Large-Radius Aluminum Cable Tray Systems Mount Flawlessly with No Extra Cutting, Set-Up Oror Surplussurplus Material

Total Page:16

File Type:pdf, Size:1020Kb

Large-Radius Aluminum Cable Tray Systems Mount Flawlessly with No Extra Cutting, Set-Up Oror Surplussurplus Material Options Large-Radius AluminumAluminum CableCable Tray Tray • No mitered joints ble • No mitered joints Ca Cable Tray • No bent splice plate ® ® • Less costly T&B T&B • Easier to install — • Faster to install New Method Tray • Fewer skills required to install 1 • ble • Cleaner lines Ca • More resistant support structure & • More resistant support structure • ImprovedImproved functionality andand aesthetics ing The custom-built cable support system makes l Fram this cablecable traytray designdesign ideal for petrochemicalpetrochemical Old Method ta tanks and towers as well asas otherother applicationsapplications Me Metal Framing & Cable Tray — requiring a wider radius. Thomas & Betts takes pride in manufacturing a complete system to meet your most rigorous requirements. Our cable support systems reduce Rung Spacing the costlycostly and labor-intensivelabor-intensive modifications required to assemble straight sections, splice plates and accessories thatthat fit in your tank or Clearance vessel. Distance Thomas & Betts Large-Radius Aluminum Cable Tray systems mount flawlessly with no extra cutting, set-up oror surplussurplus material. With the option of pre-assembly of this cable tray system Standard Length prior to erection of the tanktank oror vessel,vessel, you can (External Side Rail) drastically reduce installing time. 3m (118 in.) Vessel or Catwalk Radius Segment Arc Length Measured on Tank Tray Data Required for Quotation Radius Height of the CableCable Tray in.in. Width of the Cable Tray in.in. Rung Spacing Required in.in. Load Rating and Support Span lb./ft.lb./ft. (kg/m)(kg/m) Radius of Tank or VesselVessel in.in. Clearance Distance in.in. Segment Arc Length (measured on structure) in.in. Quantity Required (number of segments) Total Arc Length (= segment arc length x quantity) in.in. TrayTray WiWidth United States Technical Services www.tnb.comwww.tnb.com ThomaseBeits Tel: 901.252.8000901.252.8000 Tel: 888.862.3289888.862.3289 B-380 800.816.7809 Fax: 901.252.1354 T&B® Cable Tray Options Metal Framing & Cable Tray — M Aluminum Mid-Span Splice Plate et al F • Factory pre-drilled side rails for easy installation r • Allows random splice location ami n • Tested loadingloading 160160 lb./ft.,lb./ft., based on aa 20-ft.20-ft. simple beam test g & with 1.5 safetysafety factorfactor (tested(tested with AH66AH66 series) C • Supplied with stainless steel type 316 hardware abl • Great forfor ladder, vented or solid tray style e T r • Only availableavailable forfor thethe following series of aluminum trays: a AH46, AH56, AH66 and AH76* y — T * 20-ft20-ft. support support span span onty.only. T&B &B® ® C Cable Tray abl 3 3 e T W-16⁄8"-16 x 3⁄/4" SS316 Carriage Bolt r and SS304 Keps Nut a y Typical Installation of Mid-Span SpliceSplice Plate Mid-Span Splice Plate Cable Tray These heavy-duty splice plates are designed to allow random splice location, including the midspan for 20-ft. supportsupport spans.spans. TheseThese splicessplices are available for all long-span ladder, vented or solid tray styles. Note: Also available on fittings to complete the system