(Bay & Queen's Quay) from East Take 401 West to Don V

Total Page:16

File Type:pdf, Size:1020Kb

(Bay & Queen's Quay) from East Take 401 West to Don V Directions to the the Rostie Group, 20 Bay Street, Toronto, ON M5J 2N8 (Bay & Queen's Quay) From East Take 401 West to Don Valley Parkway. Take Don Valley Parkway South to Gardiner Expressway. Once on Gardiner Expressway, take the Yonge/York/Bay exit. Turn left onto Bay Street and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. From North Take Highway 400 South to Highway 401 West, Highway 401 West to Highway 427 South, then Highway 427 South to Gardiner Expressway Toronto. Take the Yonge/York/Bay Exit to the Bay St. ramp. Turn right at the first light and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. From West Take Highway 401 East to Highway 427 South to Gardiner Expressway Toronto. Take the Yonge/York/Bay Exit to the Bay St. ramp. Turn right at the first light and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. From Lester B. Pearson International Airport Take Highway 427 South to the Gardiner Expressway Toronto. Take the Yonge/York/Bay Exit to the Bay St. ramp. Turn right at the first set of lights and proceed just south of Harbour Street. 20 Bay will be on the right, at the south-west corner of Bay and Harbour Sts. Accessing the Gardiner Westbound from 20 Bay Head south on Bay St toward Queens Quay W. Take the 1st right onto Queens Quay W. Turn right at York St. Turn left to merge onto Gardiner Expressway W. Continue onto Queen Elizabeth Way W. Accessing the Gardiner Eastbound from 20 Bay Head north on Bay St. Take slight right onto the Gardiner Express way E ramp to Don Valley Pkway. Merge onto Gardiner Expy E/Ontario King's Hwy. By Subway Union Station is the closest subway stop, located .6 km north of 20 Bay. There is also a streetcar stop at Queens Quay which is directly in front of 10 Bay (underground). Parking There is a public parking lot on the west side of WaterPark Place, with access from Queen’s Quay (see the “P1” on the map below). There is also an underground parking lot at WaterPark Place, with access off Harbour Street just west of 10 Bay (see photo below). There is also a public lot (see “P2”) at the northwest corner of Bay and Harbour Streets, with access from Bay. .
Recommended publications
  • Gardiner Expressway and Lake Shore Boulevard Reconfiguration
    public information notice Gardiner Expressway and Lake Shore Boulevard Reconfiguration Waterfront Toronto and the City of Toronto of the environmental assessment for the The purpose of the ‘undertaking’ is to (City), the project co-proponents, are jointly proposed ‘undertaking’. address current problems and opportunities undertaking an environmental assessment to This study is intended to identify a plan of in the Gardiner Expressway and Lake Shore determine the future of the eastern portion action that can be fully coordinated with other Boulevard study area. Key problems include of the elevated Gardiner Expressway and Lake waterfront efforts. While the waterfront can a deteriorated Gardiner Expressway that Shore Boulevard from approximately Lower be revitalized with the Gardiner Expressway needs major repairs and a waterfront Jarvis Street to just east of the Don Valley retained or replaced or removed, a decision is disconnected from the city. Key opportunities Parkway (DVP) at Logan Avenue. As part of the needed now so development can be conducted include revitalizing the waterfront through planning process for this study, an EA Terms of in a coordinated and comprehensive fashion in city building, creating new urban form and Reference (ToR) was submitted to the Ministry this area and other waterfront neighbourhoods. character and new public realm space. The of the Environment for review as required The decision on the Gardiner Expressway and purpose of the undertaking will be refined under the Ontario Environmental Assessment Lake Shore Boulevard reconfiguration is an and described in more detail in the EA study. Act. If approved, the proposed ToR will serve important one that will influence development as a framework for the preparation and review in the City’s waterfront area for many years.
