Energy Department - Amendment to the Third Transfer Scheme for transfer of Procurement and Bulk Supply of Electricity and Trading of Electricity and allocation of Power Purchase Agreements from Transmission Corporation of Andhra Pradesh Limited to Four Distribution Companies viz. EPDCL, SPDCL, CPDCL, and NPDCL – Notification – Orders – Issued. ------ENERGY (POWER.III) DEPARTMENT

G.O.Ms.No.53 Dated.28-04-2008. Read the following:-

1. G.O.Ms.No.58, Energy (Power.III) Department, Dated 7-6-2005. 2. G.O.Ms.No.101, Energy (Power.III) Department, Dated 31-10.2005. 3. G.O.Ms.No.24, Energy (Power.III) Department, Dated 08-03-2006. 4. G.O.Ms.No.78, Energy (Power.III) Department, Dated 3-8-2007. 5. G.O.Ms.No.3, Energy (Pr.III) Department, Dated 3-1-2008. 6. From the C&MD, APTRANSCO, Lr.No.CMD/CE/RAC & Reforms/ Third Tr.Scheme/D.No.33/2008, Dated 27-3-2008. 7. G.O.Ms.No.52,Energy (Pr.III) Department, Dated.28-04-2008.

-o0o- O R D E R:-

In G.O.1 st read above, Government have issued orders publishing the Andhra Pradesh Electricity Reform (Transfer of Bulky Supply undertaking from the Transmission Corporation of Andhra Pradesh Limited to Distribution Companies) Scheme, 2005.

2. The Government have also issued certain amendments to the aforesaid A.P. Electricity Reform Scheme, 2005 vide G.Os. 2 nd to 5 th read above.

3. In the reference 6 th read above, the Chairperson & Managing Director, APTRANSCO has finalized the final allocation of capacities of DISCOMs and requested to issue an amendment to Third Transfer Scheme to that effect.

4. The Government after careful consideration have decided to issue an amendment to Third Transfer Scheme effecting final allocation of capacities.

5. The following notification will be published in the Extraordinary issue of Andhra Pradesh Gazette dated.28-04-2008.

NOTIFICATION

In exercise of the powers conferred by sections 23 and 24 of the Andhra Pradesh Electricity Reforms Act, 1998 (Andhra Pradesh Act No.30 of 1998) and section 131 of the Electricity Act, 2003 (Central Act 36 of 2003) read with clause 9 of Schedule 1 of the Provisional Third Transfer Scheme (Issued under G.O.Ms.No.58, Energy (Pr.III) Department, Dated 7-6-2005 and published in the Andhra Pradesh Gazette, Part-I, Extra-ordinary No.396, dated 9 th June, 2005), the Governor of Andhra Pradesh hereby makes the following amendments to the said Provisional Third Transfer Scheme issued under said G.O.Ms.No.58, Energy (Pr.III) Department, Dated the 7 th June, 2005.

The amendment shall be deemed to have come into force with effect from 9 th June 2005. AMENDMENT

In the said provisional Third Transfer Scheme –

1. For Schedule I, sub clause (1) of clause (2), the following shall be inserted.

The generation capacities and energy from generating stations will be divided into two parts i.e allocated share and unallocated share.

“Allocated Share” means the generating capacity and energy of all generating stations with fixed allocation ratios to each APDISCOMs.

“Unallocated Share” means the generating capacity with out any fixed allocation to any APDISCOMs but allocated to any of the APDISCOMs, at all times, based on the requisition of APDISCOMs.

For Schedule 1 clause 3 (III), the following shall be substituted.

(III) The generation capacities, as on the Effective Date, allocated to and /or vested with APTRANSCO under any PPA or otherwise, as provided in Schedule A, including the generation capacities of the private and joint sector generating stations, the AP Gas Power Corporation Limited (“APGCPL”) stations, NCEs, allocations of the CGS stations (along with any allocations from the unallocated quota therein) and APGENCO Hydel stations are considered fully (100%) allocated whereas, for APGENCO thermal stations the capacity corresponding to 80% of the generating capacity is considered as allocated share. The allocated shares shall stand entirely allocated and transferred to the APDISCOMs, as on the Effective Date, in the following fixed ratios:

APEPDCL - 15.80%

APSPDCL - 22.27%

APCPDCL - 46.06%

APNPDCL - 15.87%

The generating capacities of unallocated share of APGENCO thermal stations (20% unallocated share) will be allocated every month to Discoms based on the requisition by Discoms to APPCC. APPCC will allocate this generating capacity to discoms based on the seasonal variation and load growth of the discom.

