509 Streetcar Time Schedule & Line Route

Total Page:16

File Type:pdf, Size:1020Kb

509 Streetcar Time Schedule & Line Route 509 streetcar time schedule & line map 509 Exhibition Loop at Manitoba Dr View In Website Mode The 509 streetcar line (Exhibition Loop at Manitoba Dr) has 3 routes. For regular weekdays, their operation hours are: (1) Exhibition Loop at Manitoba Dr: 12:05 AM - 11:56 PM (2) Fleet St at Bathurst St: 1:04 AM - 7:27 PM (3) Union Station: 12:06 AM - 11:57 PM Use the Moovit App to ƒnd the closest 509 streetcar station near you and ƒnd out when is the next 509 streetcar arriving. Direction: Exhibition Loop at Manitoba Dr 509 streetcar Time Schedule 13 stops Exhibition Loop at Manitoba Dr Route Timetable: VIEW LINE SCHEDULE Sunday 12:03 AM - 11:58 PM Monday 12:08 AM - 11:56 PM Union Station 55 Front St W, Toronto Tuesday 12:05 AM - 11:56 PM Queens Quay Ferry Docks Terminal Wednesday 12:05 AM - 11:56 PM 10 Bay St, Toronto Thursday 12:05 AM - 11:56 PM Queens Quay West at Harbourfront Centre Friday 12:05 AM - 11:56 PM Queens Quay West, Toronto Saturday 12:05 AM - 11:53 PM Queens Quay West at Rees St West Side 281 Queens Quay W, Toronto Queens Quay West at Lower Spadina Ave West Side 509 streetcar Info 458 Queens Quay W, Toronto Direction: Exhibition Loop at Manitoba Dr Stops: 13 Queens Quay West at Dan Leckie Way West Side Trip Duration: 23 min 602 Queens Quay West, Toronto Line Summary: Union Station, Queens Quay Ferry Docks Terminal, Queens Quay West at Harbourfront Bathurst St at Queens Quay West North Side Billy Centre, Queens Quay West at Rees St West Side, Bishop Airport Queens Quay West at Lower Spadina Ave West Side, Bathurst Street, Toronto Queens Quay West at Dan Leckie Way West Side, Bathurst St at Queens Quay West North Side Billy Fleet St at Bathurst St West Side Bishop Airport, Fleet St at Bathurst St West Side, 21 Iannuzzi Street, Toronto Fleet St at Bastion St West Side, Fleet St at Fort York Blvd West Side, Manitoba Dr at Strachan Ave West Fleet St at Bastion St West Side Side, Exhibition Loop, Exhibition Loop at Manitoba Dr 640 Fleet St, Toronto Fleet St at Fort York Blvd West Side Manitoba Dr at Strachan Ave West Side 1 Manitoba Drive, Toronto Exhibition Loop 120 Manitoba Drive, Toronto Exhibition Loop at Manitoba Dr Direction: Fleet St at Bathurst St 509 streetcar Time Schedule 5 stops Fleet St at Bathurst St Route Timetable: VIEW LINE SCHEDULE Sunday 1:10 AM - 10:14 PM Monday 1:09 AM - 7:27 PM Exhibition Loop at Manitoba Dr Tuesday 1:04 AM - 7:27 PM Fleet St at Strachan Ave Manitoba Drive, Toronto Wednesday 1:04 AM - 7:27 PM Fleet St at Fort York Blvd East Side Thursday 1:04 AM - 7:27 PM 671 Fleet St, Toronto Friday 1:04 AM - 7:27 PM Fleet St at Bastion St Saturday 1:04 AM - 7:14 PM 4 Bastion Street, Toronto Fleet St at Bathurst St 600 Fleet St, Toronto 509 streetcar Info Direction: Fleet St at Bathurst St Stops: 5 Trip Duration: 5 min Line Summary: Exhibition Loop at Manitoba Dr, Fleet St at Strachan Ave, Fleet St at Fort York Blvd East Side, Fleet St at Bastion St, Fleet St at Bathurst St Direction: Union Station 509 streetcar Time Schedule 12 stops Union Station Route Timetable: VIEW LINE SCHEDULE Sunday 12:04 AM - 11:59 PM Monday 12:09 AM - 11:57 PM Exhibition Loop at Manitoba Dr Tuesday 12:06 AM - 11:57 PM Fleet St at Strachan Ave Manitoba Drive, Toronto Wednesday 12:06 AM - 11:57 PM Fleet St at Fort York Blvd East Side Thursday 12:06 AM - 11:57 PM 671 Fleet St, Toronto Friday 12:06 AM - 11:57 PM Fleet St at Bastion St Saturday 12:06 AM - 11:55 PM 4 Bastion Street, Toronto Fleet St at Bathurst St 600 Fleet St, Toronto 509 streetcar Info Queens Quay West at Bathurst St East Side Billy Direction: Union Station Bishop Airport Stops: 12 627A Queens Quay W, Toronto Trip Duration: 17 min Line Summary: Exhibition Loop at Manitoba Dr, Fleet Queens Quay West at Dan Leckie Way East Side St at Strachan Ave, Fleet St at Fort York Blvd East 548 Queens Quay West, Toronto Side, Fleet St at Bastion St, Fleet St at Bathurst St, Queens Quay West at Bathurst St East Side