DG set

Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number SEIAA-AGENDA-0000000001 1 Air monitoring 0.48 2 Water monitoring 0.60 3 Socio health check up, 1.8 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) Sewage Treatment 1 wastewater treatment 25.00 2.50 Plant

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 6 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) Regular Maintenance 2 container 00 3.00 of Vesssles Green Belt & 3 plantation 3.00 2.00 Horticulture 4 Housekeeping housekeeping 00 0.50 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Existing road is adequate design of confluence: Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: car parking is provided Area per car: car parking is provided Area per car: car parking is provided Number of 2- Wheelers as Parking details: approved by not applicable competent authority: Number of 4- Wheelers as approved by not applicable competent authority: Public Transport: Nearby transport facilities available Width of all Internal SEIAA-AGENDA-0000000001Not applicable roads (m): CRZ/ RRZ clearance Applied for CRZ clearance obtain, if any: Distance from Protected Areas / Critically Polluted Mangroves in vicinity of jetty areas / Eco-sensitive areas/ inter-State boundaries

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 7 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. PP to submit Rapid EIA for the project.

3. No construction in Mangroves or 50m Mangroves buffer zone is allowed.

4. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific ConditionsSEIAA-AGENDA-0000000001 by SEIAA:

1) PP informed that there will be no damage to mangroves area. FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 8 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed Construction of Residential Apartment Scheme at Plot No. 1 to 6, CTS No. 101, 154, 155 & 159, Sheet No. 227 & 233, Subhash Road, Nagpur, Maharashtra General Information: Proposed Construction of Residential Apartment Scheme at Plot No. 1 to 6, CTS No. 101, 154, 1.Name of Project 155 & 159, Sheet No. 227 & 233, Subhash Road, Nagpur, Maharashtra 2.Type of institution Government 3.Name of Project Proponent M/s. Nagpur Housing and Area Development Board (A MHADA Unit) 4.Name of Consultant M/s. Fine Envirotech Enginners 5.Type of project MHADA 6.New project/expansion in existing project/modernization/diversification New in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project Plot No. 1 to 6, CTS No. 101, 154, 155 & 159, Sheet No. 227 & 233, Subhash Road, Nagpur, 8.Location of the project Maharashtra. 9.Taluka Nagpur 10.Village Nagpur 11.Area of the project Nagpur Municipal Corporation Commencement Certificate 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: 65/bp/nagpur/TP/NMC/63,64 Dated 18/09.2014 Approval Number Approved Built-up Area: 114737.81 13.Note on the initiated work (If Total construction work completed till date is 4,9837.56 sq.mt. i.e. FSI – 2,1691.45 sq. m. and applicable) Non FSI – 2,8146.11 sq.mt. 14.LOI / NOC / IOD from MHADA/ Not Applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) 77535.00 16.Deductions 33310.66 17.Net Plot area 44224.34 a) FSI area (sq. m.): 114737.81 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): 86756.33 Non-FSI) c) Total BUA area (sq. m.): 201494.14 19.Total ground coverage (m2) 18268.66 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open 23.56 to sky) 21.Estimated cost of the project 2150000000 22.Number of buildings & its configuration Serial SEIAA-AGENDA-0000000001Building Name & number Number of floors Height of the building (Mtrs) number 1 HIG ( Exsisting) -3 Nos. B+S+10 32.75 2 MIG(Existing) 2 no. B+S+10 32.75 3 HIG 2 Nos. B+S+12 39.15 4 MIG I B+S+14 45.45 5 MIG II B+S+14 45.45 6 MIG III 2 Nos. B+S+15 48.60 7 MIG IV 2 Nos. B+S+16 51.25

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 9 of Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 205 (Chairman SEIAA) 8 MIG V B+S+16 51.25 9 HIG I 2Nos. B+S+25 78.50 10 MIG VI B+S+25 78.50 11 Club House G+1 7.0 12 Community Hall &Shopping G +2 10.5 23.Number of 1446 Tenements, 8 Shops tenants and shops 24.Number of expected residents / 7430 users 25.Tenant density 145 per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire 24 m station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all 9m, 12m,15m, 18m around the building excluding the width for the plantation 29.Existing 3 Buildings on Plot 5 & 6 structure (s) if any 30.Details of the demolition with Not Applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 10 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water NMC Fresh water (CMD): 655 Recycled water - 331 Flushing (CMD): Recycled water - 57 Gardening (CMD): Swimming pool 210 make up (Cum): Dry season: Total Water Requirement (CMD) 1043 : Fire fighting - Underground water 600 tank(CMD): Fire fighting - Overhead water Not Applicable tank(CMD): Excess treated water 321 Source of water NMC Fresh water (CMD): 655 Recycled water - 331 Flushing (CMD): Recycled water - 00 Gardening (CMD): Swimming pool 210 make up (Cum): Wet season: Total Water Requirement (CMD) 986 : Fire fighting - Underground water 600 tank(CMD): Fire fighting - Overhead water Not Applicable tank(CMD): Excess treated water 378 • Dimension of swimming Pool:12.8x7.75 • Total water Requirement in KL:210 KLD• WaterrequirementformakeupinKLD:20KLD• Details of Plant & Machinery used for treatment of Swimming pool water: Pressure sand filter to filters the suspended solids from pool water. Pump Details of Swimming to circulate water throughout circulation system• Details of quality to be achieved for swimming pool (If any) pool water and parameters to be monitored: Water has to be clear and free from suspended solids and chemically balanced should have proper pH and enough disinfectant to prevent algae and bacteria growth. Turbidity : less than 5 NTUpH between: 7.2-7.6 SEIAA-AGENDA-000000000133.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 11 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Level of the Ground 3-5 mt water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 8 nos of pits pits: Size of recharge pits 1.5 x 1.5 m : 34.Rain Water Budgetary allocation Harvesting 28 Lakhs (RWH) (Capital cost) : Budgetary allocation 5 Lakhs (O & M cost) : Residential& Commercial: Residential: Domestic UG tank Capacity: 18 tanks of combined capacity of 328.1 cum Details of UGT tanks Flushing UG tank Capacity: 7 tanks of combined capacity of 165.9 cum if any : Fire UG tank Capacity: 7 tanks of combined capacity of 600 cum Commercial: Domestic UG tank Capacity: 2 tanks of combined capacity of 4 cum Flushing UG tank Capacity: 2 tank of capacity 4 cum Fire UG tank Capacity: NA

Natural water Surface drainage connected to RWH pits drainage pattern: 35.Storm water Quantity of storm 0.42 CUM/Sec drainage water: Size of SWD: 1050 mm wide

Sewage generation 788 in KLD: STP technology: MBBR Capacity of STP 2 nOS OF 400 KLD (CMD): Sewage and Location & area of Ground Floor - Open Area Waste water the STP: Budgetary allocation 150 Lakhs (Capital cost): Budgetary allocation 28 Lakhs SEIAA-AGENDA-0000000001(O & M cost): 36.Solid waste Management Waste will be generated during Excavation and other construction Waste generation: Waste generation in activities the Pre Construction and Construction Disposal of the phase: construction waste To be disposed by handing over to authorized contractor/recycler. debris: Dry waste: 1486 kg/Day Wet waste: 2489 Kg./Day Hazardous waste: Not Applicable Waste generation Biomedical waste (If in the operation Not Applicable Phase: applicable): STP Sludge (Dry 90Kg./ay Shri Satish.M.Gavai sludge): SEIAA Meeting No: SEIAA meeting no 108 Page 12 Shri. Anand Kulkarni (Member Secretary SEIAA)Others if any: Meeting NotDate: Applicable April 7, 2017 of 205 (Chairman SEIAA) Dry waste: Will be given to authorized recycler. Will be composed in Mechanical Waste Composter and compost will be Wet waste: used as manure for gardening Hazardous waste: Not Applicable Mode of Disposal Biomedical waste (If of waste: Not Applicable applicable): STP Sludge (Dry Will be used as manure for gardening sludge): Others if any: Not applicable Location(s): Open Space

Area Area for the storage of waste & other 147 Sq.mt. requirement: material: Area for machinery: 270 Sq. Mt. Budgetary allocation Capital cost: 5000000 (Capital cost and O&M cost): O & M cost: 1140000 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases SEIAA-AGENDA-0000000001(m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 13 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Total RG area : 8111.22 sq. mt. + 2814.52 sq.mt = 10925.74 sq.mt No of trees to be cut nil : Number of trees to 1165 43.Green Belt be planted : Development List of proposed Neem, Shrish Sita Asok,Apta native trees : Timeline for completion of 3 Years plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 Pongamia pinnata Karanj 38 Shady tree Fast growing tree with beautiful 2 Gmelina arborea Shivam 77 yellow flowers 3 Putranjiva roxburghii Putranjiva 34 Medium sized evergreen tree Large tree, good for roadside 4 Azadiracta indica Neem 41 plantation Medium sized evergreen tree, 5 Michelia champaca Sonchapha 28 fragrant yellow flowers, Butterfly host plant Shady tree,good for roadside 6 Ficus retusa Nandurk 30 plantation Shady tree, good for roadside 7 Butea Monosperma Palas 32 plantation Shady tree, good for roadside 8 Albizzia lebbek Shirish 49 plantation Nyctanthes rrbor- Shady tree, yellowish green 9 Parijatak 176 tristis fragrant flowers Small deciduous fast growing tree, 10 Bauhinea purpurea Kanchan 34 beautiful flowers. Small to medium-sized deciduous 11 Cassia fistula Bhava 29 fast-growing shrub or tree Medium sized deciduous tree. 12 Bombax ceiba savar 73 Beautiful yellow flowers, Butterfly host plant 13 Erythrina indica Pangara 41 Large tree, red flowers Anthoceohallus Medium sized deciduous tree. 14 Kadamb 32 kadamb Bright scarlet flowers Small tree, Fragrant white flowers, 15 MurrayaSEIAA-AGENDA-0000000001 paniculata Kunti 43 Butterfly host plant 16 Seracaasoka Sita Ashok 36 Shady tree with red-yellow flowers Shady tree, small white fragrant 17 Minusops elengi Bakul 47 flowers 18 Termillia cuniata Arjun 39 Large evergreen tree Small tree with small white 19 Bauhinita recemosa Apta 43 flowers, Butterfly host plant 20 Plumeria alba Champa 27 Small flowering Tree

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 14 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Good for Hedge, flowers attract 21 Vitex negundo Nirgudi 25 butterflies & moths Ornamental, flowers attract 22 Stachytarpheta sp Stachytarpheta 42 butterflies 23 Acrus sapota Chikko 30 Fruit Beraing Tree 24 Annona squamosa Sitaphal 30 Fruit Beraing Tree 25 Mangifera india Mango 34 Fruit Beraing Tree 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy Source of power MSEDCL supply : During Construction Phase: (Demand 200 KW Load) DG set as Power back-up during 150 KVA construction phase During Operation phase (Connected 7090 KW load): Power During Operation requirement: phase (Demand 2836 KW load): Transformer: .... DG set as Power back-up during 200 kVA x 4 Nos. and 250 Kva X 2 Nos. operation phase: Fuel used: Deisel Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: Common area lighting and lifts 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number SEIAA-AGENDA-0000000001 Total Load of Common Services i.e. Lighting and Lifts with Conventional fixtures Total Tube Lights = 2667 Nos Electrical Load with 40w Tube Light = 106.68 kw Total Lift Load with Conventional ON OFF Drive = 24 Lifts x 11.5 kw = 276 kw Total Load of Common 1 33.6 area Lighting and Lifts = 382.68 kw Total Load of Common Services i.e. Lighting and Lifts with Energy efficient fixtures Total Tube Lights = 2667 Nos Electrical Load with 40w Tube Light = 74.676 kw Total Lift Load with Conventional ON

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 15 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not applicable Not applicable applicable

Budgetary allocation Capital cost: 550 Lakhs (Capital cost and O&M cost): O & M cost: 30 Lakhs 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 Mobile STP Water 02 Environmental Air, Noise, Water, 2 06 Monitoring Biological 3 SWM Waste 02 4 HST Training 7.5 5 Mitigation measures ... 4 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 2 STP of capacity 400 1 STP 150 28 KLD 2 RWH RWH pits 28 05 Environmental Air, Noise, Water, 3 ... 08 Monitoring Biological Green belt Area - 10925.74 sq.mt. 4 30 08 Developement and Trees-1165 nos. 5 SWM 2.5 T capacity of OWC 50 11.4 Energy saving 6 LED lights 550 30 measures 7 HST ...... 7 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of SEIAA-AGENDA-0000000001time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 16 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Nos. of the junction to the main road & Separate exit and entry points design of confluence: Number and area of One Basement , area -18332.64 sq.mt basement: Number and area of NA podia: Total Parking area: 34248.2 sq.mt. Area per car: Basement - 35.12 sq.mt, Stilt - 30.67 sq.mt , Open parking - 26.85 sq.mt Area per car: Basement - 35.12 sq.mt, Stilt - 30.67 sq.mt , Open parking - 26.85 sq.mt Number of 2- Wheelers as Parking details: approved by 1495 nos. competent authority: Number of 4- Wheelers as approved by 1056 nos. competent authority: Public Transport: On external area public transport is fully developed. Width of all Internal 9m, 12m, 15m and 18 m roads (m): CRZ/ RRZ clearance NOT APPLICABLE obtain, if any: Distance from Protected Areas / Critically Polluted NOT APPLICABLE areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA 8 (b) Notification sheet Court cases pending Court order issued by Judicial Magistrate - First Class ,Dist.- Nagpur

if any (13066 of 2015) Other Relevant Not Applicable Informations Have you previously submitted No Application online on MOEF Website. Date of online - SEIAA-AGENDA-0000000001submission Brief information of the project by SEAC DECISION OF SEAC

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 17 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEAC3 recommended the proposal for prior Enviornment Clearence in its 47th meeting subject to complaince of following conditions:

1. PP informed that they have obtained full potential sanction.

2. PP was unable to explain the slope of ramp is 1:10; SEIAA may verify the same.

3. PP to provide ventilation duct through the slab for better ventilation and illumination in basement; PP has not complied with the suggestions made during site visit.

4. PP to submit cross section of UGT showing road.

5. PP to obtain and submit drainage connection NOC.

6. PP has proposes STP having area 440 SQ.M and DG set in open space; PP to submit copy of DCR allowing both the services in open space.

7. PP informed that they have established environment monitoring cell but it seems that cell is not in existence; PP to submit documents related to its establishment.

8. PP to cover ramps exposed outside to prevent ingress of water to the basement during monsoon.

9. Traffic impact study indicates that V/C ratio will be 1.30 will be increased to 1.48 in future. PP has not suggested detailed mitigation measures with drawings to relief traffic congestion surrounding road due to the development; PP to submit the same.

10. PP to submit undertaking stating that they will provide fire hydrant system.

11. PP to provide mandatorySEIAA-AGENDA-0000000001 RG area on virgin land and submit the drawing/master plan with calculations.

SEAC decided to recommend the proposal for Prior Environmental Clearance, subject to PP complying with the above conditions.

Specific Conditions by SEAC: SEIAA DECISION

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 18 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) The proposal was earlier considered in 103rd Meeting of SEIAA and deliberated the issues of breach of provisions contained under section 5 of the Environment (Protection) Act, 1986. It was noted that as a Criminal case has been filed bearing No. 303067/2015 as the required prior environmental clearance has not been obtained by the PP before commencement of of the construction.

In 108th meeting of SEIAA PP submitted the copy of order of the court of Judicial Magistarte First Class, Nagpur dated: 01/04/2017 where in court has discarged the accused. Hence proposal was appraised.

SEIAA decided to recommed the proposal for approval subject to conditions imposed by SEAC III.