if required. Please consult the factory for more information. Reinforcing Plate 3 %"-16x⁄8"-16 x 1" SS316 Carriage Bolt and SS304 Keps Nut AMS 44 -- 66 -- 2424 -- L09L09 - 6 Material Style Series Side Rail Depth Width Bottom Type Length AMS = Mid-Span Splice 4 = Series 4 6" 06 = 6" L06 = 6" RungRung Spacing 6 = 6m 5 = Series 5 09 = 9" L09 = 9" RungRung Spacing 288 = 24 ft. 6 = Series 6 12 = 12" L12 = 12" RungRung SpacingSpacing 7 = Series 7 18 = 18" V = Ventilated 24 = 24" S = Soilid Trough To order straight sections with Mid-Span SpliceSplice Plate, 30 = 30" replace “AH”"AH" in the standard part number with “AMS”."AMS". 36 = 36" Example: AH6624L12-6AH 6624L12-6 AMS6624L12-6AMS6624L12-6 United States Technical Services www.tnb.comwww.tnb.com Tel: 901.252.8000901.252.8000 Tel: 888.862.3289888.862.3289 ThomasaBeits 800.816.7809 B-381 Fax: 901.252.1354 Options Long-Span Systems Systems — 30-ft. 30-ft. Straight Straight Tray Sections, Series Series 7–6, 7-6, 4–7, 4-7, 1–81-8 ble Ca Cable Tray ® ® Wowo WiIW T&B T&B — W Tray ble Ca & ing AH7-6 AH4-7 AH1-8 W (IN.) WI (IN.) WO (IN.) WI (IN.) WO (IN.) WI (IN.) WO (IN.) 6 4.92 8.92 4.62 8.62 4.55 10.55 l Fram 9 7.92 11.92 7.62 11.62 7.55 13.55 ta 12 10.92 14.92 10.62 14.62 10.55 16.55 Me Metal Framing & Cable Tray — 18 16.92 20.92 16.62 20.62 16.55 22.55 24 22.92 26.92 22.62 26.62 22.55 28.55 30 28.92 32.92 28.62 32.62 28.55 34.55 36 34.92 38.92 34.62 38.62 34.55 40.55 A H 7 - 66 -- 2424 -- L09L09 -- 360360 T T Material Style Series/Side Rail Depth Width Bottom Type Length H = H-Beam 76 = 6" 06 = 6"* L06 = 6" Rung Spacing 360 = 30 ft. 47 = 7" 09 = 9" L09 = 9" Rung Spacing 18 = 8" 12=12 = 12" 112L12 = 12" RungRung Spacing 18 = 18" V = VentilatedVentilated * 6"6" width not available in the A1118AH18 series.series. 24 = 24" S = SolidSolid TroughTrough 30 = 30" 36 = 36" Support Span .................................... Specifications .................................... FEETFEET • NEMA -All:— All: Exceed Exceed 20C20C SERIESSERIES 18 20 22 24 26 28 30 • UL Cross Cross Sectional Sectional Area Area — -All: All: 2.00 in.2 Load (lb./ft.) 228 185 153 128 109 94 82 • Side Rail DesignDesign Factors,Factors, 11 PairPair —- AH7-6: AH7-6: lx: Ix: 21.9621.96 in.'s; in.4; Sx: 6.38 in.3; Area: AH7-6 Deflection (in.) 2.457 3.033 3.670 4.367 5.125 5.944 6.824 3.82 in.2; AH4-7: Ix:lx: 36.8536.85 in.4; Sx: 9.089.08 in.3; Area: 4.654.65 in.2; AH1-8: Ix:lx: 58.3658.36 Deflection Factor .011 .016 .024 .034 .047 .063 .083 in.4; Sx: 13.37 in.3; Area: 5.865.86 in.2 Load (lb./ft.) 292 236 195 164 140 121 105 • Deflection — - Based Based on on 36"-wide 36"-wide cablecable traystrays withwith trays supported as simple AH4-7 Deflection (in.) 1.869 2.308 2.793 3.324 3.901 4.524 5.193 spans andand deflectiondeflection measured atat thethe midpoint;midpoint; continuous spans may reduce Deflection Factor .006 .010 .014 .020 .028 .038 .049 deflection byby asas muchmuch asas 50% Load (lb./ft.) 522 423 350 294 250 216 188 • Deflection atat Any Length Length — - For For lighter lighter loads, loads, multiply multiply LoadLoad xx DeflectionDeflection Factor AH1-8 Deflection (in.) 2.113 2.609 3.157 3.757 4.409 5.114 5.871 Deflection Factor .004 .006 .009 .013 .018 .024 .031 United StatesStates Technical Services www.tnb.comwww.tnb.com ThomaseBeits Tel: 901.252.8000 Tel: 888.862.3289 B-382 800.816.7809 Fax: 901.252.1354901.252.1354 