Billy Queens Quay West at Lower Spadina Ave East Bishop Airport, Queens Quay West at Dan Leckie Side Way East Side, Queens Quay West at Lower Spadina 415 Queens Quay W, Toronto Ave East Side, Queens Quay West at Rees St, Queens Quay West at Harbourfront Centre, Queens Quay Queens Quay West at Rees St Ferry Docks Terminal, Union Station 275 Queens Quay W, Toronto Queens Quay West at Harbourfront Centre 210 Queens Quay West, Toronto Queens Quay Ferry Docks Terminal Bay Street, Toronto Union Station 55 Front St W, Toronto 509 streetcar time schedules and route maps are available in an o«ine PDF at moovitapp.com. Use the Moovit App to see live bus times, train schedule or subway schedule, and step-by-step directions for all public transit in Toronto. Check Live Arrival Times About Moovit MaaS Solutions Supported Countries Mooviter Community © 2021 Moovit - All Rights Reserved.
Recommended publications
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Exhibition Place Master Plan – Phase 1 Proposals Report
    Acknowledgments The site of Exhibition Place has had a long tradition as a gathering place. Given its location on the water, these lands would have attracted Indigenous populations before recorded history. We acknowledge that the land occupied by Exhibition Place is the traditional territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples and is now home to many diverse First Nations, Inuit and Metis peoples. We also acknowledge that Toronto is covered by Treaty 13 with the Mississaugas of the Credit, and the Williams Treaties signed with multiple Mississaugas and Chippewa bands. Figure 1. Moccasin Identifier engraving at Toronto Trillium Park The study team would like to thank City Planning Division Study Team Exhibition Place Lynda Macdonald, Director Don Boyle, Chief Executive Officer Nasim Adab Gilles Bouchard Tamara Anson-Cartwright Catherine de Nobriga Juliana Azem Ribeiro de Almeida Mark Goss Bryan Bowen Hardat Persaud David Brutto Tony Porter Brent Fairbairn Laura Purdy Christian Giles Debbie Sanderson Kevin Lee Kelvin Seow Liz McFarland Svetlana Lavrentieva Board of Governors Melanie Melnyk Tenants, Clients and Operators Dan Nicholson James Parakh David Stonehouse Brad Sunderland Nigel Tahair Alison Torrie-Lapaire 4 - PHASE 1 PROPOSALS REPORT FOR EXHIBITION PLACE Local Advisory Committee Technical Advisory Committee Bathurst Quay Neighbourhood Association Michelle Berquist - Transportation Planning The Bentway Swinzle Chauhan – Transportation Services
    [Show full text]
  • Traffic and Transportation Report
    Appendix A5 Ontario Line Project Exhibition Station Early Works – Final Traffic and Transportation Early Works Report Metrolinx Traffic and Transportation Early Works Report Ontario Line Exhibition Station Early Works Prepared by: AECOM Canada Ltd. 105 Commerce Valley Drive West, 7th Floor Markham, ON L3T 7W3 Canada T: 905.886.7022 F: 905.886.9494 www.aecom.com Date: February 2021 Project #: 60611173 Metrolinx Ontario Line Exhibition Station Early Works – Traffic and Transportation Early Works Report Statement of Qualifications and Limitations The attached Report (the “Report”) has been prepared by AECOM Canada Ltd. (“AECOM”) for the benefit of the Client (“Client”) in accordance with the agreement between AECOM and Client, including the scope of work detailed therein (the “Agreement”). The information, data, recommendations and conclusions contained in the Report (collectively, the “Information”): § is subject to the scope, schedule, and other constraints and limitations in the Agreement and the qualifications contained in the Report (the “Limitations”); § represents AECOM’s professional judgement in light of the Limitations and industry standards for the preparation of similar reports; § may be based on information provided to AECOM which has not been independently verified; § has not been updated since the date of issuance of the Report and its accuracy is limited to the time period and circumstances in which it was collected, processed, made or issued; § must be read as a whole and sections thereof should not be read out of such context; § was prepared for the specific purposes described in the Report and the Agreement; and § in the case of subsurface, environmental or geotechnical conditions, may be based on limited testing and on the assumption that such conditions are uniform and not variable either geographically or over time.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • 550 Queen's Quay W #311