Specific Conditions by SEIAA: FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 19 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposal For CRZ Clearance For the METRO III Project of MMRCL(colaba to SEEPZ) for Vidhan Bhavan, BKC, Dharavi metro station and allied activities.Details given in form 1 of CRZ notification 2011 General Information: 1.Name of Project Vidhan Bhavan, BKC, Dharavi metro station and allied activities. 2.Type of institution Government 3.Name of Project Proponent Mumbai Metro Rail Corporation Limited 4.Name of Consultant NA 5.Type of project Transport infrastructure project 6.New project/expansion in existing project/modernization/diversification New project in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Mumbai & Mumbai Sub-urban district 9.Taluka Bandra 10.Village - 11.Area of the project 58,768 mtsq NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) 58,768 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 13040000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number SEIAA-AGENDA-0000000001 1 Not applicable Not applicable NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users 25.Tenant density NA per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 20 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 21 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic NA 0 0 NA NA NA NA 0 0

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation NA (Capital cost) : Budgetary allocation NA SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water NA drainage pattern: 35.Storm water Quantity of storm NA drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 22 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: 400 kg/day the Pre Construction Disposal of the and Construction construction waste authorised locations phase: debris: Dry waste: 250 kg/day MSW combined Wet waste: 250 kg/day MSW combined Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: MCGM Wet waste: MCGM Hazardous waste: Authorised agency Mode of Disposal Biomedical waste (If Authorised agency of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 23 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 Used oil, oil filters 5.1 NA NA NA NA Authorised agency 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 24 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power TATA Power supply : During Construction Phase: (Demand NA Load) DG set as Power back-up during NA construction phase During Operation phase (Connected NA load): Power During Operation requirement: phase (Demand NA load): Transformer: NA DG set as Power back-up during NA operation phase: Fuel used: NA Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: NA 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 NA NA 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: NA (Capital cost and O&M cost): O & M cost: NA 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001NA NA NA b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 NA NA NA NA 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 25 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted NA areas / Eco-sensitive areas/ inter-State boundaries SEIAA-AGENDA-0000000001Category as per schedule of EIA NA Notification sheet Court cases pending NA if any Other Relevant CRZ Application for Vidhan Bhavan, BKC, Dharavi station and allied

Informations activities. Have you previously submitted No Application online on MOEF Website.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 26 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 27 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 114th meeting subject to complaince of following conditions:

1. Proposed construction should be in accordance with provisions of CRZ Notification,2011(amended from time to time)

2. CRZ areas under consideration for proposed activities should be restored post construction.

3. MMRCL to implement recommendation given in the EIA report for the project during construction and operation phase. Further, Environment Management Plan and Disaster Management Plan should be implemented in letter and spirit.

4. No mangroves should be cut for the construction of underground stations and allied activities at BKC and Dharavi.

5. Since CRZ I(A) area under consideration for the proposed activities has been declared as protected forest, prior permission from concern Forest Authorities should be obtained.

6. Mangroves replantation should be undertaken by the MMRCL in consultation with the Mangroves Cell. Further, during construction, mangroves cell should be consulted to ensure measures to avoid damage to the mangroves area.

7. Prior High Court permission should be obtained, since the underground stations are proposed in CRZ I (A) i.e. Mangroves area, as per the orders passed by the Hon. High Court in PIL 87/2006 and WP No. 3246/2004.

8. PP to ensure that noise levels are within the prescribed limits and no construction should be undertaken during night hours. Noise mufflers and noise silencers on machines, noise barriers etc. should be installed during construction and operation phase.

9. Environment Management Plan should be implemented during construction and operation phase of the project

10. PP to ensure that proper disaster management plans is in place for the proposed activities.

11. Appropriate measures should be undertaken to avoid saline ingression beyond CRZ area, in consultation with expert in the field.

12. MMRCL to ensure that Muck transport should be done within 74 hours from the site. It should be ensured that muck is not stored in CRZ area.

13. All other required permissions from different statutory authorities should be obtained.

14. Control blasting, if any, should be undertaken with the prior approval of competent Authority, to ensure minimum impact in Coastal ecosystem and structures in surrounding area.

15. Dust suppression measures should be implemented during construction phase of the project.

SEIAA decided to recommend proposal for approval.

Specific ConditionsSEIAA-AGENDA-0000000001 by SEIAA: 1) PP submitted the copy of recommendation obtained from mangrooves cell for cutting of mangrooves in proposed project 2) PP to submit an undertaking for compliance of amended conditions mentioned in 115th meeting of MCZMA FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 28 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed Inland Water Transport along East Coast of Mumbai. General Information: 1.Name of Project Proposed Inland Water Transport along East Coast of Mumbai. 2.Type of institution Government 3.Name of Project Proponent Maharashtra Maritime Board 4.Name of Consultant ultratech 5.Type of project Not applicable 6.New project/expansion in existing project/modernization/diversification Proposed Inland Water Transport in existing project 7.If expansion/diversification, whether environmental clearance New. Amendment in EC has been obtained for existing project 8.Location of the project Ferry Wharf (Bhaucha Dhakka), Nerul and Mandwa 9.Taluka Mumbai, Thane and 10.Village Mumbai City, Nerul and Mandwa Mayor – Municipal Corporation of Greater Mumbai Head Quarter, Mumbai CST, 400001,Mayor – Navi Mumbai Municipal Corporation Plot No. 1, Sector- 15A, Palm Beach Junction, Belapur, Navi 11.Area of the project Mumbai, Pin: 400614,Sarpanch – Sasawane Group Village Panchayat Sasawane, Mandwa Pin: 402201 Mayor – Municipal Corporation of Greater Mumbai Head Quarter, Mumbai CST, 400001 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Mayor – Municipal Corporation of Greater Approval Number Mumbai Head Quarter, Mumbai CST, 400001 Approved Built-up Area: 1130 13.Note on the initiated work (If NO applicable) 14.LOI / NOC / IOD from MHADA/ Not Applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) 1600 16.Deductions Not applicable 17.Net Plot area 1600 a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 631500000 SEIAA-AGENDA-000000000122.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 Terminal and Utilities Area Ground 5 23.Number of Not applicable tenants and shops 24.Number of expected residents / Only passenger transport is envisaged. users 25.Tenant density Not applicable per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 29 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Local body Fresh water (CMD): 10 Recycled water - 8 Flushing (CMD): Recycled water - 10 Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) 23 : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water 0

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 30 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Local body Fresh water (CMD): 10 Recycled water - 8 Flushing (CMD): Recycled water - 0 Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) 18 : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water 0 Details of Swimming Not applicableNot applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not applicable (O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 31 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation 20 in KLD: STP technology: septic Capacity of STP 25 (CMD): Sewage and Location & area of 10 Waste water the STP: Budgetary allocation 5 (Capital cost): Budgetary allocation 1 (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: 25 the Pre Construction Disposal of the and Construction construction waste filling phase: debris: Dry waste: 20 Wet waste: 10 Hazardous waste: Negligible Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry 5 sludge): Others if any: NA Dry waste: sent to local body Wet waste: sent to local body Hazardous waste: sent to local body Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry used as manure sludge): Others if any: Not applicable Location(s): Not applicable

Area Area for the storage of waste & other Not applicable requirement: material: Area for machinery: Not applicable Budgetary allocation Capital cost: Not applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 32 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Total RG area : 500m2 No of trees to be cut 0 : Number of trees to 25 43.Green Belt be planted : Development List of proposed 25 native trees : Timeline for completion of 6 months plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 MangiferaSEIAA-AGENDA-0000000001 indica mango 10 fruit bearing evergreen tree 2 Ashoka longifolia Ashok 15 evergreen tree 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 33 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power MSEDCL supply : During Construction Phase: (Demand 10KVA Load) DG set as Power back-up during 20KVA construction phase During Operation phase (Connected 160KVA load): Power During Operation requirement: phase (Demand Not applicable load): Transformer: Not applicable DG set as Power back-up during 100KVA operation phase: Fuel used: HSD Details of high tension line passing Not applicable through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not applicable STP applicable

Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number SEIAA-AGENDA-0000000001Water For Dust 1 Air Environment Suppression Air & 0.8 Noise monitoring 2 Water Environment Water monitoring 0.6 Disinfection- Pest Control First Aid Socio- Economic Facilities Health 3 7.65 Environment Check Up Creche for children Personal protective equipment

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 34 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) Sewage Treatment 1 waste water 25 2.5 Plant Regular Maintenance Regular Maintenance 2 3.0 of Vesssles of Vesssles Green Belt & Green Belt & 3 2.0 Horticulture Horticulture 4 Housekeeping Housekeeping 0.50 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Traffic study at Thane - Belapur road and NH17 design of confluence: Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: 500m2 Area per car: 20 Area per car: 20 Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: SEIAA-AGENDA-0000000001Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: by buss Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance Applied for CRZ clerance obtain, if any:

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 35 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Distance from Protected Areas / Critically Polluted Not applicable areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC

DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 113th meeting subject to complaince of following conditions:

1. MMB should ensure that proposed activties in CRZ areas are as per provisions of CRZ Notification, 2011 (amended time to time).

2. MMB to ensure the complaince of all condition stipulated in the Environmental & CRZ Clearance granted by MoEF on 7.5.2013.

3. MMB to ensure that all protective and conservative measures are taken up for protection of Mandwa Beach. Mudflats and sand dunes should not be reclaimed. MMB to strictly ensure that there should not be loss of Mandwa Beach (i.e. CRZ I area) due proposed activities.

4. MMB to ensure that local fishing activities should not be hampered due to the proposed activities.

5. All other required permissions should be obtained before the commencement of the project. SEIAA decided toSEIAA-AGENDA-0000000001 recommend proposal for approval. Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activity FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 36 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed construction of RO-RO jetty (Vasai-Bhayandar) Dist. Palghar General Information: 1.Name of Project Proposed construction of Ferry Jetty at Marve, Mumbai Suburban by MMB 2.Type of institution Government 3.Name of Project Proponent Maharashtra Maritime Board 4.Name of Consultant STUP Consultants Pvt. Ltd. 5.Type of project Others 6.New project/expansion in existing project/modernization/diversification New in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project 55, 57 9.Taluka Vasai and Thane 10.Village Vasai and Bhayandar 11.Area of the project Municipal Corporation of Vasai-Virar and Mira-Bhayandar NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 0.0 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) NA 16.Deductions NA 17.Net Plot area NA a) FSI area (sq. m.): NA 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): NA Non-FSI) c) Total BUA area (sq. m.): NA 19.Total ground coverage (m2) NA 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open NA to sky) 21.Estimated cost of the project 10 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001NA NA NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users 25.Tenant density NA per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 37 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 38 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic NA NA NA NA NA NA NA NA NA

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation NA (Capital cost) : Budgetary allocation NA SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water Storm water drainage are provided to chanellise the storm water drainage pattern: 35.Storm water Quantity of storm 2 cubic meter per hour drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 39 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: NA the Pre Construction Disposal of the and Construction construction waste NA phase: debris: Dry waste: 120 Kg per day Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: NA Wet waste: NA Hazardous waste: NA Mode of Disposal Biomedical waste (If NA of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 40 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 NA NA NA NA NA NA NA 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 41 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power DG Set supply : During Construction Phase: (Demand 10 Kwh Load) DG set as Power back-up during 3 construction phase During Operation phase (Connected 10 Kwh load): Power During Operation requirement: phase (Demand 12 kwh load): Transformer: NA DG set as Power back-up during 2 operation phase: Fuel used: Diesel Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: Solar panel will be used for lighting 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 SPV Panel 4% 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: 5 crore (Capital cost and O&M cost): O & M cost: 5 lacs per year 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number pH, BOD, COD, TDS, 1 Water Environment 5 SEIAA-AGENDA-0000000001TSS, DO, NO2, NO3 SOx, NOx, CO, CO2, 2 Air Environment 8 HC b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) parameter to be monitored: pH, BOD, 1 Water Environment 5 lacs 5 Lacs COD, TDS, TSS, DO, NO2, NO3

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 42 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted SEIAA-AGENDA-000000000112 Km areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA 7(e) Notification sheet Court cases pending NA if any Other Relevant Not Applicable Informations

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 43 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 113th meeting subject to complaince of following conditions:

1. PP should ensure that proposed activties in CRZ areas are as per provisions of CRZ Notification, 2011 (amended time to time).

2. MMB should ensure that minimum mangrove vegetation is affected due to proposed jetty. Further, tidal flow of creek water should not be disturbed.

3. MMB to ensure that no road construction is allowed in CRZ I i.e. mangroves area.

4. MMB to ensure that construction debris should not be disposed in CRZ area.

5. MMB to obtain prior High Court permission, since the project involves destruction of mangoves.

6. All other required permissions should be obtained before the commencement of the project.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA: FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 44 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed extension and repairs of existing Jetty at Divagaon, Tal. Airoli, Dist. Thane by MMB General Information: 1.Name of Project Proposed extension and repairs of existing Jetty at Divagaon, Tal. Airoli, Dist. Thane by MMB 2.Type of institution Government 3.Name of Project Proponent Maharashtra Maritime Board 4.Name of Consultant NA 5.Type of project Others 6.New project/expansion in existing project/modernization/diversification Proposed extension and repairs of existing Jetty at Divagaon, Tal. Airoli, Dist. Thane by MMB in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Divagaon 9.Taluka Thane 10.Village Divagaon Airoli 11.Area of the project Municipal Corporation of Vasai-Virar and Mira-Bhayandar NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 0.0 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) NA 16.Deductions NA 17.Net Plot area NA a) FSI area (sq. m.): NA 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): NA Non-FSI) c) Total BUA area (sq. m.): NA 19.Total ground coverage (m2) NA 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open NA to sky) 21.Estimated cost of the project 10 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number SEIAA-AGENDA-0000000001 1 NA NA NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users 25.Tenant density NA per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 45 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 46 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic NA NA NA NA NA NA NA NA NA

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation NA (Capital cost) : Budgetary allocation NA SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water Storm water drainage are provided to chanellise the storm water drainage pattern: 35.Storm water Quantity of storm 2 cubic meter per hour drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 47 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: NA the Pre Construction Disposal of the and Construction construction waste NA phase: debris: Dry waste: 120 Kg per day Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: NA Wet waste: NA Hazardous waste: NA Mode of Disposal Biomedical waste (If NA of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 48 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 NA NA NA NA NA NA NA 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 49 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power DG Set supply : During Construction Phase: (Demand 10 Kwh Load) DG set as Power back-up during 3 construction phase During Operation phase (Connected 10 Kwh load): Power During Operation requirement: phase (Demand 12 kwh load): Transformer: NA DG set as Power back-up during 2 operation phase: Fuel used: Diesel Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: Solar panel will be used for lighting 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 SPV Panel 4% 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: 5 crore (Capital cost and O&M cost): O & M cost: 5 lacs per year 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number pH, BOD, COD, TDS, 1 Water Environment 5 SEIAA-AGENDA-0000000001TSS, DO, NO2, NO3 SOx, NOx, CO, CO2, 2 Air Environment 8 HC b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) parameter to be monitored: pH, BOD, 1 Water Environment 5 lacs 5 Lacs COD, TDS, TSS, DO, NO2, NO3

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 50 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted SEIAA-AGENDA-000000000112 Km areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA 7(e) Notification sheet Court cases pending NA if any Other Relevant NA Informations

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 51 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. No mangroves should be cut for the extension of the jetty

3. Extension of the jetty should be on pile, so that natural flow of coastal water body will not be hampered.

4. Hon. High Court permission should be obtained, if the proposed activity is situated within 50 m mangroves buffer zone area.

5. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities SEIAA-AGENDA-0000000001FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 52 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for CRZ clearance for Construction of 30 M Wide D. P. Road with drains from Diva-Shil Road to Agasan Railway Crossing by THANE MUNICIPAL CORPORATION General Information: CRZ clearance for Construction of 30 M Wide D. P. Road with drains from Diva-Shil Road to 1.Name of Project Agasan Railway Crossing by THANE MUNICIPAL CORPORATION 2.Type of institution Government 3.Name of Project Proponent Sunil Chavan 4.Name of Consultant Dr. D. A. Patil 5.Type of project Not applicable 6.New project/expansion in existing project/modernization/diversification Not applicable in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project Dativali village – S. Nos.27(pt),29(pt), 31/1(pt),73(pt),74(pt),86(pt),95(pt),96(pt), 98(pt), 126(pt), 8.Location of the project 131(pt), 135(pt),136(pt), 139(pt), 140(pt), 232(pt), 235(pt), 244(pt), 258(pt) Agasan Village - S.Nos.124(pt), 140(pt), 141(pt),146(pt),164(pt),167(pt) 9.Taluka Thane 10.Village Dhativali & Agasan village 11.Area of the project THANE MUNICIPAL CORPORATION As per DP plan 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: As per DP plan of TMC Approval Number Approved Built-up Area: 55825.00 13.Note on the initiated work (If Not applicable applicable) 14.LOI / NOC / IOD from MHADA/ As per DP plan of TMC Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 710000000 SEIAA-AGENDA-000000000122.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 Not applicable Not applicable Not applicable 2 Not applicable Not applicable Not applicable Certain patches of the above land falls in CRZ- I(ii) & CRZ -III as per approved CZMP of Thane 23.Number of and it attracts provisions of CRZ Notification 2011. tenants and shops The Total length of the road alignment is 2,175 m out of this 580.6 m is affected by the CRZ I(ii) and 204 m is affected by CRZ III. (Marked in layout)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 53 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Existing 7-15 m wide Road & proposed 30 m wide DP road station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable SEIAA-AGENDA-0000000001tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 54 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not applicable (O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 55 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not applicable in KLD: STP technology: Not applicable Capacity of STP Not applicable (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Not applicable (Capital cost): Budgetary allocation Not applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: Construction of Road project will generate the Pre Construction Disposal of the and Construction construction waste As per District collector guidelines phase: debris: Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Location(s): Not applicable

Area Area for the storage of waste & other Not applicable requirement: material: Area for machinery: Not applicable Budgetary allocation Capital cost: Not applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 56 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Total RG area : Not applicable No of trees to be cut Not applicable : Number of trees to Not applicable 43.Green Belt be planted : Development List of proposed Not applicable native trees : Timeline for completion of Not applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable Not applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 57 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power Not applicable supply : During Construction Phase: (Demand Not applicable Load) DG set as Power back-up during Not applicable construction phase During Operation phase (Connected Not applicable load): Power During Operation requirement: phase (Demand Not applicable load): Transformer: Not applicable DG set as Power back-up during Not applicable operation phase: Fuel used: Not applicable Details of high tension line passing Not applicable through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not applicable Not applicable applicable

Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not applicable Not applicable Not applicable Not applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 58 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence: Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance Project was consider in 113th MCZMA Meeting Item No. 102, Date :

obtain, if any: 09.08.2016. As per the MoM project is recommended to SEIAA. Distance from Protected Areas / Certain patches of the above land falls in CRZ- I(ii) & CRZ -III as per Critically Polluted approved CZMP of Thane and it attracts provisions of CRZ Notification areas / Eco-sensitive 2011. areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 59 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Thane Municipal Corporation (TMC) is proposing for widening of existing road to 30 M Wide (as per DP) Road with drains from Diva-Shil Road to Agasan Railway Crossing at Dativali village – S. Nos.27(pt), 29(pt), 31/1(pt), 73(pt), 74(pt), 86(pt), 95(pt), 96(pt), 98(pt), 126(pt), 131(pt), 135(pt), 136(pt), 139(pt), 140(pt), 232(pt), 235(pt), 244(pt), 258(pt), Agasan Village -S.Nos.124(pt), 140(pt), 141(pt), 146(pt), 164(pt), 167(pt). Certain patches of the above land falls in CRZ- I(ii) & Other Relevant CRZ -III as per approved CZMP of Thane and it attracts provisions of Informations CRZ Notification 2011. The Proposal is also “In Principally” approved by Hon’ble Municipal Commissioner of TMC on Dt.19/3/2014, subject to approval from MCZMA.Cost of the proposed project is Rs. 71.70 CrAlong the two sides of the road, 1.2 m wide X 1.5 m deep drains are proposed.The Total length of the road alignment is 2,175 m out of this 580.6 m is affected by the CRZ I(ii) and 204 m is affected by CRZ III. (Marked in layout) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 113th meeting subject to complaince of following conditions:

1. PP should ensure that proposed activties in CRZ areas are as per provisions of CRZ Notification, 2011 (amended time to time).

2. PP should ensure that proposed road should be constructed on landward side the existing road only.

3. PP to ensure than construction should be beyond 50 meter mangroves buffer zone.

4. All other requiredSEIAA-AGENDA-0000000001 permissions should be obtained before the commencement of the project.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 60 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 61 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for CRZ clearance for Proposed construction of 30 M W D.P. Road with drains from NH-4 to Hospital reservation on plot bearing S. No. 15B v(pt), 40A(pt), 51A(pt), 53 (pt), 54 (pt), 55(pt), 66A(pt), 67(pt). 68A (pt), 115(pt), 117A(pt), 118A(pt), 118B(pt), Village Mumbra, Thane by Thane Municipal Corporation General Information: CRZ clearance for Proposed construction of 30 M W D.P. Road with drains from NH-4 to Hospital reservation on plot bearing S. No. 15B v(pt), 40A(pt), 51A(pt), 53 (pt), 54 (pt), 55(pt), 1.Name of Project 66A(pt), 67(pt). 68A (pt), 115(pt), 117A(pt), 118A(pt), 118B(pt), Village Mumbra, Thane by Thane Municipal Corporation 2.Type of institution Government 3.Name of Project Proponent Sunil Chavan - Additional Commissioner of TMC 4.Name of Consultant Dr. D. A. Patil 5.Type of project Not applicable 6.New project/expansion in existing project/modernization/diversification Not applicable in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project S. No. 15B v(pt), 40A(pt), 51A(pt), 53 (pt), 54 (pt), 55(pt), 66A(pt), 67(pt). 68A (pt), 115(pt), 8.Location of the project 117A(pt), 118A(pt), 118B(pt) 9.Taluka Thane 10.Village Mumbra 11.Area of the project Thane Municipal corporation As per DP of Thane Municipal corporation 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: As per DP of Thane Municipal corporation Approval Number Approved Built-up Area: 10000 13.Note on the initiated work (If As per DP of Thane Municipal corporation applicable) 14.LOI / NOC / IOD from MHADA/ As per DP of Thane Municipal corporation Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated costSEIAA-AGENDA-0000000001 of the project 70000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 62 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 25.Tenant density Not applicable per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Existing 7-8 m wide & proposed 30 m wide as per DP of TMC station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable SEIAA-AGENDA-0000000001tank(CMD): Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 63 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Not Not Not Not Not Not Not Not Not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not applicable (O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 64 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not applicable in KLD: STP technology: Not applicable Capacity of STP Not applicable (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Not applicable (Capital cost): Budgetary allocation Not applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: Not applicable the Pre Construction Disposal of the and Construction construction waste Not applicable phase: debris: Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Location(s): Not applicable

Area Area for the storage of waste & other Not applicable requirement: material: Area for machinery: Not applicable Budgetary allocation Capital cost: Not applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 65 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Total RG area : Not applicable No of trees to be cut Not applicable : Number of trees to Not applicable 43.Green Belt be planted : Development List of proposed Not applicable native trees : Timeline for completion of Not applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable Not applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 66 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power Not applicable supply : During Construction Phase: (Demand Not applicable Load) DG set as Power back-up during Not applicable construction phase During Operation phase (Connected Not applicable load): Power During Operation requirement: phase (Demand Not applicable load): Transformer: Not applicable DG set as Power back-up during Not applicable operation phase: Fuel used: Not applicable Details of high tension line passing Not applicable through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not applicable Not applicable applicable

Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not applicable Not applicable Not applicable Not applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 67 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence: Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance Not applicable obtain, if any: Distance from Protected Areas / Critically Polluted Not applicable areas / Eco-sensitive areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 68 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 113th meeting subject to complaince of following conditions:

1. PP should ensure that proposed activties in CRZ areas are as per provisions of CRZ Notification, 2011 (amended time to time).

2. PP should restore the site after construction of DP road. Debris generated during construction phase should not be disposed in CRZ area.

3. PP to obtain the prior High Court permission, if the proposed DP road affect mangroves vegetation or its 50 m buffer zone.

4. All other required permissions should be obtained before the commencement of the project.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities SEIAA-AGENDA-0000000001FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 69 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed ferry jetty at Manori Mumbai Sub urban General Information: 1.Name of Project Proposed ferry jetty at Manori Mumbai Sub urban 2.Type of institution Government 3.Name of Project Proponent Maharashtra Maritime Board 4.Name of Consultant STUP Consultants Pvt. Ltd. 5.Type of project Others 6.New project/expansion in existing project/modernization/diversification New Project in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project 34, 35 9.Taluka Mumbai Suburban 10.Village Manori 11.Area of the project MCGM NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 0.0 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) NA 16.Deductions NA 17.Net Plot area NA a) FSI area (sq. m.): NA 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): NA Non-FSI) c) Total BUA area (sq. m.): NA 19.Total ground coverage (m2) NA 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open NA to sky) 21.Estimated cost of the project 58000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001NA NA NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users 25.Tenant density NA per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 70 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 71 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA Details of Swimming NA pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 2.0 4,0 6.0 1.0 2.0 3.0 NA NA NA

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation 0.0 (Capital cost) : Budgetary allocation 0.0 SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water NA drainage pattern: 35.Storm water Quantity of storm NA drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 72 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: NA the Pre Construction Disposal of the and Construction construction waste NA phase: debris: Dry waste: NA Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: NA Wet waste: NA Hazardous waste: NA Mode of Disposal Biomedical waste (If NA of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 73 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 NA NA NA NA NA NA NA 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 74 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power NA supply : During Construction Phase: (Demand NA Load) DG set as Power back-up during NA construction phase During Operation phase (Connected NA load): Power During Operation requirement: phase (Demand NA load): Transformer: NA DG set as Power back-up during NA operation phase: Fuel used: NA Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: NA 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 NA NA 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: 0.0 (Capital cost and O&M cost): O & M cost: 0.0 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001water water 10 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 NA NA NA NA 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 75 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted 13 areas / Eco-sensitive areas/ inter-State boundaries SEIAA-AGENDA-0000000001Category as per schedule of EIA 7(f) Notification sheet Court cases pending NA if any Other Relevant NA Informations Have you previously submitted No Application online on MOEF Website.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 76 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 113th meeting subject to complaince of following conditions:

1. PP should ensure that proposed activties in CRZ areas are as per provisions of CRZ Notification, 2011 (amended time to time).

2. MMB to ensure that tidal flow of coastal water body should not be hampered due to proposed jetty.

3. MMB should restore the site after construction of jetty.

4. MMB to obtain prior High Court permission, since the proposed actvities would affect mangrove vegetation.

5. All other required permissions should be obtained before the commencement of the project.

6. PP to explore possibility of alternate approach road to avoid mangroves area.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP to submit copy of point wise compliance of MCZMA conditions SEIAA-AGENDA-0000000001FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 77 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed ferry jetty at Marve General Information: 1.Name of Project Proposed ferry jetty at Marve 2.Type of institution Government 3.Name of Project Proponent Maharashtra Maritime Board 4.Name of Consultant STUP Consultants Pvt. Ltd. 5.Type of project Others 6.New project/expansion in existing project/modernization/diversification New Project in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project 45, 47 9.Taluka Mumbai Suburban 10.Village Marve 11.Area of the project MCGM NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 0.0 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) NA 16.Deductions NA 17.Net Plot area NA a) FSI area (sq. m.): NA 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): NA Non-FSI) c) Total BUA area (sq. m.): NA 19.Total ground coverage (m2) NA 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open NA to sky) 21.Estimated cost of the project 6.0 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001NA NA NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users 25.Tenant density NA per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 78 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 79 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA Details of Swimming NA pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic NA NA NA NA NA NA NA NA NA

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation NA (Capital cost) : Budgetary allocation NA SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water NA drainage pattern: 35.Storm water Quantity of storm NA drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 80 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: NA the Pre Construction Disposal of the and Construction construction waste NA phase: debris: Dry waste: NA Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: NA Wet waste: NA Hazardous waste: NA Mode of Disposal Biomedical waste (If NA of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 81 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 NA NA NA NA NA NA NA 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 82 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power NA supply : During Construction Phase: (Demand NA Load) DG set as Power back-up during NA construction phase During Operation phase (Connected NA load): Power During Operation requirement: phase (Demand NA load): Transformer: NA DG set as Power back-up during NA operation phase: Fuel used: NA Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: NA 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 NA NA 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: 0.0 (Capital cost and O&M cost): O & M cost: NA 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001water BOD 10 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 NA NA NA NA 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 83 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted NA areas / Eco-sensitive areas/ inter-State boundaries SEIAA-AGENDA-0000000001Category as per schedule of EIA NA Notification sheet Court cases pending NA if any Other Relevant NA Informations Have you previously submitted No Application online on MOEF Website.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 84 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. No mangroves should be cut for the project.

3. Prior permission from Hon High Court should be obtained, since proposed activity falls within 50 m buffer zone area.

4. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 85 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for CRZ Clearance for development of infrastructure facilities for fishermen at 9 sites General Information: 1.Name of Project CRZ Clearance for development of infrastructure facilities for fishermen at 9 sites 2.Type of institution Government 3.Name of Project Proponent Executive Engineer, Commissioner of fisheries office, Maharashtra State, Mumbai 4.Name of Consultant Aditya Environmental Services pvt. ltd. 5.Type of project others 6.New project/expansion in existing project/modernization/diversification up-gradation at 7 locations & new development at 2 locations in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project fish landing centres at Zai, Kelwa, Khardada, Juhu, Navapada, Theronda, Ekadara, Tambaldeg, 8.Location of the project Kelus 9.Taluka Talasari, Palghar, Mumbai, Raigad, Deogad & Vengurla 10.Village Zai, Kelwa, Khardada, Juhu, Navapada, Theronda, Ekadara, Tambaldeg, Kelus 11.Area of the project other area not applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: not applicable Approval Number Approved Built-up Area: 102000 13.Note on the initiated work (If not applicable applicable) 14.LOI / NOC / IOD from MHADA/ not applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 1200000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 86 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 not applicable not applicable not applicable not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 87 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment not not not not not not not not not Domestic applicable applicable applicable applicable applicable applicable applicable applicable applicable

Level of the Ground not applicable water table: Size and no of RWH tank(s) and not applicable Quantity: Location of the RWH not applicable tank(s): Quantity of recharge 34.Rain Water not applicable Harvesting pits: (RWH) Size of recharge pits not applicable : Budgetary allocation not applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation not applicable (O & M cost) : Details of UGT tanks not applicable if any :

Natural water not applicable drainage pattern: 35.Storm water Quantity of storm not applicable drainage water: Size of SWD: not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 88 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation not applicable in KLD: STP technology: not applicable Capacity of STP not applicable (CMD): Sewage and Location & area of not applicable Waste water the STP: Budgetary allocation not applicable (Capital cost): Budgetary allocation not applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: excavation/ dredge material the Pre Construction Disposal of the and Construction construction waste giving to authorised recyclers phase: debris: Dry waste: not applicable Wet waste: not applicable Hazardous waste: not applicable Waste generation Biomedical waste (If in the operation not applicable Phase: applicable): STP Sludge (Dry not applicable sludge): Others if any: not applicable Dry waste: not applicable filling, leveling for construction of solid jety/ boat yard/ fish drying Wet waste: platform etc. Hazardous waste: not applicable Mode of Disposal Biomedical waste (If of waste: not applicable applicable): STP Sludge (Dry not applicable sludge): Others if any: not applicable fish landinfg centres at Zai, Kelwa, Khardanda, Juhu, Navapada, Location(s): Theronda, Ekadara, Tambaldeg, Kelus Area Area for the storage requirement: of waste & other Not applicable material: SEIAA-AGENDA-0000000001Area for machinery: Not applicable Budgetary allocation Capital cost: Rs.1200000000 (Capital cost and O&M cost): O & M cost: Not applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD):

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 89 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Total RG area : Not applicable No of trees to be cut Not applicable : Number of trees to Not applicable 43.Green Belt be planted : Development List of proposed Not applicable native trees : Timeline for completion of Not applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number SEIAA-AGENDA-0000000001importance 1 Not applicable Not applicable Not applicable Not applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 90 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power Not applicable supply : During Construction Phase: (Demand Not applicable Load) DG set as Power back-up during Not applicable construction phase During Operation phase (Connected Not applicable load): Power During Operation requirement: phase (Demand Not applicable load): Transformer: Not applicable DG set as Power back-up during Not applicable operation phase: Fuel used: Not applicable Details of high tension line passing Not applicable through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not applicable Not applicable applicable

Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not applicable Not applicable Not applicable Not applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 91 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence: Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance CRZ recommendation obtained from MCZMA vide MoM of 114th

obtain, if any: Meeting Distance from Protected Areas / Critically Polluted Not applicable areas / Eco-sensitive areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 92 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 114th meeting subject to complaince of following conditions:

1. Proposed infrastructure facilities should be in accordance with provisions of CRZ Notification, 2011 ( amended from time to time)

2. Fisheries department to ensure that dredging should be for the purpose of clearing of channel only. No blasting for rock excavation is allowed.

