2021 04 14 Trail Database

Total Page:16

File Type:pdf, Size:1020Kb

2021 04 14 Trail Database ID Trail Name Reach Start End Miles Feet Status CD Interim Surface 3CR_01 Three Creeks Trail 01 Lonus Court Los Gatos Creek 0.04 203 Open-Interim 6 Not Interim Undeveloped 3CR_01A Three Creeks Trail 01A Los Gatos Creek (north bank) Los Gatos Creek (south bank) 0.04 205 Open-Paved 6 Not interim Bridge 3CR_02 Three Creeks Trail 02 Los Gatos Creek Coe Avenue 0.11 605 Open-Interim 6 Not Interim Undeveloped 3CR_03 Three Creeks Trail 03 Coe Avenue Broadway Avenue 0.17 898 Open-Paved 6 Not Interim Undeveloped 3CR_04 Three Creeks Trail 04 Broadway Avenue Willow Street 0.22 1141 Open-Paved 6 Not Interim Undeveloped 3CR_05 Three Creeks Trail 05 Willow Street Bird Avenue 0.07 354 Open-Paved 6 Not Interim Undeveloped 3CR_06 Three Creeks Trail 06 Bird Avenue Minnesota Avenue 0.26 1389 Open-Paved 6 Not Interim Undeveloped 3CR_07 Three Creeks Trail 07 Minnesota Avenue Guadalupe River railway bridge 0.36 1881 Open-Paved 6 Not Interim AC (Co. Std) 3CR_08 Three Creeks Trail 08 Guadalupe River Trestle Rt 87 Freeway 0.16 861 Study 6 Not Interim Undeveloped 3CR_08A Three Creeks Trail 08A Highway 87 under-crossing Alma Avenue 0.19 995 Identify 7 Not interim Undeveloped 3CR_09 Three Creeks Trail 09 Rt 87 Freeway RR along east side of Rt 87 0.05 239 Study 7 Not Interim Undeveloped 3CR_10 Three Creeks Trail 10 RR along east side of Route 87 Almaden Road 0.12 639 Study 7 Not Interim Undeveloped 3CR_11 Three Creeks Trail 11 Almaden Road 150’ west of Little Orchard 0.22 1185 Study 7 Not Interim Undeveloped 3CR_12 Three Creeks Trail 12 150’ west of Little Orchard Street Little Orchard Street 0.03 152 Study 7 Not interim Undeveloped 3CR_13 Three Creeks Trail 13 Little Orchard Street Pomona Avenue 0.08 421 Study 7 Not interim Undeveloped 3CR_14 Three Creeks Trail 14 Pomona Avenue Monterey Road 0.22 1177 Study 7 Not interim Undeveloped 3CR_15 Three Creeks Trail 15 Monterey Road RR Between Monterey & 7th Street 0.12 650 Study 7 Not interim Undeveloped 3CR_16 Three Creeks Trail 16 RR between Monterey & Seventh Street Seventh Street 0.16 833 Study 7 Not interim Undeveloped 3CR_17 Three Creeks Trail 17 Seventh Street Tenth Street 0.2 1082 Study 7 Not interim Undeveloped 3CR_18 Three Creeks Trail 18 Tenth Street Alma Avenue / Senter Road 0.55 2901 Study 7 Not interim Undeveloped 3CR_19 Three Creeks Trail 19 Alma Ave / Senter Rd Story-Keyes / Senter Rd 0.32 1694 Identify 7 Not interim Undeveloped ALB01 Albertson Parkway 1 Cresta Vista Drive Curie Drive 0.49 2565 Open-Paved 2 Not interim AC (Co. Std) ARP01 Alum Rock Park 01 Penitencia Creek Road - Parking Lot TBD 10.62 56073 Open-Hiking 4 Open Earth BAR01 Barberry Ln Pathway A Street A (Arcadia Development) Corda Drive (Meadowfair Park) 0.12 640 Identify 8 Not Interim Undeveloped BAR02 Barberry Ln Pathway B Corda Drive (Meadowfair Park) King Road 0.21 1132 Plan 8 Not Interim Undeveloped BAR03 Barberry Ln Pathway C King Road Dina Lane 0.28 1467 Open-Paved 8 Not Interim AC (Substd) BAY01 Bay Trail 1 Dixon Landing Road Hwy 237 3.17 16744 Plan 4 Not