2017 Annual Report
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
3131 Lower Don River West Lower Don River West 4.0 DESCRIPTION
Lower Don River West Environmental Study Report Remedial Flood Protection Project 4.0 DESCRIPTION OF LOWER DON 4.1 The Don River Watershed The Don River is one of more than sixty rivers and streams flowing south from the Oak Ridges Moraine. The River is approximately 38 km long and outlets into the Keating Channel, which then conveys the flows into Toronto Harbour and Lake Historic Watershed Ontario. The entire drainage basin of the Don urbanization of the river's headwaters in York River is 360 km2. Figure 4.1 and Figure 4.2, on the Region began in the early 1980s and continues following pages, describe the existing and future today. land use conditions within the Don River Watershed. Hydrologic changes in the watershed began when settlers converted the forests to agricultural fields; For 200 years, the Don Watershed has been many streams were denuded even of bank side subject to intense pressures from human vegetation. Urban development then intensified settlement. These have fragmented the river the problems of warmer water temperatures, valley's natural branching pattern; degraded and erosion, and water pollution. Over the years often destroyed its once rich aquatic and during the three waves of urban expansion, the terrestrial wildlife habitat; and polluted its waters Don River mouth, originally an extensive delta with raw sewage, industrial/agricultural marsh, was filled in and the lower portion of the chemicals, metals and other assorted river was straightened. contaminants. Small Don River tributaries were piped and Land clearing, settlement, and urbanization have buried, wetlands were "reclaimed," and springs proceeded in three waves in the Don River were lost. -
Acoustic Telemetry in Toronto Harbour: Assessing Residency, Habitat Selection, and Within-Harbour Movements of Fishes Over a Five-Year Period
Acoustic telemetry in Toronto Harbour: assessing residency, habitat selection, and within-harbour movements of fishes over a five-year period Jonathan D. Midwood1, Andrew M. Rous2, Susan E. Doka1, and Steven J. Cooke2 1Central and Arctic Region Fisheries and Oceans Canada 867 Lakeshore Road Burlington, ON L7S 1A1 2Carleton University Department of Biology 1125 Colonel By Dr. Ottawa, ON, K1S 5B6 2019 Canadian Technical Report of Fisheries and Aquatic Sciences 3331 1 Canadian Technical Report of Fisheries and Aquatic Sciences Technical reports contain scientific and technical information that contributes to existing knowledge but which is not normally appropriate for primary literature. Technical reports are directed primarily toward a worldwide audience and have an international distribution. No restriction is placed on subject matter and the series reflects the broad interests and policies of Fisheries and Oceans Canada, namely, fisheries and aquatic sciences. Technical reports may be cited as full publications. The correct citation appears above the abstract of each report. Each report is abstracted in the data base Aquatic Sciences and Fisheries Abstracts. Technical reports are produced regionally but are numbered nationally. Requests for individual reports will be filled by the issuing establishment listed on the front cover and title page. Numbers 1-456 in this series were issued as Technical Reports of the Fisheries Research Board of Canada. Numbers 457-714 were issued as Department of the Environment, Fisheries and Marine Service, Research and Development Directorate Technical Reports. Numbers 715-924 were issued as Department of Fisheries and Environment, Fisheries and Marine Service Technical Reports. The current series name was changed with report number 925. -
Trailside Esterbrooke Kingslake Harringay
