Geothermal Power Plant – Sauerlach, Germany

Total Page:16

File Type:pdf, Size:1020Kb

Geothermal Power Plant – Sauerlach, Germany Sanjay Deshmukh POWER OFFERINGS 20-Oct-2016 Unified Power Plant Automation Solutions Power Vertical Offerings Integrated Automation for Power Plant Customer Needs: • Sustained Process Performance & improved plant uptime • Process Safety • Operator & Asset Effectiveness • Control System Obsolescence & Plant Security • Load Management & Substation Automation Honeywell Solutions: • Experion PKS & Efficiency Enhancement Solutions • Industrial Power Management System and SCADA • Safety Manager for Burner Management System • UniSim OTS & Performance Monitoring Solutions • Turbine Control Solutions • Fire & Gas, CIP Solutions, Gas Metering Products Offered: • DCS – Experion PKS; BMS – Safety Manager; • Control Edge PLC; Field Instruments, CCTV • Operator Training Simulator - UniSim • Efficiency & Performance Enhancement Solutions • Elster Gas Portfolio Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Power Business In HPS Global Power Business Market Segments Served Orders in M$ • Utility Power Plant • Industrial Captive Power Plant 180 160 148 158 • Merchant Power Plant 160 • Renovation of C&I System 140 120 100 78 86 80 Power Technologies Served 60 • Pulverized Coal Fired TPS 40 • CFBC Boiler TPS 20 • Biomass Based TPS 0 2010 2011 2012 2013 2014 • Combined Cycle Power Plant • Coal Gasification • Geo Thermal Energy • Hydro Power Plant • Wind & Solar Energy Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Profile of customers served by HPS Power Equipment Manufacturers Power Plant Owners • Bharat Heavy Electrical Ltd (BHEL) • NTPC Limited • Thermax, India • Tata Power • Skoda Power (Doosan) • Jindal Steel & Power • SEC, China • Glow Energy • SEPCO, China • Reliance Energy • Doosan Heavy Electric • Reliance Industries • • Dukes Energy Power EPCs • Reliant Energy • L&T Limited • Progress Energy • Reliance Infra • Sasol • Shanghai Electric Co China • Fortum Power • MHI Japan • Saudi Electric Corp • Tata Projects • Eskom • Doosan • Nuon Magnum • Hyundai • Conoco Philips • GS E&C • Fortum Power • Lanco Infra • Abu Qir Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Recent Power Success • Nuon Magnum 1200MW CC • Reliance Rosa 600MW • Reliance Butibori 600MW • HPGCL Yamuna Nagar 600MW • WangQu 1200MW • BALCO 540MW • ESKOM Grootvlei 1200MW • SEC Quarayyah 2500MW • ConocoPhillips 1300 CCGT/CHP • NTPC Talcher 2000MW • BP Grangemouth 600 CHP • Sasol 2000 MW CHP • Bobov Dol 610 MW • ConocoPhillips 760 Mw CC • Repsol Sines 600 MW CHP • Reliance Samalkot 2400MW CC • Maritza 350 MW • NUON 4000 MW • Fortum 500 MW • NTPC Vallur 1500MW • NTPC Bongaigaon 1000MW • NTPC Singrauli 1000MW • NTPC Ramagundam 1500MW • NTPC Unchahar 500MW • WBPDCL Kolaghat 2x210MW Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Unique Enterprise-Wide Approach Honeywell's enterprise-wide • Project Engineering & MAC • Power Management System capabilities in • Physical & Cyber Security • IEC61850 compliant Electrical power help you • MES & ERP Integration Control System achieve: • Simulation • SCADA • Lifecycle Services • Enhanced • Facility Energy Management safety, • Performance Monitoring & Optimization reliability, efficiency, & sustainability • Burner Management • Turbo-Machinery Control • Highest asset • Plant DCS • Co-ordinated Control with availability • Fire & Gas Monitoring Boiler • Lowest risk • Emissions & Environmental • Interface with AVR, Synch & Management Protection system • Lowest cost of ownership • Regulatory • Field Instruments & compliance Sensors • Maximum • Gas Metering Solutions lifecycle value • Safety