------SAN JOSE ------CITY Of Trail SAN JOSE PARKS, RECREATION & NEIGHBORHOOD SERVICES Program CAPITAL OF SILICON VALLEY @SanJoseTrails SAN JOSE CAWTAL Ol SILICON VALLEY »Open Trails

Milestones Identified Trails

'• Other Jurisdiction Trails 2007:40 miles i San Jose City Limits 2017: 60 miles Class I Trails

U.S. Department of Transportation Federal Highway Administration Usage

Secured Grants

Coyote Creek Trail (Story to "IJully)

Preliminary Not For Construction

Project Grant Program Amount Coyote Crk Trail - Story to Tully AHSC Grant $5,200,000 Coyote Crk Trail - Singleton Crossing OSA Grant $200,000 Los Gatos Crk Trail Under-Crossing BEP-VTA $300,000 Guidance

SAN JOSE O'* ^ TRAIL NETWORK ms TOOLKIT Pi a & Dl ■tKSij 1 \ 'ft V J

DEPARTMENT OF PARKS RECREATION AND NEIGHBORHOOD SERVU TRAIL PROGRAM ]0W:-n rwu ffej-...... ■ SPW.vrprt’rt SfiUJOiS r.o ™ ■

4.9 miles HBffigg&r-* - *Ski ■ $47,000,000 Planning: Chynoweth Avenue

REACH 12

Chynoweth POC

TRAIL ALIGNMENT LEGEND

CONNECTION

NON-ADA COMPLIANT RAMPS BY USACE ADA COMPLIANT RAMPS FOR CONNECTIVITY BRIDGE STRUCTURE CANTILEVER Almaden PROPOSED TRAIL OVER 2 YEARWSEL Ranch USACE MAINTENANCE PATH BELOW 2 YEARWSEL Development PARK OPPORTUNITY RECLAIMED STREET

GUADALUPE RIVER H (D DC 0 DC^ CL o "D 0) CO O o DC CO o o L- O CD Mabury Road (BART) to Empire Street

/ATSON PARK DRAINAGE SWALE AND CULVERT

PROPOSED PED/BIKE BRIDGE POTENTIAL TRAIL FUTURE GATEWAY TRAIL POTENTIAL rAINING NEW BART TRAIL WALL STATION GATEWAY PARKING COYOTE CREEK

RETAINING WALL

WALL FACES TRAIL 0 50' 100' 200* 4G0

San Jose 1 .A MARK EXISTING CONDITION ■ THOMAS APRIL 13,2017 COYOTE CREEK TRAIL DESIGN CONCEPT, CITYOF SAN JOSE TEAM Coyote Creek Trail DIRECTORY CALLANDER ASSOCIATES

Selma Olinder Park to Story Road crrroFSANpss PROJECT MANAGER

MVS. INC

FEHR S PSEF.S

ZEIGER. ENGINEERS. INC,

CNA«, (NAL ( NAT. C NAI. C NAL (NAl (NAL t MAE. (NAIL ( N'AL (NAL (NAIL (NAIL - l/T BKASS DISK • wr SPAM DISK ' I^HFWSDISK Coyote Creek Trail North of Auzerais Avenue to Bird Avenue Lower Silver Creek Trail Alum Rock Avenue to Dobern Avenue

PACKING PL „

Potential tractor location- New steel trees -

New fruitless plum or pear trees Newaggregate or mulch New shrubs or graundcover Replace existing street lights------with pedestrian-sale lights?

Hew seatwall with landscaping Hew concrete paving with geometric pattern stain •New metal no-ciimb fence fn front of existing fence

Replace chain link fencing along bridge ramp (pictured below) with decorative metal screen

Kammerer Avenue Gateway Plan View

Sprtinn Flpvatinn C - C Thompson Creek Trail Thompson Creek Trail Tully-Quimby

Coyote Creek - Odette Morrow Trail Shady Oaks Park: Broderick Ave-Silver Crk Valley Road

5B20^;>3j

£ rrStft ^ ■'1 . 'TvQJyjMEilBHBWSh, ^ rSr **-■ ' “ y ktffl

gjpwra inr.|H" ,1 OK \ ' ! J Trail King Road to Berryessa BART

NEW TRAFFIC SIGNAL

EXISTING I RAC

r>AVUW

MAINTENANCE PRESERVATION OF EXISTING ACCESS NATIVE LANDSCAPING FIELD REMOVE FIT NEW TRESS AROUND NON-NATIVE EXISTING PALMS AND “ ADDITIONAL LANDSCAPING | PINES ALONG FENCE TO DETER GRAFFITTI 18' TRAIL" (12’ PAVED/6’ UNPAVED) 10’ LANDSCAPE BUFFER BENCH AND INTERPRETIVE PANELS

MAINTENANCE VEHICLE- TURN AROUND AREA

MAINTENANCE NATIVE AMERICAN

Bay Area Ridge Trail Council

FIRE-ACCESS-ROfttrV Penitencia Creek Trail Noble Avenue to Dorel Drive Council

JOURNEY INTO ALUM ROCK

ABOVE N»frow« ! C'-r;.. 1

kustic ketreat to Cjratui kesovt

Dpounded in 1872, Alum Rock Parle was * fir or city park. The Native Americans had named the creek running down the canyon ibbtuk, or place of rabbits. In the 1890s, a steam- powered, narrow-gauge train transported visitors into tht pari: with its dance pavilion, restaurant, outdoor pltmge, bathing grottos and more than two dozen mineral hot springs. Around the turn of the century, an decrric train and then a standard-gauge locomotive replaced die small steam engine as the park's character changed from rustic retreat ro a large-scale grand resort with an added exotic zoo, aviary and indoor swimming pool.

The Great Depression and the growing popularity nf the automobile transportation doomed the retorts train. People, however, kept flooduig into die park. A record was set on Easter in abundant natural beauty todap Doerr Parkway Curtner Avenue to Comstock Drive Three Creeks Trail Coe Avenue to Minnesota Avenue / Collaboration: Bikeways & Trails Interface 3 S'ooooooo itpb M H f f i i D o ommoooooood o o o o o l 505 tH 5K ml Eft be innims OOOOOJX^^ OOOOOOOQ/>\

0

tjtujwp >00000000 anil TOjHy Sqnh o 0

Hfifoooood o

30000000000000000 0 o

ooooc o o o o o o o o o o o o o o o o o

Bto o 0 oooool oooooi M

0.06 oooood;

_ o 0 oooool

W ooo

______o o o O

oo

o o o o o o o o o o o Cjx o o

o

o o o/> ooc oq

or- o

vv Of o

0 j

/

,

„ ____ oopoooooo ' o d o b o o o o o o o o

0.0

oooo „o

0

M H ^ f Q t r Q t r o ' o o30 o o c o o o o / i > n > o o o o o o / o o o o o o o o o o o l \ \ k •. v\yooooooooAv, v ^vfoOooooo\\;T\Woo

O / s \ J o O O O O , O O t t V o

/0 0 0 ooooo o

o.o

o oooooooooiV OOOAMO

ooo O

o

o o

o

0.000 o

o oooo

OOO o o

O oooo o

ooooo o

0 o

o

q o\\.

oooo oodV o\\

oo o o o

o o o o

o o\\\ ood o o

\

o\\. \

oV dy

\

o\ \

\

f'Component Parkway Trail Collaboration: Public/Private

f Three Creeks Trail - East \ SF Bay Trail ------SAN JOSE ------CITY OF ffr zUSk PARKS, RECREATION & Trail San Jose NEIGHBORHOOD SERVICES Program CAPITAL OF SILICON VALLEY @SanJoseTrails