Queens Quay Design Alternatives

Total Page:16

File Type:pdf, Size:1020Kb

Queens Quay Design Alternatives East Bayfront Transit Class Environmental Assessment Traffic Assessment Queens Quay Design Alternatives Prepared For: Toronto Transit Commission / Waterfront Toronto January 2010 Table of Contents 1. Introduction ....................................................................................................................................1 1.1 East Bayfront Transit Environmental Assessment..............................................................1 1.1.1 Environmental Assessment Study Area ................................................................1 1.1.2 Preferred Alignment and Technology ....................................................................3 1.2 Queens Quay East - Design Options Under Consideration ...............................................3 1.3 Coordination with Other Adjacent Studies ..........................................................................4 1.3.1 Queens Quay Revitalization Environmental Assessment .....................................4 1.3.2 Lower Don Lands Planning....................................................................................6 1.3.3 Gardiner Expressway.............................................................................................6 1.4 This Study ...........................................................................................................................7 1.4.1 Traffic Assessment Study Area..............................................................................7 1.4.2 Study Scope...........................................................................................................7 1.6 Summary and Key Findings................................................................................................8 2. Area Road Context.......................................................................................................................13 2.1 Study Area ........................................................................................................................13 2.2 Existing Road Network......................................................................................................14 2.3 Planned Road Modifications .............................................................................................18 2.3.1 Committed Modifications and New Roads...........................................................18 2.3.2 Planned Major Street Linkages............................................................................18 2.3.3 Potential New Development Related Connections..............................................19 3. Proposed Queens Quay East Options.......................................................................................20 3.1 Centre Transit Option........................................................................................................23 3.1.1 Queens Quay East Cross-Section.......................................................................23 3.1.2 Signalized Intersections .......................................................................................23 3.1.3 Unsignalized Intersections ...................................................................................24 3.1.4 Turning Movement Prohibitions ...........................................................................25 3.1.5 Emergency Vehicle Access .................................................................................25 3.2 South Side Transit Option.................................................................................................25 3.2.1 Queens Quay East Cross-Section.......................................................................25 3.2.2 Signalized Intersections .......................................................................................26 3.2.3 Unsignalized Intersections ...................................................................................28 3.2.4 Turning Movement Prohibitions ...........................................................................29 3.2.5 Emergency Vehicle Access .................................................................................30 3.2.6 Potential Future Pedestrian Crossings ................................................................30 4. Traffic Volume Forecasts ............................................................................................................31 4.1 Approach...........................................................................................................................31 4.1.1 Road Network Assumptions.................................................................................31 4.1.2 Traffic Volume Forecasting Methodology ............................................................31 East Bayfront Transit Class EA, Traffic Assessment 7085-01, January 2010 P:\70\85\01\2008\QQ - Preliminary Traffic Forecasts Report\EBF Traffic Report- Final Draft Jan_2010-Rev 2.doc 4.1.3 Coordination with Queens Quay Revitalization EA..............................................32 4.2 Existing Baseline Traffic Volumes.....................................................................................32 4.2.1 Intersection / Driveway Traffic Count Information................................................32 4.2.2 Volume Balancing – Queens Quay East Corridor ...............................................33 4.2.3 Existing Traffic Redistribution: Planned Area Road Network ..............................33 4.2.4 Existing Traffic Diversion: Queens Quay East to Lake Shore Boulevard East....35 4.2.5. Baseline (Adjusted) Existing Volumes .................................................................35 