<<

IR-release: Q3 and 9M 2013 operational overview

October 11, 2013 Disclaimer

IMPORTANT: You must read the following before continuing.

The below applies to the presentation (the “Presentation”) following this important notice, and you are therefore advised to read this important notice carefully before reading, accessing or making any other use of this Presentation.

The information contained herein has been prepared for the use in this Presentation and has not been independently verified. Such information is confidential and is being provided to you solely for your information and may not be reproduced, retransmitted, further distributed to any other person or published, in whole or in part, for any purpose. ALROSA relies on information obtained from sources believed to be reliable but does not guarantee its accuracy or completeness. None of ALROSA or any of its affiliates or controlling shareholders intends or otherwise is under any obligation to update or keep current the information (or to correct any inaccuracy) contained herein.

This Presentation contains statements about future events and expectations that are forward-looking statements. Any statement herein that is not a statement of historical fact is a forward- looking statement that involves known and unknown risks, uncertainties and other factors which may cause ALROSA’s actual results, performance or achievements to be materially different from any future results, performance or achievements expressed or implied by such forward-looking statements. Past performance should not be taken as an indication or guarantee of future results, and no representation or warranty, express or implied, is made regarding the future performance. ALROSA assumes no obligation to update, supplement or revise the forward-looking contained herein to reflect actual results, changes in assumptions or changes in factors affecting these statements. In no circumstances shall the distribution of this Presentation imply that no negative change may occur in the business of ALROSA after the date of such distribution, or any date of amendment and/or addition hereto.

The diamond resources and reserves estimates provided in this Presentation have been prepared and presented in accordance with the standards and classifications of the JORC Code (the Australasian Code for Reporting of Exploration Results, Mineral Resources and Ore Reserves as promulgated by the Australasian Joint Ore Reserves Committee), which differ in significant respects from the standards and classifications applicable to the disclosure of mineral resources and reserves under the laws and regulations of certain other jurisdictions, including the regulations of the U.S. Securities Exchange Commission (the “SEC”) with respect to registration statements and other documents filed with the SEC. Among other things, in accordance with the JORC Code, this Presentation provides certain mineral resources estimates classified as “inferred”, “indicated” or “measured”, which differ in significant respects from “probable” and “proven” mineral reserves estimates and are not disclosed in certain jurisdictions, including in SEC filings. There can be significant uncertainty as to whether mineral resources can ever be feasibly and commercially mined. For further explanation of the JORC Code, see the JORC website at www.jorc.org.

Neither this Presentation, nor the fact of its distribution, does constitute or form part of and should not be construed as, an offer to sell or issue or the solicitation of an offer to buy or acquire any securities in any jurisdiction or an inducement to enter into any investment activity and nothing contained herein shall form the basis of any contract or commitment or investment decision whatsoever. The contents hereof should not be construed as investment, legal, tax, accounting or other advice, and investors and prospective investors in securities of any issuer mentioned herein are required to make their own independent investigation and appraisal of the business and financial condition of such issuer and the nature of the securities and consult their own advisers as to legal, financial, tax and other related matters.

No reliance may be placed for any purposes whatsoever on the information contained in this Presentation or on its completeness, accuracy or fairness. The information in this Presentation is subject to verification, completion and change. Accordingly, no representation or warranty or undertaking, express or implied, is made as to, and no reliance should be placed on, the accuracy, completeness or fairness of the information or opinions contained in this Presentation. None of ALROSA nor any of its shareholders, directors, officers or employees, affiliates, advisors, representatives nor any other person accepts any liability whatsoever for any loss howsoever arising from any use of this Presentation or its contents or otherwise arising in connection therewith.

This Presentation is not directed to, or intended for distribution to or use by, any person or entity that is a citizen or resident or located in any locality, state, country or other jurisdiction where such distribution, publication, availability or use would be contrary to law or regulation or which would require any registration or licensing within such jurisdiction. Persons in whose possession this Presentation and/or such information may come are required to inform themselves about and to observe such restrictions.

Some numerical figures included in this Presentation have been subject to rounding adjustments.

By reviewing this Presentation you acknowledge and agree to be bound by the foregoing.

