370 QUEENS QUAY WEST Toronto, ON

Total Page:16

File Type:pdf, Size:1020Kb

370 QUEENS QUAY WEST Toronto, ON SHORT TERM RETAIL/OFFICE FOR LEASE 370 QUEENS QUAY WEST Toronto, ON PROPERTY DETAILS 370 Queens Quay West (The Quay) is located on the north side of Queens Quay West, just east of Spadina in an area transformed by the efforts of Waterfront Toronto, a public advocate and steward of the City’s waterfront revitalization created by the Governments of Canada, Ontario and the City of Toronto. Today, Toronto’s waterfront is home to extraordinary new places to live, work, learn and play. The enhanced waterfront boasts exciting building renovations, recreational parks and other attractions as well as new restaurants such as Loch & Quay restaurant located right in The Quay. Access to the TTC is available adjacent to the building, which is serviced by the 509 Harbourfront (Union Station to Exhibition) and 510 Spadina (Union Station to Spadina Station) streetcars on dedicated, private lanes. The area is also serviced by dedicated bike lanes, wide pedestrian boulevards, easy access to Billy Bishop Airport and Gardiner Expressway. HIGHLIGHTS • Panoramic lake views • Onsite amenities such as Loch & Quay restaurant, • Boardroom and Conference Room Shoppers Drug Mart and The Beer Store • Street front walk-up entrance • Close proximity to Rogers Centre • TTC street car access at your doorstep • On site property management SHORT TERM RETAIL/OFFICE FOR LEASE 370 QUEENS QUAY WEST Toronto, ON SUITE 101 - 3,212 SF DETAILS • Suite: 101 • Net Rent: Call agent for details. • Additional Rent: $15.50 • Available: Immediately SUITE 101 • Term: Landlord may exercise a demolition right as of April 1, 2021. Call agent for details. DESCRIPTION • Filled with natural light and lake views. Open concept, high ceilings. Retail/Office SHORT TERM RETAIL/OFFICE FOR LEASE 370 QUEENS QUAY WEST Toronto, ON SUITE 203A - 384 SF DETAILS • Suite: 203A • Gross Rent: $2,750.00 / Month • Available: Immediately • Term: Landlord may exercise a demolition right as of April 1, 2021. Call agent for details. DESCRIPTION • Private, open concept office. On glass. Lake views. Natural light. As-is where-is SUITE 300 - 1,732 SF DETAILS • Suite: 300 • Net Rent: Call agent for details. • Additional Rent: $15.50 • Available: June 30, 2020 • Term: Landlord may exercise a demolition right as of April 1, 2021. Call agent for details. DESCRIPTION • 2 large team rooms, one executive suite, kitchenette, elevator walk off. SUITE 300 SHORT TERM RETAIL/OFFICE FOR LEASE 370 QUEENS QUAY WEST Toronto, ON LOCATION MAP FOR MORE INFORMATION PLEASE CONTACT: Cushman & Wakefield ULC, Brokerage SAM BUCKLEY* 161 Bay Street, Suite 1500 Senior Associate P.O.Box 602 | Toronto, 416 359 2394 ON M5J 2S1 [email protected] cushmanwakefield.com Cushman & Wakefield ULC, No warranty or representation, express or implied, is made to the accuracy or completeness of the information contained herein, and same is submitted subject to errors, omissions, change of price, rental or other conditions, withdrawal without notice, and to any special listing conditions imposed by the property owner(s). As applicable, we make no representation as to the condition of the property (or properties) in question. Cushman & Wakefield ULC, Brokerage *Sales Representative.
