ONE YONGE STREET the BUILDING the Iconic Toronto Star Building Provides Unique Views of the TOBY TOBIASON CHRIS FYVIE Both the Downtown Core and the Lakefront

Total Page:16

File Type:pdf, Size:1020Kb

ONE YONGE STREET the BUILDING the Iconic Toronto Star Building Provides Unique Views of the TOBY TOBIASON CHRIS FYVIE Both the Downtown Core and the Lakefront ONE YONGE STREET THE BUILDING The iconic Toronto Star Building provides unique views of the TOBY TOBIASON CHRIS FYVIE both the Downtown core and the Lakefront. This 25 Storey +1 416 643 3459 +1 416 643 3713 tower is BOMA Best Silver certified. With LRT access and [email protected] [email protected] less than a ten-minute walk to Union Station, One Yonge Street is easily accessible by public transit. One Yonge Street offers an excellent opportunity at Yonge and Queens Quay. The building is a short walk from Harbour Square Park as well as banks, restaurants and hotels. Located close to the Air Canada Centre, Rogers Centre and the CN Tower, One Yonge is truly in the heart of the city. COLLIERS INTERNATIONAL 181 Bay Street, Suite 1400 Undergoing renovations to the lobby and entrance, corridors Toronto, ON M5J 2V1 and elevator cabs. Will consider modern, loft style office +1 416 777 2200 space. www.collierscanada.com/toronto LEASE > ONE YONGE STREET Suite 1602: 4,798 SF Suite 1205: 7,350 SF Suite 1010: 1,946 SF - March 2019 Suite 700: 6,318 SF Suite 602: 4,970 SF Suite 400: 15,500 SF - January 2019 Suite 102: 562 SF Ground Floor Retail Suite 107: 831 SF - April 2019 Net Rent: Starting at $32.00 per square foot Additional Rent: $19.70 per square foot (2018 est.) • Built out and loft style suites • 24/7 manned security Features: • Underground and surface parking available • Starbucks, Fit 4 Life and International News in the building CONTACT US TOBY TOBIASON* Senior Vice President +1 416 643 3459 [email protected] CHRIS FYVIE Associate Vice President +1 416 643 3713 [email protected] * Sales Representative. This document/email has been prepared by Colliers International for general information only. Colliers International makes no guarantees, representations or warranties of any kind, expressed or implied, regarding the information including, but not limited to, warranties of content, accuracy and reliability. Any interested party should undertake their own inquiries as to the accuracy of the information. Colliers International excludes unequivocally all inferred or implied terms, conditions and warranties arising out of this document and excludes all liability for loss and damages arising there from. This publication is the copyrighted property of Colliers International and /or its licensor(s). Colliers Macaulay Nicolls Inc., Brokerage © 2018. All rights reserved. COLLIERS INTERNATIONAL 181 Bay Street, Suite 1400 Toronto, ON M5J 2V1 +1 416 777 2200 www.collierscanada.com/toronto LEASE > SUITE 1602 - 4,798 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected] LEASE > SUITE 1205- 7,350 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected] LEASE > SUITE 1010 - 1,946 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected] LEASE > SUITE 700 - 6,318 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected] LEASE > SUITE 602 - 4,970 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected] LEASE > SUITE 400 - 15,500 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected] LEASE > GROUND FLOOR RETAIL - SUITE 102 - 831 SF & SUITE 107 - 562 SF AVAILABLE SPACE TOBY TOBIASON* CHRIS FYVIE Senior Vice President Associate Vice President +1 416 643 3459 +1 416 643 3713 [email protected] [email protected].
