672 Queen Street East Toronto, on for Lease

Total Page:16

File Type:pdf, Size:1020Kb

672 Queen Street East Toronto, on for Lease For Lease 672 Queen Street East Toronto, ON Contact CBRE Limited Rob Sweeney 145 King Street West, Suite 600 Sales Representative Toronto, ON M5H 1J8 t: 416.847.3265 [email protected] t: 416.362.2244 Mackenzie Sharpe Sales Representative t: 416.815.2382 [email protected] Alex Edmison* Sales Associate t: 416.874.7266 [email protected] * Sales Representative Table of Contents 3 Building Summary 6 Interior Photos About 672 Queen Street East 7 Area Map 4 Prime Office / Retail Key Highlights 8 Streetscape Map Salient Details Offering 9 Floor Plan 5 Riverside (Queen Street East) History Active Development Transportation 2 Building Summary About 672 Queen Street East Opportunity to lease a 7,620 SF free-stand- side neighborhood and the surrounding ing, two-storey mixed-use building in the areas are currently undergoing a signifi- rapidly developing Riverside neighbor- cant transformation, with several planned hood of Toronto. Constructed in 1938 and development projects in the immediate- extensively renovated in recent years, the ly surrounding areas including Riverside property is prominently positioned just Square, the New Broadview Hotel, the West west of the intersection of Queen Street Don Lands and a 28.5 acre multiphase East and Broadview Avenue, with direct development site to the south that would access to the Don Valley Parkway located bring about an extension of Broadview just 200 metres to the west of the site. The Avenue and improve the already excellent property benefits from a variety of nearby transportation accessibility of the property. amenities including restaurants, special- ty food shops, cafes and more. The River- 672 Queen Street East 3 Prime Office / Retail Key Highlights • Opportunity to fully lease a two-storey • Property is ideal for both professional and building in the rapidly gentrifying Riverside retail uses, including creative office, restau- neighborhood of Toronto rant, showroom and fitness space • Queen and Broadview has quickly evolved • Significantly lower gross occupancy costs into one of the fastest-growing intersec- relative to options in the traditional finan- tions in the downtown, with limited future cial core, with additional rents estimated at opportunities for full-building tenancies $10 PSF for 2015 • Character space in excellent condition • Single tenancies are preferred, although with refurbished hardwood floors, built out demisable between at-grade retail / base- washrooms and exposed brick and beams ment and second floor office, depending on throughout user type Salient Details Upper Floor Leasable Area: 3,180 SF Ground Floor Ceiling Heights: 13' Ground Floor Leasable Area: 3,180 SF Second Floor Ceiling Heights: 10' Basement Leasable Area: 1,260 SF Basement must be leased with the main floor. Offering Net rent for entire building of $25 PSF. Additional rents $10 per sq. ft. (estimate for 2015). 4 Riverside (Queen Street East) History The region was originally positioned as a are over $85,000, with 68% of residents working class residential community, with between the ages of 25-44. retail along the Queen Street corridor, medium-density housing to the north and In response to these changing demographics, various residential and light industrial uses Riverside now enjoys abundant restaurant to the south. and retail amenities both within Riverside itself as well as the neighboring areas includ- In recent decades, the area has emerged ing Leslieville, Corktown and the Distillery as a thriving arts and cultural centre, District. Along the southern portions of which has led to significant gentrification Riverside, the existing light industrial and the infusion of hip and trendy young buildings are either being retrofitted for professionals. Within a one-mile radius of new creative office and retail uses or high- the property, average household incomes density residential development. Active Development Major planned development projects in the velop over 28 