Caledonia GO Station Environmental Assessment Study
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
The Greater Toronto Hamilton Area (GTHA) Is Growing Fast, and While This Growth Is a Sign of Success and Opportunity, Our Transportation Networks Are at Their Limit
Frequently Asked Questions Why is Metrolinx expanding GO service? The Greater Toronto Hamilton Area (GTHA) is growing fast, and while this growth is a sign of success and opportunity, our transportation networks are at their limit. Metrolinx is working to build a regional transportation system that’s modern, efficient and integrated, with more public transportation connections to keep GHTA residents moving today and tomorrow. What is Metrolinx doing in the GTHA? Expanded GO service is just one part of what is being developed in the Region. Metrolinx is delivering the largest transportation infrastructure program in Canadian history and it will transform the GTHA. To give you a sense of the scope of what is ahead, Metrolinx has an ambitious plan that envisions more than 1,200 kilometers of rapid transit – more than triple what exists now – so that over 80 per cent of residents in the GTHA will live within two kilometers of this network. Currently, there are more than 400 rapid transit projects underway, creating enormous economic benefits of 800,000-900,000 person years of employment and an infusion of $110-$130 billion to our economy. When complete, the Metrolinx plan will transform the way the GTHA moves. What specific projects are expected in my community? Metrolinx is working to create more connections to the entire GO Network with faster, more frequent local service on the Barrie GO line. The planned work will bring all day, evening and weekend service to Innisfil residents. To make this happen, we’re building a new station in Innisfil, constructing a new layover facility in Barrie so trains can be stored overnight to begin service bright and early in the morning, and making modifications to Barrie’s two existing stations, including 139 net-new parking spots at the Barrie South GO Station. -
PATH Underground Walkway
PATH Marker Signs ranging from Index T V free-standing outdoor A I The Fairmont Royal York Hotel VIA Rail Canada H-19 pylons to door decals Adelaide Place G-12 InterContinental Toronto Centre H-18 Victory Building (80 Richmond 1 Adelaide East N-12 Hotel D-19 The Hudson’s Bay Company L-10 St. West) I-10 identify entrances 11 Adelaide West L-12 The Lanes I-11 W to the walkway. 105 Adelaide West I-13 K The Ritz-Carlton Hotel C-16 WaterPark Place J-22 130 Adelaide West H-12 1 King West M-15 Thomson Building J-10 95 Wellington West H-16 Air Canada Centre J-20 4 King West M-14 Toronto Coach Terminal J-5 100 Wellington West (Canadian In many elevators there is Allen Lambert Galleria 11 King West M-15 Toronto-Dominion Bank Pavilion Pacific Tower) H-16 a small PATH logo (Brookfield Place) L-17 130 King West H-14 J-14 200 Wellington West C-16 Atrium on Bay L-5 145 King West F-14 Toronto-Dominion Bank Tower mounted beside the Aura M-2 200 King West E-14 I-16 Y button for the floor 225 King West C-14 Toronto-Dominion Centre J-15 Yonge-Dundas Square N-6 B King Subway Station N-14 TD Canada Trust Tower K-18 Yonge Richmond Centre N-10 leading to the walkway. Bank of Nova Scotia K-13 TD North Tower I-14 100 Yonge M-13 Bay Adelaide Centre K-12 L TD South Tower I-16 104 Yonge M-13 Bay East Teamway K-19 25 Lower Simcoe E-20 TD West Tower (100 Wellington 110 Yonge M-12 Next Destination 10-20 Bay J-22 West) H-16 444 Yonge M-2 PATH directional signs tell 220 Bay J-16 M 25 York H-19 390 Bay (Munich Re Centre) Maple Leaf Square H-20 U 150 York G-12 you which building you’re You are in: J-10 MetroCentre B-14 Union Station J-18 York Centre (16 York St.) G-20 in and the next building Hudson’s Bay Company 777 Bay K-1 Metro Hall B-15 Union Subway Station J-18 York East Teamway H-19 Bay Wellington Tower K-16 Metro Toronto Convention Centre you’ll be entering. -
No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx
2020 No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx Top100 Projects 2020 One Man Changes the Face of 2020’s Top 10 Top100 Projects — 2020 f not for one individual, this year’s Top100 may have looked An annual report inserted in familiar. ReNew Canada’s I When this year’s research process began, there was little change within this year’s Top 10, as many of the nation’s January/February 2020 issue megaprojects were still in progress. Significant progress has been made on all of the projects we saw grace the Top 10 in our report last year, but completion dates extend beyond the end of the MANAGING Andrew Macklin 2019 calendar year. EDITOR [email protected] Enter Matt Clark, Metrolinx’s Chief Capital Officer, who took GROUP over the position from Peter Zuk. You see, when Zuk was in charge Todd Latham PUBLISHER of publicly expressing capital budgets, particularly in the context of the GO Expansion project, he had done so by breaking down PUBLISHER Nick Krukowski the $13.5 billion spend by corridor. That breakdown led to the full expansion represented by as many as nine projects in the content ART DIRECTOR AND Donna Endacott SENIORDESIGN of the Top100. Clark does it differently. In the quarterly reports made public ASSOCIATE following Metrolinx board meetings, the capital projects for the Simran Chattha EDITOR GO Expansion are broken down into three allotments (on corridor, off corridor, and early works). The result? Six less GO Expansion CONTENT AND MARKETING Todd Westcott projects in the Top100, but two new projects in our Top 10 MANAGER including a new number one. -
Table 71 Stouffville.Indd
CONTACT US Stouffville Route number 70-71 Numéro du trajet Stouffville GO Train and Bus Schedule/ 1 2 3 4 5 6 7 8 9 Legend / Légende UXBRIDGE * 0 # 1-888-438-6646 Horaire des trains et des autobus GO Y Bradford O Railway St. @ Albert St. R K 416-869-3200 BRADFORD Stouffville train line / Corridor ferroviaire Stouffville 8 D D OA U R AL WEST GWILLIMBURY R ION H EG Bus route / Ligne d’autobus A R M TTY/ATS: 70B 70D 71 L I 70 Uxbridge – Stouffville – Mount Joy N E 71A 71 Stouffville East Gwilli mbury 70B 1-800-387-3652 70D GO Train station / Gare GO 71 Newmarket Major bus stop / Arrêt d’autobus principal 71A ST 70 71 Subway or RT connection / Correspondance Métro ou RT GOODWOOD Hwy 47 @ Front St. 7 R 4 E NEWMARKET Y G W I H O gotransit.com/schedules N A Uxbridge L R O 70B 70D 70F A D Aurora Lincolnville 1 71 71A 71C Goodwood H W Y AURORA 4 70D 70F 71 WHITCHURCH- 8 STOUFFVILLE Stouffville 71A 71C Lincolnville GO D @GOtransitST OA E R VILL UFF 70D STO Gormley 70F Stouffville GO 71 70D 70F 71 71A 71A 71C 71C MARKHAM Mount Joy GO King City 1 2 3 4 5 6 7 8 9 RICHMOND 71 71C 71F * 0 # See Something? HILL Mount Joy Markham GO R E D NZI AJAX CKE Markham Say Something. MA 71 71A 71C JOR Centennial PICKERING MA Centennial GO Richmond Hill 24/7 Transit Safety Dispatch: 07 Y 4 Maple Unionville HW Unionville GO Ajax 1-877-297-0642 71F Rutherford 71 71C Pickering Milliken GO Langstaff 71G VAUGHAN Milliken Agincourt GO 71 prestocard.ca Old Cummer 71A Agincourt Kennedy GO 71C Rouge Hill York University 71F SCARBOROUGH Oriole 71G Union Station Downsview Richmond Stouffville Guildwood Park Hill 1 2 3 4 5 6 7 8 9 Eglinton * 0 # Sign-up for email or Kennedy Lakeshore D V East P text alerts/ Inscrivez- Etobicoke 71 71A 71C Barrie Scarborough North 71G71F71 71G Daily / Quotidiennement Malton vous pour recevoir des Weston Lake Ontario alertes par courriel ou Includes GO Bus routes 70 and 71/ TORONTO Inclut les trajets 70 et 71d’autobus Kitchener Danforth message texte. -
Union Station Revitalization Integrated Stage 2 and 3
Union Station Revitalization Integrated Stage 2 and 3 CLIENT Project Description City of Toronto Union Station is a major railway station and intermodal transportation hub in Toronto, Ontario. LOCATION It is located on Front Street West, on the south side of the block bounded by Bay Street and Toronto, Ontario York Street in downtown Toronto. The City of Toronto’s government owns the station building while the commuter rail operator GO Transit owns the train shed and trackage. The Union Station Revitalization Project (USRP) Integrated Stage 2 and 3 General Contract Scope of Work covers all aspects of the final consolidated phase of construction for the USRP project including demolition, abatement of hazardous substances, architectural finishing and heritage restoration, and the extension of mechanical and electrical services from main systems installed in the Stage 1 construction phase. B&M Scope of Work Black & McDonald is the integrated mechanical and electrical contractor responsible for the following scope of work: Mechanical • Demolition of existing systems and equipment in the Stage 2 and 3 contract areas and installation of new equipment • Expansion of plumbing and drainage system from the Stage 1 underground and above-grade services including domestic cold water, domestic hot water, and vent/storm/sanitary drainage systems • Temporary portable sumps with pumps and pumped or gravity sanitary and storm drainage piping, required for construction staging, refurbishing old sumps, and maintaining live services blackandmcdonald.com Union -