3. Fisheries Department to ensure that no mangroves are cut for the proposed activities. Prior High Court permission, if the project activities falls within 50 m mangroves buffer area should be obtained.

4. PP to check the alignment of proposed coastal road in Mumbai for the facilities at Khardanda and Juhu.

5. PP to carry out the modelling studies done for structural stability the jetty at Juhu, in the light of natural coastal hazards like cyclone.

6. All other required permissions from different statutory authorities should be obtained.

SEIAA decided toSEIAA-AGENDA-0000000001 recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 93 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Deepening and Widening of Existing Mumbai Harbour Channel and JN Port Channel (Phase II) General Information: 1.Name of Project Deepening and Widening of Existing Mumbai Harbour Channel and JN Port Channel (Phase II) 2.Type of institution Government 3.Name of Project Proponent Trust 4.Name of Consultant Fine Envirotech Engineers 5.Type of project others 6.New project/expansion in existing project/modernization/diversification Expansion in existing project in existing project 7.If expansion/diversification, whether environmental clearance yes has been obtained for existing project 8.Location of the project NA 9.Taluka 10.Village Sheva 11.Area of the project NA NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 20290000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number SEIAA-AGENDA-0000000001 1 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 94 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 95 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 00 00 00 00 00 00 00 00 00

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : Budgetary allocation Not applicable SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 96 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not applicable in KLD: STP technology: Not applicable Capacity of STP Not applicable (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Not applicable (Capital cost): Budgetary allocation Not applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: total quantity of dredge material 35.03 million cum the Pre Construction Disposal of the and Construction construction waste dredge material will be disposed at DS3 site approved by CWPRS phase: debris: Dry waste: 35.03 million cum Wet waste: dredge material 35.03 million cum Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Location(s): Not applicable

Area Area for the storage of waste & other Not applicable requirement: material: Area for machinery: Not applicable Budgetary allocation Capital cost: Not applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not applicable Not applicable Not applicable Not applicable applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 97 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Diesel 0 70 TPD/LKD 70 TPD/LKD 41.Source of Fuel BPCl 42.Mode of Transportation of fuel to site Bunckering

Total RG area : Not applicable No of trees to be cut Not applicable : Number of trees to Not applicable 43.Green Belt be planted : Development List of proposed Not applicable native trees : Timeline for completion of Not applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable Not applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 98 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power Not applicable supply : During Construction Phase: (Demand Not applicable Load) DG set as Power back-up during Not applicable construction phase During Operation phase (Connected Not applicable load): Power During Operation requirement: phase (Demand Not applicable load): Transformer: Not applicable DG set as Power back-up during Not applicable operation phase: Fuel used: Not applicable Details of high tension line passing Not applicable through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Dredging Use of appropriate dredgers Use of appropriate dredgers

Budgetary allocation Capital cost: Not applicable (Capital cost and O&M cost): O & M cost: Not applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number According to CPCB 1 Air environment 25 SEIAA-AGENDA-0000000001guidelines According to CPCB 2 Water Environment 30 guidelines According to CPCB 3 Noise Environment 18 guidelines Training and Training and Education Programs 4 15 Education for workers, Staff and Local people

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 99 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Social Awareness 5 Social Awareness Programs for workers, 20 Staff and Local people b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) According to CPCB 1 Air Environment 18 00 guidelines According to CPCB 2 Water Environment 22 00 guidelines According to CPCB 3 Noise Environment 10 00 guidelines Training and Training and Education Programs 4 5 00 Education for workers, Staff and Local people Social Awareness 5 Social Awareness Programs for workers, 10 00 Staff and Local people 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence:

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 100 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): MCZMA have recomended project to MOEF & CC where it was CRZ/ RRZ clearance considered in 14th EAC and in the MOM of the same CRZ clearance is obtain, if any: granted Distance from Protected Areas / Critically Polluted Not applicable areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations Have you previously submitted Yes Application online on MOEF Website. Date of online 15-07-2016 submission Brief information of the project by SEAC SEIAA-AGENDA-0000000001 DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION During meeting PP informed that project has already obtained approval/cleareance from minister of environment forest and climate change New Delhi and requested to delist the proposal from SEIAA. Hence delisted

Specific Conditions by SEIAA:

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 101 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) FINAL RECOMMENDATION Kindly find SEAC decision above.

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 102 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Construction of Coastal Berth and Approach bridges General Information: 1.Name of Project Construction of Coastal Berth and Approach bridges at Jawaharlal Nehru Port 2.Type of institution Government 3.Name of Project Proponent Jawaharlal Nehru Port Trust 4.Name of Consultant Fine Envirotech Engineers 5.Type of project Not applicable 6.New project/expansion in existing project/modernization/diversification New Project in existing project 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project 8.Location of the project Between IVth container terminal berth and existing landing jetty at awaharlal Nehru Port 9.Taluka Uran 10.Village Sheva 11.Area of the project Not applicable Not applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Not applicable Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If Not applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 1702000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 103 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 104 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 00 70 70 00 00 00 00 63 63

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : Budgetary allocation Not applicable SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 105 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation 63 in KLD: STP technology: MBBR Capacity of STP 1 STP of 4MLD (CMD): Sewage and Location & area of Behind Township Waste water the STP: Budgetary allocation 11000000 (Capital cost): Budgetary allocation 2750000 (O & M cost): 36.Solid waste Management Approx. 78,000 cum soil. Approx. 61,000 cum rock is expected to be Waste generation: Waste generation in dredged from the proposed area the Pre Construction and Construction Disposal of the The construction debris will be utilized for filling low lying areas. Rest phase: construction waste solid waste will be stored in isolated areas and will be disposed off debris: through MPCB approved contractor Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry 10 Kg/d sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry will be disposed as per guidelines sludge): Others if any: Not applicable Location(s): Between IVth container terminal berth and existing landing jetty

Area Area for the storage of waste & other Around 45.6 hector area will be provided behind berth as storage. requirement: material: Area for machinery: 00 Budgetary allocationSEIAA-AGENDA-0000000001Capital cost: 00 (Capital cost and O&M cost): O & M cost: 1702000 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 Not applicable 00 Not applicable Not applicable Not applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 106 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent 00 recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not 1 Not applicable 00 00 Not applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable 00 00 00 41.Source of Fuel IOCL 42.Mode of Transportation of fuel to site Bunckering

Appropriate green belt is developed and being maintained in the port Total RG area : premises No of trees to be cut Not applicable : Number of trees to 43.Green Belt Not applicable be planted : Development List of proposed Not applicable native trees : Timeline for completion of Not applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable Not applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 107 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power MSEDCL through JNPT Electric Department supply : During Construction Phase: (Demand 00 Load) DG set as Power back-up during 4 sets of 125 Kv each construction phase During Operation phase (Connected 350 KW load): Power During Operation requirement: phase (Demand 350 KW load): Transformer: Not applicable DG set as Power back-up during 00 operation phase: Fuel used: diesel Details of high tension line passing not applicable through the plot if any: 48.Energy saving by non-conventional method: not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Dust generation JNPT conduct monthly monitoring of all attributes to NPT conduct monthly monitoring of all attributes to due to keep check on increasing level keep check on increasing level construction activities increas in Noise levels NPT conduct monthly monitoring of all attributes to NPT conduct monthly monitoring of all attributes to due to keep check on increasing level keep check on increasing level construction activities

Budgetary allocation Capital cost: 10000000 (Capital costSEIAA-AGENDA-0000000001 and O&M cost): O & M cost: 2500000 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number According to the 1 Air Environment 19 MPCB guidelines

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 108 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) According to the 2 Water Environment 22 MPCB guidelines According to the 3 Noise Environment 13 MPCB guidelines Mangrove Ain consultation with 4 56 Management forest department Mangrove Ain consultation with 5 56 Management forest department training and education Training and programes for staff, 6 11 Education workers and local peoples b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) According to the 1 Air Environment 13 00 MPCB guidelines According to the 2 Water Environment 16 00 MPCB guidelines According to the 3 Noise Environment 7 00 MPCB guidelines Mangrove in consultation with 4 22 00 Management forest department Mangrove in consultation with 5 22 00 Management forest department training and education Training and programes for staff, 6 3 00 Education workers and local peoples 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information SEIAA-AGENDA-0000000001Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence:

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 109 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance proposal was considered in 114th MCZMA meeting and recommended

obtain, if any: to SEIAA Distance from Protected Areas / Critically Polluted Not applicable areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC SEIAA-AGENDA-0000000001DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 110 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. Environment Management Plan should be implemented effectively during construction and operation phase of the project.

3. Prior High Court permission should be obtained, if the project involves clearing of mangroves.

4. No labour camp, machineries and material storage is allowed in CRZ area & it should also be ensured that the waste water from these entities should not be released into the coastal water body. Effluent treatment plant should be located outside CRZ area.

5. Debris generated during the project activity should not be dumped in CRZ area. It should be disposed scientifically at a designated place.

6. Sewage and effluent should not be discharged into the coastal water body.

7. Extra care to be taken to avoid oil/wastes and leakages or spillages and its discharge should not be into coastal water body.

8. Project manager should ensure that best industrial practices should be followed for fire safety measures and for conservation of coastal environment

9. During the construction& operational phase, all efforts should be made to maintain ecology of the area.

10. All other necessary permissions from different competent authorities shall be taken before commencement of the proposed activities. SEIAA-AGENDA-0000000001 11. Project Proponent to give an undertaking by 11-04-2017 that the proposed work does not affect Mangroves in any manner.

SEIAA decided to recommend proposal for approval subject to the above conditions.

Specific Conditions by SEIAA:

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 111 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 112 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Widening of existing container road towards east side from 'Y' junction to north gate complex in JN port - Amendment General Information: Widening of existing container road towards east side from 'Y' junction to north gate complex in 1.Name of Project JN port 2.Type of institution Government 3.Name of Project Proponent Jawaharlaal Neharu Posrt trust 4.Name of Consultant Fine Envriotech Engineers 5.Type of project Not applicable 6.New project/expansion in existing project/modernization/diversification Expansion of existing road in existing project 7.If expansion/diversification, whether environmental clearance yes has been obtained for existing project 8.Location of the project east side from 'Y' junction to north gate complex in JN port 9.Taluka Uran 10.Village Sheva 11.Area of the project Not applicable Not applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Not applicable Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If Not applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 1203500000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number SEIAA-AGENDA-0000000001 1 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 113 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 114 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 00 00 00 00 00 00 00 00 00

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : Budgetary allocation Not applicable SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 115 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not applicable in KLD: STP technology: Not applicable Capacity of STP Not applicable (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Not applicable (Capital cost): Budgetary allocation Not applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: Not applicable the Pre Construction Disposal of the and Construction construction waste Not applicable phase: debris: Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Location(s): east side from 'Y' junction to north gate complex in JN port

Area Area for the storage of waste & other Not applicable requirement: material: Area for machinery: Not applicable Budgetary allocation Capital cost: 00 (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: 120350000 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 Not applicable 00 Not applicable 00 Not applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 116 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not applicable Not applicable applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not applicable Not applicable Not applicable applicable applicable applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Total RG area : Not applicable No of trees to be cut 9.5 ha : Number of trees to 1750 43.Green Belt be planted : Development List of proposed Not applicable native trees : Timeline for completion of Not applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable Not applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not applicable Not applicable Not applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 117 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power MSEDCL supply : During Construction Phase: (Demand Not applicable Load) DG set as Power back-up during Not applicable construction phase During Operation phase (Connected Not applicable load): Power During Operation requirement: phase (Demand Not applicable load): Transformer: Not applicable DG set as Power back-up during Not applicable operation phase: Fuel used: Not applicable Details of high tension line passing Not applicable through the plot if any: 48.Energy saving by non-conventional method: Not applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not applicable Not applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Dust water sprinkling and plantation along the road, , water sprinkling and plantation along the road emmission covered dumper to carry raw material vehicular regular maintenance of vehicle regular maintenance of vehicle will be carried out emission

Budgetary allocation Capital cost: 00 (Capital cost and O&M cost): O & M cost: 00 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial SEIAA-AGENDA-0000000001 Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 Not applicable Not applicable 00 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not applicable Not applicable 00 00

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 118 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not applicable Not applicable Not applicable Not applicable applicable applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence: Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance Project recommended for CRZ clearance in 86th meeting of SEIAA obtain, if any: Distance from Protected Areas / SEIAA-AGENDA-0000000001Critically Polluted Not applicable areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA Not applicable Notification sheet Court cases pending Not applicable if any Other Relevant Not applicable Informations

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 119 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION The proposal was earlier considered in the 86th meeting of SEIAA where the minutes mentions that "the length of road to widened is 23.5 meters towards east side....and as per typical cross section of road, the length of road to be widened is 23.5 meter towards east side..." the condition no 7 mentions "the widening of road activity is allowed on stilt"

PP brought to the notice of SEIAA that the word,"length" is wrongly used instead of word "width" . PP requested to make changes in the 86th minutes of SEIAA. PP also requested that the condition no 7 mentioned above to be removed from the minutes as the proposal is for widening of existing road.

After deliberation SEIAA decided to make following changed in the 86th minutes of SEIAA

1.The word "length" hereby replaced by word "width". The revised para shall be as below

"In that meeting representatives of the JNPT presented the proposal. As per typical cross section of road, the width of road to be widened is 23.5m towards east side from “Y” Junction to North Gate Complex in JN Port. As per typical cross section of road, the width of road to be widened is 23.5m towards east side from “Y” Junction to North Gate Complex in JN Port. Site under reference falls in CRZ I (ii). There are some sparse mangroves areas in the alignment. Area of proposed site- 150000m2 Approx."

2. As requested by PP condition no 7 mentioned in the 86th minutes of SEIAA is removed subject to PP to ensure no obstruction to water ways during their project activities.

3. Project Proponent to give an undertaking by 11-04-2017 stating that the work does not affect any Mangroves.

SEIAA decided to recommend proposal for approval.