    LIST PRICE $$259,800 ADDRESS 550 Queen’s Quay W #311 See More Photos And Community Information At… www.TorontoRealEstate.ca How Much Can YOU Afford? Based on 4.95% 5% 10% 15% 25% Mortgage Rate Down Down Down Down Down Payment $13,000 $26,000 $39,000 $65,000 TOTAL Monthly Payment $2,125 $2,025 $1,950 $1,750 (Mortgage, taxes, condo fees & utilities) Closing Costs $17,000 $30,000 $43,000 $69,000 (Including down payment) Gross Income Req’d To $68,500 $64,000 $60,500 $52,500 Qualify For The Mortgage Above calculations are estimates only for income required and closing costs … buyer must verify for themselves! Welcoming lobby with friendly, 24 hr concierge, terrific gym, sauna, and whirlpool. Huge party room with kitchen and library/TV area. Terrific city and lake views from the rooftop deck. List Of Neighbourhood Features Restaurants Many restaurants along Queens Quay … and fine dining in downtown Toronto, all the way from Hooters and Gretzky’s to the top of the CN Tower Night Clubs / Theatre duMaurier and Premier Dance Theatres, CIBC Stage and more at Harbourfront Centre … and Toronto’s Entertainment District … approx. King to Richmond, Duncan to Peter; The Paramount at Richmond and John has multi-theatres for 1st run movies, and the Princess of Wales at King & John for live theatre and musicals. Bookstores / Coffee Cafes all along Harbourfront; Chapters at SW corner of Richmond & Peter; Starbucks; Second Cup Shops at Pier 6, Harbourfront Parks Toronto Music Garden, 475 Queens Quay W; Greenspace at the Ferry Docks, ferry access to the Toronto Islands with more than 230 hectares of parkland; Spadina Quay Wetland; Harbour Square; Coronation Park, south of Lakeshore, west of Stadium Rd, and along the lake front.
    [Show full text]
  • Redesigning Streets for a Growing City and Better Neighbourhoods
    Toronto’s Great Streets Redesigning Streets for a Growing City and Better Neighbourhoods July 2018 Toronto’s Great Streets Redesigned for Greatness Harbord Street Roncesvalles Avenue St. Clair Avenue West Bike lanes for safer mobility & village improvement Toronto placemaking at its best The streetcar neighbourhood The 2014 redesign installed continuous cycling Completed in 2011, the Roncesvalles redesign The dedicated streetcar lane, opened in 2010, has infrastructure from Ossington to Parliament, trans- focused on placemaking and people, improving safety made hopping on transit an efficient alternative to forming Harbord into one of the most well-travelled and enhancing pedestrian space while strengthening the car and has transformed this midtown corridor bike routes in the city. Roncy’s capacity to serve local needs. into a vibrant main street. Queens Quay West Market Street A street for all users A future-proof street for people (and patios!) The 2015 redesign repositioned Queens Quay as Market Street’s 2014 redesign prioritizes the pedes- a public waterfront promenade, reallocating street trian experience to support adjacent retail and space to accommodate all modes – pedestrians, restaurants while celebrating the unique heritage cyclists, transit, and cars. and culture of St. Lawrence Market. Toronto’s Great Streets 2 Toronto’s Great Streets The Ones to Watch Bloor Street King Street Downtown Yonge Street Bike lanes on Bloor from east to west Relief for Toronto’s busiest surface transit route Canada’s Main Street See (a) credit image The Bike Lane Pilot Project on Bloor Street proved to The King Street Pilot Project transformed this busy A vision to pedestrianize a busy foot traffic stretch of be a great success and the lanes are now permanent.
