Plate Ah Triumph Tr6 Stationary Engine Components Ah5 Ah83 Ah85 Ah84 Ah25 Ah7 Ah26 Ah17 Ah39 Ah75 Ah76 Ah77 Ah40 Ah41 Ah38 Ah78

Total Page:16

File Type:pdf, Size:1020Kb

Plate Ah Triumph Tr6 Stationary Engine Components Ah5 Ah83 Ah85 Ah84 Ah25 Ah7 Ah26 Ah17 Ah39 Ah75 Ah76 Ah77 Ah40 Ah41 Ah38 Ah78 9 PLATE AH TRIUMPH TR6 STATIONARY ENGINE COMPONENTS AH5 AH83 AH85 AH84 AH25 AH7 AH26 AH17 AH39 AH75 AH76 AH77 AH40 AH41 AH38 AH78 AH36 AH4 AH79 AH9 AH82 AH80 AH73 AH81 AH1 AH13 AH35 AH34 AH32 AH31 AH74 AH15 AH33 AH21 AH72 AH18 AH19 AH14 AH20 AH6 AH11 AH43 AH16 AH22 AH24 AH42 AH69 AH23 AH66 AH48 AH12 AH49 AH50 AH49 AH62 AH63AH65 AH64 AH50 AH8 AH47 AH10 AH46 AH55 AH3 AH56 AH28 AH2 AH68 AH44 AH45 AH27 AH57 AH29 AH53 AH54 AH52 AH67 AH51 AH30 AH61 AH71 AH70 AH58 AH60 AH59 STATIONARY ENGINE COMPONENTS Plate No. Part No. Description No. Off Plate No. Part No. Description No. Off AH1 517611 ENGINE BLOCK ASSEMBLY, fitted up to comm. no. 1 CYLINDER HEAD ATTACHMENT STUDS—Continued CC/CP75000 CYLINDER HEAD ATTACHMENT STUDS, U.S.A., fitted 520880 ENGINE BLOCK ASSEMBLY, fitted from comm. no. 1 from engine no. CC66569 up to CC75000 CC/CP75000 up to CF/CR1 157231 Stud, shorter 12 UKC902 ENGINE BLOCK ASSEMBLY, fitted after comm. no. CF/CR1 1 156274 Stud, longer 2 HARDWARE, securing bearing caps to engine block CYLINDER HEAD ATTACHMENT STUDS, U.S.A., fitted AH2 HB1024 Bolt 8 after engine no. CC75000 AH3 WL210 Washer, lock 8 157231 Stud, shorter 12 CORE PLUGS 156274 Stud, longer 2 AH4 148353 Plug, core, rear of camshaft 1 146200 Stud, cylinder head attachment, non-U.S.A. markets, 14 AH5 144686 Plug, core, rear face and L.H. side of engine block 3 after engine no. CC/CP66569 AH6 144687 Plug, core, front face of block 1 157231 Stud, cylinder head attachment, non-U.S.A. markets, 14 AH7 144688 Plug, core, front face and R.H. side engine block 5 after engine no. CC/CP66569 OIL GALLERY PLUGS CYLINDER LINERS, for restoring badly worn or damaged AH8 PS1103 Plug, core, oil gallery, front 1 cylinder bores; see shop manual for fitting instructions AH9 118632 Plug, dry seal, oil gallery, rear 1 before purchase AH10 118686 Plug, oil gallery 6 AH26 145021 Liner, cylinder, fitted up to comm. no. CF12500/CR5000 A/R AH11 PU1404 Plug, oil gallery 1 158942 Liner, cylinder, fitted after comm.no. CF12500/CR5000 A/R AH12 116511 Plug, oil gallery 1 FRONT SEALING BLOCK DETAILS MISCELLANEOUS FITTINGS AH27 151134 Block, sealing, front 1 AH13 149776 Bush, oil pump drive shaft 1 AH28 150022 Gasket, between sealing block and engine block 2 AH14 143943 Adaptor, oil pressure gauge pipe, carb models only 1 AH29 36234 Piece, filling 2 AH15 DP514 Dowel, timing cover attachment 2 AH30 100501 Screw, securing sealing block to engine block 2 AH16 DP612 Dowel, rear engine plate attachment 2 REAR OIL SEAL DETAILS STUDS, securing various components to engine block AH31 212622 Housing, oil seal, fitted earlier 1 AH17 101962 Stud, securing distributor pedestal to engine block 2 156530 Housing, oil seal, fitted later 1 AH18 128773 Stud, securing R.H. engine mounting bracket and air 2 AH32 143456 Seal, oil, crankshaft, rear 1 manifold stay to engine block, P.I. models only AH33 105321 Gasket, between oil seal housing and engine block 1 AH19 100433 Stud, securing fuel pump to engine block, carb 2 HARDWARE, securing oil seal assembly to engine block models, fitted earlier AH34 HB809 Bolt 7 101962 Stud, securing fuel pump to engine block, carb 2 AH35 WL208 Washer, lock 6 models, fitted later AH36 500469 Washer, copper, fitted under head of bolt to 1 FUEL PUMP BLANKING DETAILS, P.I. models prevent oil leakage AH20 147876 Plate, blanking fuel pump aperture 1 REAR ENGINE PLATE DETAILS AH21 138791 Gasket, between plate and engine block 1 AH38 211505 Rear Engine Plate 1 HARDWARE, securing plate and gasket to engine block HARDWARE, securing rear engine plate to engine AH22 100433 Stud 2 block AH23 WL208 Washer, lock 2 AH39 HU807 Screw, set 7 AH24 HN2008 Nut 2 AH40 WL208 Washer, lock 7 CYLINDER HEAD ATTACHMENT STUDS AH41 139836 Stud 3 CYLINDER HEAD ATTACHMENT STUDS, U.S.A., fitted up (Continued on next page.) to engine no. CC66569 AH25 146200 Stud, shorter 13 156274 Stud, longer 1.
