e-AIP Developments within TopSky-AIM product
SEMINAR ON DATABASE MANAGEMENT FOR EAIP (LIMA, PERU, 1-4 NOVEMBER 2016)
Arnaud BELLOC TopSky-AIM Project Manager & System Engineering Manager
www.thalesgroup.com OPEN e-AIP Developments within TopSky-AIM product
1 – AIM IN THE HEART OF THALES 2 – WHY THALES FOR AN AIXM5.1 SYSTEM ? 3 – AIXM5.1 VERSUS AIXM4.5 4 – TOPSKY-EAIP SMART & MODERN DESIGN 5 – TOPSKY-AIM BENEFITS FOR SAM 6 – ASBU ROADMAP, WHATS NEXT ?
www.thalesgroup.com OPEN
1- Aeronautical Data (AIM) in the Heart of THALES
Airport & Air Traffic Flight Unmanned Aerial
Management Avionics Vehicles systems
2016 All reserved. rights
© Thales ©
-
part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Command & Control Critical Information Navigation Centres - Air Operations and CybersecurityOPEN Solutions 3 November 2016
1 - AIM part of ATM, THALES ATM solutions are trusted by 180 countries
Over 680 7,000 Radars in Navaids
Shaping Tomorrow's Sky operation
2016 All reserved. rights
© Thales ©
-
2 out of every 3 planes 130 Over 20 take-off and land safely thanks ADS-C equipped Air Traffic Control 27 AIMATC References Centres worldwide in 45 countries Systems to Thales including 8 in AIXM5.1 EUROPE Austria, Croatia, Cyprus, France, Germany, Sweden Over Over Aeronautical 27 Information 3,000 25 Mgt. Systems Controller Positions Tower Systems More than in operation 1,800 180 countries ADS-B & CENTRAL & MIDDLE EAST Lebanon, Multilateration Equip. LATIN AMERICA Bahrain Aruba, Chile, AFRICA ASECNA United Arab Emirates COCESNA (Benin, Burkina, Cameroon, Central African (Guat emala, Honduras, Salvador, Costa Rica, Belize, Nicaragua ) Republic, Comoros, Republic of the Congo, Ivory Coast, Gabon, Guinea-Bissau, Equatorial ASIA PACIFIC Guinea, Madagascar, Mali, Mauritania, Niger, Ecuador, Mexico, Senegal, Chad and Togo), Brunei, Algeria, Kenya, Panama, Hong Kong Mauritius, South Africa,
Indonesia, part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Sudan, Tanzania Taiwan, OPEN New Zealand, 4 November 2016 2 - Why THALES for an AIXM5.1 system ? 2016
Operational Mexico Complete Thales AMHS/AIM system AIXM5.1
2016 All reserved. rights
Complete Thales AMHS/AIM system AIXM5.1 Panama
Complete Thales AMHS/AIM system AIXM4.5 COCESNA
© Thales ©
-
Aruba New ! New 2016 July 2016 Thales AMHS/AIS
French Guiana Complete Thales AIM system AIXM4.5
Thales experienced in AIXM 5.1 Ecuador AIXM5.1 in operation Thales AMHS/AIS system production of digital eAIP from AIXM5.1 database Bolivia Thales deploy also regional AIXM 5.1 Thales AMHS system Centralized regional AIXM 5.1 Database Chile
part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales AMHS/AIS system OPEN 5 November 2016 3 - Why AIXM 5.1 in AIM ? / versus AIXM 4.5 AIXM4.5
? ▌ It is a MUST to achieve ICAO AIS to AIM transition, requiring to :
be eTOD Obstacle ready
2016 All reserved. rights
draw SID/STAR/IAP Procedures Geometry in Chart
© Thales ©
-
enable AMDB airport mapping production enable Business rules quality improvement manage the temporality enable SWIM for digital data exchange be Digital NOTAM ready
▌ AIXM 5.1 remains compatible with AIXM 4.5 : when AIXM4.5 is the reference, Thales is able to do a mapping in AIXM5.1,
then a validation by ATM SMS and the Regulator of AIXM5.1 converted data part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis will remain mandatory until AIXM5.1 be the reference. OPEN 6 November 2016
4 - TopSky-eAIP / TopSky-AIM components
▌ TopSky-eAIP Publication
2016 All reserved. rights
© Thales ©
-
Smart Design allowing Automation, Customization & Several products management.
Designed to be ADQ Compliant, do not open Doors when data should be protected.
Modern design handling XML as internal data structure.
Reliable Design including a CMS suitable for Large AIP.
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 7 November 2016
4 - TopSky-eAIP / Smart & Modern DESIGN
▌ Integrated Solution with Open interface
TopSky-eAIP, AGC Charting
2016 All reserved. rights
and GéoTITAN (Procedure Design including PBN )
are fully integrated with TopSky-AIXM (AIXM5 database)
© Thales ©
-
TopSky-eAIP is able to manage Several output (PDF & HTML) & products (AIP single/multi-country, IAC, VAC Aerodromes …)
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 8 November 2016 4 - TopSky-eAIP / Standard Production Workflow
Work-package identification by Coordinator.