acres of vacant land less than immediate vicinity include the West Don one kilometre to the south of the property. Lands, Riverside Square (~900 residential The plans propose a mixed-use campus of units) and the New Broadview Hotel (pro- up to 15 million square feet as well as an posed 57-room boutique hotel). A reputable extension of Broadview Avenue to the south developer has also released plans to rede- and new LRT and GO train connections. Transportation The property enjoys public transit access The property also has direct access to the from the Queen Street streetcar (501) and Don Valley Parkway, one of the largest north- King Street streetcar (504), the latter of which south roadway connections in the city. connects with Broadview subway station. 672 Queen Street East 5 Interior Photos 6 Area Map PARLIAMENT STREET PARLIAMENT BROADVIEW AVENUE BROADVIEW HAMILTON STREET HAMILTON THOMPSON STREET 672 Queen QUEEN STREET EAST * KING STREET EAST * Riverside Square DON VALLEY PARKWAY Union Station: 2.5km West Don Lands Development 28.5 Acre Development Site Distillery District * Hullmark 672 Queen Street East 7 Streetscape Map 672 Queen P CARROLL STREET CARROLL MONRO STREET STREET HAMILTON GRANT STREET AVENUE BOULTON DVP DE GRASSI STREET DAVIES AVENUE 1 2 3 4 5 6 7 8 QUEEN STREET EAST QUEEN STREET EAST P 9 10 11 12 13 14 DVP LEWIS STREET E DON ROADWAY AVENUE BROADVIEW SAULTER STREET STRANGE STREET 1 Dark Horse Espresso Bar / Sync Lofts 8 The County Cocktail 2 Aft Kitchen And Bar 9 Edge Lofts 3 Aft Kitchen And Bar 10 The Cannonball Coffee and Bar 4 Burger Shoppe 11 Riverside Square 5 Prohibition Gastrohouse 12 Boots And Bourbon 6 New Broadview Hotel 13 The Opera House 7 Ruby Watch Co. 14 Riverside Lofts 8 Floor Plan " " 8 11 - ' - ' 0 MECH. ROOM 3 1 1 18'-6" 21'-5" " 4 - ' 3 1 . P C U E L E Basement 24'-8" " " 0 - ' 2 - ' 0 3 1 2 UP 91'-9" U P 10'-0" 11'-7" " WWR MWR 11 - ' 8 " 0 1 - ' N 9 P D U First Floor ELEC. D N " 0 " 1 - 5 ' - ' 9 WWR 9 18'-5" OPEN TO BELOW " 3 - ' 3 22'-5" 69'-4" 2 MWR " DN 5 - ' 3 1 Second Floor 672 Queen Street East 9 Hullmark Developments Ltd. 495 King Street West, Suite 200 Toronto, ON M5V 1K4 t: 416.510.1700 www.hullmark.ca CBRE Limited 145 King Street West, Suite 600 Toronto, ON M5H 1J8 t: 416.362.2244 www.cbre.ca.
Recommended publications
  • Updates on Improvements to the Bike Lanes on Dundas Street East
    IE14.12 ~TORONTO REPORT FOR ACTION Updates on Improvements to the Bike Lanes on Dundas Street East Date: June 24, 2020 To: Infrastructure and Environment Committee From: General Manager, Transportation Services Wards: Wards 13 and 14 SUMMARY On May 28, 2020, City Council adopted CC21.20 Cycling Network Plan Installations: Bloor West Bikeway Extension & ActiveTO Projects and requested Transportation Services to report to the July 9, 2020 meeting of the Infrastructure and Environment Committee on the status of previous requests to improve the bike lanes on Dundas Street East. The purpose of this report is to provide an update on these requests. Bicycle lanes on Dundas Street East have long provided a vital east/west cycling connection. In the 2001 Toronto Bike Plan, Dundas Street East was identified as a candidate for bicycle lanes from River Street to Kingston Road and in 2003, bicycle lanes were installed on the section of Dundas Street East from Broadview Avenue to Kingston Road. The Dundas Street East bicycle lanes are connected to the protected bicycle lanes on Woodbine Avenue via contra-flow bicycle lanes on Dixon Avenue. Transportation Services has installed a number of safety improvements along Dundas Street East including pavement marking enhancements along the corridor and intersection improvements at Dundas Street East and Jones Avenue. In June 2020, as part of the ActiveTO program, temporary protected bicycle lanes (cycle tracks) were installed to extend the Dundas Street East bicycle lanes by 1 kilometre (km) from their end point just east of Broadview, west to Sackville Street to provide a safe connection through the Broadview intersection and over the Don Valley Parkway bridge.
