%Huu\Hvvd &Uhhn

Total Page:16

File Type:pdf, Size:1020Kb

%Huu\Hvvd &Uhhn %HUU\HVVD ¦ § ¨ © &UHHN £ ¡ ¢ £ ¤ ¥ 7UDLO6LJQDJH*XLGHOLQHV &LW\RI6DQ-RVp7UDLO3URJUDP 0DUFK &RS\ULJKWE\WKH&LW\RI6DQ-RVp$OOULJKWVUHVHUYHG %,.(5287( )22' Trail Signage Guidelines Prepared by: Callander Associates Landscape Architecture Inc. 325 S. First Street, Suite 300 San José, CA 95113 Updated By: Chris Mastrodicasa City of San Jose Landscape Designer II Prepared for: City of San José Department of Parks, Recreation and Neighborhood Services Under the direction of: City of San José Department of Public Works - City Facilities Architectural Services Division i Contents 1. Introduction Definitions.................................................................................................................2 How to Use This Document.................................................................................3 2. Trail Signs Trail Signs Index........................................................................................................6 Trail Sign Details.......................................................................................................8 Individual Trail Name Signs...................................................................................50 Matrix of Trail Systems, Icons, and Colors........................................................51 Trail Name Sign Details.........................................................................................55 3. Milestone Markers Network Map with “Zero” Points......................................................................92 Sample Trail System Map.......................................................................................94 Milestone Marker Details.....................................................................................95 4. Acknowledgements and References Project Contributors and Acknowledgements................................................99 References...............................................................................................................101 5. Appendices A - Scope Development B - Goals and Objectives C - Signage Categories and Existing Signs D - Strategies for Improvement E - Milestone Marker Deployment Strategy F - Template for Milestone Marker Documentation G - Mock Milestone Marker Deployment H - Post-Deployment Surveys I - Existing Call Boxes J - Retroreflective Thermoplastic Pavement Striping Specifications K - Anti-Graffiti Coating Specification Trail Signage Guidelines - City of San José Trail Program ii iii Introduction The purpose of this document is to provide the required tools for trail planners, designers, and contractors to deploy a cohesive trail signage program throughout the City of San José’s Trails Network. The City of San José worked closely with its citizenry to define a vision for a 100 mile interconnected network of 35 trail systems as part of its 2000 Greenprint document. This vision has been further solidified by the Mayor and City Council’s 2007 Green Vision which includes the trail network among 10 key goals to be completed within the next fifteen years. Throughout the development of this network, the City has consistently sought to incorporate design practices and elements that support safer usage. Supporting this effort is the development of a fully integrated program for trail signage that will give the users a visual understanding of trail rules and regulations, the tools to track distances traveled, the 911 operators the ability to quickly locate and dispatch assistance to trail users, and the identification of resources and destinations. In addition, a unique and consistent design approach will reinforce that the trails are within San José. Appencides offer background on the project’s development. Trail Signage Guidelines - City of San José Trail Program 1 Definitions Before moving forward, it is important to understand the differences between trail signage and milestone markers. Together these form the trail signage program but each is unique in purpose. Trail Signs A collection of informational signs are generally categorized as guidance, regulatory, warning, or custom (for a unique purpose). Guidance signs are those that identify the trail by name, provide directional information, and identify locations of destinations and amenities. Regulatory signs provide the rules and regulations as well as good behavior direction. Warning signs are very similar to traffic signs in that they alert users to changes in the trail such as curves, narrowing, cross traffic, steep grades, and areas of potential high water. This document also provides a framework and standards for customization of signs to fit site specific requirements. All signage developed for San José was influenced by existing guidelines, such as the Highway Design Manual and the MUTCD (Manual of Uniform Traffic Control Devices). Milestone Markers Milestone markers are short posts, or bollards that are graphically labeled to provide recreation and safety benefits. Recreationally, users can utilize the sequentially-numbered devices to track distances traveled on their run, walk, or bike ride. For safety, that same numbering system will be utilized by the 911 call center to better locate trail users in need of assistance and to provide details on access routes to the emergency responders. This information will improve response time because the precise location of the markers will be available to the 911 call center. 