2 I. Operational II. Aikhal Division III. Mirny Division IV. Division V. Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Operational overview of ALROSA

Diamond production (mln cts)

9M 2013 27.1 9M 2012 25.4

Diamonds produced (mln cts) 8.1 8.3 9.1 7.5 9.6 9.9

Ore and gravels Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 processed (mln t) 5.2 7.9 10.0 5.4 9.9 14.3

Grade 1.56 1.04 0.91 1.37 0.97 0.69 (cpt)

Q3 2013 diamond production totaled 9.9 mln cts, which Growth drivers: is 9% higher compared to Q3 2012 acquisition of OJSC Nizhne-Lenskoye ALROSA’s 9M 2013 diamond production totaled improved grade at Jubilee pipe 27.1 mln cts, which is 6% higher compared to 9M 2012 increased output from Mir underground mine

3 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Diamond production

Q3 2013 9M 2013 Q3 Q3 9M 9M ‘000 cts vs. vs. 2013 2012 2013 2012 Q3 2012 9M 2012 Aikhal Division 2,456 2,901 (15%) 8,109 6,348 28% Jubilee pipe 2,456 1,713 43% 6,628 4,542 46%

Aikhal underground mine 0 1,129 - 1,435 1,675 (14%)

Komsomolskaya pipe 0 59 - 46 131 (65%) Mirny Division 1,885 1,770 6% 5,455 6,662 (18%)

International underground mine 1,099 1,106 (1%) 3,228 4,658 (31%)

Mir underground mine 518 369 40% 1,586 1,366 16%

Alluvial and technogenic deposits 268 295 (9%) 641 638 0%

Udachny Division 480 241 99% 3,462 3,970 (13%)

Udachnaya pipe 465 241 93% 3,352 3,859 (13%) Zarnitsa pipe 15 0 - 110 111 (1%) Nyurba Division 2,022 2,430 (17%) 5,076 5,633 (10%) Nyurbinskaya pipe 1,504 2,020 (26%) 4,283 5,127 (16%) Alluvial deposits 517 410 26% 792 506 57%

Lomonosov Division (OJSC Severalmaz (hereinafter Severalmaz)) 155 152 2% 423 420 1%

Arkhangelskaya pipe 155 152 2% 423 420 1% OJSC Almazy Anabara (hereinafter Almazy Anabara) 1,553 1,592 (2%) 2,520 2,408 5% OJSC Nizhne-Lenskoye* (hereinafter Nizhne-Lenskoye) 1,397 1,227 - 2,009 1,521 - Total 9,947 9,086 9% 27,053 25,440 6%

* In 2012 and earlier Nizhne-Lenskoye results are not included into ALROSA operational results

4 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

ALROSA’s production footprint

Arkhangelsk Lomonosov Division (2%) region (2%) Arkhangelskaya pipe (2%)

Arkhangelsk

Karpinskogo-1 pipe ( – ) Russia

Republic of (Yakutia) (98%) Mining methods: Underground mining (23%) Open-pit mining (55%) Almazy Anabara (9%) Alluvial mining (22%)

Nizhne-Lenskoye (7%)

Republic of Sakha (Yakutia) Udachny Division (13%) Udachnaya pipe (12%) Aikhal Division (30%) Zarnitsa pipe (less than 1%) Jubilee pipe (25%) Udachny Aikhal pipe (5%) Aikhal Nyurba Division (19%) Komsomolskaya pipe Nyurbinskaya pipe (16%) (less than 1%) Nyurba Botuobinskaya pipe ( – ) Mirny Division (20%) Mirny Mir pipe (6%) Alluvial deposits (3%) International pipe (12%)

Alluvial deposits (2%)

Percentage in brackets indicates the share of region/division/pipe in 9M 2013 ALROSA production

5 AIKHAL DIVISION

6 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Aikhal Division overview

Division structure Almazy Anabara Processing plant No. 8 Aikhal pipe Komsomolskaya Nizhne-Lenskoye Komsomolskaya pipe pipe Processing plant No. 14 Udachny DIvision Jubilee pipe Processing plant No. 14 Udachny Capacity: 10 mln t annually Aikhal Division Aikhal

Nyurba DIvision Yakutsk Nyurba Mirny DIvision Mirny

Share in 2012 ALROSA Processing plant No. 8 0 200 400 km production: Capacity: 1.7 mln t annually 26% Jubilee pipe

Aikhal

Mining methods:

