Toronto Tunnels Plan

Total Page:16

File Type:pdf, Size:1020Kb

Toronto Tunnels Plan TORONTO TUNNELS PLAN 1 Toronto Tunnels Plan After reviewing traffic counts and traffic patterns throughout the City of Toronto using the latest traffic counts from the City’s transportation department, it clearly shows that the west end of the city has higher traffic levels and is prone to gridlock more than the east end. For example, traffic volumes on Highway 401 at Keele Street reach a peak of approximately 400,000 vehicles per day while volumes on Highway 401 in Scarborough is approximately 200,000 vehicles per day. Similarly, traffic volumes on the Gardiner Expressway at Dunn Avenue is approximately 200,000 vehicles per day while volume at Cherry Street at the expressway’s east end is approximately 85,000 vehicles per day. Also, there is a lack of a continuous north-south expressway between Highway 401 and the Gardiner Expressway between Highway 427 and the Don Valley Parkway, which is a width of nearly 20 kilometres. The only exception is the incomplete Allen Expressway which terminates at Eglinton Avenue. This area is served by a 2 network of local streets which are very narrow and often congested. Similarly, Highway 400 turns into Black Creek Drive south of Highway 401, which is a heavily congested arterial road which connects into very narrow local streets south of Eglinton Avenue. The area bounded by Highway 401 in the north, Highway 427 in the west, the Don Valley Parkway in the east and the Gardiner Expressway in the south is entirely made up of narrow four-lane local streets which are heavily congested and serving local businesses. There are no wide six-lane highway-type roads in this very large area covering 2/3 of the city. The only exception is the Allen Expressway north of Eglinton Avenue. Traffic volumes on some of the streets in this area are reaching highway volumes. Meanwhile, the east end of the city with its lower traffic volumes is served by two six-lane highways: the Don Valley Parkway and Kingston Road. However, these are approaching gridlock levels. THE NORTHWEST It is recommended that serving this central-west section of the city with relief road tunnels should be the priority. Opportunities for this exist by continuing two existing 3 incomplete expressways in this area: the Allen Expressway and Highway 400. In 1966, the then Metropolitan Toronto adopted an official plan which recommended extension of these two expressways into downtown Toronto. Interestingly, the plan recommended that both expressways swing further east as they headed south of Eglinton Avenue. The Allen Expressway (then called the Spadina Expressway) would swing easterly from is present alignment between Dufferin Street and Bathurst Street to Spadina Road and then turn south on Spadina Road into downtown Toronto. This would make it go through the Cedarvale Ravine and through established well-to-do neighbourhoods like Forest Hill and the Annex. Those areas were the ones which opposed the expressway in 1969 causing cancellation of further construction in 1971. Similarly, the plan recommended that Highway 400 be extended south along what is now Black Creek Drive and then turn east along Davenport Road to Christie Street. Then, it would swing directly south between Christie and Clinton Streets to the Gardiner Expressway at Strachan Avenue. This was known as the Christie-Clinton alignment. 4 When the stretch of the Gardiner Expressway at Strachan Avenue was constructed between 1959 and 1962, the structure was built with this future connection in mind (this alignment for the Highway 400 Extension was originally proposed in 1959). The Gardiner road deck goes very wide in this area to allow for future ramps from the Highway 400 Extension. This still exists today and has recently been repaired. It is recommended that construction of Allen and 400 tunnels should be built first and follow these alignments: The Allen Expressway should continue due south from Eglinton Avenue entirely in a tunnel (instead of swinging easterly to Spadina Avenue as originally planned). It should then follow the original Christie-Clinton alignment originally intended for the Highway 400 Extension to connect to the Gardiner Expressway where the space for ramps on the road deck exists. It would then also connect to the C.N.E. grounds. The advantage to this would be avoiding downtown Toronto where opposition would be strong, avoiding well-to-do established neighbourhoods, and avoiding the difficulty of building under the Cedarvale Ravine where the Spadina subway and a major trunk 5 sewer co-exist. It is also recommended that access be provided at Eglinton Avenue, St. Clair Avenue, Bloor Street, Dundas Street and the Gardiner Expressway and Exhibition Place. Additionally, the Allen Expressway should be extended north from its terminus at Wilson Heights Boulevard, north of Wilson Avenue, where it continues north as a signalized arterial road, in a tunnel under