2 How to Use This Document For ease of use, this guideline has been separated into three distinct chapters: 1. Trail Signs 2. Milestone Markers 3. Appendices Trail Signage Guidelines - City of San José Trail Program 3 4 Trail Signs Introduction At build-out, San José will have 35 unique and interconnected trail systems forming on of the nation’s largest trail networks. Signage plays an important role for users to understand where they are, nearby resources, and curcumstances to monitor. The family of signs presented by the guidelines are developed to offer a related and unified graphic appearance and to convery data clearly. The Department of Parks, Recreation and Neighborhood Services (Trail Manager) has digital files for all signage to support new or replacement installation. Chapter At-A-Glance Trail Sign Index Trail Sign Details Individual Trail Name Signs Matrix of Trail Systems, Icons, and Colors Trail Name Sign Details Trail Signage Guidelines - City of San José Trail Program 5 Trail Sign Index This chart lists each standard trail sign with its alphanumeric code, a description of where and why it should be used, and a thumbnail image of the sign. It provides a quick reference tool to easily identify sign types, uses, and general locations. $,+5 ,0 )7$= 5,++5,+, )" ,+5 )7$> 5,++5,+, 5,5& +&5,5,5*5 5,5 5 ,5,5,+5 , % 5 5 ,0 )7$@ 5, ,5 5 , 5 5 5,5" 51,5 , '5 "5 "01 )7$A 5,+, 5,55,5 65 565,5 ,++5 , 5 1'5 "535 5, 51'5+,4 ,+5 *575 , )7$B9= 5,+5 5 5+H5 5 5 5 565 ,+5 *575 )7$B9> 1 65,'65,5 65958, 851 5 15+, 5*5 5,09 ,+5 *575 )7$B9@ 5 $,+5 "575 , )7$C9= $,+5 "575 )7$C9> 5 " "5 5 5,+5 5#" 5*5 ,5 ,+95$ 515" 5 5 5 58 00"85 "9 $,+5 "575 )7$C9@ $,+5 + )7$D 5, ,5 5+55,+ (5$,5 ,+ )7$E 5 5*5 , H5 5 5,+5"5 5,",5 5 ,+5 5 " 0575 )7$F9= 5 5 5 5,55,5"1+5 05,+ 0575 )7$F9> 575 )7$=;9= 5 5 5 5,55,50,'5 5,",5,+ 575 )7$=;9> $,+5"+5, 5"+, )7$= 5,++5,+, 5 5-+ )7$> 5,+55 5* 5 "5 55,5&+ 5$, )7$@ 5 5 5,+57 7*,5*5"5+,*5 05 5,&5 " 5 ,5 )7$A 25 505 5,5,+, +5 + 5 5 , )7$B 5, *5 5 5,,5*5 +5,50 5+'+ ,5:.5 )7$C 5, *5 5 5,,5*5 +5,50 5+'+ )7$D 5, ,5 5,+5 5*5 , 5 5, 5,+ 6 Trail Signs Index $,+5 + 5$0 ,+ )7$E 5 5 5,+5,55+ 5 5,5 5 50 ,5 953( 55 #" 5*5,+5+ "5 4 '*,5 , * )7$2= 5, ,5 5 " 55,&+5+,5* "&5, 575 )7$2>9= "&5, 575 )7$2>9> 5, ,5 5"&55,+ "&5, 575 0 " 5 )7$2>9@ "&5, 575 0 " 5 )7$2>9A (7$" )7$2>9B 5$"5(7$" (7$" )7$2>9C 5$"5(7$" 5$, )7$2@ 5, ,5 5,5,7, 5 , 5 :$,+5 5, )7$2A 5 5 5,+655 5,57 5,+ 5, )7$2B 5, ,5 5,5"/ 5+ *5 5 5,+ "05, )7$2C 5, ,5 5,5"/ 55 5 5,+ 5, 5, )7$2D 5, ,5 553,++5?=;<45"++5 5 *++5 05 5,+ !52,5 )7$2E 5, ,5 5" 5 5 5, ,+5+ + * )7$2F 5, ,5 5,5,,5"5," "50 &0 '*,5 )7$2=; ,50+,5 55 5, 5 )7$ ,1 & Trail Signage Guidelines - City of San José Trail Program 7 Trail Sign Details Trail sign details have been organized by category for ease of use. Each sheet represents an individual trail sign template and provides specifics on size, layout, colors, and fonts. Digital files of all sign details are available from the City’s Trail Program Manager to assist in project development. All construction documents prepared for trail projects shall include the Trail Sign Installation Detail and a completed Trail Sign Schedule, both included in this section. The schedule will be completed by the project designer and will list each sign to be installed on the trail, its sign code, quantity, and any applicable custom features. Notes for each detail should be followed, but are subject to change based on architectural or engineering judgement. Incorporation into Existing Trails As the first step in the deployment of these new signage guidelines, field visits of existing trail systems will be undertaken to document: • directional signage at trailheads and intersections • warning and regulatory signs at relevant points • damaged or non compliant signage • redundant or superflous signage • consolidation/relocation of sign poles when feasible Existing signage that doesn’t conform to new signage guidelines will be replaced as funding becomes available or as a particular sign requires replacement. Over time, existing signage will become compliant with the signage guidelines. Signs that are determined to be redundant or excessive will be removed, and signs that can be combined onto one pole or lowered will be modified without replacement of each sign. Independent signage designs for trail projects currently in the design or construction phase will be changed to fit with the new guidelines. Project managers for current trail projects that are in design or construction phases will be contacted to become aware of these upcoming guidelines. Colors are only noted in CMYK format, some vendors may have issues with this system.