    [Show full text]
  • Updates on Improvements to the Bike Lanes on Dundas Street East
    IE14.12 ~TORONTO REPORT FOR ACTION Updates on Improvements to the Bike Lanes on Dundas Street East Date: June 24, 2020 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards: Wards 13 and 14 SUMMARY On May 28, 2020, City Council adopted CC21.20 Cycling Network Plan Installations: Bloor West Bikeway Extension & ActiveTO Projects and requested Transportation Services to report to the July 9, 2020 meeting of the Infrastructure and Environment Committee on the status of previous requests to improve the bike lanes on Dundas Street East. The purpose of this report is to provide an update on these requests. Bicycle lanes on Dundas Street East have long provided a vital east/west cycling connection. In the 2001 Toronto Bike Plan, Dundas Street East was identified as a candidate for bicycle lanes from River Street to Kingston Road and in 2003, bicycle lanes were installed on the section of Dundas Street East from Broadview Avenue to Kingston Road. The Dundas Street East bicycle lanes are connected to the protected bicycle lanes on Woodbine Avenue via contra-flow bicycle lanes on Dixon Avenue. Transportation Services has installed a number of safety improvements along Dundas Street East including pavement marking enhancements along the corridor and intersection improvements at Dundas Street East and Jones Avenue. In June 2020, as part of the ActiveTO program, temporary protected bicycle lanes (cycle tracks) were installed to extend the Dundas Street East bicycle lanes by 1 kilometre (km) from their end point just east of Broadview, west to Sackville Street to provide a safe connection through the Broadview intersection and over the Don Valley Parkway bridge.
    [Show full text]
  • GARDINER EXPRESSWAY and LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014
    GARDINER EXPRESSWAY AND LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014 1 Gardiner Expressway and Lake Shore Blvd East Reconfiguration Environmental Assessment Infrastructure Baseline Conditions Report 2014 TABLE OF CONTENTS Page 1.0 INTRODUCTION ............................................................................................................................... 1 1.1 Study Area ........................................................................................................................... 1 2.0 STUDY METHODOLOGY ................................................................................................................... 4 3.0 DESCRIPTION OF EXISTING BASELINE CONDITIONS ........................................................................ 5 3.1 Introduction ........................................................................................................................ 5 3.2 Road Infrastructure ............................................................................................................. 6 3.2.1 Gardiner Expressway Corridor ............................................................................... 6 3.2.2 Don Valley Parkway ............................................................................................. 15 3.2.3 Lake Shore Boulevard East Corridor .................................................................... 16 3.2.4 Roads and Streets ...............................................................................................
    [Show full text]
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Eastbound F. G. Gardiner Expressway and Northbound Don Valley Parkway Closures – 2019, 2020 and 2021 Toronto Triathlon Festival
    IE2.3 REPORT FOR ACTION Eastbound F. G. Gardiner Expressway and Northbound Don Valley Parkway Closures – 2019, 2020 and 2021 Toronto Triathlon Festival Date: March 4, 2019 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards:Wards 4, 10, 13, 14, 16, 19 SUMMARY The purpose of this report is to seek City Council's authority to close portions of the eastbound lanes on the F.G. Gardiner Expressway and northbound lanes on the Don Valley Parkway for the Toronto Triathlon Festival event for 2019, 2020 and 2021. The proposed route and time of year of the 2019, 2020 and 2021 Toronto Triathlon Festival event will remain the same as 2018. RECOMMENDATIONS The General Manager, Transportation Services recommends that: 1. City Council authorize the closure of the F.G. Gardiner Expressway, eastbound lanes only, from the Humber River to the Don Valley Parkway, including all ramps, and the Don Valley Parkway, northbound lanes only, from the F.G. Gardiner Expressway to Eglinton Avenue East, including all ramps, on the Sundays of, July 21, 2019, July 19, 2020 and July 18, 2021 from 2:00 a.m. to 12:00 p.m., for the 2019, 2020 and 2021 Toronto Triathlon Festival event; 2. City Council prohibit other road closures due to events or film permits on arterial roads bounded by Highway 401, Warden Avenue, Lake Ontario, Humber River, Queen Street/The Queensway, and Yonge Street, as they will be required to accommodate overflow traffic from the expressway closures resulting from the 2019, 2020 and 2021 Toronto Triathlon Festival event; and 3.