    [Show full text]
  • GARDINER EXPRESSWAY and LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014
    GARDINER EXPRESSWAY AND LAKE SHORE BOULEVARD EAST RECONFIGURATION ENVIRONMENTAL ASSESSMENT Infrastructure Baseline Conditions Report - 2014 1 Gardiner Expressway and Lake Shore Blvd East Reconfiguration Environmental Assessment Infrastructure Baseline Conditions Report 2014 TABLE OF CONTENTS Page 1.0 INTRODUCTION ............................................................................................................................... 1 1.1 Study Area ........................................................................................................................... 1 2.0 STUDY METHODOLOGY ................................................................................................................... 4 3.0 DESCRIPTION OF EXISTING BASELINE CONDITIONS ........................................................................ 5 3.1 Introduction ........................................................................................................................ 5 3.2 Road Infrastructure ............................................................................................................. 6 3.2.1 Gardiner Expressway Corridor ............................................................................... 6 3.2.2 Don Valley Parkway ............................................................................................. 15 3.2.3 Lake Shore Boulevard East Corridor .................................................................... 16 3.2.4 Roads and Streets ...............................................................................................
    [Show full text]
  • Transportation Operations Centre Operator
    Back to Available Opportunities Transportation Operations Centre Operator Based in Toronto, Fortran Traffic Systems Limited. is a leader in the North American Intelligent Transportation Systems (ITS) industry, providing totally integrated, turnkey transportation solutions. Fortran specializes in the design, development, manufacture and distribution of cutting-edge real- time, mission critical traffic management, control systems, and traffic signal equipment. With over 80 cameras, numerous Changeable Message Signs and dozens of inductive loop detectors situated along major corridors into the city, Toronto's Don Valley Parkway, Gardiner Expressway, Lake Shore Boulevard and W.R. Allen Road together comprise one of the most progressive and busiest traffic management corridors in North America. Data is fed and updated continuously to the Transportation Operations Centre where operators monitor the data being received, as well as live video images displayed over CCTV monitors. Both planned and unplanned traffic events are then disseminated to the public via the media, changeable message signs and over the Internet. Fortran has been contracted to operate the City of Toronto's Transportation Operations Centre. Fortran offers a challenging environment that fosters creativity and rewards excellence. We are currently expanding and are looking for talented and innovative individuals to fill these positions. RESPONSIBILITIES: As a member of the TOC project team, you will be responsible for monitoring the City's key corridors and arterial roadways, responding to inquires from the media, public and government agencies and for initiating calls for emergency and dispatching trouble calls to maintenance personnel as required. QUALIFICATIONS: Unique responsible individuals with excellent communication skills, computer literacy and a mature professional attitude are required to join this dedicated team of professionals in operating the City's Transportation Operations Centre located in Central Toronto.
    [Show full text]
  • Toronto Tunnels Plan
    TORONTO TUNNELS PLAN 1 Toronto Tunnels Plan After reviewing traffic counts and traffic patterns throughout the City of Toronto using the latest traffic counts from the City’s transportation department, it clearly shows that the west end of the city has higher traffic levels and is prone to gridlock more than the east end. For example, traffic volumes on Highway 401 at Keele Street reach a peak of approximately 400,000 vehicles per day while volumes on Highway 401 in Scarborough is approximately 200,000 vehicles per day. Similarly, traffic volumes on the Gardiner Expressway at Dunn Avenue is approximately 200,000 vehicles per day while volume at Cherry Street at the expressway’s east end is approximately 85,000 vehicles per day. Also, there is a lack of a continuous north-south expressway between Highway 401 and the Gardiner Expressway between Highway 427 and the Don Valley Parkway, which is a width of nearly 20 kilometres. The only exception is the incomplete Allen Expressway which terminates at Eglinton Avenue. This area is served by a 2 network of local streets which are very narrow and often congested. Similarly, Highway 400 turns into Black Creek Drive south of Highway 401, which is a heavily congested arterial road which connects into very narrow local streets south of Eglinton Avenue. The area bounded by Highway 401 in the north, Highway 427 in the west, the Don Valley Parkway in the east and the Gardiner Expressway in the south is entirely made up of narrow four-lane local streets which are heavily congested and serving local businesses.