Editors performing modification in documents
TopSky-eAIP merges in a consistent set of files
2016 All reserved. rights
source documents modified by the different Editors. © Thales ©
TopSky-eAIP generates all automatically generated sections from the
-
contents of the AIXM database such ENR, AD sections tables. TopSky-eAIP generates a validation report in order to verify Validated the completeness and consistency of the generated documents (no broken links, compliancy with configured DTD etc….). TopSky-eAIP generates the output documents in PDF and HTML format from the source files. Generated documents are approved by a quality Controller and can be published by the Publisher.
Generated output documents are diffused on CD, to EAD/PAMS system, on paper format,
on ANSP web site.
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 9 November 2016 CD-ROM 4 - TopSky-eAIP / Functionalities
▌ 2 modules accessible through single Web interface
2016 All reserved. rights
© Thales ©
-
Production Workflow module
XML document Edition module
Functionalities granted according to User Rights
Controller Publisher part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Coordinator Editors OPEN 10 November 2016
4 - TopSky-eAIP / Smart & Modern DESIGN
▌ Secured Automatic Generation of TopSky-eAIP
2016 All reserved. rights
Secure XML Previously Smart Design allowing Automation, Customization Generated <…>
© Thales © < AIXM attribute >
-
Modern design handling XML as internal data structure XML Generated Do not open Doors when data should be protected Comparison <…> < AIXM attribute > - Indeed, AIP changes are identified at the latest stage during comparison XML Newly between 2 XML files. Generated <…> < AIXM attribute >
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 11 November 2016 5 - TopSky-AIM / Benefits for SAM area
▌ Multi-Country (within a region) ▌ Improve AIP Quality & consistency
AIS (multi-NOF, multi ARO) TopSky-eAIP generates AIP using data
Internet Briefing (large capacity) extracted from a centralized AIXM
2016 All reserved. rights
database avoiding errors issued from
AIM (multi-AIP) AIP constructed from several legacy
© Thales ©
-
Centralized AIXM database database.
Remote country access ▌ Improve SAM ANSP missing FPL capability for AIS/AIM functions concern Solution for limited bandwidth network TopSky-AIS compute and fill-up Contingent AIS/AIM database in remote automatically the AFTN/AMHS distribution country address.
▌ Multi-Country ▌ Procedure design including PBN Ready to exchange/share AIXM fully integrated in AIXM5 Country remain responsible of its own
UUID (AIXM5 ) until guideline from ICAO
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 12 November 2016
6 - ASBU Roadmap / What's next ?
▌ B1-AMET ▌ B1-DAIM Event Digital Meteo (IWXXM) under AMHS ICAO Amendment 77 to Annex 3 Digital NOTAM
Airport Navaid
2016 All reserved. rights
Effective on Applicable (should) Mandatory (Shall) ▌ B1-SWIM 11 July 2016 November 2018 (or 2019)
© Thales © 10 November 2016
Runway Obstacle
AIM
-
External Publisher Taxiway Route SWIM Subscription Service Airspace
AIFS - WFS2.0 AINS SWIM - WS-N 1.3 Publication - AMQP 1.0 email Data user ICAO (EUR Doc 033) First Edition – 2016 AMHS Concept of Operations for the Transition of OPMET Data Exchange using IWXXM Pilot, ATC
…
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 13 November 2016
6 - DNOTAM embedded in TOPLINK/AIM Gate 2016
▌ The TOPLINK demonstration project, Contribution bringing together 14 European partners,
test a panel of new Aeronautical
2016 All reserved. rights
Information Services, in order to Consolidated & extended
© Thales ©
optimize pertinence, accuracy and
- AIM data available via SWIM
readability of aeronautical data to Airlines Operation Centre during flight, and after specific training and other consumer systems for pilots, airlines, ground flight enabling capacity increase dispatchers and air traffic controllers.
http://www.sesar/...TOPLINK_AIM_GATE.pdf
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 14 November 2016
6 - TOPLINK/AIM Gate, AIP SUP & DNOTAM / Special Practical use case
▌ Creating an AIP SUP
from Digital NOTAM
2016 All reserved. rights
© Thales ©
-
R-REVENCHE x + =
The associated graphical view And automatic conversion to ICAO NOTAM Substitute the creation of an AIP SUP Simple & Secure ! Event Airspace
Create the DNOTAM for a
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part Temporary Restricted ZRT OPEN 15 November 2016
6 - 2016 SWIM GLOBAL Demo & TOPLINK / AIM Gate 2016
▌ Event organized by SESAR with the 3
framework of ICAO and the FAA.