Dufferin Street to Highway 407. This stretch of Dufferin Street is heavily congested and contains large trucks. Much of this traffic is heading north into York Region and the existing arterial road is inadequate. Access points should be provided at Wilson Heights Boulevard at the existing Allen ramps, Finch Avenue, Steeles Avenue and Highways 407 and 7. These two Allen extensions, both south and north, will finally complete the Allen Expressway as a through route from Highway 407 to the Gardiner Expressway and end an incomplete situation that has existed since 1966 when the Allen first opened. It is also recommended that the name of this expressway be Allen Expressway and not Allen Road since it its truncated status will now be upgraded to completed status. 6 7 8 9 10 Highway 400 should be extended south in a tunnel under Black Creek Drive to south of Eglinton Avenue and then continue southeasterly under the Kitchener GO rail line to connect to the west end of Front Street at Bathurst Street, near the extended Allen Expressway tunnel. This would be easy to build as it would proceed south under the Black Creek river valley and a very wide railway corridor all the way down to near the lake shore. No interruptions to neighbourhoods or railways on the surface would occur. A very wide transportation corridor already exists for the entire length of this route. This extension would help to divert traffic from the Gardiner Expressway-Highway 427 route which is heading to the city’s northwest to Highway 400 which proceeds north to Barrie. Similarly, traffic heading south from Barrie on Highway 400 can continue south into the city without diverting to Highway 401 and other streets. Black Creek Drive, which is now heavily congested with dangerous intersections, can be relieved of its highway status and become a local road serving the local community. Through traffic is removed from the network of local streets in this area and put underground. Access points should be provided at the southern terminus of Highway 400 at Jane Street, Eglinton Avenue, 11 St. Clair Avenue, Bloor Street, Dundas Street and Front Street. Traffic heading to the northwest via the Gardiner-427 route clogs up downtown streets like Yonge Street, Bay Street, York Street and Spadina Avenue heading south to the Gardiner Expressway. Much of this traffic will be removed if it is able to head northwest directly in the 400 Extension and Allen tunnels from downtown. This will reduce the gridlock on the western Gardiner Expressway and help to improve commercial truck movements in and out of downtown Toronto. THE EAST Even though the northwest is a recommended priority, congestion in the east end of Toronto needs addressing. The Don Valley Parkway and Kingston Road exist as through six-lane highways. However, they are approaching gridlock proportions. The Don Valley Parkway is serving a double purpose of handling traffic which is heading both north to Highway 404 and into York Region and heading east along Highway 401 to Durham Region. 12 Kingston Road is a wide six-lane arterial east of Birchmount Road only. West of this point, it is a narrow four-lane road with a speed limit of 40 km/h and contains streetcars. A major bottleneck exists through the east Beach area. Lawrence Avenue is also a wide six-lane arterial across Scarborough. Eglinton Avenue used to be a six-lane arterial, but has now been reduced to four to provide for the Eglinton-Crosstown LRT west of Kennedy Road in its median and exclusive bus lanes east of Kennedy station. According to Toronto’s 1966 plan, the Gardiner Expressway would have been extended east along the Lakeshore East GO rail corridor to connect to Highway 2A and Highway 401 in eastern Scarborough. This was to be built after the Allen Expressway with construction scheduled to start in 1974. Lands were purchased along the route but no construction ever took place. In 1973, the route was finalized alongside the railway for most of the entire route and under Kingston Road for a short stretch at the eastern end, east of the Guildwood GO station. The route would have been in a depressed structure and covered over in some areas. 13 14 15 It is recommended that the Gardiner Expressway be extended in a tunnel under the existing Lakeshore East GO railway corridor at least as far east as Birchmount Road, and connecting to the wide six-lane part of Kingston Road which continues east from there to Highway 2A and Highway 401. Access points should be provided at the Gardiner Expressway at the Don Valley Parkway, Eastern Avenue, Greenwood Avenue, Victoria Park Avenue and Danforth Avenue near Birchmount Road. At a later date, the route should continue east under the GO rail corridor to the Guildwood GO station and then continue under Kingston Road to Highway 2A and Highway 401, as per the 1973 route plan, with access points at Birchmount Road, Brimley Road, Markham Road, Morningside Avenue and Highway 2A at the Highland Creek bridge.