4.3 New Development Related Traffic Allowances.................................................................37 4.3.1 Traffic Allowances - East Bayfront Precinct.........................................................40 4.3.2 Travel Demand Forecasts – Western Portions of Lower Don Lands ..................46 4.3.3 Travel Demand Forecasts – West Don Lands.....................................................48 4.3.4 Travel Demand Forecasts – Other Central Waterfront Area Developments .......51 4.4 Design Option Volume Forecasts .....................................................................................54 5.0 Traffic Operations Analysis ........................................................................................................58 5.1 Methodology......................................................................................................................58 5.1.1 Analysis Methodology ..........................................................................................58 5.1.2 Options Under Evaluation ....................................................................................58 5.1.3 Road Network and Lane Configurations..............................................................58 5.1.4 Intersections Analysed.........................................................................................59 5.1.5 Signal Timings......................................................................................................59 5.1.6 Pedestrian Activity Assumptions..........................................................................60 5.1.7 Peak Hour Factor - Synchro ................................................................................60 5.1.8 Heavy Vehicle Assumptions ................................................................................60 5.1.9 Base Saturation Flow Rate Assumptions ............................................................60 5.2 Analysis Findings – South Side Transit Option.................................................................60 5.2.1 Traffic Operations Analyses.................................................................................60 5.2.2 Queuing Considerations ......................................................................................62 5.3 Analysis Findings – Centre Transit Option .......................................................................64 5.3.1 Traffic Operations Analyses.................................................................................64 5.3.2 Queuing Considerations ......................................................................................64 East Bayfront Transit Class EA, Traffic Assessment 7085-01, January 2010 P:\70\85\01\2008\QQ - Preliminary Traffic Forecasts Report\EBF Traffic Report- Final Draft Jan_2010-Rev 2.doc List of Tables Table 1 East Bayfront Precinct Plan, Development Floor Areas ............................... 41 Table 2 Trip Generation Dock Side (South of Queens Quay East, Lower Jarvis Street to Sherbourne Park)....................................................................................... 44 Table 3 Traffic Volumes – East Bayfront Precinct ..................................................... 44 Table 4 Traffic Distribution Patterns – East Bayfront Precinct.................................. 45 Table 5 Lower Don Lands- West of Cherry Street- Development Floor Areas.......... 47 Table 6 Trip Generation – Lower Don Lands – West of Cherry Street...................... 47 Table 7 Traffic Distribution Patterns – Western Portions of Lower Don Lands Precinct ....................................................................................................................... 48 Table 8 West Don Lands – Block Statistics Development Floor Area / Units............ 49 Table 9 West Don Lands Precinct – Forecast Traffic Volumes ................................. 50 Table 10 Trip Generation
Recommended publications
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • 550 Queen's Quay W #311
    LIST PRICE $$259,800 ADDRESS 550 Queen’s Quay W #311 See More Photos And Community Information At… www.TorontoRealEstate.ca How Much Can YOU Afford? Based on 4.95% 5% 10% 15% 25% Mortgage Rate Down Down Down Down Down Payment $13,000 $26,000 $39,000 $65,000 TOTAL Monthly Payment $2,125 $2,025 $1,950 $1,750 (Mortgage, taxes, condo fees & utilities) Closing Costs $17,000 $30,000 $43,000 $69,000 (Including down payment) Gross Income Req’d To $68,500 $64,000 $60,500 $52,500 Qualify For The Mortgage Above calculations are estimates only for income required and closing costs … buyer must verify for themselves! Welcoming lobby with friendly, 24 hr concierge, terrific gym, sauna, and whirlpool. Huge party room with kitchen and library/TV area. Terrific city and lake views from the rooftop deck. List Of Neighbourhood Features Restaurants Many restaurants along Queens Quay … and fine dining in downtown Toronto, all the way from Hooters and Gretzky’s to the top of the CN Tower Night Clubs / Theatre duMaurier and Premier Dance Theatres, CIBC Stage and more at Harbourfront Centre … and Toronto’s Entertainment District … approx. King to Richmond, Duncan to Peter; The Paramount at Richmond and John has multi-theatres for 1st run movies, and the Princess of Wales at King & John for live theatre and musicals. Bookstores / Coffee Cafes all along Harbourfront; Chapters at SW corner of Richmond & Peter; Starbucks; Second Cup Shops at Pier 6, Harbourfront Parks Toronto Music Garden, 475 Queens Quay W; Greenspace at the Ferry Docks, ferry access to the Toronto Islands with more than 230 hectares of parkland; Spadina Quay Wetland; Harbour Square; Coronation Park, south of Lakeshore, west of Stadium Rd, and along the lake front.