Recommended publications
  • Expropriation of Part of 228-230 Queens Quay West
    GM8.19 STAFF REPORT ACTION REQUIRED Expropriation of Part of 228-230 Queens Quay West and Part of the Lands at the Rear of 250-270 Queens Quay West for the Reconstruction of the York/Bay/Yonge Off-ramp from the F.G. Gardiner Expressway Date: October 23, 2015 To: Government Management Committee From: Chief Corporate Officer Wards: Ward 20 – Trinity Spadina Reference P:\2015\Internal Services\RE\Gm15038re (AFS #21976) Number: SUMMARY The purpose of this report is to seek authorization from City Council to commence proceedings for the expropriation of certain lands forming part of the condominium property known municipally as 228-230 Queens Quay West and certain lands located to the north (rear) of the condominium properties known municipally as 250-270 Queens Quay West. These lands are required for the reconstruction and realignment of the Gardiner Expressway's York/Bay/Yonge off ramp (the "Project") with a new ramp to Lower Simcoe Street. While discussions with the affected owner and condominium corporations are ongoing, it appears unlikely that satisfactory negotiated terms can be achieved, as the required land is directly part of, or subject to easements in favour of, condominium properties. Pursuant to the Condominium Act (Ontario), a condominium corporation is prohibited from selling part of the condominium's common elements unless at least 80% of the unit owners vote in favour of the sale and 80% of those persons with a registered claim against the property consent in writing to the sale. In order to release easements that benefit a condominium, a majority, or in some cases 80%, of the unit owners must approve the release.
    [Show full text]
  • PATH Underground Walkway
    PATH Marker Signs ranging from Index T V free-standing outdoor A I The Fairmont Royal York Hotel VIA Rail Canada H-19 pylons to door decals Adelaide Place G-12 InterContinental Toronto Centre H-18 Victory Building (80 Richmond 1 Adelaide East N-12 Hotel D-19 The Hudson’s Bay Company L-10 St. West) I-10 identify entrances 11 Adelaide West L-12 The Lanes I-11 W to the walkway. 105 Adelaide West I-13 K The Ritz-Carlton Hotel C-16 WaterPark Place J-22 130 Adelaide West H-12 1 King West M-15 Thomson Building J-10 95 Wellington West H-16 Air Canada Centre J-20 4 King West M-14 Toronto Coach Terminal J-5 100 Wellington West (Canadian In many elevators there is Allen Lambert Galleria 11 King West M-15 Toronto-Dominion Bank Pavilion Pacific Tower) H-16 a small PATH logo (Brookfield Place) L-17 130 King West H-14 J-14 200 Wellington West C-16 Atrium on Bay L-5 145 King West F-14 Toronto-Dominion Bank Tower mounted beside the Aura M-2 200 King West E-14 I-16 Y button for the floor 225 King West C-14 Toronto-Dominion Centre J-15 Yonge-Dundas Square N-6 B King Subway Station N-14 TD Canada Trust Tower K-18 Yonge Richmond Centre N-10 leading to the walkway. Bank of Nova Scotia K-13 TD North Tower I-14 100 Yonge M-13 Bay Adelaide Centre K-12 L TD South Tower I-16 104 Yonge M-13 Bay East Teamway K-19 25 Lower Simcoe E-20 TD West Tower (100 Wellington 110 Yonge M-12 Next Destination 10-20 Bay J-22 West) H-16 444 Yonge M-2 PATH directional signs tell 220 Bay J-16 M 25 York H-19 390 Bay (Munich Re Centre) Maple Leaf Square H-20 U 150 York G-12 you which building you’re You are in: J-10 MetroCentre B-14 Union Station J-18 York Centre (16 York St.) G-20 in and the next building Hudson’s Bay Company 777 Bay K-1 Metro Hall B-15 Union Subway Station J-18 York East Teamway H-19 Bay Wellington Tower K-16 Metro Toronto Convention Centre you’ll be entering.