2012 Results Underground mining Diamonds Ore processed Aikhal pipe Open-pit mining produced (‘000 t) (‘000 cts)

10,526 8,945

7 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Jubilee pipe

Mining method:

Open-pit mining current mining area

Commissioned: 0 m surface 1985

Current open pit depth: 315 m -315 m current open pit depth

eastern lobe

central lobe

western lobe Resources inclusive of reserves (as of 01.07.2013) according to JORC Code -720 m target open pit depth; Contained Tonnage Grade boundary of indicated diamonds (‘000 t) (cpt) resources (‘000 cts) Indicated resources Indicated Inferred resources 129,017 0.84 108,166 -1,100 m Resources not classified in boundary of inferred Inferred accordance with JORC Code* resources 65,977 0.62 40,594 -1,300 m boundary of exploration Total

194,994 0.76 148,760 * Potential resources according to the Russian State Commission for Mineral Reserves classification

8 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Jubilee pipe: production overview

Q3 2013 diamond production increased by 43% Diamond production increase in Q3 2013 was driven Share in 2012 ALROSA compared to Q3 2012 by mining of ore from the central lobe with higher production: grades 18%

9M 2012 9M 2013 4,542 6,628

2,456 2,232 1,940 1,713 Diamonds produced 1,669 (‘000 cts) 1,160

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 2,350 2,474 2,395 2,405 2,375 2,040 (‘000 t)

Grade 0.49 0.67 0.72 0.81 0.94 1.20 (cpt)

9 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Aikhal pipe

Period of open-pit mining: current mining area 1961-1996 0 m Open pit depth: surface 305 m

Mining method: -305 m Underground mine open pit depth

Start of underground mining operations: 2005 -500 m boundary of indicated resources south-western ore body north-eastern ore body

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code Contained -700 m Tonnage Grade diamonds boundary of inferred (‘000 t) (cpt) resources of south- (‘000 cts) western ore body Indicated resources western lobe Indicated Inferred resources eastern lobe 7,729 4.68 36,159 Resources not classified in Inferred accordance with JORC Code* -900 m 8,269 3.87 31,967 boundary of exploration

Total

15,998 4.26 68,126 * Potential resources according to the Russian State Commission for Mineral Reserves classification

10 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Aikhal pipe: production overview

Ore from Aikhal underground mine was not processed in Q3 2013 due to planned maintenance works at the Share in 2012 ALROSA processing plant No.8 production: 7% 9M 2012 9M 2013 1,675 1,435

1,435 1,129 Diamonds produced (‘000 cts) 546

0 0 0

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 0 98 202 0 263 0 (‘000 t)

Grade 0.00 5.57 5.59 0.00 5.46 0.00 (cpt)

11 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Komsomolskaya pipe

Mining method: Open-pit mining

Commissioned:

2000 0 m surface Current open pit depth: 335 m

Resources inclusive of reserves (as of 01.07.2013) -335 m according to JORC Code current open pit depth Contained Tonnage Grade diamonds (‘000 t) (cpt) (‘000 cts) Indicated Indicated resources -470 m 4,812 0.38 1,808 target open pit depth; boundary of indicated Total resources 4,812 0.38 1,808

12 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Jubilee pipe Aikhal pipe Komsomolskaya pipe Komsomolskaya pipe: production overview

Ore from Komsomolskaya pipe was not processed in 3Q 2013 due to planned annual maintenance works Share in 2012 ALROSA at the processing plant No. 8 production: less than 1%

9M 2012 9M 2013 131 46

72 59 Diamonds produced 44 (‘000 cts)

0 2 0

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 0 218 152 200 6 0 (‘000 t)

Grade 0.00 0.33 0.39 0.22 0.33 0.00 (cpt)

13 MIRNY DIVISION

14 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

International pipe Mir pipe Alluvial and technogenic deposits Mirny Division overview

Division structure Almazy Anabara Processing plant No. 3 Mir pipe International pipe Nizhne-Lenskoye Vodorazdelniye Galechniki placer Udachny Division Processing plant No. 3 Udachny Tailings of Processing plant Aikhal Division Capacity: 2 mln t annually Aikhal No. 5 Dredges No. 201, 202, 203 Nyurba Division Yakutsk Nyurba Irelyakhskaya placer Mirny Division Mirny