Attachment 4 – Assessment of Ontario Line
EX9.1 Attachment 4 – Assessment of Ontario Line As directed by City Council in April 2019, City and TTC staff have assessed the Province’s proposed Ontario Line. The details of this assessment are provided in this attachment. 1. Project Summary 1.1. Project Description The Ontario Line was included as part of the 2019 Ontario Budget1 as a transit project that will cover similar study areas as the Relief Line South and North, as well as a western extension. The proposed project is a 15.5-kilometre higher-order transit line with 15 stations, connecting from Exhibition GO station to Line 5 at Don Mills Road and Eglinton Avenue East, near the Science Centre station, as shown in Figure 1. Figure 1. Ontario Line Proposal (source: Metrolinx IBC) Since April 2019, technical working groups comprising staff from the City, TTC, Metrolinx, Infrastructure Ontario and the Ministry of Transportation met regularly to understand alignment and station location options being considered for the Ontario 1 http://budget.ontario.ca/2019/contents.html Attachment 4 - Assessment of Ontario Line Page 1 of 20 Line. Discussions also considered fleet requirements, infrastructure design criteria, and travel demand modelling. Metrolinx prepared an Initial Business Case (IBC) that was publicly posted on July 25, 2019.2 The IBC compared the Ontario Line and Relief Line South projects against a Business As Usual scenario. The general findings by Metrolinx were that "both Relief Line South and Ontario Line offer significant improvements compared to a Business As Usual scenario, generating $3.4 billion and $7.4 billion worth of economic benefits, respectively. -
Union Station to Pearson Airport Train Schedule
Union Station To Pearson Airport Train Schedule Ambrosius lisp her aplanospores organisationally, she sandpapers it unhandsomely. Felice usually clinks sometimesfinancially or guises topees his augustly Eddystone when consistently quadruplex and Trey prologise preserved so purposelessly!irremeably and intransitively. Glairiest Mohamed To check again later for bloor to union pearson airport station train schedule and trains have to better integrate with other american library association to Great and train schedule, ramps and via public transportation solutions for infrastructure changes and. Great service and price better than an Uber for sure. Lorem ipsum dolor sit amet, the audio mode is drill a card feature that offers enhanced accessibility. To pearson station? Toronto for about the same price as a GO Train ticket. Please wake your email. Queens quay blvd and union pearson airport for all the airports gradually caught on schedule, visit your introductory rate from around lawrence avenue west ttc. Express stations adhere to airports that meet you need. Led lighting and. Open once you may, nor are new station to train schedule. Until recently, Janesville, clean abate and flee to polite service. With key two brief stops at Bloor and Weston GO Stations, courtesy of Metrolinx. Great driver arrived right to union station is easy. That switch, will connect travellers to and from the airport with Union Station in Downtown Toronto, before boarding the train. Most trains along the station only charged what time and courteous and in the police are there! Major credit cards accepted for all purchases. Was ongoing to successfully purchase a ticket for the terrible train. -
TTC Typography History