interim Gravel BAY02 Bay Trail 2 Coyote Creek Zanker Road 0.72 3810 Plan 4 Not Interim Undeveloped BAY03 Bay Trail 3 Zanker Road Los Esteros Road 1.82 9615 Plan 4 Not Interim Undeveloped BAY04 Bay Trail 4 Los Esteros Road Clark Street (undeveloped) 0.3 1570 Plan 4 Not Interim Undeveloped BAY05 Bay Trail 5 Spreckles Avenue USFWS Facility 3.4 17944 Plan 4 Not Interim Undeveloped BAY06 Bay Trail 6 Spreckles Avenue Hope/Elizabeth Street 0.78 4131 Plan 4 Not Interim Undeveloped BAY07 Bay Trail 7 First/Gold Street Hope/Mill Road 0.45 2370 Plan 4 Not interim Gravel BAY07a Bay Trail 7A County Marina Railway / future ped bridge 0.49 2576 Plan 4 Not interim Gravel BAY08a Bay Trail 8a North First Street Wilson Drive 0.19 1028 Plan 4 Not Interim Undeveloped BAY08b Bay Trail 08b Wilson Drive Disk Drive 0.38 1985 Plan 4 Undeveloped BAY08c Bay Trail 08c Disk Drive Spreckles Avenue 0.1 505 Plan 4 Not interim Undeveloped BAY09-1 Bay Trail 9-1 Railroad Tracks (future 9B Bridge) Fairfield Inn Frontage 0.15 800 Open-Paved 4 Not interim Undeveloped BAY09-2 Bay Trail 9-2 Fairfield Inn Frontage San Tomas Aquino Creek 1.13 5980 Design 4 Not Interim Earth BAY09a Bay Trail 9a Gold Street west Gold Street east 0.21 1100 Design 4 Not interim PCC BAY09B Bay Trail 9B South bank (w/o Gold Street) North bank (w/o Gold Street) 0.1 509 Design 4 Not Interim Undeveloped BAY09c Bay Trail 9c 9B Pedestrian Bridge west 9B Pedestrian Bridge east 0.04 200 Design 4 Not interim PCC BC01 Blossom Crest Trail 01 Westchester Drive Taft Drive 0.33 1750 Study 9 Not interim Earth BC02 Blossom Crest Trail 02 Taft Drive Pinehurst Avenue 0.16 840 Study 9 Earth BC03 Blossom Crest Trail 03 Pinehurst Avenue Unionn Avenue 0.11 570 Study 9 Not interim Earth BC04 Blossom Crest Trail 04 Union Avenue 0 0 Study 9 Not interim On-Street Roadway BC05 Blossom Crest Trail 05 Kensington Way Leigh Avenue 0.26 1360 Study 9 Not interim Earth BC06 Blossom Crest Trail 06 Leigh Avenue Copeland Lane 0.21 1130 Study 9 Earth BC07 Blossom Crest Trail 07 Copeland Lane Mary Jo Way 0.05 250 Study 9 Not interim Earth BC08 Blossom Crest Trail 08 Mary Jo Way Harwood Road 0.25 1310 Study 9 Not interim BC09 Blossom Crest Trail 09 Harwood Road Drysdale Drive 0.54 2870 Study 9 Not interim Earth BC10 Blossom Crest Trail 10 Drysdale Drive Camden Avenue 0.21 1130 Study 9 Not interim Earth BER01 Berryessa Creek 1 Morrill Avenue Piedmont Road 1.01 5334 Identify 4 Not interim Gravel CAL01 Calero Creek 1 Los Alamitos Crk Confluence Harry Road 0.68 3569 Open-Paved 10 Not Interim AC (Substd) CAL02 Calero Creek 2 Harry Road San Vicente Road / Shilingsburg Avenue 1.23 6501 Open-Interim 10 Open Earth CAN01 Canoas Creek 01 Guadalupe River Nightingale Drive 0.26 1362 Identify 6 Not interim Gravel CAN02 Canoas Creek 02 Nightingale Drive Pitlin Loop 0.33 1734 Identify 6 Not interim CAN03 Canoas Creek 03 Pitkin Loop Dow Drive 0.45 2387 Identify 6 Identified Gravel CAN04 Canoas Creek 04 Dow Drive Narvarez Drive 0.26 1395 Identify 6 Not interim CAN05 Canoas Creek 05 Narvarez/Highway 87 Bikeway Hillsdale Avenue 0.28 1480 Identify 7 Not interim Earth CAN06 Canoas