T&B® Cable Tray OptionOptions Metal Framing & Cable Tray — M Peaked CoverCover ComponentsComponents — et Horizontal Bends/VerticalBendsNertical InsideInside BendsBends al F r ami n g & C abl e T r a y — T T&B &B® ® C Horizontal Bend Cable Tray abl e T r a A UWUW- -1212 - PFC -- HB -- 9090 -- 24 y T Material Fitting Style Width Cover Type Fitting Type Degree NominalNominal A = Aluminum U = U-Beam 06 = 6" PFC = Peaked Flanged HB = Horizontal Bend 30 Radius H = H-BeamH-Beam 09 = 9" Cover VIVI = Vertical Inside Bend 45 12 = 12" 12 = 12" PVC = Peaked Vented 60 24 = 24" Flanged Cover 18 = 18" 90 36 = 36" 24 = 24" 48 = 48" 30 = 30" 36 = 36" SHW -- 2424 -- PFC -- HB -- 9090 -- 24 MateriaMaterial* * Width Cover Type FiningFitting Type Degree NominalNominal SHW = Hot-Dip 06 = 6" PFC = Peaked Flanged HB = Horizontal Bend 30 Radius Galvanized 09 = 9" Cover VIVI = Vertical Inside Bend 45 12 = 12" SSW = Stainless 12 = 12" PVC = Peaked Vented 60 24 = 24" Steel 316 18 = 18" Flanged Cover 90 36 = 36" 24 = 24" 48 = 48" 30 = 30" * Pre-GalvanizedPre-Galvanized not available. 36 = 36" United States Technical Services www.tnb.comwww.tnb.com Tel: 901.252.8000901.252.8000 Tel: 888.862.3289888.862.3289 ThomasaBeits 800.816.7809 B-383 Fax: 901.252.1354 Options PeakedPeaked CoverCover ComponentsComponents — Tray VerticalVertical OutsideOutside BendsBends ble Ca Cable Tray ® ® T&B T&B — Tray ble Ca & ing l Fram ta A UW -_4 - 12 - PFCPFC -- VOVO- -90 90- -2424 T uw Me Metal Framing & Cable Tray — T r Material Style Side Rail Height Width Cover Type Fitting Type Degree Nominal Radius A = Aluminum U = U-Beam 4 = 4" 06 = 6" PFC = Peaked VO = Vertical 30 12=12 = 12" H = H-Beam Flanged Cover Outside Bend 5 = 5" 09 = 9" 45 24 = 24" PVC = Peaked Vented 6 = 6" 12 = 12" Flanged Cover 60 36 = 36" 7 = 7" 18 = 18" 90 48 = 48"48" 24 = 24" 30 = 30" 36 = 36" SSW -- 66 -- 2424 -- PFCPFC - VO -- 9090 -- 24 Material* Side RaRail I Height Width Cover Type FiningFitting Type Degree Nominal Radius SHW = Hot-Dipped GalvanizedGalvanized 4 = 4" 06 = 6" PFC = Peaked Flanged Cover VO = Vertical 30 12=12 = 12" SSW = Stainless Steel 316 Outside 5 = 5" 09 = 9" PVC = Peaked Vented Flanged Cover Bend 45 24 = 24" 6 = 6" 12 = 12" 60 36 = 36" 7 = 7" 18 = 18" 90 48 = 48" 24 = 24" 30 = 30" 36 = 36" ** Pre-GalvanizedPre-Galvanized not available. United States Technical Services ThomaseBeits Tel: 901.252.8000901.252.8000 Tel: 888.862.3289888.862.3289 www.tnwww.tnb.com b.co m B-384 800.816.7809 Fax: 901.252.1354 T&B® Cable Tray Options Metal Framing & Cable Tray — M Peaked CoverCover ComponentsComponents — et Horizontal TeesTees al F r ami n g & C abl e T r a y — T T&B &B® ® C Cable Tray abl e T r A UW -- 12 - PFC - HT - 24 a T y Material Style Width Cover Type FiningFitting Type Nominal Radius A = Aluminum U = U-Beam 06 = 6" PFC = Peaked Flanged Cover HT = Horizontal Tee 12=12 = 12" H = H-Beam 09 = 9" PVC = Peaked Vented Flanged Cover 24 = 24" 12 = 12" 36 = 36" 18 = 18" 48 = 48" 24 = 24" 30 = 30" 36 = 36" SHW -- 2424 - PFCPFC - HT -- 2424 Material* Width Cover Type Fitting Type Nominal Radius SHW = Hot-Dipped GalvanizedGalvanized 06 = 6" PFC = Peaked Flanged Cover HT = Horizontal Tee 12=12 = 12" = Stainless Steel 316 SSW = Stainless Steel 316 09 = 9" PVC = Peaked Vented Flanged Cover 24 = 24" 12 = 12" 36 = 36" 18 = 18" 48 = 48" 24 = 24" 30 = 30" 36 = 36" * Pre-Galvanized not available.