It is clarified that any increase or decrease in the existing capacities of the generating companies / stations which are presently allocated to or vested with APTRANSCO in terms of any PPA or otherwise, shall also be allocated and transferred to the APDISCOMs in the ratios provided herein above.

Notwithstanding anything contained herein above, the PPAs between APTRANSCO and M/s LVS Projects Limited and M/s Srivathsa Power Projects Ltd. Shall stand allocated and transferred, as on the Effective Date, in the manner as follows:

Sl.No Particulars Installed capacity Allocated to (MW) 1 LVS Projects LImited 36.80 EPDCL 2 Sri Vathsa Power 17.20 EPDCL Projects Limited

2. For Schedule “A”, the following shall be substituted, namely -

Schedule “A”

A) Allocated Share:

Station wise Capacities of Central Generators (100% share) allocated to APDISCOMs

Allocated Capacity to Total Capacity in APDISCOMs Sl No Station Name MW (100%) MW 1 NTPC Simhadri TPP 1000.00 1000.00 2 NTPC STPS 837.90 837.90 Neyveli Lignite Corporation Limited TPS-II, 105.71 3 Stage-I 105.71 Neyveli Lignite Corporation Limited TPS-II, 191.44 4 Stage-II 191.44 5 Madras Atomic 31.72 31.72 6 NTPC-Kaiga Atomic Power Station* -- 7 Eastern Region** -- 8 NTPC-Talcher - II, Stage I 120.65 120.65 9 NTPC-Talcher - II, Stage II 120.65 120.65 10 NTPC-Talcher - II, Stage III 120.65 120.65 11 NTPC-Talcher - II, Stage IV 120.65 120.65 Total Central Generating Stations 2649.37 2649.37

Capacities of APGenco, Thermal ( 80% share) is allocated to APDISCOMs

Allocated Share Installed (80%) Capacity to Station Name Capacity (MW) APDISCOMs (MW) Kothegudem TPS "A" 240.00 192.00 kothegudem TPS "B" 240.00 192.00 Kothegudem TPS "C" 240.00 192.00 Kothegudem TPS Stage V - Unit 1 250.00 200.00 Kothegudem TPS Stage V - Unit 2 250.00 200.00 Vijayawada TPS-Stage I 420.00 336.00 Vijayawada TPS-Stage II 420.00 336.00 Vijayawada TPS-Stage III 420.00 336.00 Ramagundam Thermal Station-B 62.50 50.00 Rayalseema TPP-Stage I 420.00 336.00 Total APGENCO (Thermal) 2962.50 2370.00

Capacities of APGENCO, Hydel ( 100% share ) allocated to APDISCOMs

Allocated Share Installed (100%) Capacity Station Name Capacity (MW) to APDISCOMs (MW) Total APGENCO (Hydel) 3588.36 3588.36

Capacities of Independent Power Producers ( 100% share )allocated to the APDISCOMs

Allocated Share (100%) Installed Capacity to Capacity APDISCOMs Station Name (MW) (MW) GVK-Jegrupadu 216.82 216.82

Spectrum Power Generation Limited 208.31 208.31 Lanco Kondapalli Power Private Limited 351.49 351.49 Reliance Energy Limited 220 220.00 LVS Power Limited 36.8 36.80 Srivathsa Power Projects Limited 17.2 17.20 Total capacity 1050.62 1050.62

Capacities of Joint sector projects ( 100% share )allocated to the APDISCOMs

Allocated Share (100%) Installed Capacity to Capacity APDISCOMs Station Name (MW) (MW) Andhra Pradesh Gas Power Corporation Limited - Stage-I 16.00 16.00 Andhra Pradesh Gas Power Corporation Limited - Stage-II 42.80 42.80

Total Andhra Pradesh Gas Power Corporation Limited Capacity 58.80 58.80 NCL - Tungabhadra 6.60 6.60 Total capacity 65.40 65.40

Capacities of Non-Conventional Energy generators ( 100% share ) allocated to the AP Distribution Companies ( Based on Geographical Location)