Recommended publications
  • Gardiner Expressway and Lake Shore Boulevard Reconfiguration
    public information notice Gardiner Expressway and Lake Shore Boulevard Reconfiguration Waterfront Toronto and the City of Toronto of the environmental assessment for the The purpose of the ‘undertaking’ is to (City), the project co-proponents, are jointly proposed ‘undertaking’. address current problems and opportunities undertaking an environmental assessment to This study is intended to identify a plan of in the Gardiner Expressway and Lake Shore determine the future of the eastern portion action that can be fully coordinated with other Boulevard study area. Key problems include of the elevated Gardiner Expressway and Lake waterfront efforts. While the waterfront can a deteriorated Gardiner Expressway that Shore Boulevard from approximately Lower be revitalized with the Gardiner Expressway needs major repairs and a waterfront Jarvis Street to just east of the Don Valley retained or replaced or removed, a decision is disconnected from the city. Key opportunities Parkway (DVP) at Logan Avenue. As part of the needed now so development can be conducted include revitalizing the waterfront through planning process for this study, an EA Terms of in a coordinated and comprehensive fashion in city building, creating new urban form and Reference (ToR) was submitted to the Ministry this area and other waterfront neighbourhoods. character and new public realm space. The of the Environment for review as required The decision on the Gardiner Expressway and purpose of the undertaking will be refined under the Ontario Environmental Assessment Lake Shore Boulevard reconfiguration is an and described in more detail in the EA study. Act. If approved, the proposed ToR will serve important one that will influence development as a framework for the preparation and review in the City’s waterfront area for many years.
    [Show full text]
  • Updates on Improvements to the Bike Lanes on Dundas Street East
    IE14.12 ~TORONTO REPORT FOR ACTION Updates on Improvements to the Bike Lanes on Dundas Street East Date: June 24, 2020 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards: Wards 13 and 14 SUMMARY On May 28, 2020, City Council adopted CC21.20 Cycling Network Plan Installations: Bloor West Bikeway Extension & ActiveTO Projects and requested Transportation Services to report to the July 9, 2020 meeting of the Infrastructure and Environment Committee on the status of previous requests to improve the bike lanes on Dundas Street East. The purpose of this report is to provide an update on these requests. Bicycle lanes on Dundas Street East have long provided a vital east/west cycling connection. In the 2001 Toronto Bike Plan, Dundas Street East was identified as a candidate for bicycle lanes from River Street to Kingston Road and in 2003, bicycle lanes were installed on the section of Dundas Street East from Broadview Avenue to Kingston Road. The Dundas Street East bicycle lanes are connected to the protected bicycle lanes on Woodbine Avenue via contra-flow bicycle lanes on Dixon Avenue. Transportation Services has installed a number of safety improvements along Dundas Street East including pavement marking enhancements along the corridor and intersection improvements at Dundas Street East and Jones Avenue. In June 2020, as part of the ActiveTO program, temporary protected bicycle lanes (cycle tracks) were installed to extend the Dundas Street East bicycle lanes by 1 kilometre (km) from their end point just east of Broadview, west to Sackville Street to provide a safe connection through the Broadview intersection and over the Don Valley Parkway bridge.
    [Show full text]
  • Wychwood Park Wychwood Park Sits on a Height of Land That Was Once the Lake Iroquois Shore
    Wychwood Park Wychwood Park sits on a height of land that was once the Lake Iroquois shore. The source for Taddle Creek lies to the north and provides the water for the pond found in the centre of the Park. Today, Taddle Creek continues under Davenport Road at the base of the escarpment and flows like an underground snake towards the Gooderham and Worts site and into Lake Ontario. Access to this little known natural area of Toronto is by two entrances one at the south, where a gate prevents though traffic, and the other entrance at the north end, off Tyrell Avenue, which provides the regular vehicular entrance and exit. A pedestrian entrance is found between 77 and 81 Alcina Avenue. Wychwood Park was founded by Marmaduke Matthews and Alexander Jardine in the third quarter of the 19th century. In 1874, Matthews, a land- scape painter, built the first house in the Park (6 Wychwood Park) which he named “Wychwood,” after Wychwood Forest near his home in England. The second home in Wychwood Park, “Braemore,” was built by Jardine a few years later (No. 22). When the Park was formally established in 1891, the deed provided building standards and restrictions on use. For instance, no commercial activities were permitted, there were to be no row houses, and houses must cost not less than $3,000. By 1905, other artists were moving to the Park. Among the early occupants were the artist George A. Reid (Uplands Cottage at No. 81) and the architect Eden Smith (No. 5). Smith designed both 5 and 81, as well as a number of others, all in variations of the Arts and Crafts style promoted by C.F.A.