Systems Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Field and Measurement Devices Developing products and software to increase accuracy, efficiency, reliability for a lowest total cost of ownership • Modular designs • Faster, easier maintenance • Advanced displays • Lower inventory costs • Easy and intuitive Honeywell • Integrated with control User Experience system Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. SMART Tx for Pressure,Temp, Level, Flow & Analyzers Experion PKS C300 for Power • Key Features - C300 Controller - Fieldbus Interface Module (FIM) - Control Firewall For Security - 13 Power Function Blocks - New Trending - Backup & Restore - Procedural Operations - Industry standard interfaces - SOE – 1 msec - C300 Sim - Alarm Shelving & Suppression - Remote I/O Capabilities - Universal IO Module - Safety System Integration Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Designed-Vertical Space Efficient Hardware • Integrated wiring to reduce footprint • Two tier wiring for easy installation and maintenance • Optionally redundant to maximize availability • Uniform heat management to increase product life Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Power Function Blocks • Designed to Address Specific Functions Used in Power Plant Process Control Strategies • Specifically Targeted for Use by Power Gen Customers, Potential for Use in Other Industry Segments also • Major Benefits to End User - Enhanced Performance of Control Strategies - Reduced Time for Configuration & Testing - Lesser Need for Control Processing Hardware - Ease of Logic De-bugging - Simplified Logic Documentation Water & Steam Properties – ASME/ IFC-97 Compliant Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Better Performance for Power Plant Control Application Boiler Protection System/ Burner Management System • Safety Manager safety system solution which permits the safe start up, operation, and shut down of the multiple-burner furnace section of a boiler • Based on a standard package, customized for the characteristics of each boiler type • Goals: • Personnel safety - Furnace protection - Increase reliability, operator availability - Major Functions: - Automatically place burners and igniters in service - Monitor flame conditions - Remove burners and igniters from service • Meets the applicable codes and standards for safety controllers and/or burner management applications (NFPA, 85/86, ISA S84.01, TUV and IEC 61508) Safety Mandating use of Certified BMS Systems Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Not just product but - TUV certified factory and engineers too Turbine Control in EPKS 20 ms CEE New EnhaGenLin FB Base Cycle C300 C300 for valve characterization IOLink “Slow Down” Servo Valve Speed Servo Protection S S Valve S S Positioner C C V V P P o o i i P P l l M M 1 2 Local M M Indication G1 SP HYDRAULICS A P B T SVP G2 IOTA “Shut Down” IOTA L L V V D D M P T T M 1 2 M M Steam Control Valve • Speed Protection Module with 2.5ms scan time & onboard signal validation and over-speed protection • Servo Valve Positioning Module which can support wide range of servo valves. Positioning loop latency of <10ms • C300 with 20ms Control Execution Cycle Time Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. 