Recommended publications
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • 550 Queen's Quay W #311
    LIST PRICE $$259,800 ADDRESS 550 Queen’s Quay W #311 See More Photos And Community Information At… www.TorontoRealEstate.ca How Much Can YOU Afford? Based on 4.95% 5% 10% 15% 25% Mortgage Rate Down Down Down Down Down Payment $13,000 $26,000 $39,000 $65,000 TOTAL Monthly Payment $2,125 $2,025 $1,950 $1,750 (Mortgage, taxes, condo fees & utilities) Closing Costs $17,000 $30,000 $43,000 $69,000 (Including down payment) Gross Income Req’d To $68,500 $64,000 $60,500 $52,500 Qualify For The Mortgage Above calculations are estimates only for income required and closing costs … buyer must verify for themselves! Welcoming lobby with friendly, 24 hr concierge, terrific gym, sauna, and whirlpool. Huge party room with kitchen and library/TV area. Terrific city and lake views from the rooftop deck. List Of Neighbourhood Features Restaurants Many restaurants along Queens Quay … and fine dining in downtown Toronto, all the way from Hooters and Gretzky’s to the top of the CN Tower Night Clubs / Theatre duMaurier and Premier Dance Theatres, CIBC Stage and more at Harbourfront Centre … and Toronto’s Entertainment District … approx. King to Richmond, Duncan to Peter; The Paramount at Richmond and John has multi-theatres for 1st run movies, and the Princess of Wales at King & John for live theatre and musicals. Bookstores / Coffee Cafes all along Harbourfront; Chapters at SW corner of Richmond & Peter; Starbucks; Second Cup Shops at Pier 6, Harbourfront Parks Toronto Music Garden, 475 Queens Quay W; Greenspace at the Ferry Docks, ferry access to the Toronto Islands with more than 230 hectares of parkland; Spadina Quay Wetland; Harbour Square; Coronation Park, south of Lakeshore, west of Stadium Rd, and along the lake front.
    [Show full text]
  • Redesigning Streets for a Growing City and Better Neighbourhoods
    Toronto’s Great Streets Redesigning Streets for a Growing City and Better Neighbourhoods July 2018 Toronto’s Great Streets Redesigned for Greatness Harbord Street Roncesvalles Avenue St. Clair Avenue West Bike lanes for safer mobility & village improvement Toronto placemaking at its best The streetcar neighbourhood The 2014 redesign installed continuous cycling Completed in 2011, the Roncesvalles redesign The dedicated streetcar lane, opened in 2010, has infrastructure from Ossington to Parliament, trans- focused on placemaking and people, improving safety made hopping on transit an efficient alternative to forming Harbord into one of the most well-travelled and enhancing pedestrian space while strengthening the car and has transformed this midtown corridor bike routes in the city. Roncy’s capacity to serve local needs. into a vibrant main street. Queens Quay West Market Street A street for all users A future-proof street for people (and patios!) The 2015 redesign repositioned Queens Quay as Market Street’s 2014 redesign prioritizes the pedes- a public waterfront promenade, reallocating street trian experience to support adjacent retail and space to accommodate all modes – pedestrians, restaurants while celebrating the unique heritage cyclists, transit, and cars. and culture of St. Lawrence Market. Toronto’s Great Streets 2 Toronto’s Great Streets The Ones to Watch Bloor Street King Street Downtown Yonge Street Bike lanes on Bloor from east to west Relief for Toronto’s busiest surface transit route Canada’s Main Street See (a) credit image The Bike Lane Pilot Project on Bloor Street proved to The King Street Pilot Project transformed this busy A vision to pedestrianize a busy foot traffic stretch of be a great success and the lanes are now permanent.
    [Show full text]
  • September 17, 2014 by Electronic Mail and RESS Electronic Filing Ms
    Osler, Hoskin & Harcourt LLP Box 50, 1 First Canadian Place Toronto, Ontario, Canada M5X 1B8 416.362.2111 MAIN 416.862.6666 FACSIMILE Toronto September 17, 2014 Patrick G. Welsh Direct Dial: 416.862.5951 Montréal [email protected] Our Matter Number: 1151071 Ottawa By Electronic Mail and RESS Electronic Filing Calgary Ms. Kirsten Walli New York Board Secretary Ontario Energy Board 27-2300 Yonge Street Toronto, ON M4P 1E4 Dear Ms. Walli: Natural Resource Gas Limited (“NRG”) Rates, Effective October 1, 2014 EB-2014-0274 Please find enclosed an Affidavit regarding NRG’s arrangement for the publication of the Board’s Notice of Application in a national daily newspaper and a local weekly newspaper pursuant to the Board’s Letter of Direction dated September 9, 2014. Please do not hesitate to contact me if you have any questions. Yours very truly, Patrick G. Welsh Associate PW: Enclosure c: Richard King, Osler Laurie O’Meara, NRG Brian Lippold, NRG LEGAL_1:32057489.1 EB-2014-0274 ONTARIO ENERGY BOARD I IN THE MATTER OF the Ontario Energy Board Act, 1998, S.O. 1998, c.15 (Schedule B) (as amended) (the "OEB Act"); AND IN THE MATTER OF an application by Natural Resource Gas Limited for an Order or Orders pursuant to section 36 of the OEB Act approving or fixing just and reasonable rates and other charges for the sale, transmission and distribution of natural gas as of October 1, 2014. AFFIDAVIT OF SERVICE I, LINDA SHERWOOD, of the City of Pickering, in the Province of Ontario, MAKEOATHANDSAY: 1. I am an assistant at Osler, Hoskin & Harcourt LLP, counsel to Natural Resource Gas Limited and, as such, have personal knowledge of the matters hereinafter disposed.