    [Show full text]
  • Redesigning Streets for a Growing City and Better Neighbourhoods
    Toronto’s Great Streets Redesigning Streets for a Growing City and Better Neighbourhoods July 2018 Toronto’s Great Streets Redesigned for Greatness Harbord Street Roncesvalles Avenue St. Clair Avenue West Bike lanes for safer mobility & village improvement Toronto placemaking at its best The streetcar neighbourhood The 2014 redesign installed continuous cycling Completed in 2011, the Roncesvalles redesign The dedicated streetcar lane, opened in 2010, has infrastructure from Ossington to Parliament, trans- focused on placemaking and people, improving safety made hopping on transit an efficient alternative to forming Harbord into one of the most well-travelled and enhancing pedestrian space while strengthening the car and has transformed this midtown corridor bike routes in the city. Roncy’s capacity to serve local needs. into a vibrant main street. Queens Quay West Market Street A street for all users A future-proof street for people (and patios!) The 2015 redesign repositioned Queens Quay as Market Street’s 2014 redesign prioritizes the pedes- a public waterfront promenade, reallocating street trian experience to support adjacent retail and space to accommodate all modes – pedestrians, restaurants while celebrating the unique heritage cyclists, transit, and cars. and culture of St. Lawrence Market. Toronto’s Great Streets 2 Toronto’s Great Streets The Ones to Watch Bloor Street King Street Downtown Yonge Street Bike lanes on Bloor from east to west Relief for Toronto’s busiest surface transit route Canada’s Main Street See (a) credit image The Bike Lane Pilot Project on Bloor Street proved to The King Street Pilot Project transformed this busy A vision to pedestrianize a busy foot traffic stretch of be a great success and the lanes are now permanent.
    [Show full text]
  • Waterfront Transit Network Update – Summer 2020 Agenda
    Waterfront Transit Network Update Stakeholder Advisory Committee (SAC) July 23, 2020 Waterfront Transit Network Update – Summer 2020 Agenda 1. Project Overview 1. Context 2. Background 3. Timeline 2. Portal Selection Study - Summary of findings 3. Network Phasing Study – Upcoming work 4. EA Addenda/TPAP – Upcoming work 5. Preliminary Design and Engineering – Upcoming work Waterfront Transit Network Update – Summer 2020 Context Distillery Loop Union Station Waterfront Transit Network Update – Summer 2020 Background • In April 2019 , City Council endorsed the streetcar loop expansion at Union Station as the preferred option for the Union Queens Quay Link, and directed staff to commence the preliminary design and engineering phase of the extension of light rail transit to the East Bayfront beginning in 2020. • The first part of this work includes feasibility studies to assess: • An alternative portal location for the LRT along Queens Quay between Bay Street and Yonge Street, which may provide overall cost and public realm benefits • Consideration of phasing option(s) that may expedite the east-west streetcar service on Queens Quay to the East Bayfront Waterfront Transit Network Update – Summer 2020 Timeline Last time we met We are here TTC East Preliminary Transit Preliminary Bayfront Design – EBF Waterfront Union Station Project Design and Transit Portal + Transit – Queens Assessment Engineering Class EA Tunnel Reset Quay Link Process Structures Study (TPAP) (PDE) 2010 2011 2018 2019 2020 2020-2021 2020-2021 Study area from Preliminary Council Council approved Refine two Identify phase 1 Complete the Complete PDE Bay to Cherry design and cost directed streetcar loop implementation TPAP process (30% design) three St.