12 ControlEdge PLC - Differentiators Aligning with Industry 4.0 requirements – IIoT Ready UIO Proven Platform ControlEdge PLC Estimation Experion Tool Integration Cyber Security Control with an Edge Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Best solution fit for offsite plants, Water Treatment, Coal/ Ash Handling Integrated Industrial Security and F&G Solutions Intrusion Detection Flame & Smoke Det Access Control Toxic Gas Detector Radar Surveillance Camera System Video Surveillance Sounders & Beacons Common HMI F&G System SIL-3 Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Leveraging the Broader Honeywell Portfolio Integrated “OneWireless” Solutions One Multi-functional and Scalable Network Supporting: • Automated Field Inspection • Corrosion Monitoring • Asset Tracking • Mobile Workers • Inventory Management • Energy Management • People Location • Equipment Reliability • Construction Phase Asset Tracking • Extended Control Network Honeywell Confidential - © 2016 by Honeywell International Inc. All rights reserved. Delivering Wireless Solutions, ISA compliant Experion Process Knowledge System For Power Enterprise Wide Business & Casual User Desktop Access Integrated Process Data Secure Read Only for Business Physical Security Workcenter Process Display Applications Enterprise Web Server Web Browsers Building eServer Integrator Firewall Business Network Plant Asset Plant Wide Remote Operations Energy Efficiency Video as a Process Sensor Plant Simulation Management Data Warehouse Experion Station Solutions Digital Video Manager UniSim Asset Manager PHD Adv Energy Solutions Video Ethernet Advanced Applications Network Redundant GPS Master Integrated Web-based Human Interface Global Database & Historian Clock & NTP Supervisory Control Experion Station Experion Server Server ACE ASM Operator Effectiveness LVS Ergonomic Operator Consoles Icon Series Supervisory Control Network Terminal Local Control Network Regulatory, Logic C300 C200 Server Wireless Sequential & Model Access Based Controls Chassis C200, C300 IO & Profit Loop SIL 3 Safety Process Basic PMIO ControlEdge Redundant and / or System Manager Controller PLC Third Party Remote I/O Safety Manager Wireless Interfaces Transmitters Investment Protection Field Rounds ~ for TPS/TDC Field Mobility Automation Various Experion on LCN Mobile
Recommended publications
  • Annual Report 2 0 1 2 - 1 3
    Annual Report 2 0 1 2 - 1 3 Ministry of Power Government of India Shram Shakti Bhawan, Rafi Marg, New Delhi-110 001 Website : www.powermin.nic.in Shri Pranab Mukherjee, Hon’ble President of India with Shri Jyotiraditya M. Scindia, Hon’ble Union Minister of State for Power (Independent Charge) at the National Energy Conservation Day function CONTENTS Sl. No. Chapter Page No. (s) 1. Performance Highlights 5 2. Organisational Set Up and Functions of the Ministry of Power 9 3. Capacity Addition Programme in the XIIth Plan 11 4. Generation & Power Supply Position 23 5. Status of Ultra Mega Power Projects 35 6. Transmission 37 7. Status of Power Sector Reforms 41 8. Rural Electrification Programme 43 9. Re-Structured Accelerated Power Development and Reforms Programme (R-APDRP) 45 10. Energy Conservation 49 11. Renovation and Modernisation of Thermal Power Stations 53 12. Private Sector Participation in Power Sector 57 13. International Cooperation 59 14. Power Development Activities in North-Eastern Region 67 15. Central Electricity Authority 75 16. Central Electricity Regulatory Commission (CERC) 79 17. Appellate Tribunal for Electricity (APTEL) 83 Public Sector Undertakings: 18 NTPC Limited 85 19. NHPC Limited 105 20. Power Grid Corporation of India Ltd. (PGCIL) 111 21. Power Finance Corporation Ltd. (PFC) 115 22. Rural Electrification Corporation Ltd. (REC) 125 23. North Eastern Electric Power Corporation Limited (NEEPCO) 133 Joint Venture Corporations : 24. SJVN Limited (SJVNL) 135 25. THDC India Limited (THDCIL) 139 Statutory Bodies : 26. Damodar Valley Corporation (DVC) 143 27. Bhakra Beas Management Board (BBMB) 149 28. Bureau of Energy Efficiency (BEE) 155 Autonomous Bodies : 29.