    [Show full text]
  • Bay Street, Between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal)
    REPORT FOR ACTION Parking Amendments - Bay Street, between Harbour Street and Queens Quay West (York Street, Bay Street, and Yonge Street Ramp Removal) Date: October 26, 2017 To: Toronto and East York Community Council From: Acting Director, Transportation Services, Toronto and East York District Wards: Ward 28, Toronto Centre-Rosedale SUMMARY As the Toronto Transit Commission (TTC) operates a transit service on Bay Street, City Council approval of this report is required. Transportation Services is requesting approval to amend the existing parking regulations on the east side of Bay Street, between Harbour Street and Queens Quay West. The proposed changes will allow for safe and efficient northbound right-turns from Bay Street to Harbour Street, and also improve sight lines at this intersection. RECOMMENDATIONS The Acting Director, Transportation Services, Toronto and East York District, recommends that: 1. City Council rescind the existing designated commercial loading zone in effect from 4:30 p.m. of one day to 8:00 a.m. of the next following day Monday to Friday and anytime Saturday, Sunday, and public holidays from July 1 to August 31, inclusive; Anytime from September 1 of one year to June 30 of the next following year, inclusive on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north. 2. City Council rescind the existing designated bus parking zone in effect from 8:00 a.m. to 4:30 p.m. Monday to Friday from July 1 to August 31, inclusive, for a maximum period of 1 hour on the east side of Bay Street, between a point 53.6 metres north of Queens Quay West and a point 28 metres further north.
    [Show full text]
  • Board of Directors Meeting
    Board of Directors Meeting Agenda and Meeting Book THURSDAY, DECEMBER 5, 2019 FROM 08:30 AM TO 11:30 AM WATERFRONT TORONTO 20 BAY STREET, SUITE 1310 TORONTO, ON, M5J 2N8 Meeting Book - Board of Directors Meeting Agenda 8:30 a.m. 1. Motion to Approve Meeting Agenda Approval S. Diamond 8:35 a.m. 2. Declaration of Conflicts of Interest Declaration All 8:40 a.m. 3. Chair’s Opening Remarks Information S. Diamond 8:50 a.m. 4. Consent Agenda a) Draft Minutes of Open Session of the October 10 and 24, 2019 Board Approval All Meeting - Page 4 b) Draft Minutes of Open Session of the October 31, 2019 Board Approval All Meeting - Page 11 c) CEO Report - Page 15 Information G. Zegarac d) Finance Audit and Risk Management (FARM) Committee Chair's Information K. Sullivan Open Session Report - Page 44 e) Human Resources, Governance and Stakeholder Relations (HRGSR) Information S. Palvetzian Committee Chair's Open Session Report - Page 47 f) Investment, Real Estate and Quayside (IREQ) Committe Chair's Open Information M. Mortazavi Session Report - Page 48 9:00 a.m. 5. Port Lands Flood Protection (60% Design Stage Gate Status Approval D. Kusturin Update) Cover Sheet - Page 49 Presentation is attached as Appendix A to the Board Book 9:15 a.m. 6. Waterfront Toronto Priority Projects - Construction Update Information D. Kusturin Cover sheet - Page 50 Presentation is attached as Appendix B to the Board Book 9:30 a.m. 7. Motion to go into Closed Session Approval All Closed Session Agenda The Board will discuss items 8, 9 (a), (b), (c), (d) & (e) , 10, 11 and
    [Show full text]
  • No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx
    2020 No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx Top100 Projects 2020 One Man Changes the Face of 2020’s Top 10 Top100 Projects — 2020 f not for one individual, this year’s Top100 may have looked An annual report inserted in familiar. ReNew Canada’s I When this year’s research process began, there was little change within this year’s Top 10, as many of the nation’s January/February 2020 issue megaprojects were still in progress. Significant progress has been made on all of the projects we saw grace the Top 10 in our report last year, but completion dates extend beyond the end of the MANAGING Andrew Macklin 2019 calendar year. EDITOR [email protected] Enter Matt Clark, Metrolinx’s Chief Capital Officer, who took GROUP over the position from Peter Zuk. You see, when Zuk was in charge Todd Latham PUBLISHER of publicly expressing capital budgets, particularly in the context of the GO Expansion project, he had done so by breaking down PUBLISHER Nick Krukowski the $13.5 billion spend by corridor. That breakdown led to the full expansion represented by as many as nine projects in the content ART DIRECTOR AND Donna Endacott SENIORDESIGN of the Top100. Clark does it differently. In the quarterly reports made public ASSOCIATE following Metrolinx board meetings, the capital projects for the Simran Chattha EDITOR GO Expansion are broken down into three allotments (on corridor, off corridor, and early works). The result? Six less GO Expansion CONTENT AND MARKETING Todd Westcott projects in the Top100, but two new projects in our Top 10 MANAGER including a new number one.
