Transportation Operations Centre Operator

Total Page:16

File Type:pdf, Size:1020Kb

Transportation Operations Centre Operator Back to Available Opportunities Transportation Operations Centre Operator Based in Toronto, Fortran Traffic Systems Limited. is a leader in the North American Intelligent Transportation Systems (ITS) industry, providing totally integrated, turnkey transportation solutions. Fortran specializes in the design, development, manufacture and distribution of cutting-edge real- time, mission critical traffic management, control systems, and traffic signal equipment. With over 80 cameras, numerous Changeable Message Signs and dozens of inductive loop detectors situated along major corridors into the city, Toronto's Don Valley Parkway, Gardiner Expressway, Lake Shore Boulevard and W.R. Allen Road together comprise one of the most progressive and busiest traffic management corridors in North America. Data is fed and updated continuously to the Transportation Operations Centre where operators monitor the data being received, as well as live video images displayed over CCTV monitors. Both planned and unplanned traffic events are then disseminated to the public via the media, changeable message signs and over the Internet. Fortran has been contracted to operate the City of Toronto's Transportation Operations Centre. Fortran offers a challenging environment that fosters creativity and rewards excellence. We are currently expanding and are looking for talented and innovative individuals to fill these positions. RESPONSIBILITIES: As a member of the TOC project team, you will be responsible for monitoring the City's key corridors and arterial roadways, responding to inquires from the media, public and government agencies and for initiating calls for emergency and dispatching trouble calls to maintenance personnel as required. QUALIFICATIONS: Unique responsible individuals with excellent communication skills, computer literacy and a mature professional attitude are required to join this dedicated team of professionals in operating the City's Transportation Operations Centre located in Central Toronto. Work in a comfortable office environment on a 24/7 shift work basis. Complete training is provided. TO APPLY: If you are a qualified candidate and would like to be considered for this opportunity, please send us your résumé and salary expectations in confidence and refer to "TOC Operator" when applying for this position by: e-mail: resumes@fortrantraffic.com We appreciate your interest and look forward to hearing from you. We thank all applicants for their interest but only those selected for an interview will be contacted. Back to Available Opportunities Fortran Green Products © 2009 - 2016 Fortran Traffic Systems Limited. All Rights Reserved..
Recommended publications
  • Gardiner Expressway and Lake Shore Boulevard Reconfiguration
    public information notice Gardiner Expressway and Lake Shore Boulevard Reconfiguration Waterfront Toronto and the City of Toronto of the environmental assessment for the The purpose of the ‘undertaking’ is to (City), the project co-proponents, are jointly proposed ‘undertaking’. address current problems and opportunities undertaking an environmental assessment to This study is intended to identify a plan of in the Gardiner Expressway and Lake Shore determine the future of the eastern portion action that can be fully coordinated with other Boulevard study area. Key problems include of the elevated Gardiner Expressway and Lake waterfront efforts. While the waterfront can a deteriorated Gardiner Expressway that Shore Boulevard from approximately Lower be revitalized with the Gardiner Expressway needs major repairs and a waterfront Jarvis Street to just east of the Don Valley retained or replaced or removed, a decision is disconnected from the city. Key opportunities Parkway (DVP) at Logan Avenue. As part of the needed now so development can be conducted include revitalizing the waterfront through planning process for this study, an EA Terms of in a coordinated and comprehensive fashion in city building, creating new urban form and Reference (ToR) was submitted to the Ministry this area and other waterfront neighbourhoods. character and new public realm space. The of the Environment for review as required The decision on the Gardiner Expressway and purpose of the undertaking will be refined under the Ontario Environmental Assessment Lake Shore Boulevard reconfiguration is an and described in more detail in the EA study. Act. If approved, the proposed ToR will serve important one that will influence development as a framework for the preparation and review in the City’s waterfront area for many years.
    [Show full text]
  • Updates on Improvements to the Bike Lanes on Dundas Street East
    IE14.12 ~TORONTO REPORT FOR ACTION Updates on Improvements to the Bike Lanes on Dundas Street East Date: June 24, 2020 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards: Wards 13 and 14 SUMMARY On May 28, 2020, City Council adopted CC21.20 Cycling Network Plan Installations: Bloor West Bikeway Extension & ActiveTO Projects and requested Transportation Services to report to the July 9, 2020 meeting of the Infrastructure and Environment Committee on the status of previous requests to improve the bike lanes on Dundas Street East. The purpose of this report is to provide an update on these requests. Bicycle lanes on Dundas Street East have long provided a vital east/west cycling connection. In the 2001 Toronto Bike Plan, Dundas Street East was identified as a candidate for bicycle lanes from River Street to Kingston Road and in 2003, bicycle lanes were installed on the section of Dundas Street East from Broadview Avenue to Kingston Road. The Dundas Street East bicycle lanes are connected to the protected bicycle lanes on Woodbine Avenue via contra-flow bicycle lanes on Dixon Avenue. Transportation Services has installed a number of safety improvements along Dundas Street East including pavement marking enhancements along the corridor and intersection improvements at Dundas Street East and Jones Avenue. In June 2020, as part of the ActiveTO program, temporary protected bicycle lanes (cycle tracks) were installed to extend the Dundas Street East bicycle lanes by 1 kilometre (km) from their end point just east of Broadview, west to Sackville Street to provide a safe connection through the Broadview intersection and over the Don Valley Parkway bridge.