Creek 06 Hillsdale Avenue Capitol Expressway 0.43 2270 Identify 10 Not interim Earth CAN07 Canoas Creek 07 Capitol Expressway Albion Dirve 0.29 1540 Identify 10 Not interim Earth CAN08 Canoas Creek 08 Albion Drive Edelweiss Drive 0.18 940 Identify 10 Not interim Earth CAN09 Canoas Creek 09 Edleweiss Drive Branham Lane 0.28 1480 Identify 10 Not interim Earth CAN10 Canoas Creek 10 Branham Lane Hyde Park Drive 0.21 1100 Identify 7 Not interim Earth CAN11 Canoas Creek 11 Hyde Park Drive Blossom Hill LRT 0.95 5000 Plan 10 Not interim Earth CMH01 Communications Hill 01 1.57 8312 Plan 7 CMH02 Communications Hill 02 Plan 7 CMH03 Communications Hill 03 Grassina Street Lina Street (Staircase) 0.41 2173 Open-Paved 7 AC (Substd) CMH04a Communications Hill 04a Lina Street (Staircase) 450’ w/o Casselino Drive at Communications Hill Blvd 0.22 1175 Open-Paved 7 AC (Substd) CMH04b Communications Hill 04b 450’ w/o Casselino Drive at Communications Hill Blvd Casselino Drive 0.09 450 Open-Paved 7 AC (Substd) CMH05e Communications Hill 05e Hillsdale Avenue Staircase (top of stairs) Casselino Drive 0.2 1050 Open-Paved 7 AC (Co. Std) CMH05w Communications Hill 05w Casselino Drive Llanos de Los Robles 0.16 840 Open-Paved 7 AC (Substd) COA01 Coyote-Alamitos Canal 1 Miracle Mountain Dr Cottle Avenue 4.92 25997 Study 2 Not Interim Gravel COA02 Coyote-Alamitos Canal 2 Cottle Avenue Bernal Road 1.63 8585 Study 2 Not interim Gravel COA03 Coyote-Alamitos Canal 3 Bernal Road Santa Teresa Blvd 1.92 10162 Study 2 Not Interim Gravel COA04 Coyote-Alamitos Canal 4 Santa Teresa Blvd (via Tulare Hill) Coyote Creek 1.43 7524 Study 2 Not Interim Gravel COA05 Coyote-Alamitos Canal 5 Santa Teresa Boulevard Monterey Highway 1.3 6852 Study 2 Not interim Gravel COM01 Component Parkway 01 Lower Guadalupe River Trail Ramp Structure (surface trail) 0.02 100 Study 4 Not interim Undeveloped COM02 Component Parkway 02 Lower Guadalupe River Trail Orchard Parkway 0.21 1095 Open-Paved 4 Not interim Undeveloped COM03 Component Parkway 03 Orchard Parkway North First Street (LRT) 0.34 1800 Identify 4 Not interim Undeveloped COY02b Coyote Creek 02b North side / Highway 237 Bikeway South side / Highway 237 Bikeway 0.06 300 Identify 4 Not interim Bridge COY03 Coyote Creek 03 Hwy 237 Tasman Avenue 1.08 5682 Open-Paved 4 Not interim Gravel COY04 Coyote Creek 04 Tasman Avenue Montague Expressway 1.3 6849 Open-Interim 4 Open Gravel COY04a Coyote Creek 04a Iris Chang Park ramp Coyote Creek Trail (levee) 0.02 100 Open-Paved 4 PCC COY05.1 Coyote Creek 05.1 Montague Expressway Charcot Avenue 0.82 4315 Plan 4 Not interim Undeveloped COY05.2 Coyote Creek 05.2 Charcot Avenue Brokaw Avenue 0.52 2770 Plan 4 Not interim Undeveloped COY05.3 Coyote Creek 05.3 Brokaw Avenue UPRR 0.23 1225 Design 4 Not interim Undeveloped COY05.4 Coyote Creek 05.4 UPRR Old Oakland Road 0.23 1200 Open-Paved 4 Not interim Undeveloped COY05.5 Coyote Creek 05.5 Old Oakland Road Chessington Drive 0.91 4830 Plan 4 Not interim Undeveloped COY05.6 Coyote Creek 05.6 Chessington Drive Berryessa Rd / Penitencia Creek 0.29 1525 Open-Paved 4 Not interim AC (Co.