MILLIKEN COMMUNITY TRAIL CONTINUES TRAIL CONTINUES CENTRE INTO VAUGHAN INTO MARKHAM Roxanne Enchanted Hills Codlin Anthia Scoville P Codlin Minglehaze THACKERAY PARK Cabana English Song Meadoway Glencoyne Frank Rivers Captains Way Goldhawk Wilderness MILLIKEN PARK - CEDARBRAE Murray Ross Festival Tanjoe Ashcott Cascaden Cathy Jean Flax Gardenway Gossamer Grove Kelvin Covewood Flatwoods Holmbush Redlea Duxbury Nipigon Holmbush Provence Nipigon Forest New GOLF & COUNTRY Anthia Huntsmill New Forest Shockley Carnival Greenwin Village Ivyway Inniscross Raynes Enchanted Hills CONCESSION Goodmark Alabast Beulah Alness Inniscross Hullmar Townsend Goldenwood Saddletree Franca Rockland Janus Hollyberry Manilow Port Royal Green Bush Aspenwood Chapel Park Founders Magnetic Sandyhook Irondale Klondike Roxanne Harrington Edgar Woods Fisherville Abitibi Goldwood Mintwood Hollyberry Canongate CLUB Cabernet Turbine 400 Crispin MILLIKENMILLIKEN Breanna Eagleview Pennmarric BLACK CREEK Carpenter Grove River BLACK CREEK West North Albany Tarbert Select Lillian Signal Hill Hill Signal Highbridge Arran Markbrook Barmac Wheelwright Cherrystone Birchway Yellow Strawberry Hills Strawberry Select Steinway Rossdean Bestview Freshmeadow Belinda Eagledance BordeauxBrunello Primula Garyray G. ROSS Fontainbleau Cherrystone Ockwell Manor Chianti Cabernet Laureleaf Shenstone Torresdale Athabaska Limestone Regis Robinter Lambeth Wintermute WOODLANDS PIONEER Russfax Creekside Michigan . Husband EAST Reesor Plowshare Ian MacDonald Nevada Grenbeck ROWNTREE MILLS PARK Blacksmith -
Board of Directors Meeting
Board of Directors Meeting Agenda and Meeting Book THURSDAY, DECEMBER 5, 2019 FROM 08:30 AM TO 11:30 AM WATERFRONT TORONTO 20 BAY STREET, SUITE 1310 TORONTO, ON, M5J 2N8 Meeting Book - Board of Directors Meeting Agenda 8:30 a.m. 1. Motion to Approve Meeting Agenda Approval S. Diamond 8:35 a.m. 2. Declaration of Conflicts of Interest Declaration All 8:40 a.m. 3. Chair’s Opening Remarks Information S. Diamond 8:50 a.m. 4. Consent Agenda a) Draft Minutes of Open Session of the October 10 and 24, 2019 Board Approval All Meeting - Page 4 b) Draft Minutes of Open Session of the October 31, 2019 Board Approval All Meeting - Page 11 c) CEO Report - Page 15 Information G. Zegarac d) Finance Audit and Risk Management (FARM) Committee Chair's Information K. Sullivan Open Session Report - Page 44 e) Human Resources, Governance and Stakeholder Relations (HRGSR) Information S. Palvetzian Committee Chair's Open Session Report - Page 47 f) Investment, Real Estate and Quayside (IREQ) Committe Chair's Open Information M. Mortazavi Session Report - Page 48 9:00 a.m. 5. Port Lands Flood Protection (60% Design Stage Gate Status Approval D. Kusturin Update) Cover Sheet - Page 49 Presentation is attached as Appendix A to the Board Book 9:15 a.m. 6. Waterfront Toronto Priority Projects - Construction Update Information D. Kusturin Cover sheet - Page 50 Presentation is attached as Appendix B to the Board Book 9:30 a.m. 7. Motion to go into Closed Session Approval All Closed Session Agenda The Board will discuss items 8, 9 (a), (b), (c), (d) & (e) , 10, 11 and -
Humber River Watershed Plan Pathways to a Healthy Humber June 2008
HUMBER RIVER WATERSHED PLAN PAThwAYS TO A HEALTHY HUMBER JUNE 2008 Prepared by: Toronto and Region Conservation © Toronto and Region Conservation 2008 ISBN: 978-0-9811107-1-4 www.trca.on.ca 5 Shoreham Drive, Toronto, Ontario M3N 1S4 phone: 416-661-6600 fax: 416-661-6898 HUMBER RIVER WATERSHED PLAN PATHWAYS TO A HEALTHY HUMBER JUNE 2008 Prepared by: Toronto and Region Conservation i Humber River Watershed Plan, 2008 ACKNOWLEDGEMENTS This Humber River Watershed Plan—Pathways to a Healthy Humber—was written by Suzanne Barrett, edited by Dean Young and represents the combined effort of many participants. Appreciation and thanks are extended to Toronto and Region Conservation staff and consultants (listed in Appendix F) for their technical support and input, to government partners for their financial support and input, and to Humber Watershed Alliance members for their advice and input. INCORPORATED 1850 Humber River Watershed Plan, 2008 ii HUMBER RIVER WATERSHED PLAN PATHWAYS TO A HEALTHY HUMBER EXECUTIVE SUMMARY The Humber River watershed is an extraordinary resource. It spans 903 square kilometres, from the headwaters on the Niagara Escarpment and Oak Ridges Moraine down through fertile clay plains to the marshes and river mouth on Lake Ontario. The watershed provides many benefits to the people who live in it. It is a source of drinking water drawn from wells or from Lake Ontario. Unpaved land absorbs water from rain and snowfall to replenish groundwater and streams and reduce the negative impacts of flooding and erosion. Healthy aquatic and terrestrial habitats support diverse communities of plants and animals. Agricultural lands provide local sources of food and green spaces provide recreation opportunities. -