Mirny Vodorazdelniye Galechniki placer Share in 2012 ALROSA production: 0 200 400 km

25% Mir pipe

International Dredges No. 201, 202, 203 pipe 2012 Results Capacity: 4 mln t annually Mining methods: Ore processed at processing plant No.3 2,161 Irelyakhskaya Underground mining (‘000 t) placer Alluvial mining Gravels processed at dredges No. 201, 202, 203 3,193 (‘000 t)

Ore and gravels processed 5,354 (‘000 t)

Diamonds produced 8,707 (‘000 cts)

15 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

International pipe Mir pipe Alluvial and technogenic deposits International pipe

Period of open-pit mining: 0 m 1971-1981 surface Period of open pit development: 2005-2011

Open pit depth: 310 m -310 m open pit depth Mining method:

Underground mining current mining area

Start of underground mining operations: 1999

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code Contained Tonnage Grade diamonds Indicated resources (‘000 t) (cpt) (‘000 cts) Inferred resources Indicated -1,085 m Resources not classified in boundary of indicated accordance with JORC Code* 4,208 8.73 36,739 resources Inferred -1,215 m 1,542 7.98 12,304 boundary of inferred resources Total -1,475 m boundary of exploration 5,750 8.53 49,043 * Potential resources according to the Russian State Commission for Mineral Reserves classification

16 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

International pipe Mir pipe Alluvial and technogenic deposits International pipe: production overview

Q3 2013 diamond production decreased by 1% Diamond production in Q3 2013 was in line with Share in 2012 ALROSA compared to Q3 2012 the Company’s plan production: 17%

9M 2012 9M 2013 4,658 3,228

2,347

Diamonds produced 1,205 (‘000 cts) 1,106 1,082 1,047 1,099

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 299 133 124 130 118 113 (‘000 t)

Grade 7.85 9.06 8.92 8.32 8.87 9.73 (cpt)

17 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

International pipe Mir pipe Alluvial and technogenic deposits Mir pipe

Period of open-pit mining: current mining area 1959-2001

Open pit depth: 0 m 525 m surface

Mining method: Underground mining

Start of underground mining operations: -525 m 2009 open pit depth -545 m upper boundary of indicated resources

dry shutdown Resources inclusive of reserves (as of 01.07.2013) according to JORC Code Contained Indicated resources Tonnage Grade diamonds (‘000 t) (cpt) (‘000 cts) Inferred resources Indicated -950 m boundary of indicated 29,211 3.55 103,782 resources Inferred

10,913 3.11 33,940 -1,235 m boundary of exploration Total

40,124 3.43 137,722

18 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

International pipe Mir pipe Alluvial and technogenic deposits Mir pipe: production overview

Q3 2013 diamond production increased by 40% Diamond production grew in Q3 2013 due to Share in 2012 ALROSA compared to Q3 2012 increase in ore processing along with the production: Company’s plan and improved grade 5%

9M 2012 9M 2013 1,366 1,586

597 518 504 493 471 Diamonds produced 369 (‘000 cts)

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 127 135 111 144 184 154 (‘000 t)

Grade 3.97 3.65 3.32 3.27 3.24 3.36 (cpt)

19 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

International pipe Mir pipe Alluvial and technogenic deposits Alluvial and technogenic deposits Deposits Q3 2013 diamond production decreased by 9% Diamond production decreased in Q3 2013 due to Vodorazdelniye Galechniki compared to Q3 2012 planned processing of lower quality gravels placer Irelyakhskaya placer Tailings of processing plant 9M 2012 9M 2013 No. 5 638 641

295 261 268 239 Diamonds produced Share in 2012 ALROSA (‘000 cts) 134 production: 82 3% Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Gravels processed (‘000 t) 92 1,152 1,808 242 818 1,865 Grade 0.89 0.23 0.16 0.99 0.16 0.14 (cpt)

2012 Results Gravels Diamonds Grade processed produced (cpt) (‘000 t) (‘000 cts)

4,136 0.23 936

Resources and reserves of Mirny Division alluvial placers were not included into JORC Code valuation

20 UDACHNY DIVISION

21 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Udachnaya pipe Zarnitsa pipe Udacnhy Division overview

Division structure Almazy Anabara Processing plant No. 12 Udachnaya pipe Zarnitsa pipe Nizhne-Lenskoye

