------SAN JOSE ------CITY Of Trail SAN JOSE PARKS, RECREATION & NEIGHBORHOOD SERVICES Program CAPITAL OF SILICON VALLEY @SanJoseTrails SAN JOSE CAWTAL Ol SILICON VALLEY »Open Trails
Milestones Identified Trails
'• Other Jurisdiction Trails 2007:40 miles i San Jose City Limits 2017: 60 miles Class I Trails
U.S. Department of Transportation Federal Highway Administration Usage
Secured Grants
Coyote Creek Trail (Story to "IJully)
Preliminary Not For Construction
Project Grant Program Amount Coyote Crk Trail - Story to Tully AHSC Grant $5,200,000 Coyote Crk Trail - Singleton Crossing OSA Grant $200,000 Los Gatos Crk Trail Under-Crossing BEP-VTA $300,000 Guidance
SAN JOSE O'* ^ TRAIL NETWORK ms TOOLKIT Pi a & Dl ■tKSij 1 \ 'ft V J
DEPARTMENT OF PARKS RECREATION AND NEIGHBORHOOD SERVU TRAIL PROGRAM ]0W:-n rwu ffej-...... ■ SPW.vrprt’rt SfiUJOiS r.o ™ ■
4.9 miles HBffigg&r-* - *Ski ■ $47,000,000 Planning: Chynoweth Avenue
REACH 12
Chynoweth POC
TRAIL ALIGNMENT LEGEND
CONNECTION
NON-ADA COMPLIANT RAMPS BY USACE ADA COMPLIANT RAMPS FOR CONNECTIVITY BRIDGE STRUCTURE CANTILEVER Almaden PROPOSED TRAIL OVER 2 YEARWSEL Ranch USACE MAINTENANCE PATH BELOW 2 YEARWSEL Development PARK OPPORTUNITY RECLAIMED STREET
GUADALUPE RIVER H (D DC 0 DC^ CL o "D 0) CO O o DC CO o o L- O CD Coyote Creek Trail Mabury Road (BART) to Empire Street
/ATSON PARK DRAINAGE SWALE AND CULVERT
PROPOSED PED/BIKE BRIDGE POTENTIAL TRAIL FUTURE GATEWAY TRAIL POTENTIAL rAINING NEW BART TRAIL WALL STATION GATEWAY PARKING COYOTE CREEK
RETAINING WALL
WALL FACES TRAIL 0 50' 100' 200* 4G0
San Jose 1 .A MARK EXISTING CONDITION ■ THOMAS APRIL 13,2017 COYOTE CREEK TRAIL DESIGN CONCEPT, CITYOF SAN JOSE TEAM Coyote Creek Trail DIRECTORY CALLANDER ASSOCIATES
Selma Olinder Park to Story Road crrroFSANpss PROJECT MANAGER
MVS. INC
FEHR S PSEF.S
ZEIGER. ENGINEERS. INC,
CNA«, (NAL ( NAT. C NAI. C NAL (NAl (NAL t MAE. (NAIL ( N'AL (NAL (NAIL (NAIL - l/T BKASS DISK • wr SPAM DISK ' I^HFWSDISK Coyote Creek Trail Los Gatos Creek Trail North of Auzerais Avenue to Bird Avenue Lower Silver Creek Trail Alum Rock Avenue to Dobern Avenue
PACKING PL „
Potential tractor location- New steel trees -
New fruitless plum or pear trees Newaggregate or mulch New shrubs or graundcover Replace existing street lights------with pedestrian-sale lights?