Recommended publications
  • Bicycle Expenditure Program (BEP)
    Bicycle Expenditure Program (BEP) VTA administers and distributes funds from these The Bicycle Expenditure Program (BEP) is the funding sources to Member Agencies, matching appropriate proj- mechanism for planned bicycle projects in Santa Clara ect types and funding amounts with the requirements County. It is developed in conjunction with the VTP of each fund source. VTA assists Member Agencies as update. The bicycle network is an essential component necessary to comply with the various regional, state and of a fully integrated, multimodal, countywide trans- federal procedural rules of each fund source. As part of portation system, and VTA is committed to improving the VTP update, the BEP projects list will be reviewed bicycling conditions that will benefit all users 7 days per and re-adopted approximately every four years as part of week and 24 hours per day, enabling people of all ages to the VTP process. In May 2013, VTA Board of Directors bike to work, school, errands, and for recreation. adopted the BEP Project List (Table 2.7a, Figure 2.6). The BEP was first adopted by the VTA Board of The process for developing the BEP Project List involves Directors in 2000 as a financially constrained list of two main steps: 1) Developing a master list of projects, projects with a ten-year funding horizon. BEP projects and 2) Constraining the master list to the financial con- are solicited from Member Agencies and evaluated by a straints of the VTP. Per the BEP Policies, the projects committee consisting of BPAC members and VTA staff. were divided into two categories: The development of the BEP is guided by the Board- • Category 1—greater than or equal to 50 points adopted Policies and Evaluation Criteria.
    [Show full text]
  • Coyote Meadows Redevelopment Concept Plan
    COYOTE MEADOWS REDEVELOPMENT CONCEPT PLAN Coyote Meadows Coalition San José, California March, 2018 WELCOME Introduction Table of Contents In the heart of the City of San José, California, Coyote Meadows occupies a strategic creek-side location with the potential to connect surrounding Welcome.............................................................1 communities to several neighborhood and regional trails. The site is the former Site Overview....................................................3 Story Road Landfill, owned by the City of San José. Community members seek to activate the site as a natural park, offering a 360° panoramic vista of the Santa Leveraging Opportunities............................5 Clara Valley, downtown San José, the Diablo Range, the Santa Cruz Mountains and the Coyote Valley to the south. Coyote Meadows presents an opportunity to turn Community Voice............................................7 underutilized space into a community asset in partnership with the City of San Reuse Zones......................................................9 José. However, a community vision is needed to inform future use and the required landfill closure plan. Program Areas................................................11 In the spring of 2016, Keep Coyote Creek Beautiful formed the Coyote Meadows Case Studies....................................................15 Coalition to plan and advocate for the activation of the site. With funding awarded from the Santa Clara Valley Open Space Authority in December 2016, Implementation
    [Show full text]
  • SOT Brochure
    Save Our Trails invites you to join Save Our Trails us with two levels of membership: Connecting Santa Clara County Communities www.saveourtrails-scc.org Member: Your membership fee of $15 per year entitles you to vote at our annual Our mission: Promoting trails in members meeting and your contribution Santa Clara County for the benefit helps support our activities. and enjoyment of all. Associate Member: No cost. Please join our membership if you believe in the Save Our Trails is working to turn dotted lines on maps into trails importance of trails and wish to add your throughout Santa Clara County. We are name to those who support our mission. ceaseless advocates before numerous governmental bodies in favor of trails. To join, please visit our web site: saveourtrails-scc.org We continue to successfully promote the conversion of an inactive railroad right- Or fill in the information fields below, of-way into a trail: the Three Creeks stamp and seal the brochure, and mail it Trail, connecting trail systems on the Los to us. Gatos Creek, the Guadalupe River, and CA 95125 San José, 1617 Cherry Avenue Avenue Cherry 1617 Name the Coyote Creek. Treasurer, Save Our Trails Trails Our Save Treasurer, 87 Guadalupe Street Gardens 101 SJ State ? Arena Downtown City/State/Zip Diridon Happy 280 Hollow Phone >Spartan Std. SJ Giants Email Tamien Kelley Park & History Museum Willow Glen We respect your privacy, and we will never share your personal information with other organizations. Fair- 3 Creeks Trail 87 grounds Save Our Trails is proud of the accomplishments we have achieved in the short time since our founding in 2009.