    [Show full text]
  • Waterfront Transit Network Update – Summer 2020 Agenda
    Waterfront Transit Network Update Stakeholder Advisory Committee (SAC) July 23, 2020 Waterfront Transit Network Update – Summer 2020 Agenda 1. Project Overview 1. Context 2. Background 3. Timeline 2. Portal Selection Study - Summary of findings 3. Network Phasing Study – Upcoming work 4. EA Addenda/TPAP – Upcoming work 5. Preliminary Design and Engineering – Upcoming work Waterfront Transit Network Update – Summer 2020 Context Distillery Loop Union Station Waterfront Transit Network Update – Summer 2020 Background • In April 2019 , City Council endorsed the streetcar loop expansion at Union Station as the preferred option for the Union Queens Quay Link, and directed staff to commence the preliminary design and engineering phase of the extension of light rail transit to the East Bayfront beginning in 2020. • The first part of this work includes feasibility studies to assess: • An alternative portal location for the LRT along Queens Quay between Bay Street and Yonge Street, which may provide overall cost and public realm benefits • Consideration of phasing option(s) that may expedite the east-west streetcar service on Queens Quay to the East Bayfront Waterfront Transit Network Update – Summer 2020 Timeline Last time we met We are here TTC East Preliminary Transit Preliminary Bayfront Design – EBF Waterfront Union Station Project Design and Transit Portal + Transit – Queens Assessment Engineering Class EA Tunnel Reset Quay Link Process Structures Study (TPAP) (PDE) 2010 2011 2018 2019 2020 2020-2021 2020-2021 Study area from Preliminary Council Council approved Refine two Identify phase 1 Complete the Complete PDE Bay to Cherry design and cost directed streetcar loop implementation TPAP process (30% design) three St.
    [Show full text]
  • Print Untitled (7 Pages)
    HARIRI PONTARINI ARCHITECTS David Pontarini B.Arch., OAA, AAA, AIBC, FRAIC, Inti. Assoc. AlA, Founding· Partner David Pontarini, founding Partner, focuses on building better cities through quality urban developments that channel the best aspects of their site and program into architectural and public realm designs. Over the past 30 years, he has built a diverse award-winning portfolio of complex, variously scaled urban high­ rise and mixed-use developments in cities across Canada and the United States. With Partner Siamak Hariri, David's work was recognized in 2013 by the Royal Architectural Institute of Canada's Architectural Firm Award. An architect dedicated to crafting elegant urban buildings and inspiring public spaces, David believes successful development solutions start with a collaborative, design-oriented approach. As an Urban Design Specialist on the City ofToronto's study, Tall Buildings: Inviting Change in Downtown Toronto, David has helped shape the vision and performance standards that will guide future TEL 4 6 929 4901 X ":.2/ city centre development. His deep understanding of complex urban issues bas earned him the reputation FAX 416 g:g 8924 as one ofToronto's leading urban architects. Affiliated with the City ofToronto Design Review Panel and dpontarini@hp-arch com Preservation Board, and the Ontario Association of Architects Council, David takes pride in participating harinpontamu com v•ww in local design and planning processes. He and his team currently oversee nearly 4·3 million square feet of construction in more than 40 multi-unit and mixed-use developments across Canada representing over 4,500 residential units with a total value of approximately 1.3 billion dollars.
    [Show full text]
  • Insider Report OFFICE CONDO
    Insider Report OFFICE CONDO GTA RESEARCH AND INSIDER INSIGHTS SUPPORTING COMMERCIAL REAL ESTATE DECISIONS | 2018 Why Office Space Ownership is Catching On The City of Toronto’s push to revitalize transit-connected communities through mixed use developments has increased the supply of office condominiums and resulted in more organizations choosing to “buy” rather than “lease” their office space. For the right tenants, it’s a smart investment that will pay off long term. Stats Paint the Picture Strong GTA Condo Sales 1 MSF % New Downtown2.3 Office transit-connected Market Record low supply since 2013 availability $ PSF SF Average850 price for 600kYonge & Eglinton new Central Area potential space developments coming on stream For more information contact: Stefan Teague, Executive Managing Director, Market Leader, GTA, Cushman & Wakefield ULC direct: 416-359-2379 | cell: 416-278-0015 | [email protected] Insider Report OFFICE CONDO GTA RESEARCH AND INSIDER INSIGHTS SUPPORTING COMMERCIAL REAL ESTATE DECISIONS | 2018 Growing Trend in Tight Leasing Market The concept of companies owning their own office space in smaller standalone buildings is far from new, but the trend to investing in an office condo in larger buildings wasn’t widely embraced until 2015. That’s when the Hullmark Centre at 4789 Yonge Street and the World on Yonge at 7191 Yonge Street arrived on the scene – major builds providing more options to office condo ownership. These two developments brought a total of 340,000 square feet (Hullmark Centre, 240,000 square feet; World on Yonge, 100,000 square feet) to the market. In 2017, the new 7 St.