    [Show full text]
  • GARDINER EXPRESSWAY and LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014
    GARDINER EXPRESSWAY AND LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014 1 Gardiner Expressway and Lake Shore Blvd East Reconfiguration Environmental Assessment Infrastructure Baseline Conditions Report 2014 TABLE OF CONTENTS Page 1.0 INTRODUCTION ............................................................................................................................... 1 1.1 Study Area ........................................................................................................................... 1 2.0 STUDY METHODOLOGY ................................................................................................................... 4 3.0 DESCRIPTION OF EXISTING BASELINE CONDITIONS ........................................................................ 5 3.1 Introduction ........................................................................................................................ 5 3.2 Road Infrastructure ............................................................................................................. 6 3.2.1 Gardiner Expressway Corridor ............................................................................... 6 3.2.2 Don Valley Parkway ............................................................................................. 15 3.2.3 Lake Shore Boulevard East Corridor .................................................................... 16 3.2.4 Roads and Streets ...............................................................................................
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Eastbound F. G. Gardiner Expressway and Northbound Don Valley Parkway Closures – 2019, 2020 and 2021 Toronto Triathlon Festival
    IE2.3 REPORT FOR ACTION Eastbound F. G. Gardiner Expressway and Northbound Don Valley Parkway Closures – 2019, 2020 and 2021 Toronto Triathlon Festival Date: March 4, 2019 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards:Wards 4, 10, 13, 14, 16, 19 SUMMARY The purpose of this report is to seek City Council's authority to close portions of the eastbound lanes on the F.G. Gardiner Expressway and northbound lanes on the Don Valley Parkway for the Toronto Triathlon Festival event for 2019, 2020 and 2021. The proposed route and time of year of the 2019, 2020 and 2021 Toronto Triathlon Festival event will remain the same as 2018. RECOMMENDATIONS The General Manager, Transportation Services recommends that: 1. City Council authorize the closure of the F.G. Gardiner Expressway, eastbound lanes only, from the Humber River to the Don Valley Parkway, including all ramps, and the Don Valley Parkway, northbound lanes only, from the F.G. Gardiner Expressway to Eglinton Avenue East, including all ramps, on the Sundays of, July 21, 2019, July 19, 2020 and July 18, 2021 from 2:00 a.m. to 12:00 p.m., for the 2019, 2020 and 2021 Toronto Triathlon Festival event; 2. City Council prohibit other road closures due to events or film permits on arterial roads bounded by Highway 401, Warden Avenue, Lake Ontario, Humber River, Queen Street/The Queensway, and Yonge Street, as they will be required to accommodate overflow traffic from the expressway closures resulting from the 2019, 2020 and 2021 Toronto Triathlon Festival event; and 3.
    [Show full text]
  • Transportation Operations Centre Operator
    Back to Available Opportunities Transportation Operations Centre Operator Based in Toronto, Fortran Traffic Systems Limited. is a leader in the North American Intelligent Transportation Systems (ITS) industry, providing totally integrated, turnkey transportation solutions. Fortran specializes in the design, development, manufacture and distribution of cutting-edge real- time, mission critical traffic management, control systems, and traffic signal equipment. With over 80 cameras, numerous Changeable Message Signs and dozens of inductive loop detectors situated along major corridors into the city, Toronto's Don Valley Parkway, Gardiner Expressway, Lake Shore Boulevard and W.R. Allen Road together comprise one of the most progressive and busiest traffic management corridors in North America. Data is fed and updated continuously to the Transportation Operations Centre where operators monitor the data being received, as well as live video images displayed over CCTV monitors. Both planned and unplanned traffic events are then disseminated to the public via the media, changeable message signs and over the Internet. Fortran has been contracted to operate the City of Toronto's Transportation Operations Centre. Fortran offers a challenging environment that fosters creativity and rewards excellence. We are currently expanding and are looking for talented and innovative individuals to fill these positions. RESPONSIBILITIES: As a member of the TOC project team, you will be responsible for monitoring the City's key corridors and arterial roadways, responding to inquires from the media, public and government agencies and for initiating calls for emergency and dispatching trouble calls to maintenance personnel as required. QUALIFICATIONS: Unique responsible individuals with excellent communication skills, computer literacy and a mature professional attitude are required to join this dedicated team of professionals in operating the City's Transportation Operations Centre located in Central Toronto.