Recommended publications
  • Mongolian Transport Policy on Operational Connectivity for Integrated Intermodal Transport and Logistics in the Region
    MONGOLIAN TRANSPORT POLICY ON OPERATIONAL CONNECTIVITY FOR INTEGRATED INTERMODAL TRANSPORT AND LOGISTICS IN THE REGION Forum on Sustainable transport connectivity between Europe and Asia in the framework of the 62 session of UNECE and Working party on Intermodal transport and Logistics 30 OCTOBER 2019, GENEVA, SWITZERLAND Ministry of Road and Transport Development of MongoliaMongolia Page 1 CONTENT General information Legal framework and Intergovernmental Agreements Operational practice along international corridors Facilitation measures for international railway transport Vision and challenges MinistryMinistry of of Road Road and and Transport Transport Development Development of of Mongolia Mongolia – Regional MeetingUNESCAP Page 2 Mongolia is one of largest landlocked countries in the world, with a territory extending over 1.5 million square kilometers. It is bordered by Peoples Republic of China on three sides, to the East, South and West and by Russian Federation to the North. The country is rich in a variety of mineral resources and has substantial livestock herds, ranking first in per capita ownership in the world. Mongolia is a sparsely populated country, with a population of around 3.2 million, with population density of 2 persons per square kilometers. However, more than 60 percent of the population live in urban area. The construction of new roads and the maintenance of existing ones are being given high priority of the Mongolian Government. As part of the Government of Mongolia’s 2016-2020 action plan road and transport sector’s objective is to expand and develop transport and logistics network that supports economic improvement, meet social needs and requirements and provides safe and comfortable service.
    [Show full text]
  • CHIS 2019 Adult CAWI Questionnaire (Self-Administered) Version 2.73 April 26, 2021 Adult Respondents Age 18 and Older
    CHIS 2019 Adult CAWI Questionnaire (Self-administered) Version 2.73 April 26, 2021 Adult Respondents Age 18 and Older Collaborating Agencies: • UCLA Center for Health Policy Research • California Department of Health Care Services • California Department of Public Health Contact: California Health Interview Survey UCLA Center for Health Policy Research 10960 Wilshire Blvd, Suite 1550 Los Angeles, CA 90024 Telephone: (866) 275-2447 Fax: (310) 794-2686 Web: www.chis.ucla.edu Copyright © 2019 by the Regents of the University of California CHIS 2019 Adult Questionnaire Version 2.73 April 26, 2021 Table of Contents Section A: Demographic Information, Part I ......................................................................................... 6 Age ......................................................................................................................................................... 6 Gender Identity ...................................................................................................................................... 7 Ethnicity ................................................................................................................................................. 8 Race ....................................................................................................................................................... 9 Language Spoken at Home ................................................................................................................. 13 Additional Language Use ....................................................................................................................