    [Show full text]
  • 130 Queens Quay E 1,915 SF for Sale: Office
    Click Here for Virtual Tour! 130 Queens Quay E 1,915 SF For Sale: Office Here is where your business will grow. lennard.com 130 Queens Quay E 1,915 SF Office space located in the Waterfront Communities-The Island neighborhood in Toronto Suite Availability 819 Immediate Available Space Listing Agents 1,915 SF (approximately) Dillon Stanway Sales Representative Sale Price 416.649.5904 $2,290,000 [email protected] Condo Fees William J. Dempsey** $1,042.29 / month Partner Taxes 416.649.5940 $21,915.10 (2020) [email protected] **Broker Benefits • One of the best located and finished units in the East Tower • Top floor in east tower below the amenities. • Bright corner unit with great Views – 2 sides with full windows. • South and east facing – end of hall privacy. • Access to common amenity space with 2 high tech board rooms, lounge, large outdoor terrace & BBQ area over looking lake. • 24 hrs concierge • Bike locker room and shower room. • Secure heated storage locker available. Move In condition • Finished drop ceiling and premium carpet for sound attenuation • LED lighting throughout • 3 heat/cool zones with separate thermostats. • 5 private offices with glass side lights • 2 larger rooms with view • Separate kitchen with full fridge and dishwasher • Dividing half wall in open space • Extensively pre-wired for data and voip runs from server cupboard lennard.com 130 Queens Quay E lennard.com 130 Queens Quay E Building amenities Main Lobby Bike Storage Private Shower Facilities 130 Queens Quay E Common areas Private Meeting Rooms Rooftop
    [Show full text]
  • TO Condominiums 117 Gerrard Street East Toronto Terminal, the 211
    "T" T.O. Condominiums 117 Gerrard Street East Toronto Terminal, The 211 Queens Quay Toronto Terrace Court 19 Dundonald Street Toronto The Algero-Opera Place 887, 889 Bay Street Toronto The Arboretum 1901, 1903, 1905 Pilgrim's Way Oakville The Artisan 152 St. Patrick Street Toronto The Bellair-on-the Park 22, 24 Hanover Road Brampton The Bentley 55 Lombard Street Toronto The Boulevard 188 Doris Avenue Toronto The Breakers 45 Cumberland Lane Ajax The Brookbanks 17 Brookbanks Drive Toronto The Brownstones 1635 Pickering Pkwy. Pickering The Carlisle Group 115, 145, 155 Hillcrest Avenue Mississauga The Central 415 Jarvis Street Toronto The Channel Club 456 College Street Toronto The Chedington 2 Chedington Place Toronto The Churchill 342 Spadina Avenue Toronto The Citysphere 801 King Street West Toronto The Colony 180 Mississauga Valley Blvd. Mississauga The Conservatory "A" 333 Clark Avenue West Thornhill The Conservatory "B" 343 Clark Avenue West Thornhill The Coronation 10 Malta Avenue Brampton The Cosmopolitan 25 Maitland Street Toronto The Courtyards of Concorde 18 Concorde Place Toronto The Creed Building 295 Davenport Road Toronto The Dakota 225 Davenport Road Toronto The Dorchester 150 Farnham Avenue Toronto The Dunhill Club 95 Prince Arthur Avenue Toronto The Ellington 7 Carlton Street Toronto The Esplanade 25 The Esplanade Toronto The Fairways 1400 Dixie Road Mississauga The Gallery 25 Grenville Street Toronto The Granary 100 Lakeshore Road East Oakville The Hallmark 53 Church Street East Brampton The Hammersmith 2112 Queen Street East Toronto The Imperial 30 Malta Avenue Brampton The Imperial I 256 Doris Avenue Toronto The Imperial II 260 Doris Avenue Toronto The Indigo 50 Lombard Street Toronto The Jockey Club 21 Overlea Blvd.
    [Show full text]