Sl. Company Name District Allocated No. Share(100%) Capacity in MW 1 M/s Shree Papers Ltd. * E.G.District 3.24 2 M/s Sri Kalyani Agro Products & Indus. Ltd. * W.G. District 3.2 3 M/s Varam power Projects (P) Ltd. Srikakulam 6 4 M/s Gowthami Solvent Oils Private Ltd. * W.G.District 1.85 5 M/s Manihamsa Power Projects Ltd. E.G.District 2.97 6 M/s Deccan Sugars E.G.District 2 7 M/s Perpetual Energy Systems Ltd. Vizianagaram 6 8 M/s Etikoppaka Co-operative Ltd. Vizag 1.5 9 M/s Chodavaram Co-operative Sugars Ltd. * Vizag 6.25 10 M/s Vamshi Industries Ltd. E.G.District 4 11 M/s Vensa Biotek Ltd. * E.G. District 2.45 12 M/s Sai Renewable Power Ltd. E.G. District 4.5 13 M/s. GMR Technologies & Industries Ltd.* Srikakulam 9.5 14 M/s The Jeypore Sugar Company Ltd. * W.G. District 9 15 M/s. Jocil Limited * Guntur 2.4 16 M/s Matrix Power Pvt. Ltd. Guntur 4.5 17 M/s Roshni Power Tech. Ltd. Krishna 6 18 M/s Satyakala Power projects (P) Ltd. Krishna 3.6 19 M/s Veeraiah Non-Conventional Power Projects Krishna 4 Ltd. 20 M/s Vijay Agro Products Pvt. Ltd. * Krishna 2.94 21 M/s SLS Power Ltd. Nellore 6 22 M/s Active Power Corporation Private Ltd. Krishna 1.4 23 M/s PMC Power Private Ltd. Guntur 0.65 24 M/s KMS Power Ltd. Guntur 6 25 M/s Rithwik Energy System Ltd. Chittoor 6 26 M/s Shree Vaani Sugars Ltd * Chittoor 5.52 27 M/s Balaji Agro Oils ltd. * Krishna 3.73 28 M/s Agri Gold Projects Ltd. Prakasham 4 29 M/s B.Seenaiah & Co. (projects) Ltd. Nellore 5.52 30 M/s Sri balaji Biomass Power Ltd. Cuddapah 5.4 31 M/s Jyothi bio Energy Ltd. Prakasham 5.4 32 M/s Om Shakti renergies Ltd. Chittoor 5.4 33 M/s Shriram energies Ltd. Krishna 5.25 34 M/s NEDCAP Nellore 2.48 35 M/s Sathya Maharshi Power Corporation Ltd. Guntur 5.52 36 M/s Bhavani Hydro Guntur 0.54 37 M/s Sagar Sugars & Allied Products Ltd * Chittoor 12.93 38 M/s Clarion Power Corp. Ltd. Prakasham 11.04 39 M/s Saro Power & Infrastructures Ltd. Mahaboobnag 6 ar 40 M/s Suchand Power Gen (P) Ltd. Kurnool 6

41 M/s IL & FS Wind Farms Ltd. Ananthapur 6.5 42 M/s NCL Energy Ltd. Kurnool 7.5 43 M/s NEDCAP Kurnool 2.75 44 M/s BHEL * Ananthapur 2.55 45 M/s BHEL Ananthapur 3 46 M/s Srinivasa Power Pvt Ltd., Nalgonda 0.55 47 M/s Janapadu Hydro Power Proejcts Pvt. Ltd., Nalgonda 1 48 M/s KM Power Ltd. Kurnool 4 49 M/s KM Power Ltd. Kurnool 3.3 50 M/s KM Power Ltd. Kurnool 4 51 M/s Veeramani Biscuit Ind Ltd. Ananthapur 1 52 M/s Gayatri Agro Ind Power Ltd. Nalgonda 6 53 M/s NILE Limited Ananthapur 2 54 M/s Selco International Ltd. Mahaboobnag 5.94 ar 55 M/s Sree Rayalaseema Hi-Strength Hypo Ltd. * Kurnool 5.75 56 M/s Nagarjuna Green Power Ltd.,(My Home Power 8.19 Ltd.) 57 M/s Ganapathi Sugar Ind Ltd.* Medak 10.69 58 M/s Rithwik Power Projects Ltd. 5.52 59 M/s Gowthami Bio- Energies Ltd. Khammam 5.52 60 M/s NCS Gayatri Sugars Ltd. Nizamabad 6 61 M/s Shalivahana Constructions Ltd. Adilabad 5.46 62 M/s Kallam Spinning Mills Ltd. * Khammam 0.72 63 M/s Saraswathi Power & IND Ltd. Karimnagar 2 64 M/s Indur Green Power Private Ltd. Nizambad 6 65 M/s Kakatiya Cements Ltd. * Khammam 7.44 Total Capacity 304.06