    [Show full text]
  • SAARC Countries I Ii Seminar Book
    Munich Personal RePEc Archive Future-of-Eco-Coop-in-SARRC- Countries Shah, Syed Akhter Hussain Pakistan Institute of Development Economics Islamabad 2014 Online at https://mpra.ub.uni-muenchen.de/59275/ MPRA Paper No. 59275, posted 30 Dec 2014 23:42 UTC Future of Economic Cooperation in SAARC Countries i ii Seminar Book Future of Economic Cooperation in SAARC Countries iii CONTENTS Acknowledgements Acronyms Introduction 1 Welcome Address 12 Ambassador (R) Sohail Amin Opening Remarks 15 Kristof W. Duwaerts Inaugural Address 18 Riaz Mohammad Khan Concluding Address 24 Dr. Ishrat Hussain Concluding Remarks 26 Kristof W. Duwaerts Vote of Thanks 27 Ambassador (R) Sohail Amin Recommendations 29 CHAPTER 1 Regional Trade — Driver for Economic Growth 37 Dr. Kamal Monnoo CHAPTER 2 Meeting Energy Requirement: Potential for Intra-regional Energy Trade 61 Dr. Janak Lal Karmacharya CHAPTER 3 Building Regional Transport and Communication Infrastructure 81 Ms. Arshi Saleem Hashmi iv Seminar Book CHAPTER 4 Developing Energy Corridor from Central and West Asia to South Asia 101 Prof. Savita Pande CHAPTER 5 The New Silk Road Initiative: Economic Dividends 119 Mr. Nabi Sroosh and Mr.Yosuf Sabir CHAPTER 6 China‟s Growing Economic Relations with South Asia 127 Dr. Liu Zongyi CHAPTER 7 Fast Tracking Economic Collaboration in SAARC Countries 146 Dr. Pervez Tahir CHAPTER 8 Towards an Asian Century: Future of Economic Cooperation in SAARC Countries: A View from FPCCI 159 Mr. Muhammad Ali CHAPTER 9 Economic Cooperation among SAARC Countries: Political Constraints 163 Dr. Rashid Ahmad Khan CHAPTER 10 Implications of Bilateral and Sub-regional Trade Agreements on Economic Cooperation: A Case Study of SAARC in South Asia 177 Dr.
    [Show full text]
  • Salem Generating Station, Units 1 & 2, Revision 29 to Updated Final Safety Analysis Report, Chapter 4, Figures 4.5-1 to 4.5
    r------------------------------------------- 1 I p M J B I R N L K H G F E D c A I I I I I Af'Jq AF20 AF54 AF72 32 AF52 AF18 I L-q L-10 L-15 D-6 -11 E-10 D-8 l I AF03 Af't;qAH44 AH60 AH63 AG70 AH65 AH7l AH47 AFS4 AF08 I N-ll H-3 FEED FEED FEED H-14 FEED FEED FEED M-12 C-11 2 I AF67 AH4q AH04 AG27 AG2<i' AG21 AG16 AG42 AF71 AF07 AF01 AG36 AH!5!5 3 I E-3 M-6 FEED M-3 FEED P-1 J-14 B-11 FEED D-3 FEED F-4 L-3 I AF67 AH5S AG56 Atflq AGsq AH2<1' AG48 AH30 AG68 AH08 AG60 AH30 AF55 I D-12 FEED F-2 FEED N-11 FEED F-14 FEED C-11 FEED B-11 FEED C-8 4 I AF12 AH57 AG43 AH38 AHtiJq AG12 AH24 AGfR AH25 AGil AG31 AH45 AF21 AGlM AH21 5 I H~4 FEED N-4 FEED H-7 FEED K~q