    [Show full text]
  • GARDINER EXPRESSWAY and LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014
    GARDINER EXPRESSWAY AND LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014 1 Gardiner Expressway and Lake Shore Blvd East Reconfiguration Environmental Assessment Infrastructure Baseline Conditions Report 2014 TABLE OF CONTENTS Page 1.0 INTRODUCTION ............................................................................................................................... 1 1.1 Study Area ........................................................................................................................... 1 2.0 STUDY METHODOLOGY ................................................................................................................... 4 3.0 DESCRIPTION OF EXISTING BASELINE CONDITIONS ........................................................................ 5 3.1 Introduction ........................................................................................................................ 5 3.2 Road Infrastructure ............................................................................................................. 6 3.2.1 Gardiner Expressway Corridor ............................................................................... 6 3.2.2 Don Valley Parkway ............................................................................................. 15 3.2.3 Lake Shore Boulevard East Corridor .................................................................... 16 3.2.4 Roads and Streets ...............................................................................................
    [Show full text]
  • Eglinton Ave W
    Parking Parking hours on the following residential streets will be extended from one hour to three hours: Backgrounder Work Zone in the area of Bathurst Street and Chaplin Crescent at Eglinton Avenue West • Glenarden Road – Eglinton Avenue West to Old Forest Hill Road on the west side of the road • Wembley Road – West of Glenarden Road to Hilltop Road on the south side of the road see maps inside • Hilltop Road – Wembley Road to Old Forest Hill Road on the west side of the road EGLINTON • Old Forest Hill Road – Hilltop Road to Bathurst Street on the north side of the road • Old Forest Hill Road – Bathurst Street to Eglinton Avenue West on the northeast side of the road • Vesta Drive – Eglinton Avenue West to Chadwick Avenue on the east side of the road Spring 2015 • Gardiner Road – Eglinton Avenue West to Chadwick Avenue on the east side of the road Work Zone in the area of Avenue Road at Eglinton Avenue West What is the Crosstown? • Castlewood Road – Eglinton Avenue West to Crestview Road on the east side of the road The Eglinton Crosstown is a 19-kilometre light rail transit (LRT) line that will run along Eglinton Avenue through the • Shields Avenue – Burnaby Boulevard to Crestview Road on the east side of the road heart of Toronto, with an underground central section. The line will connect Mount Dennis Station in the west to • Castle Knock Road – Willowbank Boulevard to Crestview Road on the east side of the road Kennedy Station in the east, and the new service will be up to 60% faster than the bus service today.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Eastbound F. G. Gardiner Expressway and Northbound Don Valley Parkway Closures – 2019, 2020 and 2021 Toronto Triathlon Festival
    IE2.3 REPORT FOR ACTION Eastbound F. G. Gardiner Expressway and Northbound Don Valley Parkway Closures – 2019, 2020 and 2021 Toronto Triathlon Festival Date: March 4, 2019 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards:Wards 4, 10, 13, 14, 16, 19 SUMMARY The purpose of this report is to seek City Council's authority to close portions of the eastbound lanes on the F.G. Gardiner Expressway and northbound lanes on the Don Valley Parkway for the Toronto Triathlon Festival event for 2019, 2020 and 2021. The proposed route and time of year of the 2019, 2020 and 2021 Toronto Triathlon Festival event will remain the same as 2018. RECOMMENDATIONS The General Manager, Transportation Services recommends that: 1. City Council authorize the closure of the F.G. Gardiner Expressway, eastbound lanes only, from the Humber River to the Don Valley Parkway, including all ramps, and the Don Valley Parkway, northbound lanes only, from the F.G. Gardiner Expressway to Eglinton Avenue East, including all ramps, on the Sundays of, July 21, 2019, July 19, 2020 and July 18, 2021 from 2:00 a.m. to 12:00 p.m., for the 2019, 2020 and 2021 Toronto Triathlon Festival event; 2. City Council prohibit other road closures due to events or film permits on arterial roads bounded by Highway 401, Warden Avenue, Lake Ontario, Humber River, Queen Street/The Queensway, and Yonge Street, as they will be required to accommodate overflow traffic from the expressway closures resulting from the 2019, 2020 and 2021 Toronto Triathlon Festival event; and 3.