Udachny Division Udachny Aikhal Division Aikhal Zarnitsa pipe Nyurba Division Yakutsk Nyurba

Mirny Division Udachnaya Mirny pipe

Share in 2012 ALROSA 0 production: 200 400 км 17%

Mining method:

Processing plant No. 12 Open-pit mining Capacity: 12 mln t annually

2012 Results Diamonds Ore processed produced (‘000 t) (‘000 cts)

4,619 5,845

22 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Udachnaya pipe Zarnitsa pipe Udachnaya pipe

Mining method:

Open-pit mining current mining area Ore stockpile (measured resources) Commissioned:

1971 0 m surface

Current open pit depth: 640 m

-640 m current open pit depth

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code -890 m boundary of indicated Contained Tonnage Grade resources diamonds (‘000 t) (cpt) (‘000 cts) western lobe

Measured eastern lobe 4,820 1.52 7,329 Measured resources Indicated Indicated resources 82,297 1.49 122,278 Inferred resources Inferred -1,390 m boundary of inferred 78,305 1.25 98,157 resources

Total

165,422 1.38 227,764

23 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Udachnaya pipe Zarnitsa pipe Udachnaya pipe: production overview

Share in 2012 ALROSA In Q3 2013 diamond production increased 1.9 times compared to Q3 2012, ore processing increased 3 times production: due to lower grade at eastern ore lobe of Udachnaya pipe 16% 9M 2012 9M 2013 3,859 3,352

2,050

1,568 1,557 Diamonds produced 1,330 (‘000 cts)

465 241

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 1,308 1,008 150 1,400 1,563 447 (‘000 t)

Grade 1.57 1.56 1.61 1.11 0.85 1.04 (cpt)

24 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Udachnaya pipe Zarnitsa pipe Zarnitsa pipe

Mining method:

Open-pit mining current mining area

Commissioned:

1999 0 m surface

Current open pit depth: -90 m current open pit depth 90 m

-200 m boundary of indicated resources

-400 m target open pit depth

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code Contained Tonnage Grade diamonds (‘000 t) (cpt) Indicated resources (‘000 cts) Resources not classified in Indicated accordance with JORC Code* 58,554 0.21 12,007 -700 m boundary of exploration Total

58,554 0.21 12,007 * Estimated reserves and potential resources according to the Russian State Commission for Mineral Reserves classification

25 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Udachnaya pipe Zarnitsa pipe Zarnitsa pipe: production overview

In Q3 2013 diamond production at Zarnitza pipe totaled 15 thousand cts Share in 2012 ALROSA production: In 9M 2013 diamond production reached 110 thousand cts, which is in line with production in 9M 2012 Ore from Zarnitsa pipe was not processed in Q3 2012 due to planned maintenance works at the processing less than 1% plant No.12 9M 2012 9M 2013 111 110

69 53 Diamonds produced 42 42 (‘000 cts)

15 0

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 320 200 0 250 295 150 (‘000 t)

Grade 0.22 0.21 0.00 0.17 0.18 0.10 (cpt)

26 NYURBA DIVISION

27 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Nyurbinskaya pipe Botuobinskaya pipe Alluvial deposits Nyurba Division overview

Division structure Almazy Anabara Processing plant No. 15

Nyurbinskaya placer Processing plant No. 15 Capacity: 0.5 mln t annually Botuobinskaya placer* Nizhne-Lenskoye Processing plant No. 16 Udachny Division Nyurbinskaya pipe Processing plant No. 16 Udachny Capacity: 1.4 mln t annually Aikhal Division Botuobinskaya pipe* Aikhal

Nyurbinskaya placer Nyurba Division Yakutsk Nyurba * Pre-construction activities and waste Mirny Division Mirny stripping are in progress

Share in 2012 ALROSA 0 200 400 km production: 23% Nyurbinskaya placer

Botuobinskaya Nyurbinskaya placer pipe

Mining method:

2012 Results Underground mining Diamonds Ore processed Open-pit mining produced Botuobinskaya (‘000 t) (‘000 cts) pipe Alluvial mining

2,105 7,956

28 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Nyurbinskaya pipe Botuobinskaya pipe Alluvial deposits Nyurbinskaya pipe