    [Show full text]
  • Government of India Ministry of Power Rajya Sabha Unstarred Question No.2704 Answered on 17.03.2020
    GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.244 ANSWERED ON 17.03.2020 POWER GENERATION FROM THERMAL AND HYDRO POWER PLANTS †*244. SHRI LAL SINH VADODIA: Will the Minister of POWER be pleased to state: (a) the quantum of power generated in terms of megawatts by hydro-power stations as on date; (b) the quantum of power generated in terms of megawatts by thermal power stations; and (c) the cost of per unit power generation by hydro-power stations and per unit cost of power generation by thermal power stations? A N S W E R THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER, NEW & RENEWABLE ENERGY AND THE MINISTER OF STATE FOR SKILL DEVELOPMENT & ENTREPRENEURSHIP ( SHRI R.K. SINGH) (a) to (c) : A Statement is laid on the Table of the House. ******* STATEMENT STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (c) OF STARRED QUESTION NO. 244 ANSWERED IN THE RAJYA SABHA ON 17.03.2020 REGARDINGPOWER GENERATION FROM THERMAL AND HYDRO POWER PLANTS. ********* (a) & (b): As on 29.02.2020, the installed generation capacity of hydro and thermal power stations are 45,699 megawatts (MW) and 2,30,190 MW respectively. The electricity generated from the hydro and thermal power plants during the current year 2019-20 (upto February, 2020) are about 146.7 Billion Units (BU) and about 960 BU respectively. (c): The cost of power generation from thermal and hydro to power projects depends upon various factors, which inter alia are: 1. Type of fuel – Coal, lignite, gas, naptha, diesel etc.
    [Show full text]
  • Final Draft of CEA Anual Report 2019-20
    CEA ANNUAL REPORT 2019-20 CENTRAL ELECTRICITY AUTHORITY GOVERNMENT OF INDIA MINISTRY OF POWER The AUTHORITY (As on 31.03.2020) Sh. Prakash Mhaske Chairperson & Addl. Charge of Member (Power System) Dr. Somit Dasgupta Sh. P.D. Siwal Member (E&C) Member (Thermal) (upto 31.12.2019) (upto 29.02.2020) Sh.Sandesh Kumar Sharma Sh. Dinesh Chandra Member (Planning) Member (Hydro) Addl.charge Member(E&C) Addl.Charge of Member (GO&D) ORGANIZATION CHART OF CEA (AS ON 31.03.2020) CHAIRPERSON (Prakash Mhaske) MEMBER MEMBER MEMBER MEMBER MEMBER MEMBER (THERMAL) (HYDRO) (POWER SYSTEM) (GRID OPN. & (ECONOMIC & COMM.) (PLANNING (P.D. Siwal) (Dinesh Chandra) Addl. Charge DISTN.) (Dr. Somit Dasgupta) (Sandesh Kumar Sharma) with Chairperson, CEA Addl. Charge with (प्रकाश मके) CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER (INTEGRATED (HYDRO (POWER SYSTEM (FINANCIAL CHIEF ENGINEER-I (THERMAL CHIEF ENGINEER–II SECERETARY RESOURCE ENGINEERING AND PLANNING & STUDIES & (Chander Shakhar) PROJECT (B.K. Sharma) (P.C. KUREEL) PLANNING) RENOVATION & APPRAISAL-I) ANALYSIS) MONITORING-I) MODERNIZATION) CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER (FUEL CHIEF ENGINEER CHIEF ENGINEER (GRID CHIEF ENGINEER (COORDINATION) MANAGEMENT) (THERMAL CHIEFI ENGINEER (POWER SYSTEM MANAGEMENT) (FINANCIAL & PROJECT APPRAISAL PROJECT (HYDRO PROJECT PLANNING & APPRAISAL) COMMERCIAL COMMITTEE MONITORING-II) APPRAISAL-II) CHIEF ENGINEER APPRAISAL) CHIEF ENGINEER CHIEF ENGINEER (POWER DATA MS (NRPC) (DISTRIBUTION (HUMAN CHIEF ENGINEER CHIEF
    [Show full text]
  • Amendment to the Third Transfer Scheme for Transfer of Procurement
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT Energy Department - Amendment to the Third Transfer Scheme for transfer of Procurement and Bulk Supply of Electricity and Trading of Electricity and allocation of Power Purchase Agreements from Transmission Corporation of Andhra Pradesh Limited to Four Distribution Companies viz. EPDCL, SPDCL, CPDCL, and NPDCL – Notification – Orders – Issued. -------------------------------------------------------------------------------------- ENERGY (POWER.III) DEPARTMENT G.O.Ms.No.53 Dated.28-04-2008. Read the following:- 1. G.O.Ms.No.58, Energy (Power.III) Department, Dated 7-6-2005. 2. G.O.Ms.No.101, Energy (Power.III) Department, Dated 31-10.2005. 3. G.O.Ms.No.24, Energy (Power.III) Department, Dated 08-03-2006. 4. G.O.Ms.No.78, Energy (Power.III) Department, Dated 3-8-2007. 5. G.O.Ms.No.3, Energy (Pr.III) Department, Dated 3-1-2008. 