Land Use Study: Development in Proximity to Rail Operations
Phase 1 Interim Report Land Use Study: Development in Proximity to Rail Operations City of Toronto Prepared for the City of Toronto by IBI Group and Stantec August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Document Control Page CLIENT: City of Toronto City-Wide Land Use Study: Development in Proximity to Rail PROJECT NAME: Operations Land Use Study: Development in Proximity to Rail Operations REPORT TITLE: Phase 1 Interim Report - DRAFT IBI REFERENCE: 105734 VERSION: V2 - Issued August 30, 2017 J:\105734_RailProximit\10.0 Reports\Phase 1 - Data DIGITAL MASTER: Collection\Task 3 - Interim Report for Phase 1\TTR_CityWideLandUse_Phase1InterimReport_2017-08-30.docx ORIGINATOR: Patrick Garel REVIEWER: Margaret Parkhill, Steve Donald AUTHORIZATION: Lee Sims CIRCULATION LIST: HISTORY: Accessibility This document, as of the date of issuance, is provided in a format compatible with the requirements of the Accessibility for Ontarians with Disabilities Act (AODA), 2005. August 30, 2017 IBI GROUP PHASE 1 INTERIM REPORT LAND USE STUDY: DEVELOPMENT IN PROXIMITY TO RAIL OPERATIONS Prepared for City of Toronto Table of Contents 1 Introduction ......................................................................................................................... 1 1.1 Purpose of Study ..................................................................................................... 2 1.2 Background ............................................................................................................. -
Attachment 1: Table of Projects Being Planned Under the ERMP in 2021
Attachment 1: Table of projects being planned under the ERMP in 2021 Municipality Ward Project Name Portfolio 2021 Project Status City of Brampton 2 Wegneast Valley Erosion Control Project Region of Peel Erosion Control & Infrastructure Protection Construction City of Brampton 7 I-360/I-361 Region of Peel Erosion Control & Infrastructure Protection Study, Planning or Design York Region Streambank Infrastructure Erosion Control City of Markham 1 German Mills Settlers Park Sites 2-3 Sanitary Infrastructure Protection Management Program Study, Planning or Design City of Markham 4 70 Main Street South Erosion Control Project TRCA Maintenance & Other Hazards (York Region) Construction City of Mississauga 5 Brandon Gate Park - Bank Stabilization Project Region of Peel Erosion Control & Infrastructure Protection Construction City of Mississauga 5 I-700 Region of Peel Erosion Control & Infrastructure Protection Study, Planning or Design York Region Streambank Infrastructure Erosion Control City of Richmond Hill 5 Patterson Creek I-066, I-067, I-065, I-064, P-102 Management Program Post-Construction York Region Streambank Infrastructure Erosion Control City of Richmond Hill 5 Patterson Creek near North Richvale Sanitary Infrastructure Protection Management Program Construction City of Richmond Hill 5 Patterson Valley South Richvale Erosion Hazards Fee For Service Post-Construction City of Toronto 1 22-24 Bucksburn Road Erosion Control and Slope Stabilization Project Valley Erosion Hazards Study, Planning or Design City of Toronto 1 Hadrian Drive -
TORONTO PORT AUTHORITY (Doing Business As Portstoronto) MANAGEMENT's DISCUSSION & ANALYSIS – 2017 (In Thousands of Dolla