    [Show full text]
  • Transportation Operations Centre Operator
    Back to Available Opportunities Transportation Operations Centre Operator Based in Toronto, Fortran Traffic Systems Limited. is a leader in the North American Intelligent Transportation Systems (ITS) industry, providing totally integrated, turnkey transportation solutions. Fortran specializes in the design, development, manufacture and distribution of cutting-edge real- time, mission critical traffic management, control systems, and traffic signal equipment. With over 80 cameras, numerous Changeable Message Signs and dozens of inductive loop detectors situated along major corridors into the city, Toronto's Don Valley Parkway, Gardiner Expressway, Lake Shore Boulevard and W.R. Allen Road together comprise one of the most progressive and busiest traffic management corridors in North America. Data is fed and updated continuously to the Transportation Operations Centre where operators monitor the data being received, as well as live video images displayed over CCTV monitors. Both planned and unplanned traffic events are then disseminated to the public via the media, changeable message signs and over the Internet. Fortran has been contracted to operate the City of Toronto's Transportation Operations Centre. Fortran offers a challenging environment that fosters creativity and rewards excellence. We are currently expanding and are looking for talented and innovative individuals to fill these positions. RESPONSIBILITIES: As a member of the TOC project team, you will be responsible for monitoring the City's key corridors and arterial roadways, responding to inquires from the media, public and government agencies and for initiating calls for emergency and dispatching trouble calls to maintenance personnel as required. QUALIFICATIONS: Unique responsible individuals with excellent communication skills, computer literacy and a mature professional attitude are required to join this dedicated team of professionals in operating the City's Transportation Operations Centre located in Central Toronto.
    [Show full text]
  • FOR SALE PHILLIP CHEUNG* INDUSTRIAL BUILDING Senior Vice President 416 798 6243 [email protected] 1 WHITLAM AVENUE EVAN S
    WHITLAM AVENUE TWENTY FOURTH STREET TWENTY SECOND STREET SECOND TWENTY FOR SALE PHILLIP CHEUNG* INDUSTRIAL BUILDING Senior Vice President 416 798 6243 [email protected] 1 WHITLAM AVENUE EVAN S. WHITE* TORONTO, ONTARIO Executive Vice President 416 798 6232 [email protected] 6,570 SQ. FT. ON 0.86 ACRES *Sales Representative 1 Whitlam Avenue, Toronto FOR SALE PROPERTY DETAILS Location Birmingham Street & Kipling Avenue Total Area: ±6,570 Sq. Ft. BUILDING SIZE Office Area: ±3,220 Sq. Ft. Industrial Area: ±3,350 Sq. Ft. LOT SIZE 0.86 acres ASKING PRICE $2,950,000.00 TAXES (EST.2018) $28,135.09 POSSESSION Immediate SHIPPING 6 Drive-in doors CLEAR HEIGHT 10’ - 11’6” ZONING IC-1 and IC-2 COMMENTS + Clear height in warehouse ranges from 10’ - 11’6” + Large fenced yard + Close proximity to the Gardiner Expressway and Lakeshore Road 1 Whitlam Avenue, Toronto FOR SALE PROPERTY PHOTOS 1 Whitlam Avenue, Toronto FOR SALE PROPERTY SURVEY 1 Whitlam Avenue, Toronto FOR SALE PROPERTY ZONING IC-1 & IC-2 ZONING IC-1 IC-2 CLICK HERE TO VIEW PERMITTED USES FOR IC-1 AND IC-2 1 Whitlam Avenue, Toronto FOR SALE AMENITIES Islington Subway Station Kipling Subway Station Kipling Station Cloverdale Mall Gardiner Expressway abeth Way Eliz en ue Q Mimico Station Sherway Gardens 1 Whitlam Avenue, Toronto FOR SALE DRIVE TIME ANALYSIS BRAMPTON TORONTO PEARSON INTERNATIONAL AIRPORT TORONTO MISSISSAUGA ETOBICOKE Location Distance Time Gardiner Expressway 3.3 km 7 mins Highway 427 5.5 km 8 mins Downtown Core 15.3 km 16 mins Highway 401 11.6 km 13 mins PLEASE CONTACT: PHILLIP CHEUNG* EVAN S.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Toronto Tunnels Plan
    TORONTO TUNNELS PLAN 1 Toronto Tunnels Plan After reviewing traffic counts and traffic patterns throughout the City of Toronto using the latest traffic counts from the City’s transportation department, it clearly shows that the west end of the city has higher traffic levels and is prone to gridlock more than the east end. For example, traffic volumes on Highway 401 at Keele Street reach a peak of approximately 400,000 vehicles per day while volumes on Highway 401 in Scarborough is approximately 200,000 vehicles per day. Similarly, traffic volumes on the Gardiner Expressway at Dunn Avenue is approximately 200,000 vehicles per day while volume at Cherry Street at the expressway’s east end is approximately 85,000 vehicles per day. Also, there is a lack of a continuous north-south expressway between Highway 401 and the Gardiner Expressway between Highway 427 and the Don Valley Parkway, which is a width of nearly 20 kilometres. The only exception is the incomplete Allen Expressway which terminates at Eglinton Avenue. This area is served by a 2 network of local streets which are very narrow and often congested. Similarly, Highway 400 turns into Black Creek Drive south of Highway 401, which is a heavily congested arterial road which connects into very narrow local streets south of Eglinton Avenue. The area bounded by Highway 401 in the north, Highway 427 in the west, the Don Valley Parkway in the east and the Gardiner Expressway in the south is entirely made up of narrow four-lane local streets which are heavily congested and serving local businesses.