FEED F-q FEED G-8 FEED C-4 FEED J-15 I AF50 AH72 AH22 AGS6 AH15 AGll.lAG64 AG41 AG52 AG88 AH18 AG65 AHIJ2 AH5q AF51 I F-5 FEED FEED F-3 FEED M-5 r+q G-14 o-q E-4 FEED K-3 FEED FEED K-5 6 I f:Fl7 AH73 AG24 AH28 AG82 AG71 AH14 AG18 AHil AG46 AG17 AH35 AG22 AH61 AF26 7 I E-8 FEED E-2 FEED G-6 G-4 FEED E-12 FEED J-4 J-6 FEED L-2 FEED E-5 I Af&q I qeo AF65 AG45 AtM0 AG57 AH33 AG32 AG16 AH01 AGI6 AG3<1' AH27 AG51 AG44 AG55 K-4 B-8 e-q B-6 FEED B-7 P-5 FEEC M-11 P-q FEED P-11 P-7 P-8 F-12 8 I AF47 AH68 AF23 AH41 AF1!5 AG62 AH26 AG03 AH23 AH32 AG28 AHsq AF3<1' q I L-U FEED E-14 FEED G-10 G-12 FEED L-4 FEED FEED L-14 FEED L-8 I ~~ AF66 AH66 AH10 AG67 AH37 AGJq AG68 AG3l AG63 AG05 AH08 AG5q AH17 AH67 AF41 I F-11 FEED FEED F-13 FEED L-12 M-7 J-2 D-7 D-11 FEED K-13 FEED FEED K-11 10 I AE33 AH!52 AG37 AH31 AG14 AH20 AF20 AH34 AG13 AH36 AG07 AH40 AG38 AH!53 AF27 I G-ll FEED N-12 FEED J-8 FEED K-7 FEED
    [Show full text]
  • List of Non-QPL Material Source Codes NON-QPL AGGREGATES - - (MISC) Company Location Material Code A.B
    List of Non-QPL Material Source Codes NON-QPL AGGREGATES - - (MISC) Company Location Material Code A.B. FUTCH & SONS, INC. EUNICE FINE SAND (HMAC) AH18 ACME SAND & GRAVEL(KENT PIT#2) BAYWOOD FINE SAND (HMAC) AJ74 ANDING, LEE PIT WEST MONROE FINE SAND (HMAC) AH76 B & C ASPHALT #2 AMITE FINE SAND (HMAC) AK12 B & D SAND PIT PARKS FINE SAND (HMAC) AK98 B. D. KEEL CONST. INC. DERIDDER FINE SAND (HMAC) AK59 B. S. TAYLOR PIT WEST MONROE SAND CLAY GRAVEL AH89 BARBER BROS.#3(ESSEN LANE) BATON ROUGE FINE SAND (HMAC) AJ89 BARBER BROS.#5(LA 37) BAYWOOD FINE SAND (HMAC) AJ90 BARRIERE BUSH SAND CLAY GRAVEL AG59 BARRIERE FRANKLINTON FINE SAND AL25 BARRIERE ISABEL (H116) FINE SAND (HMAC) AJ45 BARRIERE LIVINGSTON FINE SAND AL24 BARRIERE PIT POINT A LA HACHE GRANULAR MATERIAL AG82 BARRY L. MOORE PIT PORT ALLEN FINE SAND (HMAC) AH43 BEAR INDUSTRIES CARVILLE BLENDED CALCIUM SULF AL47 BEAR INDUSTRIES PORT ALLEN GRANULAR MATERIAL AK87 BEARD PIT JONESVILLE FINE SAND (HMAC) AJ33 BECK AND STEIN VACHERIE FINE SAND (HMAC) AH97 BEVERLY CONSTRUCTION HAHNVILLE SAND AL14 BEVERLY PIT BRIDGE CITY NON-PLASTIC EMB AL33 BEVERLY PIT CHALMETTE SAND FOR EMBAKMENT AL48 BEVERLY PIT NINE MILE POINT SAND AL40 BILLEAUD SAND PIT BROUSSARD FINE SAND (HMAC) AK54 BLAIN COMPANIES, THE CRANFIELD, MA FINE SAND (HMAC) AK97 BLEWER PIT CLARENCE FINE SAND AL41 BRISTERS PIT ANACOCO FINE SAND (HMAC) AJ94 BROWN PIT HEFLIN PIT RUN SAND/GRAVEL AJ05 BUDDY CAZES PIT BRUSLY FINE SAND (HMAC) AK35 BUDDYS PIT (LA 67) FRED FINE SAND (HMAC) AJ92 BURNS SAND & GRAVEL ROSEPINE SAND CLAY GRAVEL AK52 BYRON TALBOT CONST.