    [Show full text]
  • New Track and Facilities
    Public Meeting #1 Welcome to the GO Expansion OnCorridor Program GO Expansion – New Track & Facilities TPAP Scan here to visit project site Proposed Layover & Train Storage Additional layover/storage yard facilities are required to accommodate service expansion. Layover/storage yards are strategically located throughout the rail network. Layover and storage facilities are necessary to achieve the targeted GO Expansion service levels by: • Reducing long-distance non-revenue trips. 3 • Accommodating train storage during off-peak hours. • Allowing trains to be routinely serviced and cleaned. Train Wash Facility • Providing flexibility for trains to operate more seamlessly across the network. A structure for cleaning the 4 5 exterior of trains, similar to a 2 drive-thru car wash. Progressive Maintenance Facility • A sheltered 400 metre long garage for train maintenance. 1 Exterior Interior Example of the Willowbrook Layover Facility, City of Toronto Layovers Facilities typically include: 3) Waste Management 1) Train Storage 4) Crew Services 2) Cleaning and Servicing 5) Track, Switches and Utilities Lincolnville Layover Facility GO Expansion – New Track & Facilities TPAP Scan here to visit project site Proposed Beach Layover Facility - City of Burlington To meet increasing service levels, the Beach Layover Facility is required for: • Storing trains during the day and night. • Reducing rail congestion on the Lakeshore West Corridor. • Serving as the terminus of electrification of the corridor. Existing Site Proposed Site Design Elements: Surrounding
    [Show full text]
  • ONTARIO ROAD SAFETY Annual Report 2017 Printed on Paper with Recycled Content
    ONTARIO ROAD SAFETY Annual Report 2017 Printed on paper with recycled content. ISSN #0832-8269 (Printed Version) ISSN #1710-2480 (Internet Version) ONTARIO ROAD SAFETY ANNUAL REPORT 2017 This document is available online at: www.ontario.ca/orsar If you are seeking information on driving and road safety in Ontario, visit the Ministry of Transportation website at ontario.ca/transportation. The Ministry of Transportation’s Official Driver’s Handbook is available online at www.mto.gov.on.ca/english/publications/handbooks.shtml. You can also purchase hardcopies at DriveTest Centres, and at various department stores, automotive retail outlets and book stores. 1 For more information on the data in this publication, please contact the Road Safety Research Office at 416-235-3585. Produced by: Road Safety Research Office Safety Policy & Education Branch Ministry of Transportation 87 Sir William Hearst Avenue, Room 212 Toronto, Ontario M3M 0B4 Phone: 416-235-3585 Ontario Road Safety Annual Report 2017 CONTENTS Section/Title Page Foreword 6 1. Overview 20 1a Synopsis 22 1b Health Perspective 23 2. The People 24 2a People in Collisions 26 2b Putting The People In Context 37 3. The Collision 44 3a Types of Collisions 46 3b Time and Environment 49 2 3c The Collision Location 52 4. Place of Collision 54 Contents 5. The Vehicle 72 5a Vehicles in Collisions 74 5b Putting the Vehicle in Context 76 6. Special Vehicles 78 6a Motorcycles 79 6b School Vehicles 80 6c Large Trucks 81 6d Off-Road Vehicles 82 6e Motorized Snow Vehicles 83 6f Bicycles 85 7. Conviction, Offence and Suspension Data 86 7a Conviction Data 88 7b Offence Data 89 7c Suspension Data 90 8.
    [Show full text]
  • Beaches Streetfront Retail Opportunity 2298 Queen Street East Toronto, ON
    Elliot Medoff* Vice President, Capital Markets +1 416 238 9768 For2298 Queen Street East Sale [email protected] Toronto, ON Euan Darling* Senior Associate, Capital Markets Beaches Streetfront Retail Opportunity +1 416 238 9961 [email protected] Jones Lang LaSalle Real Estate Services Inc. (“JLL” and/or the “Advisor”) is pleased to offer for sale a 100% freehold interest in 2298 Queen Street East (the “Property”). The Michael Botting* Property represents an excellent opportunity to acquire a two-level retail building, Associate, Capital Markets currently built-out as a restaurant & bar in The Beaches neighbourhood. Strategically +1 416 238 9829 [email protected] located at the corner of Queen Street East and Scarborough Road, the Property is approximately 300 meters from the shores of Lake Ontario. *Sales Representative Property Details Geography, Transit & Landscape The Property is located in the east end of Toronto’s Beaches neighbourhood, one of the GTA’s most affluent and vibrant locales. ‘The Beaches’, bordered by Kingston Road to the north, Coxwell Avenue to the west, Victoria Park Avenue to the east and Lake Ontario to the south and the surrounding neighbourhoods are dominated by up-scale detached housing. Queen Street East has long been the established retail node in the neighbourhood with a variety of buildings occupied by restaurants, bars, cafés, clothing stores, and local service providers. Other nearby amenities include Ashbridge’s Bay Park, Kew Gardens Park, and Woodbine Beach to the west, and the Toronto Hunt Club to the east. The Property is less than 100m from the Queen Street East streetcar and bus stop at Silver Birch Avenue, which frequently services the area, and connects commuters throughout the city.