    [Show full text]
  • Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn
    Waterfront Transit “Reset” Phase 2 Study Public Information & Consultation Meetings September 18 & 26, 2017 Agenda 6:00 Open House 6:30 Agenda Review, Opening Remarks and Introductions 6:40 Study Overview and Presentation 7:20 Questions of Clarification 7:30 Facilitated Open House 8:30 Adjourn 2 Project Study Team • A Partnership of: • The project study team is led by a joint City-TTC- Waterfront Toronto Executive Steering Committee • Metrolinx, City of Mississauga and MiWay have also provided input on relevant aspects of the study 3 What’s the Purpose of this Meeting? • Present the waterfront transit network travel demand considerations to 2041 • Present and gather feedback on options assessment for transit improvements in key areas of the network, including: – Union Station – Queens Quay Connection – Humber Bay Link – Bathurst - Fleet - Lake Shore – Queens Quay Intersection • Report the overall draft findings of the Phase 2 Study, priorities, and draft directions for further study prior to reporting to Executive Committee and Council 4 Study Timeline 5 Phase 1 Recap To view the Phase 1 Report and other background material, please visit the City’s website: www.toronto.ca/waterfronttransit 6 Vision Provide high quality transit that will integrate waterfront communities, jobs, and destinations and link the waterfront to the broader City and regional transportation network Objectives Connect waterfront communities locally and to Downtown with reliable and convenient transit service: • Promote and support residential and employment growth
    [Show full text]
  • Park Lawn Lake Shore Transportation Master Plan (TMP)
    Park Lawn Lake Shore Transportation Master Plan (TMP) This document includes all information that was planned to be presented at the Public Open House originally scheduled to take place on March 24, 2020, that was postponed due to COVID-19. Public Information Update June 2020 Park Lawn / Lake Shore TMP Background & Study Area The Park Lawn Lake Shore Transportation Master Plan (TMP) is the first step in a multi-year process to The Park Lawn Lake Shore TMP Study Area within evaluate options to improve the area's transportation network. Following the TMP launch in 2016, the which potential improvements are being considered is TMP was put on hold until a final decision was reached on the land use of the Christie's Site. bound by: Ellis Avenue to the east, Legion Road to the west, The Queensway to the north, Lake Ontario to the south. The Christie's Planning Study was launched in October 2019 with a goal of creating a comprehensive planning framework for the area. The study will result in a Secondary Plan and Zoning By-law for the site. The traffic analysis for this study spans a broader area, and includes: •Gardiner Expressway, from Kipling Avenue on/off Ramps to Jameson Avenue on/off Ramps •Lake Shore Boulevard, from Legion Road to Meeting Objectives Jameson Avenue •The Queensway, from Royal York Road to Jameson Avenue The Christie’s Planning Study Area sits on the former Mr. Christie factory site, and is bound by the Gardiner Expressway to the north; Lake Shore Boulevard West to the east and southeast; and Park Lawn Road to the west and southwest.
    [Show full text]