    [Show full text]
  • TORONTO PORT AUTHORITY (Doing Business As Portstoronto) MANAGEMENT's DISCUSSION & ANALYSIS – 2017 (In Thousands of Dolla
    TORONTO PORT AUTHORITY (Doing Business as PortsToronto) MANAGEMENT’S DISCUSSION & ANALYSIS – 2017 (In thousands of dollars) May 3, 2018 Management's discussion and analysis (MD&A) is intended to assist in the understanding and assessment of the trends and significant changes in the results of operations and financial condition of the Toronto Port Authority, doing business as PortsToronto (the “Port Authority” or “TPA”) for the years ended December 31, 2017 and 2016 and should be read in conjunction with the 2017 Audited Financial Statements (the “Financial Statements”) and accompanying notes. Summary The Port Authority continued to be profitable in 2017. Net Income (excluding the gain on the sale of the 30 Bay Street/60 Harbour Street Property) for the year was $6,368, slightly down from $6,684 in 2016. This MD&A will discuss the reasons for changes in Net Income year over year, as well as highlight other areas impacting the Port Authority’s financial performance in 2017. The Port Authority presents its financial statements under International Financial Reporting Standards (“IFRS”). The accounting policies set out in Note 2 of the Financial Statements have been applied in preparing the Financial Statements for the year ended December 31, 2017, and in the comparative information presented in these Financial Statements for the year ended December 31, 2016. Introduction The TPA was continued on June 8, 1999 as a government business enterprise under the Canada Marine Act as the successor to the Toronto Harbour Commissioners. The Port Authority is responsible for operating the lands and harbour it administers in the service of local, regional and national social and economic objectives, and for providing infrastructure and services to marine and air transport to facilitate these objectives.
    [Show full text]
  • Caledonia GO Station Environmental Assessment Study
    Caledonia GO Station Environmental Assessment Study Public Meeting #1 Summary Report Metrolinx R.J. Burnside & Associates Limited 6990 Creditview Road, Unit 2 Mississauga ON L5N 8R9 CANADA August 2015 300034767.0000 Metrolinx i Caledonia GO Station Environmental Assessment Study Public Meeting #1 Summary Report August 2015 Distribution List No. of Hard PDF Email Organization Name Copies 0 Yes Yes Metrolinx Record of Revisions Revision Date Description 0 July 2015 Draft Submission to Metrolinx 1 August 2015 Final Submission to Metrolinx R.J. Burnside & Associates Limited Report Prepared By: Ashley Gallaugher Environmental Scientist AG:mp Report Reviewed By: Jennifer Vandermeer, P.Eng. Environmental Assessment Lead Jim Georgas, C.E.T. Transit Manager R.J. Burnside & Associates Limited 300034767.0000 034767_Caledonia GO Station TPAP EA Public Meeting 1 Summary Report.docx Metrolinx ii Caledonia GO Station Environmental Assessment Study Public Meeting #1 Summary Report August 2015 Executive Summary PROJECT Caledonia GO Station, Transit Project Assessment Process Environmental Assessment (EA) Study PROPONENT Metrolinx ACTIVITY Public Meeting #1, Open House Format DATE, TIME & May 26, 2015 LOCATION 6:00 to 9:00 p.m. York Memorial Collegiate 2690 Eglinton Avenue West, Toronto, ON, M6M 1T9 PROJECT TEAM Elise Croll, Metrolinx MEMBERS Trevor Anderson, Metrolinx PRESENT Carolina Daza Ortiz, Metrolinx Tania Gautam, Metrolinx Georgina Collymore, Metrolinx Vanessa Anders, Metrolinx Doug Keenie R.J. Burnside & Associates Limited (Burnside) Jim Georgas, Burnside Jennifer Vandermeer, Burnside Debanjan Mookerjea, Burnside • To describe the existing study corridor and opportunities. PURPOSE • To introduce Metrolinx’ transportation goals. • To describe the proposed study and purpose. • To present the proposed infrastructure for the new Caledonia GO Station.