    [Show full text]
  • GET TORONTO MOVING Transportation Plan
    2 ‘GET TORONTO MOVING’ TRANSPORTATION PLAN SUMMARY REPORT TABLE OF CONTENTS Who we are 4 Policy 4 Rapid Transit Subways 5 Findings of the 1985 ‘Network 2011’ TTC Study 6 Transit Projects Around The World 6 ‘SmartTrack’ 7 GO Trains 7 Roads 10 Elevated Gardiner Expressway 12 Bicycle Trails 14 Funding 16 Toronto Transportation History Timeline 17 BIBLIOGRAPHY ‘Network 2011’ TTC Report 1985 Boro Lukovic – tunnelling expert Globe and Mail newspaper GO Transit Canadian Automobile Association Canada Pension Plan Investment Board Ontario Teachers Pension Fund Investment Board City of Toronto Metrolinx 3 WHO WE ARE The task force who have contributed to this plan consist of: James Alcock – Urban transportation planner Bruce Bryer – Retired TTC employee Kurt Christensen – political advisor and former Scarborough City Councillor Bill Robertson – Civil Engineer Kevin Walters – Civil Engineer POLICY There are two ways needed to end traffic gridlock: High-capacity rapid transit and improved traffic flow. The overall guiding policy of this plan is: the "Get Toronto Moving' Transportation Plan oversees policies and projects with the goal of improving the efficiency of all modes of transportation which are the choices of the people of Toronto, including automobiles, public transit, cycling and walking within available corridors. The City has no place to ‘encourage’ or entice people to switch to different forms of transportation from what they regularly use. That is the free choice of the people. The City and the Province are only responsible for providing the facilities for the transportation choices of the people. Neighbourhoods and residential and commercial communities must be left intact to flourish.
    [Show full text]
  • 1233-1243 Queen Street East & 77 Leslie Street
    1233-1243 Queen Street East & 77 Leslie Street DON VALLEY PARKWAY TORONTO | ONTARIO GO TRAIN & FUTURE ONTARIO LINE East Harbour Transit Hub (Future) QUEEN STREET EAST LESLIE STREET Investment Summary Executive Summary Downtown Toronto Lake Ontario 4.6 km| ~14 minutes olliers International (“Colliers” or the “Advisor”) has been retained exclusively to arrange for the sale of 1233-1243 Queen Street East & 77 Leslie Street (the “Property” or “Site”), an assemblage of lands located along the Queen Street Billy Bishop Airport C 6.9 km | ~18 minutes East corridor, at the Southeast corner of Queen Street East and Leslie Street. The Property presents a unique opportunity to acquire a rare 23,022 SF land site in the gentrifying Leslieville neighbourhood, with direct transit access. The site is ideal for 01 East Harbour development of mid-rise, mixed-use building with front door access to the Queen Transit Hub Street East streetcar. 01(Future) The site benefits from unparalleled transit connectivity with direct access to the 501 Queen Street Streetcar and car access to Lakeshore Boulevard which provide convenient accessibility to Downtown Toronto. This connectivity has provided a wealth of amenities, schools (Bruce Public School, St. Joseph Catholic School, Duke of Connaught, Leslieville Junior Public School, Morse Street Public School) and parks, (Maple Leaf Forever Park, Leslie Grove Park, Greenwood Park) supplying a healthy and vibrant community which bodes well for further residential developments. 83 Gardiner Expressway / Don Valley
    [Show full text]
  • William R. Allen Road Temporary Closure – Metrolinx Eglinton Crosstown LRT Tunnel Boring Machine Lift
    PW2.5 STAFF REPORT ACTION REQUIRED William R. Allen Road Temporary Closure – Metrolinx Eglinton Crosstown LRT Tunnel Boring Machine Lift Date: February 2, 2015 To: Public Works and Infrastructure Committee From: General Manager, Transportation Services Wards: Ward 15 (Eglinton-Lawrence) Ward 21 (St. Paul's) Reference P:\2015\ClusterB\TRA\TIM\pw15004tim.docx Number: SUMMARY The purpose of this report is to seek City Council’s authority to close the section of William R. Allen Road between Eglinton Avenue West and Lawrence Avenue West for one weekend in order to safely facilitate the lift and transfer of two tunnel boring machines being utilized by Metrolinx for its construction of the Eglinton Crosstown LRT project. A closing of one of the southbound lanes is also recommended prior to the weekend closure in order to facilitate construction staging. Additional closures are required on Eglinton Avenue West from Flanders Road (immediately to the east of William R. Allen Road) to Park Hill Road (immediately to the west of William R. Allen Road). This includes the off-ramp from southbound William R. Allen Road and the on-ramp to northbound William R. Allen Road. These closures can be approved by the General Manager of Transportation Services. Further to the proposed closure of William R. Allen Road between Eglinton Avenue West and Lawrence Avenue West, the section between Lawrence Avenue West and Sheppard Avenue West would also be closed at the same time for maintenance purposes. This additional closure for City maintenance, which also falls under the delegated authority of the General Manager, is being combined with the closure proposed by Metrolinx to avoid the need for a second weekend closure of William R.