Recommended publications
  • Bicycle Expenditure Program (BEP)
    Bicycle Expenditure Program (BEP) VTA administers and distributes funds from these The Bicycle Expenditure Program (BEP) is the funding sources to Member Agencies, matching appropriate proj- mechanism for planned bicycle projects in Santa Clara ect types and funding amounts with the requirements County. It is developed in conjunction with the VTP of each fund source. VTA assists Member Agencies as update. The bicycle network is an essential component necessary to comply with the various regional, state and of a fully integrated, multimodal, countywide trans- federal procedural rules of each fund source. As part of portation system, and VTA is committed to improving the VTP update, the BEP projects list will be reviewed bicycling conditions that will benefit all users 7 days per and re-adopted approximately every four years as part of week and 24 hours per day, enabling people of all ages to the VTP process. In May 2013, VTA Board of Directors bike to work, school, errands, and for recreation. adopted the BEP Project List (Table 2.7a, Figure 2.6). The BEP was first adopted by the VTA Board of The process for developing the BEP Project List involves Directors in 2000 as a financially constrained list of two main steps: 1) Developing a master list of projects, projects with a ten-year funding horizon. BEP projects and 2) Constraining the master list to the financial con- are solicited from Member Agencies and evaluated by a straints of the VTP. Per the BEP Policies, the projects committee consisting of BPAC members and VTA staff. were divided into two categories: The development of the BEP is guided by the Board- • Category 1—greater than or equal to 50 points adopted Policies and Evaluation Criteria.
    [Show full text]
  • Coyote Meadows Redevelopment Concept Plan
    COYOTE MEADOWS REDEVELOPMENT CONCEPT PLAN Coyote Meadows Coalition San José, California March, 2018 WELCOME Introduction Table of Contents In the heart of the City of San José, California, Coyote Meadows occupies a strategic creek-side location with the potential to connect surrounding Welcome.............................................................1 communities to several neighborhood and regional trails. The site is the former Site Overview....................................................3 Story Road Landfill, owned by the City of San José. Community members seek to activate the site as a natural park, offering a 360° panoramic vista of the Santa Leveraging Opportunities............................5 Clara Valley, downtown San José, the Diablo Range, the Santa Cruz Mountains and the Coyote Valley to the south. Coyote Meadows presents an opportunity to turn Community Voice............................................7 underutilized space into a community asset in partnership with the City of San Reuse Zones......................................................9 José. However, a community vision is needed to inform future use and the required landfill closure plan. Program Areas................................................11 In the spring of 2016, Keep Coyote Creek Beautiful formed the Coyote Meadows Case Studies....................................................15 Coalition to plan and advocate for the activation of the site. With funding awarded from the Santa Clara Valley Open Space Authority in December 2016, Implementation
    [Show full text]
  • SOT Brochure
    Save Our Trails invites you to join Save Our Trails us with two levels of membership: Connecting Santa Clara County Communities www.saveourtrails-scc.org Member: Your membership fee of $15 per year entitles you to vote at our annual Our mission: Promoting trails in members meeting and your contribution Santa Clara County for the benefit helps support our activities. and enjoyment of all. Associate Member: No cost. Please join our membership if you believe in the Save Our Trails is working to turn dotted lines on maps into trails importance of trails and wish to add your throughout Santa Clara County. We are name to those who support our mission. ceaseless advocates before numerous governmental bodies in favor of trails. To join, please visit our web site: saveourtrails-scc.org We continue to successfully promote the conversion of an inactive railroad right- Or fill in the information fields below, of-way into a trail: the Three Creeks stamp and seal the brochure, and mail it Trail, connecting trail systems on the Los to us. Gatos Creek, the Guadalupe River, and CA 95125 San José, 1617 Cherry Avenue Avenue Cherry 1617 Name the Coyote Creek. Treasurer, Save Our Trails Trails Our Save Treasurer, 87 Guadalupe Street Gardens 101 SJ State ? Arena Downtown City/State/Zip Diridon Happy 280 Hollow Phone >Spartan Std. SJ Giants Email Tamien Kelley Park & History Museum Willow Glen We respect your privacy, and we will never share your personal information with other organizations. Fair- 3 Creeks Trail 87 grounds Save Our Trails is proud of the accomplishments we have achieved in the short time since our founding in 2009.