    [Show full text]
  • 390 Bay Street
    Ground Floor & PATH Retail for Lease 390 Bay Street Eric Berard Sales Representative 647.528.0461 [email protected] RETAIL FOR LEASE 390 BAY ST 390 Bay Street CITY HALL OLD CITY EATON - CENTRE N.P. SQUARE HALL Queen St FOUR SEASONS CENTRE FOR THE PERFORMING ARTS University Ave Richmond St Wine Academy Bay St Bay York St York Yonge St Yonge Sheppard St Sheppard Church St Church Adelaide St FIRST CANADIAN PLACE SCOTIA PLAZA King St TORONTO DOMINION CENTRE COMMERCE COURT WALRUS PUB Wellington St ROYAL BANK BROOKFIELD PLAZA PLACE View facing south from Old City Hall OVERVIEW DEMOGRAPHICS (3KM, 2020) 390 Bay St. (Munich RE Centre) is located at northwest corner 702,631 of Bay St. and Richmond St. W within Toronto’s Financial Core. DAYTIME POPULATION It is a BOMA BEST Gold certified 378,984 sf A-Class office tower, with PATH connected retail. 390 Bay is well located with connec- $ $114,002 tivity to The Sheraton Centre, Hudson’s Bay Company/Saks Fifth AVG. HOUSEHOLD INCOME Avenue, Toronto Eaton Centre and direct proximity to Nathan Phillips Square and Toronto City Hall. Full renovations have been 182,265 completed to update the Lobby and PATH level retail concourse. HOUSEHOLDS RETAIL FOR LEASE 390 Bay Street "Client" Tenant Usable Area Major Vertical Penetration Floor Common Area Building Common Area UP DN UP DN Version: Prepared: 30/08/2016 UP FP2A Measured: 01/05/2019 390 Bay Street Toronto, Ontario 100 Floor 1 FHC ELEV GROUND FLOOR AVAILABILITY DN ELEC. UP ROOM ELEV ELEV DN Please Refer to Corresponding ELEV MECH.
    [Show full text]
  • Exhibition Place Master Plan – Phase 1 Proposals Report
    Acknowledgments The site of Exhibition Place has had a long tradition as a gathering place. Given its location on the water, these lands would have attracted Indigenous populations before recorded history. We acknowledge that the land occupied by Exhibition Place is the traditional territory of many nations including the Mississaugas of the Credit, the Anishnabeg, the Chippewa, the Haudenosaunee and the Wendat peoples and is now home to many diverse First Nations, Inuit and Metis peoples. We also acknowledge that Toronto is covered by Treaty 13 with the Mississaugas of the Credit, and the Williams Treaties signed with multiple Mississaugas and Chippewa bands. Figure 1. Moccasin Identifier engraving at Toronto Trillium Park The study team would like to thank City Planning Division Study Team Exhibition Place Lynda Macdonald, Director Don Boyle, Chief Executive Officer Nasim Adab Gilles Bouchard Tamara Anson-Cartwright Catherine de Nobriga Juliana Azem Ribeiro de Almeida Mark Goss Bryan Bowen Hardat Persaud David Brutto Tony Porter Brent Fairbairn Laura Purdy Christian Giles Debbie Sanderson Kevin Lee Kelvin Seow Liz McFarland Svetlana Lavrentieva Board of Governors Melanie Melnyk Tenants, Clients and Operators Dan Nicholson James Parakh David Stonehouse Brad Sunderland Nigel Tahair Alison Torrie-Lapaire 4 - PHASE 1 PROPOSALS REPORT FOR EXHIBITION PLACE Local Advisory Committee Technical Advisory Committee Bathurst Quay Neighbourhood Association Michelle Berquist - Transportation Planning The Bentway Swinzle Chauhan – Transportation Services
    [Show full text]
  • Improving Transit Service Options to Major Music Festivals