    [Show full text]
  • FOR SALE PHILLIP CHEUNG* INDUSTRIAL BUILDING Senior Vice President 416 798 6243 [email protected] 1 WHITLAM AVENUE EVAN S
    WHITLAM AVENUE TWENTY FOURTH STREET TWENTY SECOND STREET SECOND TWENTY FOR SALE PHILLIP CHEUNG* INDUSTRIAL BUILDING Senior Vice President 416 798 6243 [email protected] 1 WHITLAM AVENUE EVAN S. WHITE* TORONTO, ONTARIO Executive Vice President 416 798 6232 [email protected] 6,570 SQ. FT. ON 0.86 ACRES *Sales Representative 1 Whitlam Avenue, Toronto FOR SALE PROPERTY DETAILS Location Birmingham Street & Kipling Avenue Total Area: ±6,570 Sq. Ft. BUILDING SIZE Office Area: ±3,220 Sq. Ft. Industrial Area: ±3,350 Sq. Ft. LOT SIZE 0.86 acres ASKING PRICE $2,950,000.00 TAXES (EST.2018) $28,135.09 POSSESSION Immediate SHIPPING 6 Drive-in doors CLEAR HEIGHT 10’ - 11’6” ZONING IC-1 and IC-2 COMMENTS + Clear height in warehouse ranges from 10’ - 11’6” + Large fenced yard + Close proximity to the Gardiner Expressway and Lakeshore Road 1 Whitlam Avenue, Toronto FOR SALE PROPERTY PHOTOS 1 Whitlam Avenue, Toronto FOR SALE PROPERTY SURVEY 1 Whitlam Avenue, Toronto FOR SALE PROPERTY ZONING IC-1 & IC-2 ZONING IC-1 IC-2 CLICK HERE TO VIEW PERMITTED USES FOR IC-1 AND IC-2 1 Whitlam Avenue, Toronto FOR SALE AMENITIES Islington Subway Station Kipling Subway Station Kipling Station Cloverdale Mall Gardiner Expressway abeth Way Eliz en ue Q Mimico Station Sherway Gardens 1 Whitlam Avenue, Toronto FOR SALE DRIVE TIME ANALYSIS BRAMPTON TORONTO PEARSON INTERNATIONAL AIRPORT TORONTO MISSISSAUGA ETOBICOKE Location Distance Time Gardiner Expressway 3.3 km 7 mins Highway 427 5.5 km 8 mins Downtown Core 15.3 km 16 mins Highway 401 11.6 km 13 mins PLEASE CONTACT: PHILLIP CHEUNG* EVAN S.
    [Show full text]
  • Toronto Tunnels Plan
    TORONTO TUNNELS PLAN 1 Toronto Tunnels Plan After reviewing traffic counts and traffic patterns throughout the City of Toronto using the latest traffic counts from the City’s transportation department, it clearly shows that the west end of the city has higher traffic levels and is prone to gridlock more than the east end. For example, traffic volumes on Highway 401 at Keele Street reach a peak of approximately 400,000 vehicles per day while volumes on Highway 401 in Scarborough is approximately 200,000 vehicles per day. Similarly, traffic volumes on the Gardiner Expressway at Dunn Avenue is approximately 200,000 vehicles per day while volume at Cherry Street at the expressway’s east end is approximately 85,000 vehicles per day. Also, there is a lack of a continuous north-south expressway between Highway 401 and the Gardiner Expressway between Highway 427 and the Don Valley Parkway, which is a width of nearly 20 kilometres. The only exception is the incomplete Allen Expressway which terminates at Eglinton Avenue. This area is served by a 2 network of local streets which are very narrow and often congested. Similarly, Highway 400 turns into Black Creek Drive south of Highway 401, which is a heavily congested arterial road which connects into very narrow local streets south of Eglinton Avenue. The area bounded by Highway 401 in the north, Highway 427 in the west, the Don Valley Parkway in the east and the Gardiner Expressway in the south is entirely made up of narrow four-lane local streets which are heavily congested and serving local businesses.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • Park Lawn Lake Shore Transportation Master Plan (TMP)
    Park Lawn Lake Shore Transportation Master Plan (TMP) This document includes all information that was planned to be presented at the Public Open House originally scheduled to take place on March 24, 2020, that was postponed due to COVID-19. Public Information Update June 2020 Park Lawn / Lake Shore TMP Background & Study Area The Park Lawn Lake Shore Transportation Master Plan (TMP) is the first step in a multi-year process to The Park Lawn Lake Shore TMP Study Area within evaluate options to improve the area's transportation network. Following the TMP launch in 2016, the which potential improvements are being considered is TMP was put on hold until a final decision was reached on the land use of the Christie's Site. bound by: Ellis Avenue to the east, Legion Road to the west, The Queensway to the north, Lake Ontario to the south. The Christie's Planning Study was launched in October 2019 with a goal of creating a comprehensive planning framework for the area. The study will result in a Secondary Plan and Zoning By-law for the site. The traffic analysis for this study spans a broader area, and includes: •Gardiner Expressway, from Kipling Avenue on/off Ramps to Jameson Avenue on/off Ramps •Lake Shore Boulevard, from Legion Road to Meeting Objectives Jameson Avenue •The Queensway, from Royal York Road to Jameson Avenue The Christie’s Planning Study Area sits on the former Mr. Christie factory site, and is bound by the Gardiner Expressway to the north; Lake Shore Boulevard West to the east and southeast; and Park Lawn Road to the west and southwest.