Specific ConditionsSEIAA-AGENDA-0000000001 by SEIAA: FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 120 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Expansion of existing Bridge-II and Vashi Toll Plaza on Sion highway. General Information: 1.Name of Project Expansion of existing Thane Creek Bridge-II and Vashi Toll Plaza on Sion Panvel highway. 2.Type of institution Government 3.Name of Project Proponent Shrikant V. Jadhav 4.Name of Consultant Fine Envirotech Engineers 5.Type of project Not applicable 6.New project/expansion in existing It is proposed expansion of existing Thane Creek Bridge-II by adding 3 + 3 lanes across Thane project/modernization/diversification Creek and expansion of existing Vashi Toll Plaza on Sion Panvel Highway to improve the in existing project connectivity between Mumbai & Navi Mumbai 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project 8.Location of the project The proposed project is for expansion of existing Thane Creek bridge (TCB II). 9.Taluka Navi mumbai 10.Village vashi 11.Area of the project MCGM and NMMC Not applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Not applicable Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If Not applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 7600000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number SEIAA-AGENDA-0000000001 1 Not applicable Not applicable Not applicable 2 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 121 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 122 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 00 25kld 25kld 00 2.5 2.5 00 22.5 22.5

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : Budgetary allocation Not applicable SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 123 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not applicable in KLD: STP technology: Not applicable Capacity of STP Not applicable (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Not applicable (Capital cost): Budgetary allocation Not applicable (O & M cost): 36.Solid waste Management During Construction phase solid waste will be generated during Waste generation: Waste generation in excavation for the pillers/columns in the landward area/marine area. the Pre Construction and Construction Disposal of the phase: construction waste Excavated earth will be utilised for construction of roads. debris: Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable It is proposed expansion of existing Thane Creek Bridge-II by adding 3 + 3 lanes across Thane Creek and expansion of existing Vashi Toll Plaza Location(s): on Sion Panvel Highway to improve the connectivity between Mumbai & Area Navi Mumbai requirement: Area for the storage of waste & other Goods and Materials will be stored in shed area at site SEIAA-AGENDA-0000000001material: Area for machinery: At the site area Budgetary allocation Capital cost: 00 (Capital cost and O&M cost): O & M cost: 00 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 Not applicable 00 Not applicable Not applicable Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 124 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not 1 Not applicable 00 Not applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 Not applicable Not applicable 00 00 00 00 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Green belt will be developed by using extra spaces on or near to the Total RG area : footpath, space around junctions etc. will be beautified by providing landscaping the trees which are affected due to extra widening for approach roads No of trees to be cut and relocation of utilities will be calculated and a tree cutting proposal : will be prepared and submitted to Tree Authority of MCGM for 43.Green Belt obtaining approval. Recommended replantation will be implemented. Number of trees to Development Will be finalised after consultation with forest department be planted : List of proposed Will be finalised after consultation with forest department native trees : Timeline for completion of - - - - - SEIAA-AGENDA-0000000001plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 ------45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 125 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 1 ------47.Energy Source of power MSEB supply : During Construction Phase: (Demand 100 kw Load) DG set as Power back-up during YES construction phase During Operation phase (Connected 300 KVA load): Power During Operation requirement: phase (Demand 200 KVA load): Transformer: 300 KVA DG set as Power back-up during 250 operation phase: Fuel used: Disel Details of high tension line passing No through the plot if any: 48.Energy saving by non-conventional method: By using Solar Lights 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 20% - - - - 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Fugitive Sprinkling water will control fugitive dust Dust ------entrainment. Emission Monitor periodically ambient air quality at selected Vehicular ------sites and Regular Maintenance of Construction Emission vehicles Noise monitoring will be carried out during operational phase to collect comparative data and Increase SEIAA-AGENDA-0000000001Construction works will be undertaken in the agreed in noise ------working hours. Construction activities involving level generation of high noise shall be avoided between 10 pm and 6 am in the residential and sensitive areas.

Budgetary allocation Capital cost: - - - - - (Capital cost and O&M cost): O & M cost: ------51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up):

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 126 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number As per the CPCB 1 Air Environment 10,40,000 Norms As per the CPCB 2 Water Environment 6,72,000 Norms As per the CPCB 3 Noise Environment 1,20,000 Norms 4 Mobile STP - - - -- 20,00,000 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) As per the CPCB 1 Air Environment 3,80,000 00 Norms As per the CPCB 2 Water Environment 1,25,000 00 Norms As per the CPCB 3 Noise Environment 40,000 00 Norms 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not applicable Not applicable 00 00 00 Not applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence:

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 127 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance the project was consider in 114th meeting of MCZMA and

obtain, if any: recommended to SIEAA Distance from Protected Areas / Critically Polluted The protected area is beyond 15 km of radius from proposed site areas / Eco-sensitive areas/ inter-State boundaries Category as per schedule of EIA 7f Notification sheet Court cases pending NO if any Other Relevant NO Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC SEIAA-AGENDA-0000000001DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 128 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 113th meeting subject to complaince of following conditions:

1. Proposed expansion of Thane Creek Bridge should be as per the provisions of CRZ Notification, 2011 (amended from time to time)

2. Prior High Court permission should be obtained by MSRDC, since mangroves are affected due to project.

3. PP to implement the Environment Management Plan while implementation and operation phase of the project.

4. PP to ensure that piers in creek should not disturb the tidal flow of creek water.

5. PP to ensure minimum mangrove vegetation is affected due to proposed bridge during its construction and operational phase.

6. PP to ensure that construction debris should not be disposed of in CRZ area and particularly in mangroves.

7. PP should restore the mangroves affected area / site after completion of the proposed activities.

8. Navigational routes of local fisherman should not be hampered.

9. MSRDC to carry out compensatory mangrove replantation with the help of Mangroves Cell.

10. PP to ensure that proper disaster management plans is in place for the proposed activities.

11. All other required permissions from different statutory authorities should be obtained.

SEIAA decided to defer the proposal till PP submits compliance.

Specific Conditions by SEIAA:

1) PP to obtain and submit copy of recommendations obtained from mangrove cell for cutting of mangroves 2) PP to submit point wise compliance of conditions stipulated by MCZMA in their 113th meeting FINAL RECOMMENDATION SEIAA have decided to defer the proposal till PP submits the additional information as per above conditions within 30 days

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 129 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed elevated road and grade improvement on existing Thane - Ghodbundar Road General Information: 1.Name of Project Proposed elevated road and grade improvement on existing Thane - Ghodbundar Road 2.Type of institution Government 3.Name of Project Proponent Dattatray. M. Bhonde 4.Name of Consultant Fine Envirotech Engineers 5.Type of project Others The thane-Ghodbandar road from chainage 0/000 to 0/405 and 0/500 to 14/900 is minimum 3+3 6.New project/expansion in existing lanes, except in length from Ghodbandar 0/405 to Gaimukh 4/400 which is ghat road and 2+2 project/modernization/diversification lanes wide. Now it is proposed to Widening (Stage I- at grade 3+3 lane) of existing thane in existing project ghodbandar road from chanaige 0/000 to chanaige 4/890 and proposed elevated road (Stage II- Elevated 4 lane) on exisiting thane ghodbandar road from chainage 0/740 to chainage 4/890. 7.If expansion/diversification, whether environmental clearance Not applicable has been obtained for existing project The elevated road project proposed on existing thane ghodbandar road from chanaige 0/000 to 8.Location of the project chanaige 4/890 9.Taluka Thane 10.Village Ghodbandar, Chena, Gaimukh 11.Area of the project Thane Municipal Corporation and Mira Bhayndar Municipal Corporation Not applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Not applicable Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If Not applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 7250000000 SEIAA-AGENDA-000000000122.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 Not applicable Not applicable Not applicable 2 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 130 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 25.Tenant density Not applicable per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Not applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not applicable Not applicable Not applicable Not applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable SEIAA-AGENDA-0000000001tank(CMD): Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 131 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 00 12.180 12.180 00 1.2 1.2 00 10.98 10.98

Level of the Ground Not applicable water table: Size and no of RWH tank(s) and Not applicable Quantity: Location of the RWH Not applicable tank(s): Quantity of recharge 34.Rain Water Not applicable Harvesting pits: (RWH) Size of recharge pits Not applicable : Budgetary allocation Not applicable (Capital cost) : Budgetary allocation Not applicable SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks Not applicable if any :

Natural water Not applicable drainage pattern: 35.Storm water Quantity of storm Not applicable drainage water: Size of SWD: Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 132 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not applicable in KLD: STP technology: Not applicable Capacity of STP Not applicable (CMD): Sewage and Location & area of Not applicable Waste water the STP: Budgetary allocation Not applicable (Capital cost): Budgetary allocation Not applicable (O & M cost): 36.Solid waste Management During Construction phase solid waste will be generated from excavation for the pillers/columns in the landward area. Surplus Waste generation: Waste generation in excavated earth will be used in filling low line areas with approval of the Pre Construction Authorities. and Construction phase: Disposal of the construction waste Excavated earth will be utilised for construction of roads. debris: Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Waste generation Biomedical waste (If in the operation Not applicable Phase: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable Dry waste: Not applicable Wet waste: Not applicable Hazardous waste: Not applicable Mode of Disposal Biomedical waste (If Not applicable of waste: applicable): STP Sludge (Dry Not applicable sludge): Others if any: Not applicable It is proposed to Widening ( Stage I- at grade 3+3 lane ) of existing thane ghodbandar road from chanaige 0/000 to chanaige 4/890 and Location(s): proposed elevated road ( stage II- Elevated 4 lane ) on exisiting thane Area ghodbandar road from chainage 0/740 to chainage 4/890. requirement:SEIAA-AGENDA-0000000001Area for the storage of waste & other Goods and Materials will be stored in shed areas material: Area for machinery: At the site area Budgetary allocation Capital cost: 00 (Capital cost and O&M cost): O & M cost: 00 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 133 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 1 Not applicable 00 Not applicable Not applicable Not applicable Amount of effluent generation Not applicable (CMD): Capacity of the ETP: Not applicable Amount of treated effluent Not applicable recycled : Amount of water send to the CETP: Not applicable Membership of CETP (if require): Not applicable Note on ETP technology to be used Not applicable Disposal of the ETP sludge Not applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not 1 Not applicable 00 Not applicable applicable applicable applicable applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 Not applicable Not applicable 00 00 00 00 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not applicable Not applicable Not applicable Not applicable 41.Source of Fuel Not applicable 42.Mode of Transportation of fuel to site Not applicable

Proper green belt management will be encouraged with the government Total RG area : authorities. No of trees to be cut enumeration of trees will be done with department : Number of trees to 43.Green Belt Will be finalised after consultation with forest department be planted : Development List of proposed Will be finalised after consultation with forest department native trees : Timeline for completion of - - - - - plantation : 44.NumberSEIAA-AGENDA-0000000001 and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 ------45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 ------

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 134 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 47.Energy Source of power MSEB supply : During Construction Phase: (Demand 100 kw Load) DG set as Power back-up during YES construction phase During Operation phase (Connected 500 KVA load): Power During Operation requirement: phase (Demand 400 KVA load): Transformer: 500 KVA DG set as Power back-up during 250 KVA operation phase: Fuel used: Diesel Details of high tension line passing No through the plot if any: 48.Energy saving by non-conventional method: By using Solar Lights 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 25% - - - - 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Fugitive Sprinkling water will control fugitive dust Dust ------entrainment. Emission Monitor periodically ambient air quality at selected Vehicular ------sites and Regular Maintenance of Construction Emission vehicles Noise monitoring will be carried out during operational phase to collect comparative data and Increase Construction works will be undertaken in the agreed in noise ------working hours. Construction activities involving level SEIAA-AGENDA-0000000001 generation of high noise shall be avoided between 10 pm and 6 am in the residential and sensitive areas.

Budgetary allocation Capital cost: - - - - - (Capital cost and O&M cost): O & M cost: ------51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up):

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 135 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number As per the CPCB 1 Air Environment 12.8 Norms As per the CPCB 2 Water Environment 7.2 Norms As per the CPCB 3 Noise Environment 1.28 Norms 4 Mobile STP - - - -- 20 b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) As per the CPCB 1 Air Environment 9.60 00 Norms As per the CPCB 2 Water Environment 7.20 00 Norms As per the CPCB 3 Noise Environment 1.28 00 Norms 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not applicable Not applicable 00 00 00 Not applicable applicable applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not applicable design of confluence:

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 136 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Number and area of Not applicable basement: Number and area of Not applicable podia: Total Parking area: Not applicable Area per car: Not applicable Area per car: Not applicable Number of 2- Wheelers as Parking details: approved by Not applicable competent authority: Number of 4- Wheelers as approved by Not applicable competent authority: Public Transport: Not applicable Width of all Internal Not applicable roads (m): CRZ/ RRZ clearance the project was consider in 115th meeting of MCZMA and

obtain, if any: recommended to SIEAA Distance from Protected Areas / Critically Polluted The proposed alignment is existing State Highway no 42 and passes

areas / Eco-sensitive through the Sanjay Gandhi National Park. areas/ inter-State boundaries Category as per schedule of EIA 7f Notification sheet Court cases pending NO if any Other Relevant NO Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC SEIAA-AGENDA-0000000001DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 137 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

3. Extension portion of the proposed jetty should be on stilt.

4. Prior permissions of IBWL needs to be obtain.

5. Prior permission from Hon High Court should be obtained, if the proposed activity falls in mangroves or its 50 m buffer zone area.

6. Proper management of debris to be carried out and no debris to be dumped in CRZ area.

SEIAA decided to defer proposal.