    [Show full text]
  • Round 2 Noise Monitoring Results August 2019
    Ararat Wind Farm Round 2 Noise Compliance Testing S2894C45 August 2019 sonus . Sonus Pty Ltd 17 Ruthven Avenue Adelaide 5000 SA Phone: +61 (8) 8231 2100 www.sonus.com.au Page 1 Ararat Wind Farm Round 2 Noise Compliance Testing S2894C45 August 2019 . sonus Document Title : Ararat Wind Farm Round 2 Noise Compliance Testing Document Reference : S2894C45 Date : August 2019 Prepared By : Chris Turnbull, MAAS Reviewed By : Jason Turner, MAAS TABLE OF CONTENTS 1 INTRODUCTION ................................................................................................................................. 3 2 CRITERIA ........................................................................................................................................... 3 3 STAGE 1 TESTING .............................................................................................................................. 7 3.1 Testing Location ...............................................................................................................................7 3.2 Data Collection .................................................................................................................................8 3.3 Data Analysis ....................................................................................................................................9 3.4 Stage 1 Test Results....................................................................................................................... 10 4 STAGE 2 TESTING ...........................................................................................................................
    [Show full text]
  • The Transport Trend of Thailand and Malaysia
    Executive Summary Report The Potential Assessment and Readiness of Transport Infrastructure and Services in Thailand for ASEAN Economic Community (AEC) Content Page 1. Introduction 1.1 Rationales 1 1.2 Objectives of Study 1 1.3 Scopes of Study 2 1.4 Methodology of Study 4 2. Current Status of Thailand Transport System in Line with Transport Agreement of ASEAN Community 2.1 Master Plan and Agreement on Transport System in ASEAN 5 2.2 Major Transport Systems for ASEAN Economic Community 7 2.2.1 ASEAN Highway Network 7 2.2.2 Major Railway Network for ASEAN Economic Community 9 2.2.3 Main Land Border Passes for ASEAN Economic Community 10 2.2.4 Main Ports for ASEAN Economic Community 11 2.2.5 Main Airports for ASEAN Economic Community 12 2.3 Efficiency of Current Transport System for ASEAN Economic Community 12 3. Performance of Thailand Economy and Transport Trend after the Beginning of ASEAN Economic Community 3.1 Factors Affecting Cross-Border Trade and Transit 14 3.2 Economic Development for Production Base Thriving in Thailand 15 3.2.1 The analysis of International Economic and Trade of Thailand and ASEAN 15 3.2.2 Major Production Bases and Commodity Flow of Prospect Products 16 3.2.3 Selection of Potential Industries to be the Common Production Bases of Thailand 17 and ASEAN 3.2.4 Current Situation of Targeted Industries 18 3.2.5 Linkage of Targeted Industries at Border Areas, Important Production Bases, 19 and Inner Domestic Areas TransConsult Co., Ltd. King Mongkut’s University of Technology Thonburi 2T Consulting and Management Co., Ltd.