Recommended publications
  • Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5
    r------------------------------------------- 1 I p M J B I R N L K H G F E D c A I I I I I Af'Jq AF20 AF54 AF72 32 AF52 AF18 I L-q L-10 L-15 D-6 -11 E-10 D-8 l I AF03 Af't;qAH44 AH60 AH63 AG70 AH65 AH7l AH47 AFS4 AF08 I N-ll H-3 FEED FEED FEED H-14 FEED FEED FEED M-12 C-11 2 I AF67 AH4q AH04 AG27 AG2<i' AG21 AG16 AG42 AF71 AF07 AF01 AG36 AH!5!5 3 I E-3 M-6 FEED M-3 FEED P-1 J-14 B-11 FEED D-3 FEED F-4 L-3 I AF67 AH5S AG56 Atflq AGsq AH2<1' AG48 AH30 AG68 AH08 AG60 AH30 AF55 I D-12 FEED F-2 FEED N-11 FEED F-14 FEED C-11 FEED B-11 FEED C-8 4 I AF12 AH57 AG43 AH38 AHtiJq AG12 AH24 AGfR AH25 AGil AG31 AH45 AF21 AGlM AH21 5 I H~4 FEED N-4 FEED H-7 FEED K~q FEED F-q FEED G-8 FEED C-4 FEED J-15 I AF50 AH72 AH22 AGS6 AH15 AGll.lAG64 AG41 AG52 AG88 AH18 AG65 AHIJ2 AH5q AF51 I F-5 FEED FEED F-3 FEED M-5 r+q G-14 o-q E-4 FEED K-3 FEED FEED K-5 6 I f:Fl7 AH73 AG24 AH28 AG82 AG71 AH14 AG18 AHil AG46 AG17 AH35 AG22 AH61 AF26 7 I E-8 FEED E-2 FEED G-6 G-4 FEED E-12 FEED J-4 J-6 FEED L-2 FEED E-5 I Af&q I qeo AF65 AG45 AtM0 AG57 AH33 AG32 AG16 AH01 AGI6 AG3<1' AH27 AG51 AG44 AG55 K-4 B-8 e-q B-6 FEED B-7 P-5 FEEC M-11 P-q FEED P-11 P-7 P-8 F-12 8 I AF47 AH68 AF23 AH41 AF1!5 AG62 AH26 AG03 AH23 AH32 AG28 AHsq AF3<1' q I L-U FEED E-14 FEED G-10 G-12 FEED L-4 FEED FEED L-14 FEED L-8 I ~~ AF66 AH66 AH10 AG67 AH37 AGJq AG68 AG3l AG63 AG05 AH08 AG5q AH17 AH67 AF41 I F-11 FEED FEED F-13 FEED L-12 M-7 J-2 D-7 D-11 FEED K-13 FEED FEED K-11 10 I AE33 AH!52 AG37 AH31 AG14 AH20 AF20 AH34 AG13 AH36 AG07 AH40 AG38 AH!53 AF27 I G-ll FEED N-12 FEED J-8 FEED K-7 FEED
    [Show full text]
  • Office of Personnel Management (Opm)
    Friday April 25, 1997 Part XXXVI Office of Personnel Management Semiannual Regulatory Agenda federal register 22499 VerDate 14-MAR-97 10:08 Apr 25, 1997 Jkt 173997 PO 00000 Frm 00001 Fmt 4717 Sfmt 4717 E:\FR\FM\ADV88.034 25ap34 22500 Federal Register / Vol. 62, No. 80 / Friday, April 25, 1997 / Unified Agenda OFFICE OF PERSONNEL MANAGEMENT (OPM) OPM OFFICE OF PERSONNEL SUMMARY: The following Office of binding obligation on the Office of MANAGEMENT Personnel Management (OPM) Personnel Management with regard to regulations are scheduled for any specific item on the agenda. 5 CFR Ch. I development or review from April 1, Additional regulatory action is not 1997, through March 31, 1998. This precluded. agenda carries out OPM's Semiannual Regulatory Agenda responsibilities to publish a semiannual FOR FURTHER INFORMATION CONTACT: AGENCY: Office of Personnel agenda under E.O. 12866 ``Regulatory Jacquline D. Carter, (202) 606-1973. Management. Planning and Review'' and the Regulatory Flexibility Act (5 U.S.C. Office of Personnel Management. ACTION: Semiannual regulatory agenda. chapter 6). This publication in the James B. King, Federal Register does not impose a Director. Prerule Stage Sequence Regulation Title Identifier Number Number 3646 Availability of Official Information ................................................................................................................................... 3206-AG92 Proposed Rule Stage Regulation Sequence Title Identifier Number Number 3647 Appointment of Noncitizens in the Excepted Service ...................................................................................................