B) Unallocated Share

Capacities of APGenco, Thermal ( 20% share) allocated to APDISCOMs month to month based on requisition by the APDISCOM i. Existing Generation Capacity Unallocated Installed Share (20%) Capacity in Capacity in Sl. No. Particulars MW MW 1 KTPS "A" 240.00 48.00 2 KTPS "B" 240.00 48.00 3 KTPS "C" 240.00 48.00 4 KTPS V - Unit 1 250.00 50.00 5 KTPS V - Unit 2 250.00 50.00 6 VTPS I 420.00 84.00 7 VTPS II 420.00 84.00 8 VTPS III 420.00 84.00 9 Nellore 0.00 0.00 10 Ramagundam B 62.50 12.50 11 RTPP - Stage I 420.00 84.00 Total APGenco (Thermal) 2963.00 592.50

ii. New Generation Capacity

Installed Unallocated Capacity in Share (20%) Sl. No. Particulars MW Capacity in Rayalaseema Thermal Power 420.00 84.00 1 Plant Vijayawada Thermal Power 660.00 132.00 2 Station Total APGenco (Thermal) 1080.00 216.00

3. For Schedule “B”, under Part – 1 for Para 1, the following shall be substituted, namely -

Schedule “B”

BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO APEPDCL

PART I

1. Bulk Supply Undertaking

Allocated Capacities

(i) Hydel energy from APGenco (including that from Jurala, at appropriate time of commissioning) will be allocated to each APDISCOM, in proportion to the capacities (in MW) allocated, as per the table set out below. (ii) NCEs has been allocated based on their geographical location to the AP Discom (iii) The capacity allocation percentage of APEPDCL is 15.80%

Generating stations and their capacities, along with Power Purchase Agreements are as follows:

Allocated Capacity Capacity Installed Installed % Share to allocated to allocated Station Name Capacity Summary Capacity Allocated APDISCOMs EPDCL to EPDCL (MW) (MW) Share (MW) (MW) (MW) Kothegudem TPS "A" 240.00 192.00 30.34 APGENCO (Thermal) 2962.50 80% 374.46 kothegudem TPS "B" 240.00 192.00 30.34 APGENCO (Hydel) 3588.36 100% 566.96 Independent Power 240.00 192.00 30.34 1050.62 100% 211.47 Kothegudem TPS "C" Plants Central Generating 250.00 200.00 31.60 2649.37 100% 418.60 Kothegudem TPS Stage V - Unit 1 Stations Kothegudem TPS Stage V - Unit 2 250.00 200.00 31.60 Joint Sector 58.80 100% 9.29 Non-Conventional 420.00 336.00 53.09 304.06 100% 62.46 Vijayawada TPS-Stage I Energy # Vijayawada TPS-Stage II 420.00 336.00 53.09 NCL Tungabadra 6.60 100% 1.04 Vijayawada TPS-Stage III 420.00 336.00 53.09 Grand Total 10620.31 8496.25 1644.28 Ramagundam Thermal Station-B 62.50 50.00 7.90 Rayalseema TPP-Stage I 420.00 336.00 53.09 Total APGENCO (Thermal) 2962.50 2370.00 374.46 GVK-Jegrupadu 216.82 216.82 34.26 Capacity Installed % allocated 208.31 208.31 32.91 New Capacities Capacity Allocated to EPDCL (MW) Share Spectrum Power Generation Limited (MW) Lanco Kondapalli Power Private Limited @ 351.49 351.49 55.54 EPS 220.00 220.00 34.76 445.00 100% 70.31 Reliance Energy Limited Oakwell Power Limited Gautami Power Private 36.80 36.80 36.80 470.00 100% 74.26 LVS Power Limited Limited Vemagiri Power 17.20 17.20 17.20 370.00 100% 58.46 Srivathsa Power Projects Limited Generation Limited 1050.62 1050.62 211.47 GVK Power Pvt. Limited 220.00 100% 34.76 Total Independent Power Plants Rayalaseema Thermal 1000.00 1000.00 158.00 420.00 80% 53.09 NTPC Simhadri TPP Power Plant Vijayawada Thermal 837.90 837.90 132.39 660.00 80% 83.42 NTPC Ramagundam STPS Power Station Future Non-Conventional Neyveli Lignite Corporation Limited TPS-II, 105.71 105.71 16.70 277.17 100% 42.19 Energy *** Stage-I Neyveli Lignite Corporation Limited TPS-II, 191.44 191.44 30.25 Jurala 117.00 100% 18.49 Stage-II Madras Atomic Power Station 31.72 31.72 5.01 Total New Capacities 2979.17 434.98 NTPC-Kaiga Atomic Power Station* ------Eastern Region** ------NTPC-Talcher - II, Stage I 120.65 120.65 19.06 NTPC-Talcher - II, Stage II 120.65 120.65 19.06 NTPC-Talcher - II, Stage III 120.65 120.65 19.06 NTPC-Talcher - II, Stage IV 120.65 120.65 19.06 Total Central Generating Stations 2649.37 2649.37 418.60 Andhra Pradesh Gas Power Corporation 16.00 16.00 2.53 Limited - Stage-I Andhra Pradesh Gas Power Corporation 42.80 42.80 6.76 Limited - Stage-II Total Joint Sector 58.80 58.80 9.29 * Through the agreement is in force, the share has been allocated to TNEB **Subject to renewal of allocation by GoI *** The extent of vesting of capacity of generating station is in accordance with AP Transcos share under the agreement # Aggregate capacity allocated to the Discoms “@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no 24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of , New Delhi,