    [Show full text]
  • SAN JOSE Trail Program @Sanjosetrails
    -------------------- SAN JOSE -------------------- CITY Of Trail SAN JOSE PARKS, RECREATION & NEIGHBORHOOD SERVICES Program CAPITAL OF SILICON VALLEY @SanJoseTrails SAN JOSE CAWTAL Ol SILICON VALLEY »Open Trails Milestones Identified Trails '• Other Jurisdiction Trails 2007:40 miles i San Jose City Limits 2017: 60 miles Class I Trails U.S. Department of Transportation Federal Highway Administration Usage Secured Grants Coyote Creek Trail (Story to "IJully) Preliminary Not For Construction Project Grant Program Amount Coyote Crk Trail - Story to Tully AHSC Grant $5,200,000 Coyote Crk Trail - Singleton Crossing OSA Grant $200,000 Los Gatos Crk Trail Under-Crossing BEP-VTA $300,000 Guidance SAN JOSE O'* ^ TRAIL NETWORK ms TOOLKIT Pi a & Dl ■tKSij 1 \ 'ft V J DEPARTMENT OF PARKS RECREATION AND NEIGHBORHOOD SERVU TRAIL PROGRAM ]0W:-n rwu ffej-... ...... ■ SPW.vrprt’rt SfiUJOiS r.o ™ ■ 4.9 miles HBffigg&r-* - *Ski ■ $47,000,000 Planning: Chynoweth Avenue REACH 12 Chynoweth POC TRAIL ALIGNMENT LEGEND CONNECTION NON-ADA COMPLIANT RAMPS BY USACE ADA COMPLIANT RAMPS FOR CONNECTIVITY BRIDGE STRUCTURE CANTILEVER Almaden PROPOSED TRAIL OVER 2 YEARWSEL Ranch USACE MAINTENANCE PATH BELOW 2 YEARWSEL Development PARK OPPORTUNITY RECLAIMED STREET GUADALUPE RIVER H (D DC 0 DC^ CL o "D 0) CO O o DC CO o o L- O CD Coyote Creek Trail Mabury Road (BART) to Empire Street /ATSON PARK DRAINAGE SWALE AND CULVERT PROPOSED PED/BIKE BRIDGE POTENTIAL TRAIL FUTURE GATEWAY TRAIL POTENTIAL rAINING NEW BART TRAIL WALL STATION GATEWAY PARKING COYOTE CREEK RETAINING WALL WALL FACES TRAIL 0 50' 100' 200* 4G0 San Jose 1 .A MARK EXISTING CONDITION ■ THOMAS APRIL 13,2017 COYOTE CREEK TRAIL DESIGN CONCEPT, CITYOF SAN JOSE TEAM Coyote Creek Trail DIRECTORY CALLANDER ASSOCIATES Selma Olinder Park to Story Road crrroFSANpss PROJECT MANAGER MVS.