    [Show full text]
  • T&B Cable Tray
    T&B Cable Tray Metallic – Aluminum Table of Contents Metallic – Aluminum ................................................. A33 –A110 Overview ........................................................................................A35 Straight Lengths .................................................................... A36–A49 Fittings .................................................................................. A50–A87 Explaining the Fitting Styles ................................................... A50–A51 Horizontal Fittings Selection Guide ......................................... A53–A55 Vertical Fittings Selection Guide ............................................. A56–A59 U-Style Fittings – Horizontal Bends 90º / 60º..................................A60 H-Style Fittings – Horizontal Bends 90º / 60º .................................A61 U-Style Fittings – Horizontal Bends 45º / 30º ..................................A62 H-Style Fittings – Horizontal Bends 45º / 30º ..................................A63 U-Style Fittings – Horizontal Tee, Cross ..........................................A64 H-Style Fittings – Horizontal Tee, Cross ..........................................A65 U-Style Fittings – Horizontal Reducing Tee .....................................A66 H-Style Fittings – Horizontal Reducing Tee .....................................A67 U-Style Fittings – Horizontal Expanding Tee ....................................A68 H-Style Fittings – Horizontal Expanding Tee ....................................A69 U-Style Fittings – Horizontal
    [Show full text]
  • 1St IRF Asia Regional Congress & Exhibition
    1st IRF Asia Regional Congress & Exhibition Bali, Indonesia November 17–19 , 2014 For Professionals. By Professionals. "Building the Trans-Asia Highway" Bali’s Mandara toll road Executive Summary International Road Federation Better Roads. Better World. 1 International Road Federation | Washington, D.C. ogether with the Ministry of Public Works Indonesia, we chose the theme “Building the Trans-Asia Highway” to bring new emphasis to a visionary project Tthat traces its roots back to 1959. This Congress brought the region’s stakeholders together to identify new and innovative resources to bridge the current financing gap, while also sharing case studies, best practices and new technologies that can all contribute to making the Trans-Asia Highway a reality. This Congress was a direct result of the IRF’s strategic vision to become the world’s leading industry knowledge platform to help countries everywhere progress towards safer, cleaner, more resilient and better connected transportation systems. The Congress was also a reflection of Indonesia’s rising global stature. Already the largest economy in Southeast Asia, Indonesia aims to be one of world’s leading economies, an achievement that will require the continued development of not just its own transportation network, but also that of its neighbors. Thank you for joining us in Bali for this landmark regional event. H.E. Eng. Abdullah A. Al-Mogbel IRF Chairman Minister of Transport, Kingdom of Saudi Arabia Indonesia Hosts the Region’s Premier Transportation Meeting Indonesia was the proud host to the 1st IRF Asia Regional Congress & Exhibition, a regional gathering of more than 700 transportation professionals from 52 countries — including Ministers, senior national and local government officials, academics, civil society organizations and industry leaders.
    [Show full text]
  • The World's Colonisation and Trade Routes Formation As Imitated By
    The World's Colonisation and Trade Routes Formation as Imitated by Slime Mould Andrew Adamatzky University of the West of England, Bristol, United Kingdom This is unedited preprint with low-resolution photographs. Final and edited version of this paper is published in Int. J. Bifurcation Chaos, 22, 1230028 (2012) [26 pages] DOI: 10.1142/S0218127412300285 Abstract The plasmodium of Physarum polycephalum is renowned for spanning sources of nutrients with networks of protoplasmic tubes. The networks transport nutrients and metabolites across the plas- modium's body. To imitate a hypothetical colonisation of the world and formation of major trans- portation routes we cut continents from agar plates arranged in Petri dishes or on the surface of a three-dimensional globe, represent positions of selected metropolitan areas with oat flakes and inoculate the plasmodium in one of the metropolitan areas. The plasmodium propagates towards the sources of nutrients, spans them with its network of protoplasmic tubes and even crosses bare substrate between the continents. From the laboratory experiments we derive weighted Physarum graphs, analyse their structure, compare them with the basic proximity graphs and generalised graphs derived from the Silk Road and the Asia Highway networks. Keywords: biological transport networks, unconventional computing, slime mould 1 Introduction Nature-inspired computing paradigms and experimental laboratory prototypes are demonstrated reason- able success in approximation of shortest, and often collision-free, paths between two given points in an arXiv:1209.3958v1 [nlin.AO] 18 Sep 2012 Euclidean space or a graph. Examples include ant-based optimisation of communication networks [15], approximation of a shortest path in experimental reaction-diffusion chemical systems [1], gas-discharge analog systems [35], spatially extended crystallisation systems [5], fungi mycelia networks [22], and maze solving by Physarum polycephalum [29].