TORONTO PORT AUTHORITY (Doing Business as PortsToronto) MANAGEMENT’S DISCUSSION & ANALYSIS – 2017 (In thousands of dollars) May 3, 2018 Management's discussion and analysis (MD&A) is intended to assist in the understanding and assessment of the trends and significant changes in the results of operations and financial condition of the Toronto Port Authority, doing business as PortsToronto (the “Port Authority” or “TPA”) for the years ended December 31, 2017 and 2016 and should be read in conjunction with the 2017 Audited Financial Statements (the “Financial Statements”) and accompanying notes. Summary The Port Authority continued to be profitable in 2017. Net Income (excluding the gain on the sale of the 30 Bay Street/60 Harbour Street Property) for the year was $6,368, slightly down from $6,684 in 2016. This MD&A will discuss the reasons for changes in Net Income year over year, as well as highlight other areas impacting the Port Authority’s financial performance in 2017. The Port Authority presents its financial statements under International Financial Reporting Standards (“IFRS”). The accounting policies set out in Note 2 of the Financial Statements have been applied in preparing the Financial Statements for the year ended December 31, 2017, and in the comparative information presented in these Financial Statements for the year ended December 31, 2016. Introduction The TPA was continued on June 8, 1999 as a government business enterprise under the Canada Marine Act as the successor to the Toronto Harbour Commissioners. The Port Authority is responsible for operating the lands and harbour it administers in the service of local, regional and national social and economic objectives, and for providing infrastructure and services to marine and air transport to facilitate these objectives. -
Festival Guide
FESTIVAL GUIDE DU GUÍA DEL GUIDE FESTIVAL FESTIVAL July 10–August 15, 2015 10 juillet au 15 août 2015 10 julio – 15 agosto 2015 LEAD PARTNER PARTENAIRE PRINCIPAL SOCIO PRINCIPAL PREMIER PARTNERS GRANDS PARTENAIRES SOCIOS PREMIERES OPENING CEREMONY CREATIVE PARTNER OFFICIAL BROADCASTER PARTENAIRE CRÉATIF POUR LA CÉRÉMONIE D’OUVERTURE DIFFUSEUR OFFICIEL SOCIO CREATIVO PARA LA CEREMONIA DE INAUGURACIÓN EMISORA OFICIAL OFFICIAL SUPPLIERS FOURNISSEURS OFFICIELS PROVEEDORES OFICIALES PROUD SUPPORTERS FIERS PARRAINEURS COLABORADORES PRINCIPALES Acklands-Grainger ATCO Structures & Logistics Ltd. Bochner Eye Institute BT/A Advertising Burnbrae Farms The Canadian Press Carbon60 Networks The Carpenters’ Union CGC Inc. Division Sports-Rep Inc. ELEIKO EllisDon-Ledcor Esri Canada eSSENTIAL Accessibility Freeman Audio Visual Canada Gateman-Milloy Inc. George Brown College Gerflor Gold Medal Systems La Presse LifeLabs Medical Laboratory Services MAC Cosmetics Minavox Modu-loc Fence Rentals Morningstar Hospitality Services Inc. Nautique Boats ONRoute Highway Service Centres Ontario Power Generation PortsToronto Riedel Communications Roots Rosetta Stone SpiderTech Sportsnet 590 The Fan S4OPTIK Starwood Hotels and Resorts TBM Service Group TLN Telelatino Toronto Port Lands Company UP Express VIA Rail Canada VOIT Vision Critical Waste Management Yonex YouAchieve ZOLL 407 ETR FUNDING PARTIES HOST CITY HOST FIRST NATION BAILLEURS DE FONDS VILLE HÔTE PREMIÈRE NATION HÔTE PROVEEDORES DE FINANCIAMIENTO CIUDAD ANFITRIONA PRIMERA NACIÓN ANFITRIONA Live Sites/Sites -
Peer Review EA Study Design Billy Bishop Toronto City Airport BBTCA
Imagine the result Peer Review – EA Study Design Billy Bishop Toronto City Airport (BBTCA) Runway Expansion and Introduction of Jet Aircraft Final Report August 2015 BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS ii 1.0 INTRODUCTION 1-1 1.1 Background 1-1 1.2 Current Assignment 1-3 2.0 PEER REVIEW APPROACH 2-1 2.1 Methodology 2-1 3.0 FINDINGS OF PEER REVIEW OF AECOM’S DRAFT STUDY DESIGN REPORT 3-1 3.1 EA Process and Legislation 3-1 3.2 Public Consultation & Stakeholder Engagement 3-1 3.3 Air Quality 3-2 3.4 Public Health 3-5 3.5 Noise 3-6 3.6 Natural Environment 3-10 3.7 Socio-Economic Conditions 3-11 3.8 Land Use & Built Form 3-14 3.9 Marine Physical Conditions and Water Quality 3-15 3.10 Transportation 3-15 3.11 Archaeology & Cultural Heritage 3-18 4.0 SUMMARY RECOMMENDATIONS 4-1 APPENDIX A Presentation Given to