    [Show full text]
  • SAN JOSE Trail Program @Sanjosetrails
    -------------------- SAN JOSE -------------------- CITY Of Trail SAN JOSE PARKS, RECREATION & NEIGHBORHOOD SERVICES Program CAPITAL OF SILICON VALLEY @SanJoseTrails SAN JOSE CAWTAL Ol SILICON VALLEY »Open Trails Milestones Identified Trails '• Other Jurisdiction Trails 2007:40 miles i San Jose City Limits 2017: 60 miles Class I Trails U.S. Department of Transportation Federal Highway Administration Usage Secured Grants Coyote Creek Trail (Story to "IJully) Preliminary Not For Construction Project Grant Program Amount Coyote Crk Trail - Story to Tully AHSC Grant $5,200,000 Coyote Crk Trail - Singleton Crossing OSA Grant $200,000 Los Gatos Crk Trail Under-Crossing BEP-VTA $300,000 Guidance SAN JOSE O'* ^ TRAIL NETWORK ms TOOLKIT Pi a & Dl ■tKSij 1 \ 'ft V J DEPARTMENT OF PARKS RECREATION AND NEIGHBORHOOD SERVU TRAIL PROGRAM ]0W:-n rwu ffej-... ...... ■ SPW.vrprt’rt SfiUJOiS r.o ™ ■ 4.9 miles HBffigg&r-* - *Ski ■ $47,000,000 Planning: Chynoweth Avenue REACH 12 Chynoweth POC TRAIL ALIGNMENT LEGEND CONNECTION NON-ADA COMPLIANT RAMPS BY USACE ADA COMPLIANT RAMPS FOR CONNECTIVITY BRIDGE STRUCTURE CANTILEVER Almaden PROPOSED TRAIL OVER 2 YEARWSEL Ranch USACE MAINTENANCE PATH BELOW 2 YEARWSEL Development PARK OPPORTUNITY RECLAIMED STREET GUADALUPE RIVER H (D DC 0 DC^ CL o "D 0) CO O o DC CO o o L- O CD Coyote Creek Trail Mabury Road (BART) to Empire Street /ATSON PARK DRAINAGE SWALE AND CULVERT PROPOSED PED/BIKE BRIDGE POTENTIAL TRAIL FUTURE GATEWAY TRAIL POTENTIAL rAINING NEW BART TRAIL WALL STATION GATEWAY PARKING COYOTE CREEK RETAINING WALL WALL FACES TRAIL 0 50' 100' 200* 4G0 San Jose 1 .A MARK EXISTING CONDITION ■ THOMAS APRIL 13,2017 COYOTE CREEK TRAIL DESIGN CONCEPT, CITYOF SAN JOSE TEAM Coyote Creek Trail DIRECTORY CALLANDER ASSOCIATES Selma Olinder Park to Story Road crrroFSANpss PROJECT MANAGER MVS.