Mining method: Open-pit mining

current mining area Commissioned: 2001 0 m surface Current open pit depth: 265 m

-265 m current open pit depth

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code -570 m Contained target open pit depth; Tonnage Grade diamonds boundary of indicated (‘000 t) (cpt) (‘000 cts) resources

Indicated -750 m 12,264 4.13 50,661 boundary of exploration; Indicated resources boundary of inferred Inferred resources Inferred resources 1,192 5.42 6,465 Resources not classified in Total accordance with JORC Code*

13,456 4.25 57,126 * Potential resources according to the Russian State Commission for Mineral Reserves classification

29 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Nyurbinskaya pipe Botuobinskaya pipe Alluvial deposits Nyurbinskaya pipe: production overview

Q3 2013 diamond production decreased by 26% Diamond production decreased in Q3 2013 due to Share in 2012 ALROSA compared to Q3 2012 lower volumes of processed ore caused by grown production: gravels involvement into processing at the processing plant No.16 as scheduled along with 21% the Company’s plan 9M 2012 9M 2013 5,127 4,283

2,020 1,978 1,756 1,504 1,351 Diamonds produced (‘000 cts) 801

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 400 220 415 400 124 285 (‘000 t)

Grade 4.39 6.14 4.87 4.95 6.46 5.28 (cpt)

30 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Nyurbinskaya pipe Botuobinskaya pipe Alluvial deposits Botuobinskaya pipe

Commence of waste stripping: December 2012

0 m surface -75 m depth of ore body bedding

overburden

Resources inclusive of reserves -580 m (as of 01.07.2013) target open pit depth; according to JORC Code boundary of indicated Contained resources Tonnage Grade diamonds (‘000 t) (cpt) (‘000 cts) -780 m Indicated resources boundary of inferred Indicated resources 13,679 5.19 71,044 Inferred resources Resources not classified in Inferred accordance with JORC Code* -980 m 2,685 5.14 13,790 boundary of exploration Total

16,364 5.18 84,834 * Potential resources according to the Russian State Commission for Mineral Reserves classification

31 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Nyurbinskaya pipe Botuobinskaya pipe Alluvial deposits Alluvial deposits

Deposits Q3 2013 diamond production increased by 26% Diamond production increase in Q3 2013 was Nyurbinskaya placer compared to Q3 2012 driven by increased volumes of gravels mined as scheduled along with the Company’s plan Botuobinskaya placer

9M 2012 9M 2013 506 792

517 410

Diamonds produced 275 Share in 2012 ALROSA (‘000 cts) production: 96 2% 0 0 Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Gravels processed (‘000 t) 0 201 410 0 251 520 2012 Results Grade Gravels Diamonds 0.00 0.48 1.00 0.00 1.10 0.99 Grade (cpt) processed produced (cpt) (‘000 t) (‘000 cts)

679 1.00 680

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code Contained Tonnage Grade diamonds (‘000 t) (cpt) (‘000 cts)

13,668 1.68 22,989

32 LOMONOSOV DIVISION (SEVERALMAZ)

33 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Arkhangelskaya pipe Karpinskogo-1 pipe Lomonosov Division (Severalmaz) overview

Division structure Processing plant No. 1* Arkhangelskaya pipe Karpinskogo-1 pipe** Lomonosov Division * Development in progress, construction of module No. 2 ** Waste stripping in progress Arkhangelsk Karpinskogo-1 pipe Processing plant No. 1

0 250 500 km Share in 2012 ALROSA Module No. 1 Module No. 2 production: Capacity: 1 mln t annually Capacity: 3 mln t annually 2%

Mining method: Arkhangelskaya pipe Open-pit mining

2012 Results Diamonds Ore processed produced (‘000 t) (‘000 cts)

1,100 559

34 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Arkhangelskaya pipe Karpinskogo-1 pipe Arkhangelskaya pipe

Mining method: Open-pit mining current mining area Commissioned: 0 m 2005 surface

Current open pit depth:

114 m -114 m current open pit depth

-348 m target open pit depth

Resources inclusive of reserves -460 m boundary of indicated (as of 01.07.2013) resources according to JORC Code Contained Tonnage Grade diamonds (‘000 t) (cpt) (‘000 cts) Indicated

56,226 0.77 43,406 Indicated resources

Inferred Inferred resources 39,408 0.98 38,623 -940 m boundary of inferred Total resources