    [Show full text]
  • Tectonic Interpretation of the Metamorphic Field Gradient South of the Koralpe in the Eastern Alps
    Austrian Journal of Earth Sciences Vienna 2018 Volume 111/2 155 - 170 DOI: 10.17738/ajes.2018.0010 Tectonic interpretation of the metamorphic field gradient south of the Koralpe in the Eastern Alps Alexandra HERG*) & Kurt STÜWE Institute of Earth Sciences, University of Graz, Universitätsplatz 2, A-8010, Graz, Austria; *) Corresponding author: Alexandra Herg, [email protected] KEYWORDS Pohorje; Koralpe; slab extraction; Plattengneis-Plankogel shear zone Abstract In order to constrain tectonic models for the nature of the Eoalpine high pressure belt at the eastern end of the Alps, we investigate the formation pressure of metamorphic rocks along a profile between the Koralpe and the well-known UHP rocks of the southern Pohorje mountains. Rocks from three different regions are considered: (i) the rocks of the southernmost Koralpe to the north, (ii) the rocks of the Plankogel Unit between the Plankogel detachment and the Drava valley and (iii) the rocks between the Possruck range and the southern Pohorje mountains. In the Koralpe, pelitic rocks record a formation pressure around 15 – 18 kbar, as reported in the literature. For the Plankogel Unit, we derive pres- sures between 7.1 ± 1.95 kbar and 11.5 ± 3.42 kbar at 650 °C and recognize only a single Eoalpine metamorphic event. For the high grade rocks of the Pohorje mountains, we derive peak metamorphic pressures (explored with the garnet- muscovite-kyanite-quartz assemblage) that rise from 16.2 ± 3.45 kbar (at 700°C) in the north, to 23.9 ± 2.49 kbar (at 700 °C) in the south. There, we also recognize a later lower pressure event that is derived from pressure calculations with the full equilibrium assemblage.
    [Show full text]
  • Auction 14A Final Draft.Vp
    OUR STAFF Stephen Album Paul Montz Director of Islamic & Early Indian Numismatics Director of World Coins Steve has been serving the Paul joined the staff in January numismatic community since 2011. He attended UC Davis 1960. In 1976 he began dealing from 1975-80, earning bachelor's nearly exclusively in Islamic and and master's degrees in Indian coins. He has authored Agricultural Science & several books including the Management and Agronomy, Catalogue of California Trade respectively. He began working Tokens, Volumes I & II in 1972 in the numismatic field in the and 1974 respectively. 1977 saw 1970's. In 1981, he founded the release of his complete rewrite of Marsden's Olde World Numismatics in Chico, CA, a business he Numismata Orientalia Illustrata, a guide to Islamic ran for 30 years, focusing on A-Z world coins, before and Oriental coins with values. In 1993 he published merging with Stephen Album Rare Coins. He has put A Checklist of Islamic Coins, which now in its second out price lists for many years and has been a fixture edition is the standard for collectors of Islamic coins. at major shows since the 1980's. Paul is a life Mr. Album is currently a senior fellow at the member of the American Numismatic Association Worcester College, Oxford, England, and in this and is a member of other organizations. He has been position has authored three of the ten volumes of the a contributing editor for the Standard Catalog of Sylloge of Islamic Coins in the Ashmolean (Museum) World Coins since 1998. Paul brings experience in beginning in 1999.
    [Show full text]
  • Growing Together Articulates a Number of Proposals That Can Help the Region Exploit Its Huge Untapped Potential for Regional Economic Integration
    i Photo by Warren Field ii FOREWORD For the global economy, these are difficult times. The world is emerging from a crisis whose aftershocks continue to resonate – trapping some of the richest economies in recession and shaking the foundations of one of the world’s major currencies. Here at ESCAP, there are historical echoes. What is now the Economic and Social Commission for Asia and the Pacific was founded more than 60 years ago – also in the aftermath of a global crisis. The countries of Asia and the Pacific established their new Commission partly to assist them in rebuilding their economies as they came out of the yoke of colonialism and the Second World War. The newly established ECAFE, as ESCAP was called then, held a ministerial conference on regional economic cooperation in 1963 that resolved to set up the Asian Development Bank with the aim of assisting the countries in the region in rebuilding their economies. Fifty years later, the Asia-Pacific region is again at a crossroads, on this occasion seeking ways and means to sustain its dynamism in a dramatically changed global context in the aftermath of a global financial and economic crisis. An important change is the fact that, burdened by huge debts and global imbalances, the advanced economies of the West are no longer able to play the role of engines of growth for the Asia-Pacific region that they played in the past. Hence, the Asia-Pacific region has to look for new engines of growth. The secretariat of ESCAP has argued over the past few years that regional developmental challenges, such as poverty and wide disparities in social and physical infrastructure, can be turned into opportunities for sustaining growth in the future.