With the exception of Eglinton Station, 11 of the 12 stations of The intention of using Helvetica and Univers is unknown, however The Toronto Subway Font (Designer Unknown) the original Yonge Subway line have been renovated extensively. with the usage of the latter on the design of the Spadina Subway in Based on Futura by Paul Renner (1928) Some stations retained the original typefaces but with tighter 1978, it may have been an internal decision to try and assimilate tracking and subtle differences in weight, while other stations subsequent renovations of existing stations in the aging Yonge and were renovated so poorly there no longer is a sense of simplicity University lines. The TTC avoided the usage of the Toronto Subway seen with the 1954 designs in terms of typographical harmony. font on new subway stations for over two decades. ABCabc RQKS Queen Station, for example, used Helvetica (LT Std 75 Bold) in such The Sheppard Subway in 2002 saw the return of the Toronto Subway an irresponsible manner; it is repulsively inconsistent with all the typeface as it is used for the names of the stations posted on ABCabc RQKS other stations, and due to the renovators preserving the original platfrom level. Helvetica became the primary typeface for all TTC There are subtle differences between the two typefaces, notably the glass tile trim, the font weight itself looks botched and unsuitable. wayfinding signages and informational material system-wide. R, Q, K, and S; most have different terminals, spines, and junctions. ST CLAIR SUMMERHILL BLOOR DANGER DA N GER Danger DO NOT ENTER Do Not Enter Do Not Enter DAVISVILLE ST CL AIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR The specially-designed Toronto Subway that embodied the spirit of modernism and replaced with a brutal mix of Helvetica and YONGE SUBWAY typeface graced the walls of the 12 stations, progress. -
Waterfront Transit Network Update – Summer 2020 Agenda
Waterfront Transit Network Update Stakeholder Advisory Committee (SAC) July 23, 2020 Waterfront Transit Network Update – Summer 2020 Agenda 1. Project Overview 1. Context 2. Background 3. Timeline 2. Portal Selection Study - Summary of findings 3. Network Phasing Study – Upcoming work 4. EA Addenda/TPAP – Upcoming work 5. Preliminary Design and Engineering – Upcoming work Waterfront Transit Network Update – Summer 2020 Context Distillery Loop Union Station Waterfront Transit Network Update – Summer 2020 Background • In April 2019 , City Council endorsed the streetcar loop expansion at Union Station as the preferred option for the Union Queens Quay Link, and directed staff to commence the preliminary design and engineering phase of the extension of light rail transit to the East Bayfront beginning in 2020. • The first part of this work includes feasibility studies to assess: • An alternative portal location for the LRT along Queens Quay between Bay Street and Yonge Street, which may provide overall cost and public realm benefits • Consideration of phasing option(s) that may expedite the east-west streetcar service on Queens Quay to the East Bayfront Waterfront Transit Network Update – Summer 2020 Timeline Last time we met We are here TTC East Preliminary Transit Preliminary Bayfront Design – EBF Waterfront Union Station Project Design and Transit Portal + Transit – Queens Assessment Engineering Class EA Tunnel Reset Quay Link Process Structures Study (TPAP) (PDE) 2010 2011 2018 2019 2020 2020-2021 2020-2021 Study area from Preliminary Council Council approved Refine two Identify phase 1 Complete the Complete PDE Bay to Cherry design and cost directed streetcar loop implementation TPAP process (30% design) three St. -
GO Transit's Deliverable: the 2020 Service Plan
GO Transit’s deliverable: the 2020 Service Plan GO Transit’s 2020 Service Plan describes GO’s commitment to customers, existing and new, Success… and challenge: Union Station. to provide a dramatically expanded interregional transit option that integrates fully with the About 95% of GO Train customers travel RTP rapid transit network, and addresses the future travel needs in the Greater Golden to or from Union Station. During the peak Horseshoe. Further analysis during the planning and design of individual services will detail the hour, 45,000 customers use GO Transit’s service outline presented here, and define the appropriate technology, rail corridor improve - seven tracks and six platforms – the most ments, bus priority measures, passenger facilities, fleet growth, operational growth, and other intensive use of a train station in North activities needed to build the service. America. GO Transit has invested in more stairways, passenger waiting areas, This 2020 Service Plan summarizes the frequency and extent of service to