Specific Conditions by SEIAA: FINAL RECOMMENDATION SEIAA have decided to defer the proposal till PP submits the additional information as per above conditions within 30 days

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 138 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Government Project of Construction of Bridge. General Information: Demolition and reconstruction of Carnac Rail over Bridge in between Masjid station and CST 1.Name of Project station. 2.Type of institution Government 3.Name of Project Proponent MCGM ( Municipal Corporation of Greater Mumbai) 4.Name of Consultant M/s Aqura Enviro Projects Pvt Ltd 5.Type of project Others: Reconstruction of Rail Over Bridge ( Infrastructure) 6.New project/expansion in existing project/modernization/diversification Reconstruction of Rail Over Bridge ( Infrastructure) in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Carnac Rail over Bridge in between Masjid station and CST station. 9.Taluka Masjid Bunder 10.Village Mumbai 11.Area of the project MCGM ( Municipal Corporation of Greater Mumbai) NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: GAD : C.RLY.DRG.NO.G.M.(W) BB/P-12535 Approval Number Approved Built-up Area: 7456.00 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ Other Approvals in Standing Committee Meeting: SCR/1331 of 28.12.2016. Other approvals (If applicable) 15.Total Plot Area (sq. m.) Bridge Area : 7456.00 Sq.M. 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 412715915 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 139 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire Not Applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Old Rail Over Bridge structure (s) if any 30.Details of the demolition with Old Rail Over Bridge will be demolished having total quantity 1984 CUM & same will be disposal (If disposed in Municipal Dumping Ground. applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 32.Total Water Requirement Source of water MCGM Fresh water (CMD): 20 CMD ( In construction Phase for Labour) Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 140 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water MCGM Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Requirem Existing Proposed Total Existing Proposed Total Existing Proposed Total ent Not Not Not Not Not Not Not Not Not Domestic Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable

Level of the Ground Not Applicable water table: Size and no of RWH tank(s) and Not Applicable Quantity: Location of the RWH Not Applicable tank(s): Quantity of recharge 34.Rain Water Not Applicable Harvesting pits: (RWH) Size of recharge pits Not Applicable : Budgetary allocation Not Applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not Applicable (O & M cost) : Details of UGT tanks Not Applicable if any :

Natural water Not Applicable drainage pattern: 35.Storm water Quantity of storm Not Applicable drainage water: Size of SWD: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 141 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not Applicable in KLD: STP technology: Not Applicable Capacity of STP Not Applicable (CMD): Sewage and Location & area of Not Applicable Waste water the STP: Budgetary allocation Not Applicable (Capital cost): Budgetary allocation Not Applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: Debris generated due to demolishing of old Rail Over Bridge. the Pre Construction Disposal of the and Construction construction waste MCGM Dumping Ground ( Quantity 1984 CUM) phase: debris: Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Waste generation Biomedical waste (If in the operation Not Applicable Phase: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Mode of Disposal Biomedical waste (If Not Applicable of waste: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Location(s): Not Applicable

Area Area for the storage of waste & other Not Applicable requirement: material: Area for machinery: Not Applicable Budgetary allocation Capital cost: Not Applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not Applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not Applicable Not Applicable Not Applicable Not Applicable Applicable Amount of effluent generation Not Applicable (CMD): Capacity of the ETP: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 142 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not Applicable recycled : Amount of water send to the CETP: Not Applicable Membership of CETP (if require): Not Applicable Note on ETP technology to be used Not Applicable Disposal of the ETP sludge Not Applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 41.Source of Fuel Not Applicable 42.Mode of Transportation of fuel to site Not Applicable

Total RG area : Not Applicable No of trees to be cut Not Applicable : Number of trees to Not Applicable 43.Green Belt be planted : Development List of proposed Not Applicable native trees : Timeline for completion of Not Applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable Not Applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not Applicable Not Applicable Not Applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 143 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power BEST supply : During Construction Phase: (Demand 20 KW Load) DG set as Power back-up during Not Applicable construction phase During Operation phase (Connected 20 KW load): Power During Operation requirement: phase (Demand 30 KW load): Transformer: Not Applicable DG set as Power back-up during Not Applicable operation phase: Fuel used: Not Applicable Details of high tension line passing Not Applicable through the plot if any: 48.Energy saving by non-conventional method: Not Applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not Applicable Not Applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not Applicable Not Applicable Applicable

Budgetary allocation Capital cost: Not Applicable (Capital cost and O&M cost): O & M cost: Not Applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not Applicable Not Applicable Not Applicable Not Applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 144 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & 2 design of confluence: Number and area of Not Applicable basement: Number and area of Not Applicable podia: Total Parking area: Not Applicable Area per car: Not Applicable Area per car: Not Applicable Number of 2- Wheelers as Parking details: approved by Not Applicable competent authority: Number of 4- Wheelers as approved by Not Applicable competent authority: Public Transport: Not Applicable Width of all Internal Not Applicable roads (m): CRZ/ RRZ clearance Not Applicable obtain, if any: Distance from Protected Areas / Critically Polluted Not Applicable areas / Eco-sensitive areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not Defined ( Reconstruction of Rail Over Bridge) Notification sheet Court cases pending Not Applicable if any Other Relevant CRZ Proposal for Reconstruction of Rail Over Bridge between Masjid

Informations Bunder & CST railway station.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 145 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. Project proponent to submit traffic management plan during construction of the bridge.

3. Natural course of creek water and tidal regime should not be hampered due to proposed activities.

4. No destruction of mangroves is allowed.

5. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed SEIAA-AGENDA-0000000001that no mangroves are involved in the proposed project activity FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 146 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Government Project of Construction of Bridge. General Information: Demolition and reconstruction of Carnac Rail over Bridge in between Masjid station and CST 1.Name of Project station. 2.Type of institution Government 3.Name of Project Proponent MCGM ( Municipal Corporation of Greater Mumbai) 4.Name of Consultant M/s Aqura Enviro Projects Pvt Ltd 5.Type of project Others: Reconstruction of Rail Over Bridge ( Infrastructure) 6.New project/expansion in existing project/modernization/diversification Reconstruction of Rail Over Bridge ( Infrastructure) in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Carnac Rail over Bridge in between Masjid station and CST station. 9.Taluka Masjid Bunder 10.Village Mumbai 11.Area of the project MCGM ( Municipal Corporation of Greater Mumbai) NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: GAD : C.RLY.DRG.NO.G.M.(W) BB/P-12535 Approval Number Approved Built-up Area: 7456.00 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ Other Approvals in Standing Committee Meeting: SCR/1331 of 28.12.2016. Other approvals (If applicable) 15.Total Plot Area (sq. m.) Bridge Area : 7456.00 Sq.M. 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 412715915 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 147 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire Not Applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Old Rail Over Bridge structure (s) if any 30.Details of the demolition with Old Rail Over Bridge will be demolished having total quantity 1984 CUM & same will be disposal (If disposed in Municipal Dumping Ground. applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 32.Total Water Requirement Source of water MCGM Fresh water (CMD): 20 CMD ( In construction Phase for Labour) Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 148 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water MCGM Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Requirem Existing Proposed Total Existing Proposed Total Existing Proposed Total ent Not Not Not Not Not Not Not Not Not Domestic Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable

Level of the Ground Not Applicable water table: Size and no of RWH tank(s) and Not Applicable Quantity: Location of the RWH Not Applicable tank(s): Quantity of recharge 34.Rain Water Not Applicable Harvesting pits: (RWH) Size of recharge pits Not Applicable : Budgetary allocation Not Applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not Applicable (O & M cost) : Details of UGT tanks Not Applicable if any :

Natural water Not Applicable drainage pattern: 35.Storm water Quantity of storm Not Applicable drainage water: Size of SWD: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 149 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not Applicable in KLD: STP technology: Not Applicable Capacity of STP Not Applicable (CMD): Sewage and Location & area of Not Applicable Waste water the STP: Budgetary allocation Not Applicable (Capital cost): Budgetary allocation Not Applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: Debris generated due to demolishing of old Rail Over Bridge. the Pre Construction Disposal of the and Construction construction waste MCGM Dumping Ground ( Quantity 1984 CUM) phase: debris: Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Waste generation Biomedical waste (If in the operation Not Applicable Phase: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Mode of Disposal Biomedical waste (If Not Applicable of waste: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Location(s): Not Applicable

Area Area for the storage of waste & other Not Applicable requirement: material: Area for machinery: Not Applicable Budgetary allocation Capital cost: Not Applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not Applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not Applicable Not Applicable Not Applicable Not Applicable Applicable Amount of effluent generation Not Applicable (CMD): Capacity of the ETP: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 150 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not Applicable recycled : Amount of water send to the CETP: Not Applicable Membership of CETP (if require): Not Applicable Note on ETP technology to be used Not Applicable Disposal of the ETP sludge Not Applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 41.Source of Fuel Not Applicable 42.Mode of Transportation of fuel to site Not Applicable

Total RG area : Not Applicable No of trees to be cut Not Applicable : Number of trees to Not Applicable 43.Green Belt be planted : Development List of proposed Not Applicable native trees : Timeline for completion of Not Applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable Not Applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not Applicable Not Applicable Not Applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 151 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power BEST supply : During Construction Phase: (Demand 20 KW Load) DG set as Power back-up during Not Applicable construction phase During Operation phase (Connected 20 KW load): Power During Operation requirement: phase (Demand 30 KW load): Transformer: Not Applicable DG set as Power back-up during Not Applicable operation phase: Fuel used: Not Applicable Details of high tension line passing Not Applicable through the plot if any: 48.Energy saving by non-conventional method: Not Applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not Applicable Not Applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not Applicable Not Applicable Applicable

Budgetary allocation Capital cost: Not Applicable (Capital cost and O&M cost): O & M cost: Not Applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not Applicable Not Applicable Not Applicable Not Applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 152 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & 2 design of confluence: Number and area of Not Applicable basement: Number and area of Not Applicable podia: Total Parking area: Not Applicable Area per car: Not Applicable Area per car: Not Applicable Number of 2- Wheelers as Parking details: approved by Not Applicable competent authority: Number of 4- Wheelers as approved by Not Applicable competent authority: Public Transport: Not Applicable Width of all Internal Not Applicable roads (m): CRZ/ RRZ clearance Not Applicable obtain, if any: Distance from Protected Areas / Critically Polluted Not Applicable areas / Eco-sensitive areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not Defined ( Reconstruction of Rail Over Bridge) Notification sheet Court cases pending Not Applicable if any Other Relevant CRZ Proposal for Reconstruction of Rail Over Bridge between Masjid

Informations Bunder & CST railway station.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 153 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. Project proponent to submit traffic management plan during construction of the bridge.

3. Natural course of creek water and tidal regime should not be hampered due to proposed activities.

4. No destruction of mangroves is allowed.

5. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed SEIAA-AGENDA-0000000001that no mangroves are involved in the proposed project activity FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 154 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla, Malad (West), in P/N Ward, Mumbai. General Information: Proposed Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla, Malad 1.Name of Project (West), in P/N Ward, Mumbai. 2.Type of institution Government 3.Name of Project Proponent MCGM (Municipal Corporation of Greater Mumbai) 4.Name of Consultant M/S Aqura Enviro Projects Pvt Ltd 5.Type of project Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla 6.New project/expansion in existing project/modernization/diversification Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla in existing project 7.If expansion/diversification, whether environmental clearance Not Applicable has been obtained for existing project 8.Location of the project Mahakali Nalla & Malvani Nalla, Malad (West), in P/N Ward, Mumbai. 9.Taluka Malad 10.Village Malad 11.Area of the project MCGM (Municipal Corporation of Greater Mumbai) Not Applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: SCR/1273 of 21.12.2016- Mahakali Nalla & Approval Number SCR/1274 of 21.12.2016 - Malvani Nalla Approved Built-up Area: 1636 13.Note on the initiated work (If Not Applicable applicable) 14.LOI / NOC / IOD from MHADA/ Standing Committee Meeting :- SCR/1273 of 21.12.2016- Mahakali Nalla & SCR/1274 of Other approvals (If applicable) 21.12.2016 - Malvani Nalla 15.Total Plot Area (sq. m.) 1636 Sq.M. (915 Sq.M for Malvani Nalla & 721 Sq.M. For Mahakali Nalla) 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 186000000 22.Number of buildings & its configuration Serial SEIAA-AGENDA-0000000001Building Name & number Number of floors Height of the building (Mtrs) number 1 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 155 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Not Applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Bridge structure (s) if any 30.Details of the demolition with Existing Vehicular bridge will be demolished (Qty:- 60000 CUM) disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 32.Total Water Requirement Source of water MCGM Fresh water (CMD): 4 CMD ( For Construction Labour) Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 156 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water MCGm Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Requirem Existing Proposed Total Existing Proposed Total Existing Proposed Total ent Not Not Not Not Not Not Not Not Not Domestic Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable

Level of the Ground Not Applicable water table: Size and no of RWH tank(s) and Not Applicable Quantity: Location of the RWH Not Applicable tank(s): Quantity of recharge 34.Rain Water Not Applicable Harvesting pits: (RWH) Size of recharge pits Not Applicable : Budgetary allocation Not Applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not Applicable (O & M cost) : Details of UGT tanks Not Applicable if any :

Natural water Not Applicable drainage pattern: 35.Storm water Quantity of storm Not Applicable drainage water: Size of SWD: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 157 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not Applicable in KLD: STP technology: Not Applicable Capacity of STP Not Applicable (CMD): Sewage and Location & area of Not Applicable Waste water the STP: Budgetary allocation Not Applicable (Capital cost): Budgetary allocation Not Applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: 60000 the Pre Construction Disposal of the and Construction construction waste Municipal Dumping Ground phase: debris: Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Waste generation Biomedical waste (If in the operation Not Applicable Phase: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Mode of Disposal Biomedical waste (If Not Applicable of waste: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Location(s): Not Applicable

Area Area for the storage of waste & other Not Applicable requirement: material: Area for machinery: Not Applicable Budgetary allocation Capital cost: Not Applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not Applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not Applicable Not Applicable Not Applicable Not Applicable Applicable Amount of effluent generation Not Applicable (CMD): Capacity of the ETP: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 158 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not Applicable recycled : Amount of water send to the CETP: Not Applicable Membership of CETP (if require): Not Applicable Note on ETP technology to be used Not Applicable Disposal of the ETP sludge Not Applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 41.Source of Fuel Not Applicable 42.Mode of Transportation of fuel to site Not Applicable

Total RG area : Not Applicable No of trees to be cut Not Applicable : Number of trees to Not Applicable 43.Green Belt be planted : Development List of proposed Not Applicable native trees : Timeline for completion of Not Applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable Not Applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not Applicable Not Applicable Not Applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 159 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power Reliance Energy Ltd / TATA Power supply : During Construction Phase: (Demand 20 KW Load) DG set as Power back-up during Not Applicable construction phase During Operation phase (Connected 40 KW load): Power During Operation requirement: phase (Demand 50 KW load): Transformer: Not Applicable DG set as Power back-up during Not Applicable operation phase: Fuel used: Not Applicable Details of high tension line passing Not Applicable through the plot if any: 48.Energy saving by non-conventional method: Not Applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not Applicable Not Applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not Applicable Not Applicable Applicable

Budgetary allocation Capital cost: Not Applicable (Capital cost and O&M cost): O & M cost: Not Applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not Applicable Not Applicable Not Applicable Not Applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 160 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not Applicable design of confluence: Number and area of Not Applicable basement: Number and area of Not Applicable podia: Total Parking area: Not Applicable Area per car: Not Applicable Area per car: Not Applicable Number of 2- Wheelers as Parking details: approved by Not Applicable competent authority: Number of 4- Wheelers as approved by Not Applicable competent authority: Public Transport: Not Applicable Width of all Internal Not Applicable roads (m): CRZ/ RRZ clearance Not Applicable obtain, if any: Distance from Protected Areas / Critically Polluted Not Applicable areas / Eco-sensitive areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not Applicable Notification sheet Court cases pending Not Applicable if any Other Relevant In this submission there are two vehicular bridges on Lagoon Road,

Informations over the Mahakali Nalla & Malvani Nalla.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 161 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. Natural course of creek water and tidal regime should not be hampered due to proposed activities.