    [Show full text]
  • San José Trail Program AWARD WINNING PROJECTS ______
    San José Trail Program AWARD WINNING PROJECTS _____________________________ Lupe the Mammoth – Public Art Lower Guadalupe River Trail 2016 Excellence in Hot-Dip Galvanizing Awards Artistic Category American Galvanizers Association Three Creeks Trail Master Plan Los Gatos Creek Trail to Guadalupe River Trail 2015 Merit Award - Planning California Trails & Greenways Conference Lower Guadalupe River Trail Highway 880 to Gold Street in Alviso, North San José (6.4 miles) 2013 Best Trail and Bikeway Project American Society of Civil Engineers (San Francisco Section) 2013 Award of Merit California Trails and Greenways Conference 2013 Project of the Year; Sustainability / Green Category American Public Works Association (Silicon Valley Section) Guadalupe River Trail Virginia Street to Woz Way, Downtown San José 2012 Award of Merit, Construction California Trails & Greenways Conference 2012 Award of Excellence California Parks and Recreation Society Coyote Creek Trail Master Plan Story Road to Highway 101 at Watson Park 2012 Award of Merit, Project Planning California Trails & Greenways Conference 2013 Award of Excellence California Parks and Recreation Society Guadalupe River Trail Airport Parkway Under-Crossing (600 feet) 2008 Award of Excellence California Parks and Recreation Society Guadalupe River Trail Trail, Cilker Park, Coleman Road Pedestrian Bridge 2004 Award of Excellence, Facility Design California Parks and Recreation Society Three Creeks Trail Master Plan, Lonus Street (Los Gatos Creek) to Guadalupe River 2015 Award of Merit, Planning
    [Show full text]
  • Toolkit Planning & Design
    SAN JOSÉ TRAIL NETWORK TOOLKIT PLANNING & DESIGN CITY OF SAN JOSÉ DEPARTMENT OF PARKS, RECREATION AND NEIGHBORHOOD SERVICES TRAIL PROGRAM in collaboration with MIG, INC. JULY 2018 BUILDING COMMUNITY THROUGH FUN Lower Guadalupe River Trail in north San José SAN JOSÉ TRAIL NETWORK TOOLKIT PLANNING & DESIGN CITY OF SAN JOSÉ DEPARTMENT OF PARKS, RECREATION & NEIGHBORHOOD SERVICES TRAIL PROGRAM In collaboration with MIG, INC. FINAL DRAFT | MAY 2018 BUILDING COMMUNITY THROUGH FUN Intersecting trails in north San José TABLE OF CONTENTS Trail Network 7 Lighting ............................................................... 70 Striping ........................................................... 68-70 Executive Summary 9 Aesthetics ........................................................... 73 Trail Gateways and Access Points ....................... 73 Chapter 1: How to Use The Toolkit 13 Node-Intersecting Trails Trail Systems and Design Themes ....................... 76 Chapter 2: Trail Network Planning 17 Interpretive Signage ........................................... 81 Our Focus ............................................................. 17 Public Art and Design Amenities ........................ 84 Planning & Design Objectives ............................. 19 Landscaping ........................................................ 87 Trail Types ........................................................... 22 Seating ................................................................ 92 Core Trails Bike Racks ..........................................................
    [Show full text]
  • Notice of Contracts Executed by Council Appointees
    Notice of Contracts Executed by Council Appointees In accordance with Municipal Code Section 4.04.080, entitled “Quarterly Reports,” the following is submitted as a report on contracts executed by Council Appointees or designee during the second quarter of Fiscal Year 2018–2019 (October 1, 2018 – December 31, 2018), as reported by each Council Appointee. Notes: (a) The “Sole Source” column designates if the agreement was issued through a competitive process. A “Yes” response indicates a sole source contract, a “No” response indicates that the contractor was competitively selected, and a “N/A” response indicates that the action is not applicable, such as amendments, temporary staffing, or contracts issued directly to another public agency. (b) The “Retro” column designates whether work started before or after contract execution. A “Yes” indicates that contractor started work prior to contract execution, a “No” response indicates that contractor started working after contract execution, and a “N/A” response indicates that the action is not applicable, such as amendments, temporary staffing, or contracts issued directly to another public agency. City Attorney’s Contract Activity Contractor Description of Contract Amount Sole Retro Source Braun Blaising Smith Wynne P.C. Legal services for the San José Clean Energy program. $50,000 No No County Legal Service, Inc. 1st Amendment to vendor agreement to provide personal subpoena process $10,000 N/A N/A services. Davis Wright Tremaine LLP Consultant agreement for legal services related to operating a community $50,000 No No choice aggregation program - clean energy. Ellison Schneider Harris & Donlan LLP 4th Amendment to legal services for the San José Clean Energy program - professional services and reimbursable expenses.