    [Show full text]
  • San José Trail Program AWARD WINNING PROJECTS ______
    San José Trail Program AWARD WINNING PROJECTS _____________________________ Lupe the Mammoth – Public Art Lower Guadalupe River Trail 2016 Excellence in Hot-Dip Galvanizing Awards Artistic Category American Galvanizers Association Three Creeks Trail Master Plan Los Gatos Creek Trail to Guadalupe River Trail 2015 Merit Award - Planning California Trails & Greenways Conference Lower Guadalupe River Trail Highway 880 to Gold Street in Alviso, North San José (6.4 miles) 2013 Best Trail and Bikeway Project American Society of Civil Engineers (San Francisco Section) 2013 Award of Merit California Trails and Greenways Conference 2013 Project of the Year; Sustainability / Green Category American Public Works Association (Silicon Valley Section) Guadalupe River Trail Virginia Street to Woz Way, Downtown San José 2012 Award of Merit, Construction California Trails & Greenways Conference 2012 Award of Excellence California Parks and Recreation Society Coyote Creek Trail Master Plan Story Road to Highway 101 at Watson Park 2012 Award of Merit, Project Planning California Trails & Greenways Conference 2013 Award of Excellence California Parks and Recreation Society Guadalupe River Trail Airport Parkway Under-Crossing (600 feet) 2008 Award of Excellence California Parks and Recreation Society Guadalupe River Trail Trail, Cilker Park, Coleman Road Pedestrian Bridge 2004 Award of Excellence, Facility Design California Parks and Recreation Society Three Creeks Trail Master Plan, Lonus Street (Los Gatos Creek) to Guadalupe River 2015 Award of Merit, Planning
    [Show full text]
  • Toolkit Planning & Design
    SAN JOSÉ TRAIL NETWORK TOOLKIT PLANNING & DESIGN CITY OF SAN JOSÉ DEPARTMENT OF PARKS, RECREATION AND NEIGHBORHOOD SERVICES TRAIL PROGRAM in collaboration with MIG, INC. JULY 2018 BUILDING COMMUNITY THROUGH FUN Lower Guadalupe River Trail in north San José SAN JOSÉ TRAIL NETWORK TOOLKIT PLANNING & DESIGN CITY OF SAN JOSÉ DEPARTMENT OF PARKS, RECREATION & NEIGHBORHOOD SERVICES TRAIL PROGRAM In collaboration with MIG, INC. FINAL DRAFT | MAY 2018 BUILDING COMMUNITY THROUGH FUN Intersecting trails in north San José TABLE OF CONTENTS Trail Network 7 Lighting ............................................................... 70 Striping ........................................................... 68-70 Executive Summary 9 Aesthetics ........................................................... 73 Trail Gateways and Access Points ....................... 73 Chapter 1: How to Use The Toolkit 13 Node-Intersecting Trails Trail Systems and Design Themes ....................... 76 Chapter 2: Trail Network Planning 17 Interpretive Signage ........................................... 81 Our Focus ............................................................. 17 Public Art and Design Amenities ........................ 84 Planning & Design Objectives ............................. 19 Landscaping ........................................................ 87 Trail Types ........................................................... 22 Seating ................................................................ 92 Core Trails Bike Racks ..........................................................
    [Show full text]
  • Notice of Contracts Executed by Council Appointees
    Notice of Contracts Executed by Council Appointees In accordance with Municipal Code Section 4.04.080, entitled “Quarterly Reports,” the following is submitted as a report on contracts executed by Council Appointees or designee during the second quarter of Fiscal Year 2018–2019 (October 1, 2018 – December 31, 2018), as reported by each Council Appointee. Notes: (a) The “Sole Source” column designates if the agreement was issued through a competitive process. A “Yes” response indicates a sole source contract, a “No” response indicates that the contractor was competitively selected, and a “N/A” response indicates that the action is not applicable, such as amendments, temporary staffing, or contracts issued directly to another public agency. (b) The “Retro” column designates whether work started before or after contract execution. A “Yes” indicates that contractor started work prior to contract execution, a “No” response indicates that contractor started working after contract execution, and a “N/A” response indicates that the action is not applicable, such as amendments, temporary staffing, or contracts issued directly to another public agency. City Attorney’s Contract Activity Contractor Description of Contract Amount Sole Retro Source Braun Blaising Smith Wynne P.C. Legal services for the San José Clean Energy program. $50,000 No No County Legal Service, Inc. 1st Amendment to vendor agreement to provide personal subpoena process $10,000 N/A N/A services. Davis Wright Tremaine LLP Consultant agreement for legal services related to operating a community $50,000 No No choice aggregation program - clean energy. Ellison Schneider Harris & Donlan LLP 4th Amendment to legal services for the San José Clean Energy program - professional services and reimbursable expenses.