    [Show full text]
  • The Development of the Toronto Conurbation
    Buffalo Law Review Volume 13 Number 3 Article 4 4-1-1964 The Development of the Toronto Conurbation Jac. Spelt University of Toronto Follow this and additional works at: https://digitalcommons.law.buffalo.edu/buffalolawreview Part of the Land Use Law Commons Recommended Citation Jac. Spelt, The Development of the Toronto Conurbation, 13 Buff. L. Rev. 557 (1964). Available at: https://digitalcommons.law.buffalo.edu/buffalolawreview/vol13/iss3/4 This Leading Article is brought to you for free and open access by the Law Journals at Digital Commons @ University at Buffalo School of Law. It has been accepted for inclusion in Buffalo Law Review by an authorized editor of Digital Commons @ University at Buffalo School of Law. For more information, please contact [email protected]. THE DEVELOPMENT OF THE TORONTO CONURBATION* JAC. SPELT** THE SITE BROADLY speaking, the terrain on which Toronto has grown up consists of a rather level plain, slowly rising from the lake to a steep cliff beyond which extends a somewhat more varied surface. The Humber and Don Rivers traverse the area in a general northwest southeast direction. To the south, land and water seem to interlock as part of the lake found shelter behind a westward jutting sandy peninsula. The bedrock is exposed at only a few places in the bottom of the valleys and has not significantly interfered with the building of the city. Even under the so-called City Plain it is buried under thick deposits laid down by Lake Iroquois, a post-glacial predecessor of present-day Lake Ontario. The above- mentioned cliff forms its shoreline which at present rises as a 50 to 75 foot hill above the plain (Fig.
    [Show full text]
  • Flagship Bloor Street West Retail 10 0 for Sublease
    FLAGSHIP BLOOR STREET WEST RETAIL 10 0 FOR SUBLEASE 1 TABLE BLOOR OF CONTENTS STREET 4 TORONTO OVERVIEW WEST 6 CURRENT & INCOMING NEIGHBOURING TENANTS 8 AREA DEMOGRAPHICS 10 TRANSIT MAP 12 YORKVILLE OVERVIEW 14 RETAIL MAP 1016 BLOOR STREET STREETSCAPE 0 16 PROPERTY INFORMATION 28 FLOOR PLANS 2 3 100 BLOOR STREET WEST | TORONTO BLOOR STREET 10 0 WEST TORONTO OVERVIEW Toronto is the fourth largest City in North America and Canada’s financial and business capital, with a GTA population in excess of 6.4M people. It is a global centre for business, finance, arts and culture, and is consistently ranked as one of the world’s most livable cities. With a wide range of key sectors from financial services to technology, education, and life sciences, the city has a robust economic base that drives Canada’s economy and provides an attractive environment for foreign investment. In addition to being an international centre for business, innovation, scientific research, and education, Toronto is the country’s cultural heartland. Toronto hosts international audiences for a variety of art, music, and sporting events. It is the country’s leading tourist destination, attracting over 40 million visitors each year. 4 5 4 5 BLOOR CURRENT & INCOMING STREET NEIGHBOURING TENANTS 10 0 WEST 6 7 6 7 2,300,000 Square feet of retail in the Bloor– BLOOR Yorkville retail node STREET WEST 4,552,717 10 0 Square feet of office space* DEMOGRAPHICS 30 2,690,000 Median age* Toronto population 216,189 183,238 Daily TTC Bloor–Danforth Line ridership Daily TTC Yonge–University
    [Show full text]