    [Show full text]
  • 12. Schematic Diagram - This Document Can Not Be Used Without Samsung’S Authorization - 1
    12. Schematic Diagram - This Document can not be used without Samsung’s authorization - 1. VIDEO Samsung Electronics ESPEC12-1 2. MPEG - This Document can not be used without Samsung’s authorization - 12-2 ESPECSamsung Electronics 3. FRONT - This Document can not be used without Samsung’s authorization - Samsung Electronics ESPEC12-3 4. SMPS - This Document can not be used without Samsung’s authorization - 12-4 ESPECSamsung Electronics 5. MIC, ECHO - This Document can not be used without Samsung’s authorization - Samsung Electronics ESPEC12-5 6. SUB, SCART - This Document can not be used without Samsung’s authorization - 12-6 ESPECSamsung Electronics 1.Exploded Views and Parts List 1-1 Total Exploded View Samsung Electronics ESPEC1-1 * Parts List of Total Exploded view No. Code No. Description Specification Q’ty Remark 1 AH64-03184B DECO-STAND BY PMMA 1 2 AH64-03185B WINDOW-VFD PMMA 1 3 AH63-00875A FILTER-VFD PC 0.5T 1 4 AH64-03178B CABINET-FRONT PC/ABS 1 5 AH64-03181B DECO-SIDE R B ABS 1 6 AH64-03180B DECO-SIDE L B ABS 1 7 AH67-00201A LENS-POWER PMMA 1 8 AH64-03189B KNOB-POWER ABS 1 9 AH64-03188B KNOB-OPEN ABS 1 10 AH64-03186B KNOB-FUNCTION ABS 1 11 AH63-00892A SHEET-VFD PC 0.5T 1 12 AH61-01766A BRKT-JACK SECC 0.6T 1 13 AH64-03187B KNOB-MIC ABS 2 14 AH64-03190B CABINET-BOTTOM-REAER SECC 0.6T 1 15 AH64-03179B DOOR-CD ABS 1 16 AH61-01765A HOLDER-VFD ABS 1 17 AH63-00856A SHEET-PCB PC 0.5T 1 18 AH63-00876A SHEET-TOP PC 0.5T 1 19 AH64-03183B DECO-SIDE R UP ABS 1 20 AH64-03191A CABINET-TOP SECC 0.5T 1 21 AH64-03182B DECO-SIDE L UP ABS 1 A 6002-000126 TAPTITE SCREW FH + 3*10 B 6003-001327 TAPTITE SCREW RH + 2.6*12 C 6003-001479 TAPTITE SCREW BH + 1.7*4 D 6003-001561 TAPTITE SCREW BH + 3*6 E 6003-000275 TAPTITE SCREW BH + 3*10(BLK) 1-2 ESPECSamsung Electronics 1-2 DVD MECHA Exploded View and Parts list No.
    [Show full text]
  • Asian Highway Handbook
    ECONOMIC AND SOCIAL COMMISSION FOR ASIA AND THE PACIFIC ASIAN HIGHWAY HANDBOOK UNITED NATIONS New York, 2003 ST/ESCAP/2303 The Asian Highway Handbook was prepared under the direction of the Transport and Tourism Division of the United Nations Economic and Social Commission for Asia and the Pacific. The team of staff members of the Transport and Tourism Division who prepared the Handbook comprised: Fuyo Jenny Yamamoto, Tetsuo Miyairi, Madan B. Regmi, John R. Moon and Barry Cable. Inputs for the tourism- related parts were provided by an external consultant: Imtiaz Muqbil. The designations employed and the presentation of the material in this publication do not imply the expression of any opinion whatsoever on the part of the Secretariat of the United Nations concerning the legal status of any country, territory, city or area or of its authorities, or concerning the delimitation of its frontiers or boundaries. This publication has been issued without formal editing. CONTENTS I. INTRODUCTION TO THE ASIAN HIGHWAY………………. 1 1. Concept of the Asian Highway Network……………………………… 1 2. Identifying the Network………………………………………………. 2 3. Current status of the Asian Highway………………………………….. 3 4. Formalization of the Asian Highway Network……………………….. 7 5. Promotion of the Asian Highway……………………………………... 9 6. A Vision of the Future………………………………………………… 10 II. ASIAN HIGHWAY ROUTES IN MEMBER COUNTRIES…... 16 1. Afghanistan……………………………………………………………. 16 2. Armenia……………………………………………………………….. 19 3. Azerbaijan……………………………………………………………... 21 4. Bangladesh……………………………………………………………. 23 5. Bhutan…………………………………………………………………. 27 6. Cambodia……………………………………………………………… 29 7. China…………………………………………………………………... 32 8. Democratic People’s Republic of Korea……………………………… 36 9. Georgia………………………………………………………………... 38 10. India…………………………………………………………………… 41 11. Indonesia………………………………………………………………. 45 12. Islamic Republic of Iran………………………………………………. 49 13 Japan…………………………………………………………………..