    [Show full text]
  • Annual Count & Survey of San José Trails
    TRAIL COUNT Annual Count & Survey of San José Trails With Supplemental Covid-19 Survey (Appendix A) 2020 Trail Count 2020 Trail Count 2020 was conducted under unique circumstances not previously encountered. Volunteers and staff recorded a large decrease in users at most count stations. It is anticipated this is related to the current world health pandemic, Covid-19, the Santa Clara County Shelter-In-Place Order, and the prominent wildfires throughout California and the Bay Area during the week of Trail Count 2020. Ranging between 50 (Moderate Levels) to 150 (Unhealthy Levels for Sensitive Groups), the air quality experienced by trail users during the day of Trail Count 2020 influenced how many people used the trail network. However, seeing the number of people still accessing the trails during these conditions shows the value and daily need of the San Jose Trail Network to provide opportunities for active transportation and recreation. For 2020, the annual Trail Count Survey in alignment with Trail Count Day, received 78 responses. This is low compared to prior years. This reduced amount of responses may be related to the fact that over 300 trail users completed a special survey in June 2020 related to Covid-19 and the County’s Shelter-In-Place Order (for more information, see Appendix A at the end of this report). Having only recently completed a survey within the last three months, trail users may have been less likely to respond to the Annual Trail Count Survey. The following Summary Report shares the purpose and process behind Trail Count, specific findings per trail system, and overall findings based on the San Jose Trail Network.
    [Show full text]
  • Envision Silicon Valley Preliminary Project Lists
    VTA BOARD OF DIRECTORS APPROVED - 10/1/15 ENVISION SILICON VALLEY PRELIMINARY PROJECT LIST ENVISION SILICON VALLEY PRELIMINARY PROJECT LISTS PROGRAM AREAS (IN $ MILLIONS) HIGHWAY $11,085.0 M TRANSIT $22,519.6 M EXPRESSWAYS* $1,362.2 M LOCAL STREETS AND ROADS $10,908.6 M LOCAL OPERATION SYSTEMS $608.1 M PEDESTRIAN AND BICYCLE $2,226.8 M TOTAL $48,710.3 M *Some Expressway Projects are captured in the Highway Project List. 1 VTA BOARD OF DIRECTORS APPROVED - 10/1/15 HIGHWAY PROJECT LIST NEW VTP Cost ($M) in # ID Route Project Title 2017 1 E017-01 SR 17 SR 17 Express Lanes: I-280 to SR 85 $ 32 2 E085-01 SR 85 SR 85 Express Lanes: US 101 (South San Jose) to Mountain View$ 181 3 E087-01 SR 87 SR 87 Express Lanes: SR 85 to US 101 $ 38 4 E101-01 US 101 US 101 Express Lanes: Whipple Ave. in San Mateo County to Cochrane Rd. in Morgan Hill.$ 465 5 E101-02 US 101 US 101 Express Lanes: Cochrane Rd. to Masten Ave. $ 116 6 E101-03 US 101 US 101 Express Lanes: Masten Ave. to 10th St. $ 73 7 E101-04 US 101 US 101 Express Lanes: 10th St. to SR 25 $ 54 8 E237-01 SR 237 SR 237 Express Lanes: North First St. to Mathilda Ave.$ 26 9 E237-02 SR 237 SR 237 Express Lanes: Mathilda Ave. to SR 85 $ 87 10 E280-01 I-280 I-280 Express Lanes: US 101 to Leland Ave. $ 27 11 E280-02 I-280 I-280 Express Lanes: Leland Ave.