2016 All reserved. rights
▌ 40 organizations demonstrating SWIM Demo
© Thales ©
global interoperability capabilities
-
in accordance with regional plans as well as ICAO provisions. ▌ TOPLINK / AIM Gate used as DNOTAM Hub/Backbone Simulate several kinds of information collecting DNOTAM from different exchange related to different phases providers and distributing them to of the flight, such as: flight planning, subscribers (Eurocontrol, FAA, …) departure, cruise and arrival. During each phase, events demonstrates Integration of many configurable information publication in standard SWIM communication interfaces formats: AIXM for aeronautical information, Inter- Validation of interfaces with iWXXM for meteorological information and operability several tools from AIM industries
FIXM for flight and network information. part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Interoperability with external AIM OPEN 16 November 2016 databases 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
Electronic aeronautical charts
Aeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Management Information briefing with data networks Information
originators
© Thales ©
-
Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP Integrated database
Obstacles Digital Unique identifiers Going
Terrain AI conceptual model
Data Integrity Monitoring
Data Quality Monitoring
Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
17 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
Electronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Management Information briefing with data networks Information
originators
© Thales ©
-
Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP IntegratedIntegrated database
Obstacles Digital Unique identifiers Going
Terrain AI conceptualconceptual model
Data Integrity Monitoring
DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
18 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
Electronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Management Information briefing with data networks Information
originators
© Thales ©
-
Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP IntegratedIntegrated database
Obstacles Digital Unique identifiers Going
Terrain AI conceptualconceptual model
Data Integrity Monitoring
eAIP - TopSky-eAIP DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
19 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
Electronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Management Information briefing with data networks Information
originators
© Thales ©
-
Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP IntegratedIntegrated database GéoTITAN ® Obstacles
Procedures - Digital Data4Flight® eTOD Unique identifiers Going Terrain AI conceptualconceptual model
Data Integrity Monitoring
eAIP - TopSky-eAIP DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
20 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
ElectronicElectronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Management Information briefing with data networks Information
originators
© Thales ©
-
Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP Charts - Chart4Flight ® IntegratedIntegrated database GéoTITAN ® Obstacles
Procedures - Digital Data4Flight® eTOD Unique identifiers Going Terrain AI conceptualconceptual model
Data Integrity Monitoring
eAIP - TopSky-eAIP DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
21 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
ElectronicElectronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Management InformationInformation briefing with data networks Information
originators
© Thales ©
- AIS - TopSky-AIS
ARO, NOF, MET, Briefing Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP Charts - Chart4Flight ® IntegratedIntegrated database GéoTITAN ® Obstacles
Procedures - Digital Data4Flight® eTOD Unique identifiers Going Terrain AI conceptualconceptual model
Data Integrity Monitoring
eAIP - TopSky-eAIP DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
22 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
ElectronicElectronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Training Catalogue Management InformationInformation briefing with data networks Information
originators
© Thales ©
- AIS - TopSky-AIS
ARO, NOF, MET, Briefing Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP Charts - Chart4Flight ® IntegratedIntegrated database GéoTITAN ® Obstacles
Procedures - Digital Data4Flight® eTOD Unique identifiers Going Terrain AI conceptualconceptual model
Data Integrity Monitoring
eAIP - TopSky-eAIP DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
23 November 2016 Consolidation 6 – contribution for ICAO AIS to AIM Roadmap
Digital NOTAM
DNOTAM ElectronicElectronic aeronautical charts
AeronauticalAeronautical data exchange 2016 All reserved. rights
Aeronautical Agreements Communication
Training Catalogue Management InformationInformation briefing with data networks Information
originators
© Thales ©
- AIS - TopSky-AIS
ARO, NOF, MET, Briefing Training MET/AIM
interoperability
Aerodrome mapping Electronic AIP Charts - Chart4Flight ® IntegratedIntegrated database GéoTITAN ® Obstacles
Procedures - Digital Data4Flight® eTOD Unique identifiers Going Terrain AI conceptualconceptual model
Data Integrity Monitoring
eAIP - TopSky-eAIP DataData Quality Monitoring
Database - TopSky-AIXM Quality Management System
Annex differences 25% WGS 84 Adherence to AIRAC part or disclosed to a third party without the prior written consent of Thales of consent written prior the without party third a disclosed to or part This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis OPEN
24 November 2016 Consolidation
Conclusion
▌ Thales plays a Key role in AIM in America Latina
Key References - Large AIM system with full AIM offer
2016 All reserved. rights
Long term roadmap with AIM/ATM integrated solution
© Thales ©
-
▌ Thales is committed to play a Key Role in America Latina
Possibility to propose services along with our ANSP partners
Strong know-how in all key ATM and Cyber Security domains
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 25 November 2016
2016 All reserved. rights
© Thales ©
-
Thank you for your attention !
This document may not be reproduced, modified, adapted, published, translated, in any way, in whole or in in or whole any in in way, translated, published, adapted, modified, reproduced, be not may documentThis Thales of consent written prior the without party third a disclosed to or part OPEN 26 November 2016