    [Show full text]
  • Retail Plaza with Prime Redevelopment Potential Toronto, Ontario
    824 177,179,181 SHEPPARD AVE W & COCKSFIELD AVE RETAIL PLAZA WITH PRIME REDEVELOPMENT POTENTIAL TORONTO, ONTARIO Accelerating success. 824 Sheppard Avenue West, Toronto MASSING CONCEPT Job No. 19255 | 08.26.2019 Plan View Massing Views Proposed Driveway Access Cocksfield Avenue Cocksfield Avenue 45.8m3.0m 2 ST. 3.0m 4 ST. 5.5m Wilmington Avenue 6 Sheppard Avenue West 22.0m ST. 7.5m Minimum 1,038 sq.m. Floorplate 10.9m Proposed 9-storey Mixed-use Building 12.9m Blairville Road 22.0m Northwest View 15.0m PROPERTY PROFILE 122.4m 2 ST. 6 Proposed 9-storey ST. Proposed 9-storey Blairville Road Mixed-use Building 3.0m 9 Mixed-use Building ST. 3.0m Sheppard Avenue West 21.1m 1.5m 5.5m Minimum 5.5m 668 sq.m. Wilmington Avenue Floorplate 6 12 ST. 11 ST. Wilmington Avenue 22.0m ST. 10 Planned ROW 3.0m ST. 3.0m 2.7m Road Widening 36.0 m Cocksfield Avenue 3.0m 2.7m 32.4m Sheppard Avenue West Southwest View ADDRESS 824 Sheppard Avenue West, 177,Notes: 179 & 181 Cocksfield Avenue SITE GROSS CONSTRUCTION GROSS FLOOR AREA: SHEPPARD FRONTAGE COCKSFIELD FRONTAGE DENSITY: SITE AREA 51,296 SF | ± 1.19 Acres -Ground floor height= 4.5m AREA: AREA: (95% of GCA) MAX HEIGHT: MAX HEIGHT: (Lot Area Excludes Road Widening) BUILDING SIZE 15,500 SF -Residential floor height= 3.0m 4,705sq.m. [approx.] 21,750sq.m. [approx.] 20,660sq.m. [approx.] 12ST/39.5m 6ST/19.5mFRONTAGE 4.39FSI106 Ft on Sheppard Avenue; 151-Ground Ft on Cocksfield floor GFA =Avenue 3,022sq.m.
    [Show full text]
  • New Track and Facilities
    Public Meeting #1 Welcome to the GO Expansion OnCorridor Program GO Expansion – New Track & Facilities TPAP Scan here to visit project site Proposed Layover & Train Storage Additional layover/storage yard facilities are required to accommodate service expansion. Layover/storage yards are strategically located throughout the rail network. Layover and storage facilities are necessary to achieve the targeted GO Expansion service levels by: • Reducing long-distance non-revenue trips. 3 • Accommodating train storage during off-peak hours. • Allowing trains to be routinely serviced and cleaned. Train Wash Facility • Providing flexibility for trains to operate more seamlessly across the network. A structure for cleaning the 4 5 exterior of trains, similar to a 2 drive-thru car wash. Progressive Maintenance Facility • A sheltered 400 metre long garage for train maintenance. 1 Exterior Interior Example of the Willowbrook Layover Facility, City of Toronto Layovers Facilities typically include: 3) Waste Management 1) Train Storage 4) Crew Services 2) Cleaning and Servicing 5) Track, Switches and Utilities Lincolnville Layover Facility GO Expansion – New Track & Facilities TPAP Scan here to visit project site Proposed Beach Layover Facility - City of Burlington To meet increasing service levels, the Beach Layover Facility is required for: • Storing trains during the day and night. • Reducing rail congestion on the Lakeshore West Corridor. • Serving as the terminus of electrification of the corridor. Existing Site Proposed Site Design Elements: Surrounding
    [Show full text]