    [Show full text]
  • FOR SALE PHILLIP CHEUNG* INDUSTRIAL BUILDING Senior Vice President 416 798 6243 [email protected] 1 WHITLAM AVENUE EVAN S
    WHITLAM AVENUE TWENTY FOURTH STREET TWENTY SECOND STREET SECOND TWENTY FOR SALE PHILLIP CHEUNG* INDUSTRIAL BUILDING Senior Vice President 416 798 6243 [email protected] 1 WHITLAM AVENUE EVAN S. WHITE* TORONTO, ONTARIO Executive Vice President 416 798 6232 [email protected] 6,570 SQ. FT. ON 0.86 ACRES *Sales Representative 1 Whitlam Avenue, Toronto FOR SALE PROPERTY DETAILS Location Birmingham Street & Kipling Avenue Total Area: ±6,570 Sq. Ft. BUILDING SIZE Office Area: ±3,220 Sq. Ft. Industrial Area: ±3,350 Sq. Ft. LOT SIZE 0.86 acres ASKING PRICE $2,950,000.00 TAXES (EST.2018) $28,135.09 POSSESSION Immediate SHIPPING 6 Drive-in doors CLEAR HEIGHT 10’ - 11’6” ZONING IC-1 and IC-2 COMMENTS + Clear height in warehouse ranges from 10’ - 11’6” + Large fenced yard + Close proximity to the Gardiner Expressway and Lakeshore Road 1 Whitlam Avenue, Toronto FOR SALE PROPERTY PHOTOS 1 Whitlam Avenue, Toronto FOR SALE PROPERTY SURVEY 1 Whitlam Avenue, Toronto FOR SALE PROPERTY ZONING IC-1 & IC-2 ZONING IC-1 IC-2 CLICK HERE TO VIEW PERMITTED USES FOR IC-1 AND IC-2 1 Whitlam Avenue, Toronto FOR SALE AMENITIES Islington Subway Station Kipling Subway Station Kipling Station Cloverdale Mall Gardiner Expressway abeth Way Eliz en ue Q Mimico Station Sherway Gardens 1 Whitlam Avenue, Toronto FOR SALE DRIVE TIME ANALYSIS BRAMPTON TORONTO PEARSON INTERNATIONAL AIRPORT TORONTO MISSISSAUGA ETOBICOKE Location Distance Time Gardiner Expressway 3.3 km 7 mins Highway 427 5.5 km 8 mins Downtown Core 15.3 km 16 mins Highway 401 11.6 km 13 mins PLEASE CONTACT: PHILLIP CHEUNG* EVAN S.
    [Show full text]
  • STAFF REPORT ACTION REQUIRED 309 Cherry Street
    STAFF REPORT ACTION REQUIRED 309 Cherry Street – Phase 1 and Phase 2 – Zoning Amendment Application – Request for Direction Report Date: April 23, 2018 To: Toronto and East York Community Council From: Acting Director, Community Planning, Toronto and East York District Wards: Ward 30 – Toronto-Danforth Reference 12 131809 STE 30 OZ; 16 271912 STE 30 OZ Number: SUMMARY This report reviews a Phase 1 (12 131809 STE 30 OZ) and Phase 2 (16 271912 STE 30 OZ) development proposal, as a combined, inappropriate development proposed for the subject site. In March 2012, Aird & Berlis LLP submitted a rezoning application for the northern half (Phase 1) of the site on behalf of the landowners (two Ontario numbered companies, 2034055 Ontario Limited and 1337194 Ontario Inc.). This application is considered Phase 1 of a proposed two-phase development on the subject site. In December 2016, Castelpoint Numa submitted a rezoning application for the southern half of the site (Phase 2) on behalf of the landowners (the same two Ontario numbered companies noted above). This application is considered Phase 2 of a proposed two-phase development on the subject site. The Phase 1 application proposes to develop the northern half of the subject site with a mixed-use development comprising of an eight-storey office/retail base building, a 26-storey residential tower and two partially retained heritage buildings. The Phase 2 application proposes to Staff report for action – Request for Direction - 309 Cherry Street – Phase 1 and Phase 2 1 V.05/13 develop the southern half of the subject site with an 11-storey building along Cherry Street and a 52-storey building atop a podium base ranging in height from 4 to 12-storeys along Commissioners Street and the proposed future Foundry Street.