6. From the C&MD, APTRANSCO, Lr.No.CMD/CE/RAC & Reforms/ Third Tr.Scheme/D.No.33/2008, Dated 27-3-2008. 7. G.O.Ms.No.52,Energy (Pr.III) Department, Dated.28-04-2008. -o0o- O R D E R:- In G.O.1 st read above, Government have issued orders publishing the Andhra Pradesh Electricity Reform (Transfer of Bulky Supply undertaking from the Transmission Corporation of Andhra Pradesh Limited to Distribution Companies) Scheme, 2005. 2. The Government have also issued certain amendments to the aforesaid A.P. Electricity Reform Scheme, 2005 vide G.Os. 2 nd to 5 th read above. 3. In the reference 6 th read above, the Chairperson & Managing Director, APTRANSCO has finalized the final allocation of capacities of DISCOMs and requested to issue an amendment to Third Transfer Scheme to that effect.
    [Show full text]
  • Final Environmental Impact Assessment Report for Telangana Super Thermal Power Project Stage-I (2X800 MW) at Ramagundam, Karimnagar District, Telangana State
    Final Environmental Impact Assessment Report for Telangana Super Thermal Power Project Stage-I (2x800 MW) at Ramagundam, Karimnagar District, Telangana State Project Proponent : NTPC Limited (A Government of India Enterprise) New Delhi Environmental Consultant : Vimta Labs Limited 142, IDA, Phase-II, Cherlapally, Hyderabad–500 051, Telangana State (Approved Consultant) www.vimta.com, [email protected] (NABL/ISO 17025 Certified Laboratory, Recognized by MoEF, New Delhi) October, 2015 FINAL REPORT M/s. NTPC Limited Ramagundam, Telangana ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR TELANGANA SUPER THERMAL POWER PROJECT STAGE-I (2X800 MW) AT RAMAGUNDAM, KARIMNAGAR DISTRICT, TELANGANA STATE For and on behalf of VIMTA Labs Limited Approved by : M. Janardhan Signed : Position : HOD & Vice President (Env) Date : October 9, 2015 The report has been prepared inline with the prescribed TORs issued vide No.J- 13012/112/2010-IA.II (T) dated 16.09.2014 and its amendment dated 12.12.2014 of Ministry of Environment and Forests, New Delhi. This report has been prepared by Vimta Labs Limited with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. Table of Contents Final Environmental Impact Assessment Doc No.9591/999/GEG/S/001 Report for Rev No. 0 Telangana Super Thermal Power Project Issue Date: 09.10.2015 Stage-I (2 X 800 MW) Page 1 of 8 Table of Contents _______________________________________________________________
    [Show full text]
  • Explain the Importance of Agriculture in Telangana. Explain the TS Govt Measures to Promote Agriculture
    www.OnlineIAS.com [email protected] Explain the importance of agriculture in Telangana. Explain the TS govt measures to promote agriculture. Introduction Agriculture plays a pivotal role in the economy of Telangana and the better performance of this sector is vital for inclusive growth. Telangana went in for the Green Revolution in rice cultivation in the 1970s. There have been significant changes in the structure and performance of the agrarian economy in the state in the recent years. Telangana State is endowed with bountiful resources having good soils, diversified cropping pattern and major irrigation systems fed by rivers like Godavari and Krishna. Agriculture is a way of life, a tradition that has shaped the culture and economic life of the people of Telangana. Therefore, it will continue to be central to all strategies for planned socio-economic development of the State. The State Government has emphasized the need to achieve 6% growth rate and increased returns on investment to farmers through improved technology, effective extension reach, efficient input delivery, mechanisation, marketing tie up, adequate credit and crop insurance. The total Geographical area of the State is 114.84 lakh ha with a Gross Cropped Area of 62.88 lakh ha in the year 2013-14. 1. Total Geographical Area 114.84 Lakh Ha 2. Gross Cropped Area 62.88 3 Lakh Ha 3. Net Cropped Area 49.61 4 Lakh Ha 4. Gross Irrigated Area 31.64 Lakh Ha 5. Net Irrigated Area 22.89 Lakh Ha 6. No. of Farm holdings 55.54 Lakh Nos. www.OnlineIAS.com 9246365622 www.OnlineIAS.com [email protected] 7 .Average Farm Holding size 1.12 Ha 8.