    [Show full text]
  • 3 Cd Changer Mini Mini Component Max-S720/S720s/S725 Max-Zs720/Zs720g
    3 CD CHANGER MINI MINI COMPONENT MAX-S720/S720S/S725 MAX-ZS720/ZS720G SERVICE Manual MIMI MIMI COMPONENT SYSTEM CONTENTS 1. Alignment and Adjustments 2. Exploded Views and Parts List 3. Electrical Parts List 4. Block Diagrams 5. PCB Diagrams 6. Wiring Diagram 7. Schematic Diagrams - Confidential - 1. Alignment and Adjustments 1-1. Tuner FM FM THD Adjustment Output Antenna SET GND SSG FREQ. 98 MHz Terminal Oscilloscope Adjustment FM S.S.G Input point FM DETECTOR COIL Speaker (FM DET) Terminal output Input Output 60 dB Distortion Meter Minumum Distortion (0.4% below) (Figure 1-1) Figure1-1 IF CENTER and THD Adjustment FM Search Level Adjustment FM Antenna SSG FREQ. 98 MHz 28 dB Adjustment BEACON SET point SENSITIVITY GND (SVR1) SEMI-VR(10KΩ) FM S.S.G FM IN Output 28 dB(±2dB) 20 kΩ * Adjustment Location of Tuner PCB Adjust SVR1 (Figure 1-2) *Adjust FM S.S.G level to 28dB AM(MW) OSC AM(MW) RF LW OSC LW RF ITEAM Figure1-2 FM Auto Search Level Adjustment Adjustment Adjustment Adjustment Adjustment Received FREQ. 522~1611 KHz 594 KHz 146~290 KHz 150 KHz Adjustment MO MA LO LA point AM(MW) I.F Adjustment 60cm Maximum Output 1~7.0±0.5V Maximum 2~7.0±0.5V Output(Fig1-4) Output(Fig1-4) SSG FREQ. 450 kHz AM IF Frequency 522 kHz OUTPUT AM ANT IN Adjustment point AM IF AM SSG Speaker Terminal 450KHZ Maximum output (Figure 1-3) INPUT OUTPUT VTVM Oscilloscope Figure1-3 AM I.F Adjustment Fig 1-4 OSC Voltage Samsung Electronics 1-1 Alignment and Adjustments 1-1-2 AM(MW),LW,SW1,SW2 Adjustment Circuit Measuring Instrument & Step S.S.G Radio dial Adjusting Adjust for to be Arrangement Frequency Setting Point Adjusted 1 522KHz 522KHz MW OSC Adjust for 1.0V±0.1V at the low.
    [Show full text]
  • Tracer Modelling and Heat Mining Calculations for the Ahuachapan Geothermal Field El Salv Ador C.A
    " Q~ The United Nations zrs: University GEOTHERMAL TRAINING PROGRAMME Reports 1996 Orkustofnun, Grensasvegur 9, Number 2 IS-108 Reykjavik, Iceland IAEA Project ELS/B/005 TRACER MODELLING AND HEAT MINING CALCULATIONS FOR THE AHUACHAPAN GEOTHERMAL FIELD EL SALV ADOR C.A. Francisco E. Montalvo L. Com isi6n Ejecutiva Hidroelectrica del Rio Lempa (C .E.L.), Centra de Investigaciones Geotermicas (C.LG.). km 11 Y2 Carretera al Puerto La Libertad, Santa Teela, La Libertad, EL SAL V ADOR C.A. ABSTRACT Nine tracer test experiments using Ill\ and one using Jl l' were carried out in the Ahuachapan geothermal field during 1987 to 1992. In only six of the tests some tracer recovery was reported ranging from 0.1 % to 28% for individual wells. In order to obtain a one-dimensional fracture flow model estimate of reservoir geometry parameters, several simulations were carried out using the TRJNV code for selected tests that show the higher tracer recovery values. The simulations provide a support for the conceptual reservoir model as the tracer velocities in the southern upflow zone of the field, are more than 10 times higher than when the tracer is injected in the north-east part, where colder downflow influences the reservoir. The results of the tracer simulations were used as input for simulating heat mining from the reservoir during long tenn injection. A reservoir parameters sensitivity study was carried out using different values of porosity, injection temperatures, formation temperatures, constant and variable injection flow rates, fracture thickness and height. Additional high pressure steam and additional thermal power recovery due to the injection were also estimated.
    [Show full text]
  • Tear It up and Start Again!