    Attachment 1 For Action Improving Transit Service to Major Music Festivals Date: May 8, 2018 To: TTC Board From: Chief Operating Officer Summary The purpose of this report is to respond to the Board’s request to report on how the TTC plans and co-ordinates service to special events, including major music festivals. Recommendations It is recommended that the Board: 1. Receive the report for information; and 2. Direct staff to forward this report to Councillor Mike Layton, City of Toronto Transportation Services, Toronto Music Advisory Council, Exhibition Place, Ontario Place and Metrolinx for information. Financial Summary This report has no financial impact. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Equity/Accessibility Matters The TTC has made significant progress in providing barrier-free, accessible transit services for all customers. Presently, all TTC bus services are operated using accessible, low-floor buses. New low-floor streetcars are currently being deployed and all routes will have accessible streetcars by 2019. All subway stations will be accessible by 2025. By providing public transit services to special events the TTC encourages and supports more spontaneous trip-making, which is an important part of making the conventional system attractive to potential new customers, such as Wheel-Trans registrants who are taking advantage of the TTC’s Family of Services, and to all travellers in Toronto. This Improving Transit Service to Major Music Festivals Page 1 of 5 supports the Accessibility for Ontarians with Disabilities Act (AODA) objectives of more- spontaneous travel options for customers with disabilities, and the City’s Poverty Reduction Strategy of making transit more accessible and attractive to everyone.
    [Show full text]
  • Toronto Central Waterfront Public Forum #2
    TORONTO CENTRAL WATERFRONT PUBLIC FORUM #2 Queens Quay Revitalization EA Bathurst Street to Lower Jarvis Street Municipal Class Environmental Assessment (Schedule C) December 08, 2008 1 WATERFRONT TORONTO UPDATE 2 Central Waterfront International Design Competition 3 Waterfront Toronto Long Term Plan – Central Waterfront 4 Waterfront Toronto Long Term Plan – Central Waterfront 5 Waterfront Toronto Long Term Plan – Central Waterfront 6 Waterfront Toronto Long Term Plan – Central Waterfront 7 East Bayfront Waters Edge Promenade: Design Underway 8 Spadina Wavedeck: Opened September 2008 9 Spadina Wavedeck: Opened September 2008 10 Spadina Wavedeck: Opened September 2008 Metropolis Article 11 Rees Wavedeck: Construction Underway 12 Simcoe Wavedeck: Construction Underway 13 Spadina Bridge: Construction Early-2009 14 What Have We Been Doing for the Past 11 Months? • Consider and follow up on comments from Public Forum 1 • Assess baseline technical feasibility of design alternatives – Over 90 meetings in total: • City and TTC technical staff • Partner agencies •Stakeholders • Landowners/Property Managers • Adjacent project efforts • Advanced transit and traffic modelling • Develop Alternative Design Concepts and Evaluation (Phase 3) • Coordination with East Bayfront Transit EA 15 Study Area: Revised 16 Overview • Review of EA Phases 1 & 2 from Public Forum #1: January 2008 • EA Phase 3: Alternative Design Alternatives – Long list of Design Alternatives – Evaluation of Design Alternatives • Next Steps – Evaluation Criteria for Shortlisted Design
    [Show full text]
  • Attachment 4 – Assessment of Ontario Line
    EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively.
    [Show full text]