    [Show full text]
  • 160 Avenue Road Toronto
    160 Avenue Road Toronto HIGH PROFILE RETAIL SPACE FOR LEASE Located at the gateway to Toronto’s premier residential, shopping, design, entertainment and hospitality district, 160 Avenue Road offers a retailer the rare opportunity to secure an urban flagship location in stunning retail space. 9,000 divisible square feet with double height glazing and over 100 feet of frontage, 160 Avenue Road delivers unparalleled exposure and branding opportunities for any and all retailers. E.&O.E. 160 AVENUE ROAD HIGH PROFILE RETAIL SPACE FOR LEASE PROPERTY HIGHLIGHTS • Over 100 ft. of frontage on Avenue Rd. • Soaring 16.5 ft. ceiling heights • 5,625 sq. ft. of ground floor retail • 3,438 sq. ft. of concourse level retail • Direct access to building loading area and exclusive retail garbage room • At the base of a 175 unit luxury condominium • Over 120,000 cars drive by the site daily SITE PLAN PEARS AVENUE CONDO ENTRANCE ENTRANCE Retail Unit 3 3,438 sq. ft. Retail AVENUE ROAD Residential Unit 2 Condominium 2,403 sq. ft. Retail Unit 1 ENTRANCE 3,222 sq. ft. *Units 1, 2, 3 combines for 9,063 sq. ft. 2 160 AVENUE ROAD, TORONTO E.&O.E. 160 AVENUE ROAD HIGH PROFILE RETAIL SPACE FOR LEASE This disclaimer shall apply to CBRE Limited, Real Estate Brokerage, and to all other divisions of the Corporation; to include all employees and independent contractors (“CBRE”). The information set out herein, including, without limitation, any projections, images, opinions, assumptions and estimates obtained from third parties (the “Information”) has not been verified by CBRE, and CBRE does not represent, war- rant or guarantee the accuracy, correctness and completeness of the Information.
    [Show full text]
  • Contract Award for the FG Gardiner Expressway Rehabilitation Project
    PW30.3 REPORT FOR ACTION Contract Award for the F.G. Gardiner Expressway Rehabilitation Project: Section 1 – Jarvis Street to Cherry Street, Request for Tenders 1-2018, Contract No. 18ECS-TI-01GE and Amendments to Purchase Orders for Owner Controlled Insurance and External Legal Services Date: June 4, 2018 To: Public Works and Infrastructure Committee From: Chief Engineer and Executive Director, Engineering and Construction Services Chief Purchasing Officer Acting Executive Director, Corporate Finance Wards: Ward 28 (Toronto Centre-Rosedale) and Ward 30 (Toronto-Danforth) SUMMARY The purpose of this report is to: (a) advise of the results of Tender Call 1-2018 issued for Contract No. 18ECS-TI-01GE for the rehabilitation of the F.G. Gardiner Expressway (Expressway) between Jarvis Street and Cherry Street, and to request the authority to award this contract to Aecon Construction and Materials Limited in the amount of $280,840,287 which represents the "A" bid price including HST. An additional $60,000,000 plus HST will be available to the Chief Engineer and Executive Director, Engineering and Construction Services for the Project as may be required; (b) request authority to amend Purchase Order No. 6041404 with Marsh Canada Limited, for the procurement, maintenance and payment of insurance premiums associated with an Owner Controlled Insurance Program (OCIP) for Contract No. 18ECS-TI-01GE, for rehabilitation of the F. G. Gardiner Expressway Section 1 – Jarvis Street to Cherry Street, by an additional amount of $1,680,057 net of all taxes ($1,814,462 including PST); and, (c) request authority to amend Purchase Order No.
    [Show full text]
  • Toronto Community Services Resource Guide
    Please check our website at www.socialplanningtoronto.org for: Access to Services Without Fear Immigration Campaign • Multilingual versions of the guide • The online expanded version of the guide which includes detailed service provider information including: languages of services, hours of operation, services offered, program eligibility, etc. TTOORROONNTTOO • The most up-to-date version of the guide – The guide is a continuous work-in-progress. All changes, additions and updates are included in the online CCOOMMMMUUNNIITTYY expanded version of the guide and maintained for future printed editions. SSEERRVVIICCEESS RREESSOOUURRCCEE If your agency or organization is listed in this guide and you GGUUIIDDEE have changes you would like to report to us, or if you are an agency that works with non-status people and would like to be included in future editions or on our online version, please send your information to us at the Community Social Planning Council: [email protected] or 416-351-0095 ext 219 This book provides information about This guide includes service providers located in the city of Toronto. We have surveyed all of the agencies included in this community services in Toronto (not the GTA) guide to find out more about their work with people with less to people without immigration status. than full immigration status and their services. Questions included the type of work done with non-status people, language If you don’t have immigration status or are still waiting for a of service available, eligibility requirements, and under what Canadian immigration decision, there are places to get services circumstances a person’s name and status information was like schools, health care, dental care and legal advice in shared to others outside of the agency.
    [Show full text]