#SoftLandings2019 Section 1 Setting the Criteria
Soft Landings Conference 2019 BSRIA © Setting the criteria Design for compliance?
Soft Landings Conference 2019 BSRIA © Setting the criteria Design for performance?
Soft Landings Conference 2019 BSRIA © Setting the criteria What did the client want?
Soft Landings Conference 2019 BSRIA © Setting the criteria What can the budget can afford?
Soft Landings Conference 2019 BSRIA © Setting the criteria
Think beyond construction. 25 year lifecycle of a typical business.
SALARIES OF OCCUPANTS – 85%
CONSTRUCTION COSTS – 6.5%
M&E OPERATIONAL SERVICES – 4% Source: CABE / BCO
Soft Landings Conference 2019 BSRIA © Setting the criteria
Think beyond energy. Energy is easy.
Typical annual business costs. Source: WGBC report – Health, Wellbeing & Productivity in Offices
Soft Landings Conference 2019 BSRIA © Setting the criteria
Engineer’s metrics.
Energy use Maintenance Utilities costs Carbon costs emissions
Temperature Humidity CO2 levels VOC levels
Soft Landings Conference 2019 BSRIA © Setting the criteria
Client’s metrics. £
Productivity Staff retention Sick days Turnover ? Customer Reputation Resale value Footfall? feedback Research papers?
Soft Landings Conference 2019 BSRIA © Setting the criteria
Environmental Physical Functional Economic Wellbeing
Operational Temperature Space Cost of Overall Needs Energy Noise Toilets maintenance met Embodied Glare Meeting Cost of Perceived energy Daylight and rooms energy Productivity Water use lighting Storage Cost/capita Perceived Waste Control Cleaning overall comfort Indoor Air Noise Quality Perceived spatial Density
Soft Landings Conference 2019 BSRIA © Setting the criteria
Use your metrics to inform your strategies.
Soft Landings Conference 2019 BSRIA © Setting the criteria
What do you measure? It’s all about knowledge.
Soft Landings Conference 2019 BSRIA © Setting the criteria
“Spending more time at the beginning does not need to make the project take longer overall – it may reduce the total time… .”
Ian Mehrtens, Royal Veterinary College (source: Client Conversations - Insights into successful project outcomes, RIBA, 2013)
Soft Landings Conference 2019 BSRIA © Setting the criteria
Briefing should be a continual process
Large or complex organisations may have several stakeholders who influence the brief.
Client should coordinate these stakeholders through a single representative (…really?)
Soft Landings Conference 2019 BSRIA © Setting the criteria
“Everyone has to buy into the overall vision, and the customer’s needs must be at the heart of that. Early engagement is so important ….working together to get it right the first time as the design evolves.
Julia Plaskett, Crest Nicholson (source: Client Conversations - Insights into successful project outcomes, RIBA, 2013)
Soft Landings Conference 2019 BSRIA © Section 2 Protecting the Criteria
Soft Landings Conference 2019 BSRIA © Protecting the criteria
• Soft Landings Champion
• Think about the impact of design decisions
• Procurement routes
• Training
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Embed the SLC in the project team
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Think about the impact of your designs
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Traditional procurement
Detailed design by Construction works by More certainty consultant team contractor on quality of materials and equipment
Design and Build Performance Detailed Construction works requirements by design by carried out by consultant team contractor contractor More certainty on cost and programme
Client considers monitoring roles
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Research funded by Innovate UK
1-3 years after completion
Over 40 non-domestic buildings
Standard satisfaction survey
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Influence of Procurement on Outcomes
Bigger range with D&B
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Influence of Procurement on Outcomes
Better energy performance delivered by ‘traditional’ procurement
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Influence of Procurement on Outcomes
Other findings from the study: ▪ Good team relationships and individual personalities have a strong influence on outcomes. ▪ Lack of team continuity can be detrimental to project outcomes. ▪ Complex buildings are more likely to go wrong ▪ Simpler buildings tend to perform better
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Training
Understand they may be non- technical.
They have other things to do.
It needs to be easy to understand.
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Building Knowledge.
DESIGN TEAM FM TEAM
Soft Landings Conference 2019 BSRIA © Protecting the criteria
Building Knowledge.
FM TEAM
DESIGN TEAM
Soft Landings Conference 2019 BSRIA © Protecting the criteria
User Guidance is vital.
Soft Landings Conference 2019 BSRIA © Section 3 Evaluating the Criteria
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
"... the process of evaluating buildings in a systematic and rigorous manner after they have been built and occupied for some time“ Preiser et al. (1988)
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
What defines a successful project?
Functionality objectives Comfort criteria Sustainability targets User productivity
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
How do you measure performance?
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
How do you measure performance?
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
How do you measure performance?
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
How do you measure performance?
Interviews with Building Manager and user representatives Standard satisfaction questionnaires, e.g. BUS Bespoke online survey (to be reviewed and tested before sending to occupants)
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
How do you measure performance?
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
Level of light
Layout and density of occupation
Range of amenities available to occupants
Indoor air quality / ventilation Thermal comfort Ergonomics
(Source: Wellbeing Matters, Feel Good Foundation, 2014)
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
Effective maintenance response
Controllability
Flexibility and adaptability
Space utilisation
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
Stakeholder Lessons learnt Design and Handover Aftercare engagement workshops construction reviews and training
Comfort criteria Sustainability targets Post occupancy Agree project evaluation objectives and intended outcomes
Functionality Operational cost objectives objectives Feedback / verification
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
Stage 7 takes time and needs to be detailed.
Have you agreed who will do it and who will pay?
Soft Landings Conference 2019 BSRIA © Evaluating the criteria The results
These three buildings were subject to a structured handover & aftercare process
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
The results GSHP Contribution to Heating to GSHP Contribution
Soft Landings Conference 2019 BSRIA © Evaluating the criteria Metering
Why do you want metering?
Where do you want metering?
Commissioning takes time, but it’s important to get right.
Soft Landings Conference 2019 BSRIA © Evaluating the criteria
Soft Landings Conference 2019 BSRIA © We have a long way to go…
Survey results (n=30). How many of your projects…
2019 …benefited from engagement with FM during design? 30% …had ‘Soft Landings’ included? 4% …had a formal POE exercise? 8% …do you have data relating to individual system performance for? 28% …have an on-going engagement? 8% …have a bespoke strategy for metering or data collection? 21%
Soft Landings Conference 2019 BSRIA © But look what we can achieve when we put our mind to it…
Soft Landings Conference 2019 BSRIA © Thank you
Eimear Moloney & Oliver Lockhart Performance Group – Hoare Lea [email protected] [email protected]
Soft Landings Conference 2019 BSRIA ©