95,634 0.86 82,029

35 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Arkhangelskaya pipe Karpinskogo-1 pipe Arkhangelskaya pipe: production overview

Q3 2013 diamond production increased by 2% Diamond production increased in Q3 2013 due to Share in 2012 ALROSA compared to Q3 2012 higher grades production: 2% 9M 2012 9M 2013 420 423

152 155 148 142 120 126 Diamonds produced (‘000 cts)

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Ore processed 272 279 285 272 279 281 (‘000 t)

Grade 0.44 0.53 0.53 0.46 0.51 0.55 (cpt)

36 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Arkhangelskaya pipe Karpinskogo-1 pipe Karpinskogo-1 pipe

Current open pit depth:

44 m 0 m surface Commence of waste stripping: -44 m 2009 current open pit depth

overburden

-262 m target open pit depth

-462 m boundary of indicated resources

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code -662 m Contained boundary of inferred Tonnage Grade diamonds resources (‘000 t) (cpt) (‘000 cts) Indicated resources

Indicated Inferred resources 24,988 1.08 26,960 Resources not classified in accordance with JORC Code* Inferred -942 m 5,168 1.26 6,512 boundary of exploration Total

30,156 1.11 33,472 * Potential resources according to the Russian State Commission for Mineral Reserves classification

37 ALMAZY ANABARA

38 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Almazy Anabara

Deposits Q3 2013 diamond production decreased by 2% Diamond production decreased in Q3 2013 due to Morgogor placer compared to Q3 2012 lower grades and increased volumes of gravels processed Istok placer Holomolokh placer

Ebelyakh placer 9M 2012 9M 2013 Gusinaya placer 2,408 2,520 41 Ruchey placer Kurung-Yuryakh placer 1,592 1,553

Diamonds produced 967 816 (‘000 cts) Share in 2012 ALROSA production: 7% 0 0 Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Gravels processed (‘000 t) 0 1,801 3,967 0 1,874 4,876 2012 Results Grade Gravels Diamonds 0.00 0.45 0.40 0.00 0.52 0.32 Grade (cpt) processed produced (cpt) (‘000 t) (‘000 cts)

5,768 0.42 2,408

Resources inclusive of reserves (as of 01.07.2013) according to JORC Code Contained * In JORC report as of 01.07.2013 the Tonnage Grade diamonds resources of Solur-Vostochnaya placer (‘000 t) (cpt) was excluded from the calculation of (‘000 cts) Almazy Anabara resources and reviewed independently by MICON 36,816 0.80 29,597

39 NIZHNE-LENSKOYE

40 I. Operational II. Aikhal Division III. Mirny Division IV. Udachny Division V. Nyurba Division VI. Lomonosov Division VII. Alamazy Anabara VIII. Nizhne-Lenskoye overview

Nizhne-Lenskoye

Deposits Situated in Bulunsky and Anabarsky municipal Acquired by Almazy Anabara in 2013 Molodo placer districts of the Republic of Sakha (Yakutia) close to Q3 2013 diamond production totaled 1.4 mln carats the existing production facilities of Almazy Anabara Billyakh placer

9M 2012 9M 2013 1,521 2,009

1,397 1,227

Diamonds produced 612 (‘000 cts) 294

0 0

Q1 2012 Q2 2012 Q3 2012 Q1 2013 Q2 2013 Q3 2013 Gravels processed (‘000 t) 0 890 2,849 0 1,786 3,552 Grade 0.00 0.33 0.43 0.00 0.34 0.39 (cpt)

2012 Results* Gravels Diamonds Grade processed produced (cpt) (‘000 t) (‘000 cts) 3,739 0.41 1,521

* In 2012 and earlier Nizhne-Lenskoye results are not included into ALROSA operational results

41 Appendix

42 Diamond production

Q1 Q2 Q3 9M Q4 Q1 Q2 Q3 9M ‘000 cts 2011 2012 2012 2012 2012 2012 2012 2013 2013 2013 2013

Aikhal Division 5,262 8,945 1,160 2,287 2,901 6,348 2,597 1,984 3,669 2,456 8,109