    www.grapevine.is THE ESSENTIAL GUIDE TO LIFE, TRAVEL & ENTERTAINMENT IN ICELAND IN THE ISSUE Issue 01 • 2011 • January 7 - February 3 + COMPLETE CITY LISTINGS - INSIDE! Tear it up and start again! What happened during the last decade? How can we avoid messing up the new one? : ) Phew. New decade time. This is a joyous occasion, as the one we're leaving behind was by most accounts a failed one (although it did have some awesome bits in between). In our first issue of this shiny new decade, we consult historians, poets, CEOs, authors, politicians, artists, businessfolks, teenagers and seniors alike to try and determine just what happened, and what's in store. The Reykjavík Grapevine Issue 1 — 2011 THE REYKJAVÍK GRAPEVINE Hafnarstræti 15, 101 Reykjavík 2 www.grapevine.is [email protected] Editorial | Haukur S. Magnússon Published by Fröken ehf. www.froken.is Member of the Icelandic Travel Industry Association www.saf.is Printed by Landsprent ehf. in 25.000 copies. EDITOR: Haukur S Magnússon / [email protected] JOURNALIST: Valgerður Þóroddsdóttir / [email protected] HOPE and CHANGE and stuff EDITORIAL: +354 540 3600 / [email protected] ADVERTISING: +354 540 3605 / [email protected] PUBLISHER: Hilmar Steinn Grétarsson / [email protected] I watched the Prime Minister’s address on New +354 540 3601 / [email protected] Year’s Eve. I should not have bothered. There were CONTRIBUTING WRITERS: no surprises. It was Your Standard Prime Minister Eísabet Jökulsdóttir Of Iceland’s New Year’s Address, with no original Jón Baldvin Hannibalsson Ásmundur Ásmundsson thought (nor commentary, nor ideas, nor sign of Eiríkur Örn Norðdahl life) managing to seep through the thick cloak of Sigríður Þorgeirsdóttir mundane mediocrity that Iceland’s government Bart Cameron Kristín Eiríksdóttir seems determined to shroud itself in.
    [Show full text]
  • T&B Cable Tray
    T&B Cable Tray Metallic – Aluminum Table of Contents Metallic – Aluminum ................................................. A33 –A110 Overview ........................................................................................A35 Straight Lengths .................................................................... A36–A49 Fittings .................................................................................. A50–A87 Explaining the Fitting Styles ................................................... A50–A51 Horizontal Fittings Selection Guide ......................................... A53–A55 Vertical Fittings Selection Guide ............................................. A56–A59 U-Style Fittings – Horizontal Bends 90º / 60º..................................A60 H-Style Fittings – Horizontal Bends 90º / 60º .................................A61 U-Style Fittings – Horizontal Bends 45º / 30º ..................................A62 H-Style Fittings – Horizontal Bends 45º / 30º ..................................A63 U-Style Fittings – Horizontal Tee, Cross ..........................................A64 H-Style Fittings – Horizontal Tee, Cross ..........................................A65 U-Style Fittings – Horizontal Reducing Tee .....................................A66 H-Style Fittings – Horizontal Reducing Tee .....................................A67 U-Style Fittings – Horizontal Expanding Tee ....................................A68 H-Style Fittings – Horizontal Expanding Tee ....................................A69 U-Style Fittings – Horizontal
    [Show full text]
  • Dating of Remains of Neanderthals and Homo Sapiens from Anatolian Region by ESR-US Combined Methods: Preliminary Results
    INTERNATIONAL JOURNAL OF SCIENTIFIC & TECHNOLOGY RESEARCH VOLUME 5, ISSUE 05, MAY 2016 ISSN 2277-8616 Dating Of Remains Of Neanderthals And Homo Sapiens From Anatolian Region By ESR-US Combined Methods: Preliminary Results Samer Farkh, Abdallah Zaiour, Ahmad Chamseddine, Zeinab Matar, Samir Farkh, Jamal Charara, Ghayas Lakis, Bilal Houshaymi, Alaa Hamze, Sabine Azoury Abstract: We tried in the present study to apply the electron spin resonance method (ESR) combined with uranium-series method (US), for dating fossilized human teeth and found valuable archaeological sites such as Karain Cave in Anatolia. Karain Cave is a crucial site in a region that has yielded remains of Neanderthals and Homo sapiens, our direct ancestors. The dating of these remains allowed us to trace the history, since the presence of man on earth. Indeed, Anatolia in Turkey is an important region of the world because it represents a passage between Africa, the Middle East and Europe. Our study was conducted on faunal teeth found near human remains. The combination of ESR and US data on the teeth provides an understanding of their complex geochemical evolution and get better estimated results. Our samples were taken from the central cutting where geological layers are divided into archaeological horizons each 10 cm. The AH4 horizon of I.3 layer, which represents the boundary between the Middle Paleolithic and Upper Paleolithic, is dated to 29 ± 4 ka by the ESR-US model. Below, two horizons AH6 and AH8 in the same layer I.4 are dated respectively 40 ± 6 and 45 ± 7 ka using the ESR-US model.
    [Show full text]