    [Show full text]
  • Annual Count & Survey of San José Trails
    TRAIL COUNT Annual Count & Survey of San José Trails With Supplemental Covid-19 Survey (Appendix A) 2020 Trail Count 2020 Trail Count 2020 was conducted under unique circumstances not previously encountered. Volunteers and staff recorded a large decrease in users at most count stations. It is anticipated this is related to the current world health pandemic, Covid-19, the Santa Clara County Shelter-In-Place Order, and the prominent wildfires throughout California and the Bay Area during the week of Trail Count 2020. Ranging between 50 (Moderate Levels) to 150 (Unhealthy Levels for Sensitive Groups), the air quality experienced by trail users during the day of Trail Count 2020 influenced how many people used the trail network. However, seeing the number of people still accessing the trails during these conditions shows the value and daily need of the San Jose Trail Network to provide opportunities for active transportation and recreation. For 2020, the annual Trail Count Survey in alignment with Trail Count Day, received 78 responses. This is low compared to prior years. This reduced amount of responses may be related to the fact that over 300 trail users completed a special survey in June 2020 related to Covid-19 and the County’s Shelter-In-Place Order (for more information, see Appendix A at the end of this report). Having only recently completed a survey within the last three months, trail users may have been less likely to respond to the Annual Trail Count Survey. The following Summary Report shares the purpose and process behind Trail Count, specific findings per trail system, and overall findings based on the San Jose Trail Network.
    [Show full text]
  • Envision Silicon Valley Preliminary Project Lists
    VTA BOARD OF DIRECTORS APPROVED - 10/1/15 ENVISION SILICON VALLEY PRELIMINARY PROJECT LIST ENVISION SILICON VALLEY PRELIMINARY PROJECT LISTS PROGRAM AREAS (IN $ MILLIONS) HIGHWAY $11,085.0 M TRANSIT $22,519.6 M EXPRESSWAYS* $1,362.2 M LOCAL STREETS AND ROADS $10,908.6 M LOCAL OPERATION SYSTEMS $608.1 M PEDESTRIAN AND BICYCLE $2,226.8 M TOTAL $48,710.3 M *Some Expressway Projects are captured in the Highway Project List. 1 VTA BOARD OF DIRECTORS APPROVED - 10/1/15 HIGHWAY PROJECT LIST NEW VTP Cost ($M) in # ID Route Project Title 2017 1 E017-01 SR 17 SR 17 Express Lanes: I-280 to SR 85 $ 32 2 E085-01 SR 85 SR 85 Express Lanes: US 101 (South San Jose) to Mountain View$ 181 3 E087-01 SR 87 SR 87 Express Lanes: SR 85 to US 101 $ 38 4 E101-01 US 101 US 101 Express Lanes: Whipple Ave. in San Mateo County to Cochrane Rd. in Morgan Hill.$ 465 5 E101-02 US 101 US 101 Express Lanes: Cochrane Rd. to Masten Ave. $ 116 6 E101-03 US 101 US 101 Express Lanes: Masten Ave. to 10th St. $ 73 7 E101-04 US 101 US 101 Express Lanes: 10th St. to SR 25 $ 54 8 E237-01 SR 237 SR 237 Express Lanes: North First St. to Mathilda Ave.$ 26 9 E237-02 SR 237 SR 237 Express Lanes: Mathilda Ave. to SR 85 $ 87 10 E280-01 I-280 I-280 Express Lanes: US 101 to Leland Ave. $ 27 11 E280-02 I-280 I-280 Express Lanes: Leland Ave.