    [Show full text]
  • Trail Vision Study and Neighborhood Services October 2015 ACKNOWLEDGEMENTS
    lane SKY Prepared for the Department of Parks and Recreation trail vision study and Neighborhood Services October 2015 ACKNOWLEDGEMENTS City of San José Consultant Team City Council Callander Associates Landscape Architecture, Inc. Sam Liccardo, Mayor Brian Flecher, Principal-in-charge Charles “Chappie” Jones, District 1 Marie Mai, Project Manager Ash Kalra, District 2 Likun Cao, Project Assistant Raul Peralez, District 3 Manh Nguyen, District 4 Magdalena Carrasco, District 5 Pierluigi Oliverio, District 6 Tam Nguyen, District 7 Vice Mayor Rose Herrera, District 8 Donald Rocha, District 9 Johnny Khamis, District 10 Public Works Department Barry Ng, Interim Director Jan Palajac, Senior Landscape Architect Jane Wu, Associate Landscape Designer Parks, Recreation and Neighborhood Services Angel Rios Jr., Director Yves Zsutty, Trail Network Manager Marybeth Harasz, Division Manager Greg Meek, Senior Landscape Architect Yu-Wen Huang, Structure Landscape Designer Office of Cultural Affairs – San Jose Public Art Jennifer Easton, Director TABLE OF CONTENTS I EXECUTIVE SUMMARY...........................................................................................1 II EXISTING CONDITIONS.........................................................................................5 III VISIONING PROCESS...........................................................................................13 Design Charette #1 Design Charette #2 Design Charette #3 IV PROPOSED TRAIL.................................................................................................23
    [Show full text]
  • Community Meeting #2, Kelley Park Master Plan Update
    SUMMARY Meeting date: February 25, 2016 Community Meeting #2, Kelley Park Master Plan Update The second community meeting and workshop served as both a review and overview of the Master Plan Update for the public and park neighbors in the City of San Jose. The Master Plan Update is building on the existing Master Plan to update and focus on providing unified wayfinding and circulation hierarchy, enhancing existing facilities and making suggestions for undeveloped and under-used areas. Phasing and prioritization of future improvements will be a key consideration of the Master Plan Update. The meeting began shortly past 6:30pm in the Okayama Room of the Leininger Center at Kelley Park; 133 people signed in but a head count indicated upwards of 165 attendees. Simultaneous translation was provided in Vietnamese and Spanish. Councilmember Tam Nguyen and Deputy Director Marybeth Harasz gave some introductory remarks including clarify that there is a separate programming feasibility study underway to review the needs of a potential Vietnamese Community Center. A brief overview of the project, meeting, and evening’s agenda was given before a verbal and slide presentation. The presentation summarized project goals for the Master Plan Update, as well as a brief review of the park’s history and site analysis. Results to date of the online survey which will be available through the end of March for additional feedback (survey is in English, Vietnamese, and Spanish), suggested changes to the under-utilized areas of Kelley Park, and draft approaches for enhancing overall park circulation were the focus of the presentation. Before breaking into small discussion groups, there was a call for discussion and general comments followed the presentation, allowing meeting attendees to respond to the options presented for the varied park areas and amenities.
    [Show full text]
  • 2017-2018 Annual Report
    TRAIL ANNUAL REPORT 2017-18 Identify Study Plan Design Build Open Undeveloped projects Projects that have been Projects that have been Projects that have been Projects that are Projects that are open identified in the Trail or are currently being or are currently being or are currently being under construction. to the public. Database studied to determine a master planned for designed (construction 0.72 miles 59.49 miles, 14.27 miles feasible alignment. future development. documents). composed of: 17.46 miles 40.74 miles 9.76 miles 50.62 miles (paved) 8.87 miles (interim) Funding for trail projects was substantially higher this Overview fiscal year with $32,900,000 budgeted. The prior fiscal year (2015/16) provided $19,000,000 for San José seeks to be the national leader in urban studies, plans, design and construction work. This trail development. The Department of Parks, report provides an update for many of the active Recreation and Neighborhood Services’ Trail projects over the past 12 months. Program advances this vision by delivering the highest quality trails, meeting a Class I Bikeway standard across a distributed citywide network. Program Updates Once fully developed, the Trail Network will offer 100 Awards and Recognition miles of interconnected trails across 40 trail systems. The City of San José and CH2M-Hill (now Jacobs Linkages to hiking trails within San Jose’s parks and Engineering) received the Project of the Year Award regional systems will support recreation and active from the American Public Works Association - Silicon transportation in the region. This large number and Valley Chapter for the Penitencia Creek Trail Reach interface with regional, state and national systems 1B project from Noble Avenue to Dorel Avenue.
    [Show full text]