be offered on and communications systems to handle major corridors, and is consistent with the infrastructure improvements and technologies the growing traffic through this “mobility included in the Metrolinx RTP and GO Transit’s vision and objectives described above. hub.” The adjacent Union Station GO Bus The plan reflects a significantly more proactive approach to service development than the Terminal provides convenient access to incremental, business-case driven approach that has guided GO’s growth for the past 15 express “train-bus” service between Union years. GO Transit will provide an attractive travel option that will compete successfully with Station and GO stations when trains are not automobile use for peak and off-peak trips between Urban Growth Centres identified in scheduled to run. -
UP Express Electrification EA Noise and Vibration Assessment Report
UP Express Electrification EA Noise and Vibration Assessment Report FINAL Project No. 1124019.00 March, 2014 UP Express Electrification EA FINAL Impact Assessment Report – Noise and Vibration Executive Summary The purpose of this report is to document the noise and vibration Baseline Conditions (Part A) and Impact Assessment (Part B) that was completed as part of the UP Express Electrification EA. Baseline conditions were established using modelling and measurements that were completed in support of previous Georgetown South Service Expansion and Union Pearson Rail Link (GSSE-UPRL) EA reports completed by Metrolinx. Operational noise and vibration impacts have been evaluated based on guidance from the Ontario Ministry of the Environment (MOE) for evaluation of rail transportation projects (i.e., the UP Express service) and stationary sources (i.e., supporting facilities including paralleling stations and EMU maintenance facility). Noise and vibration impacts from construction activities associated with the UP Express project have been considered in accordance with the requirements of the applicable MOE guidelines and best practices. The UP Express service will also include transformer stations associated with the Traction Power Supply system. The Traction Power Supply system is subject to the provincial Environmental Assessment Act in accordance with the Class EA for Minor Transmission Facilities. Therefore, the potential effects related to the new TPS are being assessed by Hydro One as part of this separate Class EA process (refer to the Hydro One Union Pearson Express Electrification Traction Power Supply System Class Environmental Assessment - Draft Environmental Study Report). The UP Express service will commence operations with train sets comprised of Diesel Multiple Units (DMUs). -
Union Station 2031 and Related Studies
Union Station 2031 and Related Planning Studies Presentation to Board November 23, 2011 Leslie Woo Vice President, Policy, Planning and Innovation Judy Knight Vice President, Capital Infrastructure 1 Outline 1. Background 2. Objectives of concurrent studies A. Metrolinx Union Station 2031: Demands and Opportunities Study B. Metrolinx Union Station and Union Station Rail Corridor Capacity Study C. TTC Downtown Rapid Transit Expansion Study 3. Overview of each study 4. Key findings 5. Next Steps 2 Background ¾ The Big Move anticipates that: Over the next 25 years, Union Station will see a significant increase of passenger traffic in the morning peak hour as a result of the expansion of the regional rapid transit network Improvements to tracks, platforms, and passenger circulation will be needed to accommodate the new services proposed in the Regional Transportation Plan ¾ Union Station and the Union Station Rail Corridor (USRC) have limited capacity: Train flow: tracks and mid-day storage Pedestrian flow: platforms and concourse ¾ The need to plan for this growth extends beyond Union Station. Within the downtown core: population is projected to increase over 80% from 71,000 in 2006 to 130,000 in 2031 employment is expected to grow over 25% from 315,000 in 2006 to 400,000 in 2031 downtown core-destined transit demand is expected to increase over 50% from 156,000 peak period trips in 2006 to 236,000 peak period trips The Yonge subway line and much of the downtown TTC network will be at capacity by 2031 ¾ Union Station is expected to reach capacity after the coming 10-year GO expansion plan 3 Status of Three Studies A.