    [Show full text]
  • Waterfront Transit Network Update – Summer 2020 Agenda
    Waterfront Transit Network Update Stakeholder Advisory Committee (SAC) July 23, 2020 Waterfront Transit Network Update – Summer 2020 Agenda 1. Project Overview 1. Context 2. Background 3. Timeline 2. Portal Selection Study - Summary of findings 3. Network Phasing Study – Upcoming work 4. EA Addenda/TPAP – Upcoming work 5. Preliminary Design and Engineering – Upcoming work Waterfront Transit Network Update – Summer 2020 Context Distillery Loop Union Station Waterfront Transit Network Update – Summer 2020 Background • In April 2019 , City Council endorsed the streetcar loop expansion at Union Station as the preferred option for the Union Queens Quay Link, and directed staff to commence the preliminary design and engineering phase of the extension of light rail transit to the East Bayfront beginning in 2020. • The first part of this work includes feasibility studies to assess: • An alternative portal location for the LRT along Queens Quay between Bay Street and Yonge Street, which may provide overall cost and public realm benefits • Consideration of phasing option(s) that may expedite the east-west streetcar service on Queens Quay to the East Bayfront Waterfront Transit Network Update – Summer 2020 Timeline Last time we met We are here TTC East Preliminary Transit Preliminary Bayfront Design – EBF Waterfront Union Station Project Design and Transit Portal + Transit – Queens Assessment Engineering Class EA Tunnel Reset Quay Link Process Structures Study (TPAP) (PDE) 2010 2011 2018 2019 2020 2020-2021 2020-2021 Study area from Preliminary Council Council approved Refine two Identify phase 1 Complete the Complete PDE Bay to Cherry design and cost directed streetcar loop implementation TPAP process (30% design) three St.
    [Show full text]
  • Insider Report OFFICE CONDO
    Insider Report OFFICE CONDO GTA RESEARCH AND INSIDER INSIGHTS SUPPORTING COMMERCIAL REAL ESTATE DECISIONS | 2018 Why Office Space Ownership is Catching On The City of Toronto’s push to revitalize transit-connected communities through mixed use developments has increased the supply of office condominiums and resulted in more organizations choosing to “buy” rather than “lease” their office space. For the right tenants, it’s a smart investment that will pay off long term. Stats Paint the Picture Strong GTA Condo Sales 1 MSF % New Downtown2.3 Office transit-connected Market Record low supply since 2013 availability $ PSF SF Average850 price for 600kYonge & Eglinton new Central Area potential space developments coming on stream For more information contact: Stefan Teague, Executive Managing Director, Market Leader, GTA, Cushman & Wakefield ULC direct: 416-359-2379 | cell: 416-278-0015 | [email protected] Insider Report OFFICE CONDO GTA RESEARCH AND INSIDER INSIGHTS SUPPORTING COMMERCIAL REAL ESTATE DECISIONS | 2018 Growing Trend in Tight Leasing Market The concept of companies owning their own office space in smaller standalone buildings is far from new, but the trend to investing in an office condo in larger buildings wasn’t widely embraced until 2015. That’s when the Hullmark Centre at 4789 Yonge Street and the World on Yonge at 7191 Yonge Street arrived on the scene – major builds providing more options to office condo ownership. These two developments brought a total of 340,000 square feet (Hullmark Centre, 240,000 square feet; World on Yonge, 100,000 square feet) to the market. In 2017, the new 7 St.
    [Show full text]
  • 130 Queens Quay E 1,915 SF for Sale: Office
    Click Here for Virtual Tour! 130 Queens Quay E 1,915 SF For Sale: Office Here is where your business will grow. lennard.com 130 Queens Quay E 1,915 SF Office space located in the Waterfront Communities-The Island neighborhood in Toronto Suite Availability 819 Immediate Available Space Listing Agents 1,915 SF (approximately) Dillon Stanway Sales Representative Sale Price 416.649.5904 $2,290,000 [email protected] Condo Fees William J. Dempsey** $1,042.29 / month Partner Taxes 416.649.5940 $21,915.10 (2020) [email protected] **Broker Benefits • One of the best located and finished units in the East Tower • Top floor in east tower below the amenities. • Bright corner unit with great Views – 2 sides with full windows. • South and east facing – end of hall privacy. • Access to common amenity space with 2 high tech board rooms, lounge, large outdoor terrace & BBQ area over looking lake. • 24 hrs concierge • Bike locker room and shower room. • Secure heated storage locker available. Move In condition • Finished drop ceiling and premium carpet for sound attenuation • LED lighting throughout • 3 heat/cool zones with separate thermostats. • 5 private offices with glass side lights • 2 larger rooms with view • Separate kitchen with full fridge and dishwasher • Dividing half wall in open space • Extensively pre-wired for data and voip runs from server cupboard lennard.com 130 Queens Quay E lennard.com 130 Queens Quay E Building amenities Main Lobby Bike Storage Private Shower Facilities 130 Queens Quay E Common areas Private Meeting Rooms Rooftop
    [Show full text]