3. No destruction of mangroves is allowed.

4. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 162 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla, Malad (West), in P/N Ward, Mumbai. General Information: Proposed Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla, Malad 1.Name of Project (West), in P/N Ward, Mumbai. 2.Type of institution Government 3.Name of Project Proponent MCGM (Municipal Corporation of Greater Mumbai) 4.Name of Consultant M/S Aqura Enviro Projects Pvt Ltd 5.Type of project Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla 6.New project/expansion in existing project/modernization/diversification Reconstruction of Bridge at lagoon road over Mahakali Nalla & Malvani Nalla in existing project 7.If expansion/diversification, whether environmental clearance Not Applicable has been obtained for existing project 8.Location of the project Mahakali Nalla & Malvani Nalla, Malad (West), in P/N Ward, Mumbai. 9.Taluka Malad 10.Village Malad 11.Area of the project MCGM (Municipal Corporation of Greater Mumbai) Not Applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: SCR/1273 of 21.12.2016- Mahakali Nalla & Approval Number SCR/1274 of 21.12.2016 - Malvani Nalla Approved Built-up Area: 1636 13.Note on the initiated work (If Not Applicable applicable) 14.LOI / NOC / IOD from MHADA/ Standing Committee Meeting :- SCR/1273 of 21.12.2016- Mahakali Nalla & SCR/1274 of Other approvals (If applicable) 21.12.2016 - Malvani Nalla 15.Total Plot Area (sq. m.) 1636 Sq.M. (915 Sq.M for Malvani Nalla & 721 Sq.M. For Mahakali Nalla) 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 186000000 22.Number of buildings & its configuration Serial SEIAA-AGENDA-0000000001Building Name & number Number of floors Height of the building (Mtrs) number 1 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 163 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire Not Applicable station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Bridge structure (s) if any 30.Details of the demolition with Existing Vehicular bridge will be demolished (Qty:- 60000 CUM) disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 32.Total Water Requirement Source of water MCGM Fresh water (CMD): 4 CMD ( For Construction Labour) Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 164 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water MCGm Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Requirem Existing Proposed Total Existing Proposed Total Existing Proposed Total ent Not Not Not Not Not Not Not Not Not Domestic Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable Applicable

Level of the Ground Not Applicable water table: Size and no of RWH tank(s) and Not Applicable Quantity: Location of the RWH Not Applicable tank(s): Quantity of recharge 34.Rain Water Not Applicable Harvesting pits: (RWH) Size of recharge pits Not Applicable : Budgetary allocation Not Applicable (Capital cost) : SEIAA-AGENDA-0000000001Budgetary allocation Not Applicable (O & M cost) : Details of UGT tanks Not Applicable if any :

Natural water Not Applicable drainage pattern: 35.Storm water Quantity of storm Not Applicable drainage water: Size of SWD: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 165 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not Applicable in KLD: STP technology: Not Applicable Capacity of STP Not Applicable (CMD): Sewage and Location & area of Not Applicable Waste water the STP: Budgetary allocation Not Applicable (Capital cost): Budgetary allocation Not Applicable (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: 60000 the Pre Construction Disposal of the and Construction construction waste Municipal Dumping Ground phase: debris: Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Waste generation Biomedical waste (If in the operation Not Applicable Phase: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Mode of Disposal Biomedical waste (If Not Applicable of waste: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Location(s): Not Applicable

Area Area for the storage of waste & other Not Applicable requirement: material: Area for machinery: Not Applicable Budgetary allocation Capital cost: Not Applicable (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: Not Applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not Applicable Not Applicable Not Applicable Not Applicable Applicable Amount of effluent generation Not Applicable (CMD): Capacity of the ETP: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 166 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent Not Applicable recycled : Amount of water send to the CETP: Not Applicable Membership of CETP (if require): Not Applicable Note on ETP technology to be used Not Applicable Disposal of the ETP sludge Not Applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 41.Source of Fuel Not Applicable 42.Mode of Transportation of fuel to site Not Applicable

Total RG area : Not Applicable No of trees to be cut Not Applicable : Number of trees to Not Applicable 43.Green Belt be planted : Development List of proposed Not Applicable native trees : Timeline for completion of Not Applicable plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable Not Applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not Applicable Not Applicable Not Applicable 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 167 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power Reliance Energy Ltd / TATA Power supply : During Construction Phase: (Demand 20 KW Load) DG set as Power back-up during Not Applicable construction phase During Operation phase (Connected 40 KW load): Power During Operation requirement: phase (Demand 50 KW load): Transformer: Not Applicable DG set as Power back-up during Not Applicable operation phase: Fuel used: Not Applicable Details of high tension line passing Not Applicable through the plot if any: 48.Energy saving by non-conventional method: Not Applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not Applicable Not Applicable 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not Applicable Not Applicable Applicable

Budgetary allocation Capital cost: Not Applicable (Capital cost and O&M cost): O & M cost: Not Applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001Not Applicable Not Applicable Not Applicable b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 Not Applicable Not Applicable Not Applicable Not Applicable 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 168 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Not Not Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Not Applicable design of confluence: Number and area of Not Applicable basement: Number and area of Not Applicable podia: Total Parking area: Not Applicable Area per car: Not Applicable Area per car: Not Applicable Number of 2- Wheelers as Parking details: approved by Not Applicable competent authority: Number of 4- Wheelers as approved by Not Applicable competent authority: Public Transport: Not Applicable Width of all Internal Not Applicable roads (m): CRZ/ RRZ clearance Not Applicable obtain, if any: Distance from Protected Areas / Critically Polluted Not Applicable areas / Eco-sensitive areas/ inter-State SEIAA-AGENDA-0000000001boundaries Category as per schedule of EIA Not Applicable Notification sheet Court cases pending Not Applicable if any Other Relevant In this submission there are two vehicular bridges on Lagoon Road,

Informations over the Mahakali Nalla & Malvani Nalla.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 169 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. Natural course of creek water and tidal regime should not be hampered due to proposed activities.

3. No destruction of mangroves is allowed.

4. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP informed that no mangroves will be affected by project activities FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 170 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Strengthening and Widening of Shilphata to Bhiwandi section from 4 Lane to 6 Lane Road and Construction of Elevated Road General Information: Strengthening and Widening of Shilphata to Bhiwandi section from 4 Lane to 6 Lane Road and 1.Name of Project Construction of Elevated Road 2.Type of institution Government 3.Name of Project Proponent Dattatray. M. Bhonde 4.Name of Consultant Consulting Engineers Group Ltd. Jaipur 5.Type of project Others 6.New project/expansion in existing project/modernization/diversification Expansion in Existing Project in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Linear Project situated in TMC, KDMC & Part of Bhiwandi municipal corporation 9.Taluka Thane, Kalyan & Bhiwandi Shil, Dhaighar, Padale, Desai, Sagarli, Nilje, Katai, sonarpada, saagaon, Mangaon, Golavali, 10.Village Pisavali, Netivali, Kachore, kalyan, kongaon, Gove, Pimpalghar, Rajnoli, Ghodbandar, Chena, Gaimukh 11.Area of the project Thane, Kalyan-Dombivli & Bhiwandi Municipal Corporation NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) NA 16.Deductions NA 17.Net Plot area NA a) FSI area (sq. m.): NA 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): NA Non-FSI) c) Total BUA area (sq. m.): NA 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 14033800000.00 SEIAA-AGENDA-000000000122.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 NA NA NA 2 NA NA NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 171 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 25.Tenant density NA per hectare 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Dry season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA SEIAA-AGENDA-0000000001tank(CMD): Excess treated water NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 172 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water NA Fresh water (CMD): NA Recycled water - NA Flushing (CMD): Recycled water - NA Gardening (CMD): Swimming pool NA make up (Cum): Wet season: Total Water Requirement (CMD) NA : Fire fighting - Underground water NA tank(CMD): Fire fighting - Overhead water NA tank(CMD): Excess treated water NA Details of Swimming NA pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Fresh water 00 223 223 00 00 00 00 00 00 requireme nt

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation SEIAA-AGENDA-0000000001NA (Capital cost) : Budgetary allocation NA (O & M cost) : Details of UGT tanks NA if any :

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 173 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Natural water NA drainage pattern: 35.Storm water Quantity of storm NA drainage water: Size of SWD: NA

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management This is the project of widening of existing 4 lane to 6 lane road, there Waste generation in Waste generation: will not be any waste generated neither in construction phase nor in the Pre Construction Operation phase and Construction Disposal of the phase: construction waste Demolition waste will be reused during construction of the road. debris: Dry waste: NA Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: NA Wet waste: NA Hazardous waste: NA Mode of Disposal Biomedical waste (If NA of waste: applicable): STP Sludge (Dry NA sludge): SEIAA-AGENDA-0000000001Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: At the site area Budgetary allocation Capital cost: NA (Capital cost and O&M cost): O & M cost: NA 37.Effluent Charecterestics

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 174 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 NA NA NA NA NA NA NA 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut 1835 : Number of trees to 5505 43.Green Belt be planted : Development List of proposed Specie of trees will be finalized after consultation with concern native trees : department Timeline for completion of The Plantation will be started during construction period SEIAA-AGENDA-0000000001plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 ------2 ------45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG:

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 175 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Serial Name C/C Distance Area m2 Number 1 ------47.Energy Source of power NA supply : During Construction Phase: (Demand NA Load) DG set as Power back-up during YES construction phase During Operation phase (Connected NA load): Power During Operation requirement: phase (Demand NA load): Transformer: NA DG set as Power back-up during 250 KVA operation phase: Fuel used: Diesel Details of high tension line passing No through the plot if any: 48.Energy saving by non-conventional method: NA 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 00 00 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Fugitive Sprinkling water will control fugitive dust Dust ------entrainment. Emission Monitor periodically ambient air quality at selected Vehicular ------sites and Regular Maintenance of Construction Emission SEIAA-AGENDA-0000000001vehicles Noise monitoring will be carried out during operational phase to collect comparative data and Increase Construction works will be undertaken in the agreed in noise ------working hours. Construction activities involving level generation of high noise shall be avoided between 10 pm and 6 am in the residential and sensitive areas.

Budgetary allocation Capital cost: - - - - - (Capital cost and O&M cost): O & M cost: ------51.Environmental Management plan Budgetary Allocation

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 176 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number Air monitoring parameter as per the CPCB Norms and Dust Management with 1 Air Environment 9.06 sprinkling of water, covers for vehicles transporting construction material water monitoring parameter as per the 2 Water Environment CPCB Norms and Oil 9.82 Interceptor at parking of construction vehicle Noise Monitoring as per the CPCB Norms 3 Noise Environment Installation of Noise 100.3 barrier where ever require Noise Monitoring as per the CPCB Norms 4 Noise Environment Installation of Noise 100.3 barrier where ever require b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) As per the CPCB 1 Air Environment 00 0.54 Norms As per the CPCB 2 Water Environment 00 0.24 Norms As per the CPCB 3 Noise Environment 00 0.06 Norms 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in SEIAA-AGENDA-0000000001MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence:

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 177 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance the project was consider in 115th meeting of MCZMA and

obtain, if any: recommended to SEIAA Distance from Protected Areas / Critically Polluted NA areas / Eco-sensitive areas/ inter-State boundaries Category as per As per EIA Notification of September 14, 2006 and its amendment schedule of EIA August 22, 2013, the project does not need environmental clearance as Notification sheet it is less than 100 km length and widening is not more than 40 m. Court cases pending NO if any Other Relevant NO Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC SEIAA-AGENDA-0000000001DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 178 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 115th meeting subject to complaince of following conditions:

1. The proposed activity should be carried out strictly as per the provisions of CRZ Notification, 2011 (as amended from time to time) and guidelines/ clarifications given by MoEF from time to time.

2. All other required permissions from different statutory authorities should be obtained prior to commencement of work.

3. Compensatory for the 1835 trees proposed to be cut should be submitted. MSRDCL to ensure that at list three the trees cut during construction should be planted again during operation phase.

SEIAA decided to defer the proposal till submission of compliance.

Specific Conditions by SEIAA:

1) PP to obtain and submit the permission of tree cutting from KDMC. FINAL RECOMMENDATION SEIAA have decided to defer the proposal till PP submits the additional information as per above conditions within 30 days

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 179 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposed Construction of 11m Wide By Pass Road From Hotel Anandi To Uran City. General Information: 1.Name of Project Proposed Construction of 11m Wide By Pass Road From Hotel Anandi To Uran City. 2.Type of institution Government 3.Name of Project Proponent City and Industrial Development Corporation Ltd. 4.Name of Consultant Fine Envirotech Engineers 5.Type of project Not applicable 6.New project/expansion in existing project/modernization/diversification New in existing project 7.If expansion/diversification, whether environmental clearance Not Applicable has been obtained for existing project 8.Location of the project Mora CS. No. 42, Nagaon, and Bori 9.Taluka Uran 10.Village Mora, Nagaon, Kegaon and Bori 11.Area of the project Other Area Not Applicable 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: Not Applicable Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If Not Applicable applicable) 14.LOI / NOC / IOD from MHADA/ Not Applicable Other approvals (If applicable) 15.Total Plot Area (sq. m.) Not applicable 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 350000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number 1 SEIAA-AGENDA-0000000001Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 180 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire 11 meter station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 181 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic 00 60 60 00 54 54 00 6 6

Level of the Ground Not Applicable water table: Size and no of RWH tank(s) and Not Applicable Quantity: Location of the RWH Not Applicable tank(s): Quantity of recharge 34.Rain Water Not Applicable Harvesting pits: (RWH) Size of recharge pits Not Applicable : Budgetary allocation Not Applicable (Capital cost) : Budgetary allocation Not Applicable SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks Not Applicable if any :

Natural water Not Applicable drainage pattern: 35.Storm water Quantity of storm Not Applicable drainage water: Size of SWD: Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 182 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation Not Applicable in KLD: STP technology: Not Applicable Capacity of STP Not Applicable (CMD): Sewage and Location & area of Not Applicable Waste water the STP: Budgetary allocation Not Applicable (Capital cost): Budgetary allocation Not Applicable (O & M cost): 36.Solid waste Management The solid waste generated consists of only construction debris and it Waste generation in Waste generation: will be disposed off at designated place in low lying areas / abandoned the Pre Construction Quarries. and Construction Disposal of the phase: construction waste Not Applicable debris: Dry waste: Not Applicable Wet waste: Not Applicable Hazardous waste: Not Applicable Waste generation Biomedical waste (If in the operation Not Applicable Phase: applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Construction debris will be disposed off at designated place in low lying Dry waste: areas / abandoned Quarries. Wet waste: Not Applicable Hazardous waste: Not Applicable Mode of Disposal Biomedical waste (If of waste: Not Applicable applicable): STP Sludge (Dry Not Applicable sludge): Others if any: Not Applicable Location(s): Not Applicable

Area Area for the storage of waste & other Not Applicable requirement: material: SEIAA-AGENDA-0000000001Area for machinery: Not Applicable Budgetary allocation Capital cost: Not Applicable (Capital cost and O&M cost): O & M cost: Not Applicable 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) Not 1 Not Applicable Not Applicable Not Applicable Not Applicable Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 183 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of effluent generation Not Applicable (CMD): Capacity of the ETP: Not Applicable Amount of treated effluent Not Applicable recycled : Amount of water send to the CETP: Not Applicable Membership of CETP (if require): Not Applicable Note on ETP technology to be used Not Applicable Disposal of the ETP sludge Not Applicable 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number Not Not Not Not Not 1 Not Applicable Not Applicable Applicable Applicable Applicable Applicable Applicable 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) Not Not Not 1 Not Applicable Not Applicable Not Applicable Applicable Applicable Applicable 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 Not Applicable Not Applicable Not Applicable Not Applicable 41.Source of Fuel Not Applicable 42.Mode of Transportation of fuel to site Not Applicable

Total RG area : Not Applicable No of trees to be cut Not Applicable : Number of trees to Not Applicable 43.Green Belt be planted : Development List of proposed Not Applicable native trees : Timeline for completion of Not Applicable plantation : 44.NumberSEIAA-AGENDA-0000000001 and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 Not Applicable Not Applicable 0 Not Applicable 45.Total quantity of plants on ground 46.Number and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 Not Applicable Not Applicable Not Applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 184 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 47.Energy Source of power MSEB supply : During Construction Phase: (Demand 200 KVA Load) DG set as Power back-up during Not Applicable construction phase During Operation phase (Connected 300 KVA load): Power During Operation requirement: phase (Demand Not Applicable load): Transformer: Not Applicable DG set as Power back-up during Not Applicable operation phase: Fuel used: Not Applicable Details of high tension line passing Not Applicable through the plot if any: 48.Energy saving by non-conventional method: Not Applicable 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 Not Applicable 0 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed Not Not Applicable Not Applicable Applicable

Budgetary allocation Capital cost: Not Applicable (Capital cost and O&M cost): O & M cost: Not Applicable 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial SEIAA-AGENDA-0000000001 Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 AIR ENVIRONMENT As per CPCB Norms 7.5 WATER 2 -- 5 ENVIRONMENT NOISE 3 As per Noise Rules 4.5 ENVIRONMENT b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 185 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 1 AIR ENVIRONMENT As per CPCB Norms 0 3 WATER 2 -- 0 2 ENVIRONMENT NOISE 3 As per Noise Rules 0 2 ENVIRONMENT 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT Not Not Not Applicable Not Applicable 0 0 0 Not Applicable Applicable Applicable 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & Proposed Construction of 11m Wide By Pass Road From Hotel Anandi

design of To Uran City. confluence: Number and area of Not Applicable basement: Number and area of Not Applicable podia: Total Parking area: Not Applicable Area per car: Not Applicable Area per car: Not Applicable Number of 2- Wheelers as Parking details: approved by Not Applicable competent authority: Number of 4- Wheelers as approved by Not Applicable competent authority: Public Transport: Not Applicable Width of all Internal SEIAA-AGENDA-0000000001Not Applicable roads (m): CRZ/ RRZ clearance Not Applicable obtain, if any: Distance from Protected Areas / Critically Polluted Not Applicable areas / Eco-sensitive areas/ inter-State boundaries

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 186 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Category as per schedule of EIA 7f Notification sheet Court cases pending Not Applicable if any Other Relevant Not Applicable Informations Have you previously submitted No Application online on MOEF Website. Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 114th meeting subject to complaince of following conditions:

1. Proposed project should be as per the provisions of CRZ Notification, 2011 (amended from time to time)

2. Prior High Court permission should be obtained by MMRDA, since mangroves are affected due to proposed bypass road

3. PP to implement the Environment Management Plan while implementation and operation phase of the project.

4. PP to ensure that construction debris should not be disposed of in CRZ area.

5. PP should restore the site after completion of the proposed activities.

6. CIDCO to carry out compensatory mangrove replantation

7. All other required permissions from different statutory authorities should be obtained.

SEIAA decided to recommend proposal for approval.