    [Show full text]
  • Insider Report OFFICE CONDO
    Insider Report OFFICE CONDO GTA RESEARCH AND INSIDER INSIGHTS SUPPORTING COMMERCIAL REAL ESTATE DECISIONS | 2018 Why Office Space Ownership is Catching On The City of Toronto’s push to revitalize transit-connected communities through mixed use developments has increased the supply of office condominiums and resulted in more organizations choosing to “buy” rather than “lease” their office space. For the right tenants, it’s a smart investment that will pay off long term. Stats Paint the Picture Strong GTA Condo Sales 1 MSF % New Downtown2.3 Office transit-connected Market Record low supply since 2013 availability $ PSF SF Average850 price for 600kYonge & Eglinton new Central Area potential space developments coming on stream For more information contact: Stefan Teague, Executive Managing Director, Market Leader, GTA, Cushman & Wakefield ULC direct: 416-359-2379 | cell: 416-278-0015 | [email protected] Insider Report OFFICE CONDO GTA RESEARCH AND INSIDER INSIGHTS SUPPORTING COMMERCIAL REAL ESTATE DECISIONS | 2018 Growing Trend in Tight Leasing Market The concept of companies owning their own office space in smaller standalone buildings is far from new, but the trend to investing in an office condo in larger buildings wasn’t widely embraced until 2015. That’s when the Hullmark Centre at 4789 Yonge Street and the World on Yonge at 7191 Yonge Street arrived on the scene – major builds providing more options to office condo ownership. These two developments brought a total of 340,000 square feet (Hullmark Centre, 240,000 square feet; World on Yonge, 100,000 square feet) to the market. In 2017, the new 7 St.
    [Show full text]
  • 130 Queens Quay E 1,915 SF for Sale: Office
    Click Here for Virtual Tour! 130 Queens Quay E 1,915 SF For Sale: Office Here is where your business will grow. lennard.com 130 Queens Quay E 1,915 SF Office space located in the Waterfront Communities-The Island neighborhood in Toronto Suite Availability 819 Immediate Available Space Listing Agents 1,915 SF (approximately) Dillon Stanway Sales Representative Sale Price 416.649.5904 $2,290,000 [email protected] Condo Fees William J. Dempsey** $1,042.29 / month Partner Taxes 416.649.5940 $21,915.10 (2020) [email protected] **Broker Benefits • One of the best located and finished units in the East Tower • Top floor in east tower below the amenities. • Bright corner unit with great Views – 2 sides with full windows. • South and east facing – end of hall privacy. • Access to common amenity space with 2 high tech board rooms, lounge, large outdoor terrace & BBQ area over looking lake. • 24 hrs concierge • Bike locker room and shower room. • Secure heated storage locker available. Move In condition • Finished drop ceiling and premium carpet for sound attenuation • LED lighting throughout • 3 heat/cool zones with separate thermostats. • 5 private offices with glass side lights • 2 larger rooms with view • Separate kitchen with full fridge and dishwasher • Dividing half wall in open space • Extensively pre-wired for data and voip runs from server cupboard lennard.com 130 Queens Quay E lennard.com 130 Queens Quay E Building amenities Main Lobby Bike Storage Private Shower Facilities 130 Queens Quay E Common areas Private Meeting Rooms Rooftop
    [Show full text]
  • TO Condominiums 117 Gerrard Street East Toronto Terminal, the 211
    "T" T.O. Condominiums 117 Gerrard Street East Toronto Terminal, The 211 Queens Quay Toronto Terrace Court 19 Dundonald Street Toronto The Algero-Opera Place 887, 889 Bay Street Toronto The Arboretum 1901, 1903, 1905 Pilgrim's Way Oakville The Artisan 152 St. Patrick Street Toronto The Bellair-on-the Park 22, 24 Hanover Road Brampton The Bentley 55 Lombard Street Toronto The Boulevard 188 Doris Avenue Toronto The Breakers 45 Cumberland Lane Ajax The Brookbanks 17 Brookbanks Drive Toronto The Brownstones 1635 Pickering Pkwy. Pickering The Carlisle Group 115, 145, 155 Hillcrest Avenue Mississauga The Central 415 Jarvis Street Toronto The