    [Show full text]
  • Trail Vision Study and Neighborhood Services October 2015 ACKNOWLEDGEMENTS
    lane SKY Prepared for the Department of Parks and Recreation trail vision study and Neighborhood Services October 2015 ACKNOWLEDGEMENTS City of San José Consultant Team City Council Callander Associates Landscape Architecture, Inc. Sam Liccardo, Mayor Brian Flecher, Principal-in-charge Charles “Chappie” Jones, District 1 Marie Mai, Project Manager Ash Kalra, District 2 Likun Cao, Project Assistant Raul Peralez, District 3 Manh Nguyen, District 4 Magdalena Carrasco, District 5 Pierluigi Oliverio, District 6 Tam Nguyen, District 7 Vice Mayor Rose Herrera, District 8 Donald Rocha, District 9 Johnny Khamis, District 10 Public Works Department Barry Ng, Interim Director Jan Palajac, Senior Landscape Architect Jane Wu, Associate Landscape Designer Parks, Recreation and Neighborhood Services Angel Rios Jr., Director Yves Zsutty, Trail Network Manager Marybeth Harasz, Division Manager Greg Meek, Senior Landscape Architect Yu-Wen Huang, Structure Landscape Designer Office of Cultural Affairs – San Jose Public Art Jennifer Easton, Director TABLE OF CONTENTS I EXECUTIVE SUMMARY...........................................................................................1 II EXISTING CONDITIONS.........................................................................................5 III VISIONING PROCESS...........................................................................................13 Design Charette #1 Design Charette #2 Design Charette #3 IV PROPOSED TRAIL.................................................................................................23
    [Show full text]
  • 2021 04 14 Trail Database
    ID Trail Name Reach Start End Miles Feet Status CD Interim Surface 3CR_01 Three Creeks Trail 01 Lonus Court Los Gatos Creek 0.04 203 Open-Interim 6 Not Interim Undeveloped 3CR_01A Three Creeks Trail 01A Los Gatos Creek (north bank) Los Gatos Creek (south bank) 0.04 205 Open-Paved 6 Not interim Bridge 3CR_02 Three Creeks Trail 02 Los Gatos Creek Coe Avenue 0.11 605 Open-Interim 6 Not Interim Undeveloped 3CR_03 Three Creeks Trail 03 Coe Avenue Broadway Avenue 0.17 898 Open-Paved 6 Not Interim Undeveloped 3CR_04 Three Creeks Trail 04 Broadway Avenue Willow Street 0.22 1141 Open-Paved 6 Not Interim Undeveloped 3CR_05 Three Creeks Trail 05 Willow Street Bird Avenue 0.07 354 Open-Paved 6 Not Interim Undeveloped 3CR_06 Three Creeks Trail 06 Bird Avenue Minnesota Avenue 0.26 1389 Open-Paved 6 Not Interim Undeveloped 3CR_07 Three Creeks Trail 07 Minnesota Avenue Guadalupe River railway bridge 0.36 1881 Open-Paved 6 Not Interim AC (Co. Std) 3CR_08 Three Creeks Trail 08 Guadalupe River Trestle Rt 87 Freeway 0.16 861 Study 6 Not Interim Undeveloped 3CR_08A Three Creeks Trail 08A Highway 87 under-crossing Alma Avenue 0.19 995 Identify 7 Not interim Undeveloped 3CR_09 Three Creeks Trail 09 Rt 87 Freeway RR along east side of Rt 87 0.05 239 Study 7 Not Interim Undeveloped 3CR_10 Three Creeks Trail 10 RR along east side of Route 87 Almaden Road 0.12 639 Study 7 Not Interim Undeveloped 3CR_11 Three Creeks Trail 11 Almaden Road 150’ west of Little Orchard 0.22 1185 Study 7 Not Interim Undeveloped 3CR_12 Three Creeks Trail 12 150’ west of Little Orchard
    [Show full text]
  • Community Meeting #2, Kelley Park Master Plan Update
    SUMMARY Meeting date: February 25, 2016 Community Meeting #2, Kelley Park Master Plan Update The second community meeting and workshop served as both a review and overview of the Master Plan Update for the public and park neighbors in the City of San Jose. The Master Plan Update is building on the existing Master Plan to update and focus on providing unified wayfinding and circulation hierarchy, enhancing existing facilities and making suggestions for undeveloped and under-used areas. Phasing and prioritization of future improvements will be a key consideration of the Master Plan Update. The meeting began shortly past 6:30pm in the Okayama Room of the Leininger Center at Kelley Park; 133 people signed in but a head count indicated upwards of 165 attendees. Simultaneous translation was provided in Vietnamese and Spanish. Councilmember Tam Nguyen and Deputy Director Marybeth Harasz gave some introductory remarks including clarify that there is a separate programming feasibility study underway to review the needs of a potential Vietnamese Community Center. A brief overview of the project, meeting, and evening’s agenda was given before a verbal and slide presentation. The presentation summarized project goals for the Master Plan Update, as well as a brief review of the park’s history and site analysis. Results to date of the online survey which will be available through the end of March for additional feedback (survey is in English, Vietnamese, and Spanish), suggested changes to the under-utilized areas of Kelley Park, and draft approaches for enhancing overall park circulation were the focus of the presentation. Before breaking into small discussion groups, there was a call for discussion and general comments followed the presentation, allowing meeting attendees to respond to the options presented for the varied park areas and amenities.
    [Show full text]