    [Show full text]
  • Retirement, Renewables and Rationalisation
    [ 1 ] The 3Rs of Discom Recovery: Retirement, Renewables and Rationalisation The 3Rs of DISCOM Recovery Retirement, Renewables and Rationalisation Discoms and state governments can save thousands of crores by retiring old power plants, tapping cheaper renewable energy and freezing expenditure on new coal plants [ 2 ] The 3Rs of Discom Recovery: Retirement, Renewables and Rationalisation Authors About Climate Risk Horizons ————————————————————————————————————————— ————————————————————————————————————————— Ashish Fernandes Climate Risk Horizons’ (CRH) work highlights the systemic CEO & Lead Analyst, Climate Risk Horizons risks that disruptive climate change poses to investors, lenders [email protected] and infrastructure investments. Through a data-driven, research- oriented approach that incorporates a holistic understanding of Harshit Sharma climate policy, energy infrastructure and regulatory processes, Lead Researcher, Climate Risk Horizons CRH provides advice on risk management strategies to [email protected] minimise stranded, non-performing assets and economic disruption in the face of climate change. Suggested Citation Ashish Fernandes & Harshit Sharma. The 3Rs of Discom Learn more about our work at www.climateriskhorizons.com Recovery: Retirement, Renewables & Rationalisation. Climate Risk Horizons. August 2020. This report is for information and educational purposes only and based upon a variety of public information sources which have been cited. CRH believes such information to be reliable
    [Show full text]
  • Case Study on Use of Decant Water for Cultivation Near
    ISSN 2277-2685 IJESR/May 2019/ Vol-9/Issue-5/14-21 Arti Pasi et. al., / International Journal of Engineering & Science Research CASE STUDY ON USE OF DECANT WATER FOR CULTIVATION NEAR NTPC RAMAGUNDAM SUPER THERMAL POWER PLANT TELANGANA (ANDHRA PRADESH) Arti Pasi*1, RK Srivastava1, Avinash Jain1 1Dept. of Environmental Science, Govt. Science College, Department Of Ecology TFRI Jabalpur (M.P), India. ABSTRACT The present study encompassed the contamination of water by the fly ash released from Ramagundam Super Thermal Power Plant(TPPs), the current largest Thermal Power Plant in south India, it is a 2600 MW Thermal Power Station situated in Peddapalli district in the Indian state of Telangana, Fly ash is a by-product of the combustion of pulverized coal in power station. Fly ash is an amorphous glassy material consisting of silica, aluminum, iron and calcium oxides plus other minor constituents. Basically the releasing of huge amount of fly ash affects the water resources. Detected higher concentration of Ca, Mg, Na, K and many more element in the sample of some sites while detected minimum in some site in all the collected samples. Keywords: Fly ash, amorphous, pulverized, Ramagundam (TPPs), Peddapalli. INTRODUCTION Since coal contains trace levels of trace elements (e.g. arsenic, barium, beryllium, boron, cadmium, chromium, thallium, selenium, molybdenum and mercury), fly ash obtained after combustion of this coal contains enhanced concentrations of these elements, and therefore the potential of the ash to cause groundwater and surface water pollution needs to be evaluated. Environmental pollution by the coal based TPP all over the globe is cited to be one of the major sources of pollution affecting the general aesthetics of our environment in terms of air, soil, water and vegetation pollution.