the Working Group (22 June 2015) B Presentation of Draft Phase I Peer Review Report Results (13 July 2015) i BBTCA Peer Review of EA Study Design Report ACRONYMS AND ABBREVIATIONS AERMOD Atmospheric Dispersion Modelling System ARCADIS ARCADIS Canada Inc. BBTCA Billy Bishop Toronto City Airport CALPUFF Meteorological and Air Quality Monitoring System CCG Canadian Coast Guard CEAA Canadian Environmental Assessment Act CO Carbon Monoxide COPA Canadian Owners and Pilots Association dBA Decibel Values of Sounds EA Environmental Assessment EC Environment Canada GBE Government Business Enterprise GWC Greater Waterfront Coalition HEAT Habitat and Environmental Assessment Tool INM Integrated Noise Model Ldn Day-Night -
390 Bay Street
Ground Floor & PATH Retail for Lease 390 Bay Street Eric Berard Sales Representative 647.528.0461 [email protected] RETAIL FOR LEASE 390 BAY ST 390 Bay Street CITY HALL OLD CITY EATON - CENTRE N.P. SQUARE HALL Queen St FOUR SEASONS CENTRE FOR THE PERFORMING ARTS University Ave Richmond St Wine Academy Bay St Bay York St York Yonge St Yonge Sheppard St Sheppard Church St Church Adelaide St FIRST CANADIAN PLACE SCOTIA PLAZA King St TORONTO DOMINION CENTRE COMMERCE COURT WALRUS PUB Wellington St ROYAL BANK BROOKFIELD PLAZA PLACE View facing south from Old City Hall OVERVIEW DEMOGRAPHICS (3KM, 2020) 390 Bay St. (Munich RE Centre) is located at northwest corner 702,631 of Bay St. and Richmond St. W within Toronto’s Financial Core. DAYTIME POPULATION It is a BOMA BEST Gold certified 378,984 sf A-Class office tower, with PATH connected retail. 390 Bay is well located with connec- $ $114,002 tivity to The Sheraton Centre, Hudson’s Bay Company/Saks Fifth AVG. HOUSEHOLD INCOME Avenue, Toronto Eaton Centre and direct proximity to Nathan Phillips Square and Toronto City Hall. Full renovations have been 182,265 completed to update the Lobby and PATH level retail concourse. HOUSEHOLDS RETAIL FOR LEASE 390 Bay Street "Client" Tenant Usable Area Major Vertical Penetration Floor Common Area Building Common Area UP DN UP DN Version: Prepared: 30/08/2016 UP FP2A Measured: 01/05/2019 390 Bay Street Toronto, Ontario 100 Floor 1 FHC ELEV GROUND FLOOR AVAILABILITY DN ELEC. UP ROOM ELEV ELEV DN Please Refer to Corresponding ELEV MECH. -
Portstoronto to Sell Head-Office Property at 30 Bay Street to Oxford Properties and CPPIB
PortsToronto to Sell Head-Office Property at 30 Bay Street to Oxford Properties and CPPIB Historic Toronto Harbour Commission building to be restored and maintained in any future development planned for property Proceeds of sale paid to PortsToronto will be directed towards paying down debt and making infrastructure investments Toronto (May 1, 2017) – PortsToronto today announced that it has sold its property at the corner of 30 Bay and 60 Harbour Streets to Oxford Properties Group (Oxford) and Canada Pension Plan Investment Board (CPPIB), who will each own a 50 per cent stake. The historic Toronto Harbour Commission building, which currently serves as headquarters for PortsToronto and is located on the site along with a surface parking lot, will be restored and maintained as part of any future development plan. The sale closed today and the transaction is valued at $96 million, a portion of which will be payable over the next three years. The proceeds from this sale will be used to support PortsToronto’s federal mandate to manage operations on a self-sustaining basis in order to reinvest funds into marine safety, environmental protection, community programming, and transportation infrastructure. The federal Minister of Transport has granted an amendment to PortsToronto’s Letters Patent to enable the sale to close. “The South Core is a burgeoning area for business and residential development in Toronto given its optimal location, public transit access and amenities,” said Robert Poirier, Chair of the Board, PortsToronto. “We are pleased that this sale will provide for future opportunities that will improve utilization of the property which is consistent with PortsToronto’s federal mandate and governing Letters Patent.