Channel Club 456 College Street Toronto The Chedington 2 Chedington Place Toronto The Churchill 342 Spadina Avenue Toronto The Citysphere 801 King Street West Toronto The Colony 180 Mississauga Valley Blvd. Mississauga The Conservatory "A" 333 Clark Avenue West Thornhill The Conservatory "B" 343 Clark Avenue West Thornhill The Coronation 10 Malta Avenue Brampton The Cosmopolitan 25 Maitland Street Toronto The Courtyards of Concorde 18 Concorde Place Toronto The Creed Building 295 Davenport Road Toronto The Dakota 225 Davenport Road Toronto The Dorchester 150 Farnham Avenue Toronto The Dunhill Club 95 Prince Arthur Avenue Toronto The Ellington 7 Carlton Street Toronto The Esplanade 25 The Esplanade Toronto The Fairways 1400 Dixie Road Mississauga The Gallery 25 Grenville Street Toronto The Granary 100 Lakeshore Road East Oakville The Hallmark 53 Church Street East Brampton The Hammersmith 2112 Queen Street East Toronto The Imperial 30 Malta Avenue Brampton The Imperial I 256 Doris Avenue Toronto The Imperial II 260 Doris Avenue Toronto The Indigo 50 Lombard Street Toronto The Jockey Club 21 Overlea Blvd.
    [Show full text]
  • (Bay & Queen's Quay) from East Take 401 West to Don V
    Directions to the the Rostie Group, 20 Bay Street, Toronto, ON M5J 2N8 (Bay & Queen's Quay) From East Take 401 West to Don Valley Parkway. Take Don Valley Parkway South to Gardiner Expressway. Once on Gardiner Expressway, take the Yonge/York/Bay exit. Turn left onto Bay Street and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. From North Take Highway 400 South to Highway 401 West, Highway 401 West to Highway 427 South, then Highway 427 South to Gardiner Expressway Toronto. Take the Yonge/York/Bay Exit to the Bay St. ramp. Turn right at the first light and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. From West Take Highway 401 East to Highway 427 South to Gardiner Expressway Toronto. Take the Yonge/York/Bay Exit to the Bay St. ramp. Turn right at the first light and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. From Lester B. Pearson International Airport Take Highway 427 South to the Gardiner Expressway Toronto. Take the Yonge/York/Bay Exit to the Bay St. ramp. Turn right at the first set of lights and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. Accessing the Gardiner Westbound from 20 Bay Head south on Bay St toward Queens Quay W.
    [Show full text]
  • Document.Pdf
    “Toronto’s waterfront provides one of the most exciting vistas in Canada. Our goal is to honour the significance of the location with architecture of distinction, quality and lasting value. For us, there is never a choice between building the mediocre or the magnificent.” - Gerald D. Hines Founder and Chairman, Hines Queens Quay Place I Queens Quay Place will be adjacent to a vibrant street lined with restaurants and retail amenities. Queen’s Quay Place at Bayside Toronto will be the ultimate example of a contemporary, professional work environment. Full height floor-to-ceiling glass will With open, column-free floor plates and 9-foot-tall ceilings, provide an abundance of natural daylight throughout the floor plate. the two office buildings will offer light-filled interiors and spectacular city and lake views. As part of an expansive master-planned development, Queen’s Quay Place is designed for the current and future needs of the community, with a focus on efficiency and sustainability. Each building will have a LEED® Gold rating and will feature one of the most advanced fibre optics networks in the world. A state-of-the-art heating and cooling system will set a new standard for tenant comfort while being highly energy efficient. Queens Quay Place will offer spectacular city and lake views. Situated steps away from Lake Ontario, Queens Quay Place will feature vibrant ground floor retail with signage opportunities for office and retail tenants. Transportation Map SHERATON CENTRE HOTEL RICHMOND ST. W. HILTON HOTEL DON VALLEY PKWY. TRUMP ADELAIDE ST. W. HOTEL JARVIS ST. PARLIAMENT ST.
    [Show full text]