    [Show full text]
  • ASIAN HIGHWAY ROUTE MAP 500 Km
    40° E 60° E 80° E 100° E 120° E 140° E 500 Km. Vyborg Torpynovka 60° N St. Petersburg ASIAN HIGHWAY ROUTE MAP 500 Km. 60° N RUSSIAN FEDERATION AH8 Yekaterinburg AH7 AH6 Moscow AH6 AH6 Krasnoyarsk AH6 Ufa Petuhovo AH6 Chelyabinsk E30 Chistoe Isilkul AH6 Omsk Novosibirsk E30 AH60 Krasnoe Petropavlovsk Karakuga E30 AH4 AH8 Troisk AH6 Samara Cherlak E119 Kaerak AH7 AH62 Pnirtyshskoe E30 Kostanai AH64 Barnaul AH30 E123 Kokshetau AH60 AH30 E125 AH63 E127 Tambov E121 Pavlodar AH64 Irkutsk Ulan-Ude Borysoglebsk Saratov Kurlin AH7 AH64 Chita Kursk AH61 Pogodaevo AH60 AH6 Ozinki AH64 (AH64) AH6 E38 Shiderty (AH67) AH3 AH61 Voronezh Ural'sk AH62 Astana E127 Veseloyarskyj AH4 AH6 Krupets Kamenka AH7 (AH67) Belogorsk E38 AH8 Zhaisan E123 Krasny Aul E119 E125 Kyahta AH61 Arkalyk AH67 Semipalatinsk Heihe AH63 Altanbulag Zabaykalsk Blagoveshchensk E38 Aktobe Karabutak Karaganda AH60 E121 Tashanta (AH67) Ulaanbaishint Darkhan Georgievka AH3 Manzhouli AH30 Volgograd AH61 AH4 AH6 Donetsk AH70 E38 AH67 Khabarovsk AH32 E40 E40 AH60 (AH67) Ulaanbaatar Nalayh AH8 AH7 Hovd AH32 Sumber Arshan E119 Zhezkazgan AH32 Qiqihar AH31 Tongjiang (AH70) Atyrau AH63 E125 Taskesken Choybalsan (AH70) KAZAKHSTAN Uliastay Kotyaevka AH70 E105 Numrug Port of Odessa E40 Aralsk Baketu Ondorhaan AH62 Bakhty AH35 AH33 Astrakhan E121 E123 AH67 Takeshkan Choir Ucharal AH3 AH32 E40 AH68 MONGOLIA Yarantai Harbin AH30 Beyneu E014 Dostyk Bichigt E119 Kyzylorda AH60 AH8 Burubaital Alatawshankou AH4 E40 AH35 Daut-ota Saynshand AH6 AH60 AH5 AH31 Pogranichny AH70 AH5 Port of Constantza 500
    [Show full text]
  • Auction Catalog
    Online Only Collectibles Auction Auction catalog Title Online Only Collectibles Auction Description Online Only Collectibles Auction 13% Buyer's Premium added to the final sale. 3% waived for cash or check purchase. Items must be paid for within 3 days of the end of Auction. Items will be available for pick up at our office after the auction. Pickup is available Tuesday - Friday, 9:30AM - 4:30PM. Items must be picked up within 10 days following the auction or they will become property of Joe R. Pyle Complete Auction & Realty Service. Shipping by arrangement. Date Mon, Jul 7, 2014 Starts at 6:00 PM Address 5546 Benedum Drive, Shinnston, WV 26431 USA Categories Lot # 1 Qty 1 Title Thimble Collection (84 Total) Des. Lot # 2 Qty 1 Title Rosal Co. Stainless Steel 1976 Bicentennial State Spoons with Holder Des. Lot # 3 Qty 1 Title (65) Collector Spoons with Holder Des. Lot # 4 Qty 1 Title 50 pcs. Gold Plated Flatware in Case Des. Lot # 5 Qty 1 Title (3) Cabbage Patch Kids Dolls (2) 2003 20th Anniversary Edition Des. Lot # 6 Qty 1 Title The International Collection of World Wildlife First Day Covers Des. Lot # 7 Qty 1 Title Statesman Deluxe Volume 1 ABU_DHABI-Guyana Volume 2 Haiti-Zululand Stamps Des. 1 Online Only Collectibles Auction Lot # 8 Qty 1 Title Postal Commemorative Society U.S. First Day Covers & Special Covers Des. Lot # 9 Qty 1 Title The Official History of the United States in Mint Stamps 3464/15,000 Des. Lot # 10 Qty 1 Title 1971, 1972, 1973, 1974, 1975, 1977 Souvenir Stamp Set Des.
    [Show full text]