    [Show full text]
  • Case Study on Use of Irrigated Soil by Decant Water for Cultivation Near NTPC Ramagundam Super Thermal Power Plant Telangana (Andhra Pradesh)
    Global Journal of Science Frontier Research: H Environment & Earth Science Volume 19 Issue 2 Version 1.0 Year 2019 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global Journals Online ISSN: 2249-4626 & Print ISSN: 0975-5896 Case Study on use of Irrigated Soil by Decant Water for Cultivation Near NTPC Ramagundam Super Thermal Power Plant Telangana (Andhra Pradesh) By Aarti Pasi, Dr. R.K. Srivastava & Dr. Avinash Jain Abstract- The present study was conducted around the ash disposal sites of Ramagundam Super thermal power Plant (TPPs) Surrounding agricultural lands. It is situated in Peddapalli Telangana. Fly ash is produced as a result of coal combustion in thermal power station and discharged in ash ponds. Basically the releasing of huge amount of flay ash affects the soil quality. Detected higher concentration of Ca, Mg, Na, K and many more element in the sample of some sites while recorded minimum concentration in some site in all the collected samples. Keywords: fly ash, amorphous, pulverized, ramagundam (tpps), peddapalli. GJSFR-H Classification : FOR Code: 050399 CaseSt udyonuseofIrrigatedSoilbyDecantWaterforCultivationNearNTPCRamagundamSuperThermalPowerPlantTelanganaAndhraPradesh Strictly as per the compliance and regulations of: © 2019. Aarti pasi, Dr. R.K. Srivastava & Dr. Avinash Jain. This is a research/review paper, distributed under the terms of the Creative Commons Attribution-Noncommercial 3.0 Unported License http://creativecommons.org/licenses/by-nc/3.0/), permitting all non commercial use, distribution, and reproduction in any medium, provided the original work is properly cited. Case Study on use of Irrigated Soil by Decant Water for Cultivation Near NTPC Ramagundam Super Thermal Power Plant Telangana (Andhra Pradesh) Aarti pasi α, Dr.
    [Show full text]
  • !E"? (Y.S.GUPTA) Additional General Manager (EMG)
    ffi#rgrffi RAMAGUT{DAM Ref. No :oelEMG I ALI 2017 / 6 63 Date: 20.05.20L7 To THE DIRECTOR RegionalOffice (SEz) Ministry of Environment Forests & Climate Change l-st and 2nd Floors, Handloom Export Promotional Council 4 Cathedral Garden Road Nungambakkam, Chennai -560 034 Dear Sir Sub: Six Monthly Compliance report of EC issued to NTPC Ramagundam STPP Stage-lll (1xs00MW) -Reg We are herewith submitting the six monthly compliance reports for Environmental Clearance given to our station pertaining to the period October 2016 to March 2017. Also we are submitting the stack data, ambient air quality data and dust ) concentration data for the period along with report. Also please find enclosed the Soft copy of the report in CD. Thanking you Yours faithfully For NTPC Ltd !e"? (Y.S.GUPTA) Additional General Manager (EMG) Ramagundam Super Thermal Power Station, PO: Jyothinagar, Dist: Peddapalli, TS- 5O5 215 : Telephone no.O87 28-27 2962 F ax: O87 28-27 2L5L Regd. Office:NTPC Limited, NTPC Bhawan, Scope Complex, 7 lnstitutional Area, Lodhi Road, New Delhi-110 OO3 No. 140101D11975GO1007966 www.ntpc.co.in STATUS OF IMPLEMENTATION OF CONDITIONS STIPULATED IN ENVIRON M ENTAL CLEARANCE NAME OF THE PROJECT: RAMAGUNDAM STPP STAGE-III (lXSOOMW) LETTE R NO : OM NO J- LSOL I 20 I 9 4-tA-ll DATED 2s I 09 I L99s. s. STIPULATIONS STATUS AS ON 31.03.2017 No. 1. All the conditions stipulated by the All the conditions stipulated by the State Pollution Control Board shall be Telangana State Pollution Control Board i m plemented effectively. (TSPCB) are being implemented effectively.