Jubilee pipe 3,589 6,272 1,160 1,669 1,713 4,542 1,730 1,940 2,232 2,456 6,628

Aikhal underground mine 1,306 2,520 0 546 1,129 1,675 845 0 1,435 0 1,435

Komsomolskaya pipe 367 153 0 72 59 131 22 44 2 0 46

Mirny Division 8,138 8,707 2,933 1,959 1,770 6,662 2,045 1,792 1,778 1,885 5,455

International underground mine 5,912 5,916 2,347 1,205 1,106 4,658 1,258 1,082 1,047 1,099 3,228

Mir underground mine 1,321 1,855 504 493 369 1,366 489 471 597 518 1,586

Alluvial and technogenic deposits 905 936 82 261 295 638 298 239 134 268 641

Udachny Division 10,583 5,845 2,119 1,610 241 3,970 1,875 1,598 1,383 480 3,462

Udachnaya pipe 10,374 5,642 2,050 1,568 241 3,859 1,783 1,557 1,330 465 3,352

Zarnitsa pipe 209 203 69 42 0 111 92 42 53 15 110

Nyurba Division 7,478 7,956 1,756 1,447 2,430 5,633 2,323 1,978 1,076 2,022 5,076 Nyurbinskaya pipe 6,950 7,276 1,756 1,351 2,020 5,127 2,149 1,978 801 1,504 4,283

Alluvial deposits 528 680 0 96 410 506 174 0 275 517 792

Lomonosov Division (Severalmaz) 557 559 120 148 152 420 139 126 142 155 423

Arkhangelskaya pipe 557 559 120 148 152 420 139 126 142 155 423

Almazy Anabara 2,534 2,408 0 816 1,592 2,408 0 0 967 1,553 2,520

Nizhne-Lenskoye* 1,506 1,521 0 294 1,227 1,521 0 0 612 1,397 2,009 Total 34,552 34,420 8,088 8,266 9,086 25,441 8,980 7,478 9,627 9,947 27,053

* In 2012 and earlier Nizhne-Lenskoye results are not included into ALROSA operational results

43 Ore and sands processing

Q1 Q2 Q3 9M Q4 Q1 Q2 Q3 9M ‘000 t 2011 2012 2012 2012 2012 2012 2012 2013 2013 2013 2013

Aikhal Division 11,165 10,526 2,350 2,790 2,749 7,889 2,637 2,605 2,644 2,040 7,289 Jubilee pipe 9,833 9,627 2,350 2,474 2,395 7,219 2,408 2,405 2,375 2,040 6,820

Aikhal underground mine 231 432 0 98 202 300 132 0 263 0 263

Komsomolskaya pipe 1,101 467 0 218 152 370 97 200 6 0 206

Mirny Division 3,184 5,354 518 1,420 2,043 3,981 1,373 516 1,120 2,132 3,768

International underground mine 747 711 299 133 124 556 155 130 118 113 361

Mir underground mine 339 507 127 135 111 373 134 144 184 154 482

Alluvial and technogenic deposits 2,098 4,136 92 1,152 1,808 3,052 1,084 242 818 1,865 2,925

Udachny Division 6,350 4,619 1,628 1,208 150 2,986 1,633 1,650 1,858 597 4,105

Udachnaya pipe 5,350 3 619 1,308 1,008 150 2,466 1,153 1,400 1,563 447 3,410

Zarnitsa pipe 1,000 1 000 320 200 0 520 480 250 295 150 695

Nyurba Division 2,100 2,105 400 421 825 1,646 459 400 375 805 1,580 Nyurbinskaya pipe 1,350 1,426 400 220 415 1,035 391 400 124 285 809

Alluvial deposits 750 679 0 201 410 611 68 0 251 520 771

Lomonosov Division (Severalmaz) 1,066 1,100 272 279 285 836 264 272 279 281 832

Arkhangelskaya pipe 1,066 1,100 272 279 285 836 264 272 279 281 832

Almazy Anabara 5,961 5,768 0 1,801 3,967 5,768 0 0 1,874 4,876 6,750

Nizhne-Lenskoye* 3,604 3,739 0 890 2 849 3,739 0 0 1,786 3,552 5,338

Total 29,826 29,472 5,168 7,919 10,019 23,106 6,366 5,443 9,936 14,283 29,662

* In 2012 and earlier Nizhne-Lenskoye results are not included into ALROSA operational results

44 Thank you!

ALROSA IR-team contacts: IR@.ru