Specific ConditionsSEIAA-AGENDA-0000000001 by SEIAA: FINAL RECOMMENDATION SEIAA have decided to defer the proposal till PP submits the additional information as per above conditions within 30 days

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 187 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposal for CRZ Clearance for the METRO III Project of MMRCL (Colaba – Bandra - SEEPZ). CRZ clearance are sought for Construction activity for Laying of underground Tracks and Construction of Underground Tunnels of METRO LINE III along the Alignment, Colaba-Bandra-SEEPZ.Details given in form 1of CRZ notification of 2011. General Information: 1.Name of Project Mumbai Metro Line 3 Project 2.Type of institution Government 3.Name of Project Proponent Mumbai Metro Rail Corporation Limited 4.Name of Consultant NA 5.Type of project Transport infrastructure project 6.New project/expansion in existing project/modernization/diversification New project in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Coloba-Bandra-SEEPZ Alignment 9.Taluka Bandra 10.Village - 11.Area of the project 33.5km length NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) NA 16.Deductions Not applicable 17.Net Plot area Not applicable a) FSI area (sq. m.): Not applicable 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): Not applicable Non-FSI) c) Total BUA area (sq. m.): Not applicable 19.Total ground coverage (m2) Not applicable 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open Not applicable to sky) 21.Estimated cost of the project 42410000000 22.Number of buildings & its configuration Serial SEIAA-AGENDA-0000000001 Building Name & number Number of floors Height of the building (Mtrs) number 1 Not applicable Not applicable Not applicable 23.Number of Not applicable tenants and shops 24.Number of expected residents / Not applicable users 25.Tenant density Not applicable per hectare

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 188 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 26.Height of the building(s) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all Not applicable around the building excluding the width for the plantation 29.Existing Not applicable structure (s) if any 30.Details of the demolition with Not applicable disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): SEIAA-AGENDA-0000000001Excess treated water Not applicable

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 189 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic NA 0 0 NA NA NA NA 0 0

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation NA (Capital cost) : Budgetary allocation NA SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water NA drainage pattern: 35.Storm water Quantity of storm NA drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 190 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: 10.5 milion cubic meter the Pre Construction Disposal of the and Construction construction waste authorised locations phase: debris: Dry waste: NA Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: MCGM Wet waste: MCGM Hazardous waste: Authorised agency Mode of Disposal Biomedical waste (If Authorised agency of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 191 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 Used oil, oil filters 5.1 NA NA NA NA Authorised agency 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 192 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power TATA Power supply : During Construction Phase: (Demand NA Load) DG set as Power back-up during NA construction phase During Operation phase (Connected NA load): Power During Operation requirement: phase (Demand NA load): Transformer: NA DG set as Power back-up during NA operation phase: Fuel used: NA Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: NA 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 NA NA 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: NA (Capital cost and O&M cost): O & M cost: NA 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001NA NA NA b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 NA NA NA NA 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 193 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted NA areas / Eco-sensitive areas/ inter-State boundaries SEIAA-AGENDA-0000000001Category as per schedule of EIA NA Notification sheet Court cases pending NA if any Other Relevant Application submitted for CRZ Clearance for the alignment Colaba-

Informations Bandra-SEEPZ Have you previously submitted No Application online on MOEF Website.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 194 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 195 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 114th meeting subject to complaince of following conditions:

1. The Proposed activities should be as per the provisions of CRZ Notification, 2011 (amended from time to time)

2. Prior High Court permission should be obtained by MSRDC, since mangroves are affected due to project.

3. MMRCL to avoid cut open method for proposed underground tract and tunnel construction to avoid the destruction to mangroves and marine ecosystem.

4. MMRCL to implement the Environment Management Plan while implementation and operation phase of the project.

5. MMRCL to ensure that no mangroves should be cut for the proposed underground track and tunnel.

6. PP to ensure that noise levels are within the prescribed limits and on construction should be undertaken during night hours. Noise mufflers and noise silencers on machines should be installed.

7. PP to ensure that construction debris should not be disposed of in CRZ area.

8. Dust suppression measures should be implemented during construction phase of the project.

9. MMRCL to ensure that Muck transport should be done within 74 hours from the site.

10. Control blasting, if any, should be undertaken with the prior approval of competent Authority, to ensure minimum impact in Coastal ecosystem and structures in surrounding area.

11. PP should restore the mangroves and site after completion of the proposed activities.

12. MMRCL to carry out compensatory mangrove replantation

13. PP to ensure thatSEIAA-AGENDA-0000000001 proper disaster management plans is in place for the proposed activities.

14. All other required permissions from different statutory authorities should be obtained.

SEIAA decided to recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP submitted copy of recommendations obtained from mangrove cell for cutting of mangroves.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 196 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 197 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) SEIAA meeting 2017 SEIAA Meeting number: SEIAA meeting no 108 Meeting Date April 7, 2017 Subject: Environment Clearance for Proposal for CRZ Clearance for the METRO III Project of MMRCL (colaba to SEEPZ) for Worli, Siddhivinayak metro station and allied activities.Details given in form 1of CRZ notification of 2011. General Information: 1.Name of Project Worli, Siddhivinayak metro station and allied activities 2.Type of institution Government 3.Name of Project Proponent Mumbai Metro Rail Corporation Limited 4.Name of Consultant NA 5.Type of project NA 6.New project/expansion in existing project/modernization/diversification New project in existing project 7.If expansion/diversification, whether environmental clearance NA has been obtained for existing project 8.Location of the project Worli, Sidhivinayak 9.Taluka Worli 10.Village NA 11.Area of the project 41008 sqmt NA 12.IOD/IOA/Concession/Plan IOD/IOA/Concession/Plan Approval Number: NA Approval Number Approved Built-up Area: 00 13.Note on the initiated work (If NA applicable) 14.LOI / NOC / IOD from MHADA/ NA Other approvals (If applicable) 15.Total Plot Area (sq. m.) 41008 16.Deductions NA 17.Net Plot area NA a) FSI area (sq. m.): NA 18.Proposed Built-up Area (FSI & b) Non FSI area (sq. m.): NA Non-FSI) c) Total BUA area (sq. m.): NA 19.Total ground coverage (m2) NA 20.Ground-coverage Percentage (%) (Note: Percentage of plot not open NA to sky) 21.Estimated cost of the project 8810000000 22.Number of buildings & its configuration Serial Building Name & number Number of floors Height of the building (Mtrs) number SEIAA-AGENDA-0000000001 1 NA NA NA 23.Number of NA tenants and shops 24.Number of expected residents / NA users 25.Tenant density NA per hectare 26.Height of the building(s)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 198 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) 27.Right of way (Width of the road from the nearest fire NA station to the proposed building(s) 28.Turning radius for easy access of fire tender movement from all NA around the building excluding the width for the plantation 29.Existing NA structure (s) if any 30.Details of the demolition with NA disposal (If applicable) 31.Production Details Serial Product Existing (MT/M) Proposed (MT/M) Total (MT/M) Number 1 NA NA NA NA 32.Total Water Requirement Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Dry season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable SEIAA-AGENDA-0000000001

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 199 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of water Not applicable Fresh water (CMD): Not applicable Recycled water - Not applicable Flushing (CMD): Recycled water - Not applicable Gardening (CMD): Swimming pool Not applicable make up (Cum): Wet season: Total Water Requirement (CMD) Not applicable : Fire fighting - Underground water Not applicable tank(CMD): Fire fighting - Overhead water Not applicable tank(CMD): Excess treated water Not applicable Details of Swimming Not applicable pool (If any) 33.Details of Total water consumed Particula Consumption (CMD) Loss (CMD) Effluent (CMD) rs Water Require Existing Proposed Total Existing Proposed Total Existing Proposed Total ment Domestic NA 0 0 NA NA NA NA 0 0

Level of the Ground NA water table: Size and no of RWH tank(s) and NA Quantity: Location of the RWH NA tank(s): Quantity of recharge 34.Rain Water NA Harvesting pits: (RWH) Size of recharge pits NA : Budgetary allocation NA (Capital cost) : Budgetary allocation NA SEIAA-AGENDA-0000000001(O & M cost) : Details of UGT tanks NA if any :

Natural water NA drainage pattern: 35.Storm water Quantity of storm NA drainage water: Size of SWD: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 200 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)

Sewage generation NA in KLD: STP technology: NA Capacity of STP NA (CMD): Sewage and Location & area of NA Waste water the STP: Budgetary allocation NA (Capital cost): Budgetary allocation NA (O & M cost): 36.Solid waste Management

Waste generation in Waste generation: NA the Pre Construction Disposal of the and Construction construction waste authorised locations phase: debris: Dry waste: NA Wet waste: NA Hazardous waste: NA Waste generation Biomedical waste (If in the operation NA Phase: applicable): STP Sludge (Dry NA sludge): Others if any: NA Dry waste: MCGM Wet waste: MCGM Hazardous waste: Authorised agency Mode of Disposal Biomedical waste (If Authorised agency of waste: applicable): STP Sludge (Dry NA sludge): Others if any: NA Location(s): NA

Area Area for the storage of waste & other NA requirement: material: Area for machinery: NA Budgetary allocation Capital cost: NA (Capital cost andSEIAA-AGENDA-0000000001 O&M cost): O & M cost: NA 37.Effluent Charecterestics Serial Inlet Effluent Outlet Effluent Effluent discharge Parameters Unit Number Charecterestics Charecterestics standards (MPCB) 1 NA NA NA NA NA Amount of effluent generation NA (CMD): Capacity of the ETP: NA

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 201 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Amount of treated effluent NA recycled : Amount of water send to the CETP: NA Membership of CETP (if require): NA Note on ETP technology to be used NA Disposal of the ETP sludge NA 38.Hazardous Waste Details Serial Description Cat UOM Existing Proposed Total Method of Disposal Number 1 Used oil, oil filters 5.1 NA NA NA NA Authorised agency 39.Stacks emission Details Height Internal Serial Fuel Used with from Temp. of Exhaust Section & units Stack No. diameter Number Quantity ground Gases (m) level (m) 1 NA NA NA NA NA NA 40.Details of Fuel to be used Serial Type of Fuel Existing Proposed Total Number 1 NA NA NA NA 41.Source of Fuel NA 42.Mode of Transportation of fuel to site NA

Total RG area : NA No of trees to be cut NA : Number of trees to NA 43.Green Belt be planted : Development List of proposed NA native trees : Timeline for completion of NA plantation : 44.Number and list of trees species to be planted in the ground Serial Characteristics & ecological Name of the plant Common Name Quantity Number importance 1 NA NA NA NA 45.Total quantity of plants on ground 46.NumberSEIAA-AGENDA-0000000001 and list of shrubs and bushes species to be planted in the podium RG: Serial Name C/C Distance Area m2 Number 1 NA NA NA 47.Energy

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 202 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Source of power NA supply : During Construction Phase: (Demand NA Load) DG set as Power back-up during NA construction phase During Operation phase (Connected NA load): Power During Operation requirement: phase (Demand NA load): Transformer: NA DG set as Power back-up during NA operation phase: Fuel used: NA Details of high tension line passing NA through the plot if any: 48.Energy saving by non-conventional method: NA 49.Detail calculations & % of saving: Serial Energy Conservation Measures Saving % Number 1 NA NA 50.Details of pollution control Systems Source Existing pollution control system Proposed to be installed NA NA NA

Budgetary allocation Capital cost: NA (Capital cost and O&M cost): O & M cost: NA 51.Environmental Management plan Budgetary Allocation a) Construction phase (with Break-up): Serial Attributes Parameter Total Cost per annum (Rs. In Lacs) Number 1 SEIAA-AGENDA-0000000001NA NA NA b) Operation Phase (with Break-up): Serial Capital cost Rs. In Operational and Maintenance Component Description Number Lacs cost (Rs. in Lacs/yr) 1 NA NA NA NA 51.Storage of chemicals (inflamable/explosive/hazardous/toxic substances)

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 203 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Maximum Quantity of Storage Consumption Storage Source of Means of Description Status Location Capacity / Month in at any Supply transportation in MT MT point of time in MT NA NA NA NA NA NA NA NA 52.Any Other Information No Information Available 53.Traffic Management Nos. of the junction to the main road & NA design of confluence: Number and area of NA basement: Number and area of NA podia: Total Parking area: NA Area per car: NA Area per car: NA Number of 2- Wheelers as Parking details: approved by NA competent authority: Number of 4- Wheelers as approved by NA competent authority: Public Transport: NA Width of all Internal NA roads (m): CRZ/ RRZ clearance NA obtain, if any: Distance from Protected Areas / Critically Polluted NA areas / Eco-sensitive areas/ inter-State boundaries SEIAA-AGENDA-0000000001Category as per schedule of EIA NA Notification sheet Court cases pending NA if any Other Relevant Application submitted for CRZ Clearance for Worli and Sidhivinayak

Informations Station. Have you previously submitted No Application online on MOEF Website.

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 204 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA) Date of online - submission Brief information of the project by SEAC DECISION OF SEAC

Specific Conditions by SEAC: SEIAA DECISION MCZMA recommended the proposal to SEIAA from the CRZ point of view in its 114th meeting subject to complaince of following conditions:

1. Proposed construction should be in accordance with provisions of CRZ Notification,2011(amended from time to time)

2. Playground at Siddhivinayak temple should be restored once the Underground station is constructed.

3. MMRCL to ensure that proposed activity on reservation areas is in consonance with remarks given by the UDD.

4. Environment Management Plan should be implemented during construction and operation phase of the project

5. PP to ensure that proper disaster management plans is in place for the proposed activities.

6. Dust suppression measures should be implemented during construction phase of the project.

7. PP to ensure that noise levels are within the prescribed limits and on construction should be undertaken during night hours. Noise mufflers should be installed.

8. All other required permissions from different statutory authorities should be obtained.

SEIAA decided toSEIAA-AGENDA-0000000001 recommend proposal for approval.

Specific Conditions by SEIAA:

1) PP to submit copy of point wise compliance of conditions stipulated by MCZMA in their 114th meeting FINAL RECOMMENDATION SEIAA have decided to grant the proposal for Prior Environmental Clearance subject to above conditions

Shri Satish.M.Gavai SEIAA Meeting No: SEIAA meeting no 108 Page 205 Shri. Anand Kulkarni (Member Secretary SEIAA) Meeting Date: April 7, 2017 of 205 (Chairman SEIAA)