Hew seatwall with landscaping Hew concrete paving with geometric pattern stain •New metal no-ciimb fence fn front of existing fence
Replace chain link fencing along bridge ramp (pictured below) with decorative metal screen
Kammerer Avenue Gateway Plan View
Sprtinn Flpvatinn C - C Thompson Creek Trail Thompson Creek Trail Tully-Quimby
Coyote Creek - Odette Morrow Trail Shady Oaks Park: Broderick Ave-Silver Crk Valley Road
5B20^;>3j
£ rrStft ^ ■'1 . 'TvQJyjMEilBHBWSh, ^ rSr **-■ ' “ y ktffl
gjpwra inr.|H" ,1 OK \ ' ! J Penitencia Creek Trail King Road to Berryessa BART
NEW TRAFFIC SIGNAL
EXISTING I RAC
r>AVUW
MAINTENANCE PRESERVATION OF EXISTING ACCESS NATIVE LANDSCAPING FIELD REMOVE FIT NEW TRESS AROUND NON-NATIVE EXISTING PALMS AND “ ADDITIONAL LANDSCAPING | PINES ALONG FENCE TO DETER GRAFFITTI 18' TRAIL" (12’ PAVED/6’ UNPAVED) 10’ LANDSCAPE BUFFER BENCH AND INTERPRETIVE PANELS
MAINTENANCE VEHICLE- TURN AROUND AREA
MAINTENANCE NATIVE AMERICAN
Bay Area Ridge Trail Council
FIRE-ACCESS-ROfttrV Penitencia Creek Trail Bay Area Ridge Trail Noble Avenue to Dorel Drive Council
JOURNEY INTO ALUM ROCK
ABOVE N»frow« ! C'-r;.. 1
kustic ketreat to Cjratui kesovt
Dpounded in 1872, Alum Rock Parle was California* fir or city park. The Native Americans had named the creek running down the canyon ibbtuk, or place of rabbits. In the 1890s, a steam- powered, narrow-gauge train transported visitors into tht pari: with its dance pavilion, restaurant, outdoor pltmge, bathing grottos and more than two dozen mineral hot springs. Around the turn of the century, an decrric train and then a standard-gauge locomotive replaced die small steam engine as the park's character changed from rustic retreat ro a large-scale grand resort with an added exotic zoo, aviary and indoor swimming pool.
The Great Depression and the growing popularity nf the automobile transportation doomed the retorts train. People, however, kept flooduig into die park. A record was set on Easter in abundant natural beauty todap Doerr Parkway Curtner Avenue to Comstock Drive Three Creeks Trail Coe Avenue to Minnesota Avenue / Collaboration: Bikeways & Trails Interface 3 S'ooooooo itpb M H f f i i D o ommoooooood o o o o o l 505 tH 5K ml Eft be innims OOOOOJX^^ OOOOOOOQ/>\
0
tjtujwp >00000000 anil TOjHy Sqnh o 0
Hfifoooood o
30000000000000000 0 o
ooooc o o o o o o o o o o o o o o o o o
Bto o 0 oooool oooooi M
0.06 oooood;
_ o 0 oooool
W ooo
______o o o O
oo
o o o o o o o o o o o Cjx o o
o
o o o/> ooc oq
or- o
vv Of o
0 j
/
,
„
„ ____ oopoooooo ' o d o b o o o o o o o o
0.0
oooo „o
0
M H ^ f Q t r Q t r o ' o o30 o o c o o o o / i > n > o o o o o o / o o o o o o o o o o o l \ \ k •. v\yooooooooAv, v ^vfoOooooo\\;T\Woo
O / s \ J o O O O O , O O t t V o
/0 0 0 ooooo o
o.o
o oooooooooiV OOOAMO
ooo O
o
o o
o
0.000 o
o oooo
OOO o o
O oooo o
ooooo o
0 o
o
q o\\.
oooo oodV o\\
oo o o o
o o o o
o o\\\ ood o o
\
o\\. \
oV dy
\
o\ \
\
f'Component Parkway Trail Collaboration: Public/Private
f Three Creeks Trail - East \ SF Bay Trail ------SAN JOSE ------CITY OF ffr zUSk PARKS, RECREATION & Trail San Jose NEIGHBORHOOD SERVICES Program CAPITAL OF SILICON VALLEY @SanJoseTrails