    [Show full text]
  • Written Submissions on Behalf of the Appellant
    1 BEFORE THE NATIONAL GREEN TRIBUNAL SOUTHERN ZONE BENCH AT CHENNAI APPEAL NO. 46 OF 2016 IN THE MATTER OF: UMA MAHESWAR DAHAGAMA …APPELANT VERSUS UNION OF INDIA & ORS …RESPONDENTS WRITTEN SUBMISSIONS ON BEHALF OF THE APPELLANT MOST RESPECTFULLY SHOWETH: 1. That the Appellant is filing these written submissions in the above-mentioned Appeal. The appeal has been filed against the environmental clearance dated 20.1.2016 granted by Respondent No. 1 (Hereinafter called as “MoEF&CC”) to the proposed 2x800 MW NTPC (Hereinafter called as “Project Proponent”) Thermal Power Plant at Ramagundam, Karimnagar district, Telanagana State. 2. It is submitted that the Appellant has raised various critical issues such as Characteristic analysis of fuel not being done, its Radio Activity and Heavy metal content testing not being done and their impacts not being studied, False Ambient Air Quality (AAQ) monitoring being done, False results of AAQ being presented, Cumulative Impact Assessment not being done, Hydro-geological impacts not being considered, Health impacts not being studied, Various TOR not being complied and various environmental clearance conditions of existing plant not being complied by the Project Proponent. The Appellant has also submitted that the Expert Appraisal Committee (Hereinafter called as “EAC”) and MoEF&CC have not considered the above issues and have granted the environmental clearance for the above-said project without the application of mind and without any reasons. 2 3. The following substantial questions arise out of the present Appeal: I. Whether the non-compliance of Terms of Reference (TOR) completes and fulfils the objective and necessity of Environmental Impact Assessment (EIA) Study, Public Hearing and Appraisal under the EIA Notification, 2006, Environmental (Protection) Act, 1986 and Principles of Precaution and Sustainable Development? II.
    [Show full text]
  • Estimation of Renewable Energy Resources for Establishment of Green Microgrids
    International Journal of Science Technology & Management www.ijstm.com Volume No.04, Special Issue No.01, February 2015 ISSN (Print) 2394-1529, (Online) 2394-1537 ESTIMATION OF RENEWABLE ENERGY RESOURCES FOR ESTABLISHMENT OF GREEN MICROGRIDS S.Venkateshwarlu1, Harini.V2, Sruthi DVS3, Prudhvi Sonnati4 1,2,3,4 CVR College of Engineering, Hyderabad, (India) ABSTRACT The current Indian Power economy poses a great challenge to the dynamics of energy security of the power hungry 21st century. As technology is the roost there is an urgent need to eliminate energy poverty. The major source of power in India is through conventional energy sources like coal, fossil fuels etc. The perishable nature of these primary fuels brings in the need to tap energy from unexplored avenues. Some of the well-known and well established sources such as wind, biomass potentials have already been estimated. However newer sources are available whose potential is not estimated. This paper attempts to estimate the potential of such sources like Ocean Thermal Energy Conversion (OTEC), Biomass etc. As technology progresses commercial extraction of this energy can be made possible. The case studies of the states of Andhra Pradesh and Telangana in India has been taken and the current challenges and possible solutions have been presented here. In a nutshell the solution promotes the establishment of renewable micro grids to address local energy needs. Keywords: Bio-Mass, Micro Grid, OTEC, Renewable Energy, Solar Energy, Wave Energy I INTRODUCTION The Indian power economy is characterized by a number of technical and economical challenges where the grid is not extremely reliable.
    [Show full text]