APEPDCL:

NCE Capacities – Existing

NCE Capacities - Existing Allocated Company Name District Capacity in MW M/s Shree Papers Ltd. * E.G.District 3.24 M/s Sri Kalyani Agro Products & Indus. Ltd * W.G.District 3.20 M/s Varam Power Projects (P) Ltd. Srikakulam 6.00 M/s Gowthami Solvent Oils Private Ltd.* W.G.District 1.85 M/s Manihamsa Power Projects Ltd. E.G.District 2.97 M/s Deccan Sugars E.G.District 2.00 M/s Perpetual Energy Systems Ltd. Vizianagaram 6.00 M/s Etikoppaka Co-operative Ltd. Vizag. 1.50 M/s Chodavaram Co-operative Sugars Ltd.* Vizag. 6.25 M/s Vamshi Industries Ltd. E.G.District 4.00 M/s Vensa Biotek Ltd.* E.G.District 2.45 M/s Sai Renewable Power Ltd. E.G.District 4.50 M/s GMR Technologies & Industries Ltd.* Srikakulam 9.50 M/s The Jeypore Sugar Company Ltd.* W.G.District 9.00 Total Capacity 62.46 * The extent of vesting of capacity of the above generating stations to the Discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

NCE Capacities – To be commissioned

Allocated Company Name District Capacity in MW M/s Sri Sarvaraya Sugars Ltd E.G.District 10.00 M/s Nav Bharat Ferro Alloys Ltd. (Deccan Suguars Ltd.) E.G.District 4.66 M/s Coastal Agro Industries Ltd. W.G.District 3.20 M/s R.R. Bio Energies Ltd. W.G.District 12.00 M/s Sardar Power Ltd. Vizianagaram 2.97 M/s Foods, Fats & Fertilisers Ltd. W.G.District 4.20 M/s Raus Power (P) Ltd. E.G.District 3.66 Manihamsa Power Projects Ltd. E.G.District 1.50 Total Capacity 42.19

* The extent of vesting of capacity of the above generating stations to the Discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

4. For Schedule “C”, under Part – 1 for Para 1 the following shall be substituted, namely -

Schedule “C”

PART-I

BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO APSPDCL

1. Bulk Supply Undertaking

Allocated Capacities

(a) All Assets, Liabilities, Proceedings and Personnel pertaining exclusively or primarily to the Bulk Supply Undertaking as segregated herein below, which shall include but not be limited to the following:- (i) Hydel energy from APGenco (including that from Jurala, at appropriate time of commissioning) will be allocated to each APDISCOM, in proportion to the capacities (in MW) allocated, as per the table set out below. (ii) NCE s have been allocated based on their geographical location to the APDISCOM (iii) The capacity allocation percentage of APSPDCL is 22.27%

Generating stations and their capacity, along with Power Purchase Agreements are as follows:

Allocated Capacity Capacity Installed Installed % Share to allocated to allocated Station Name Capacity Summary Capacity Allocated APDISCOMs SPDCL to SPDCL (MW) (MW) Share (MW) (MW) (MW) Kothegudem TPS "A" 240.00 192.00 42.76 APGENCO (Thermal) 2962.50 80% 527.80 kothegudem TPS "B" 240.00 192.00 42.76 APGENCO (Hydel) 3588.36 100% 799.13 Independent Power 240.00 192.00 42.76 1050.62 100% 221.95 Kothegudem TPS "C" Plants Central Generating 250.00 200.00 44.54 2649.37 100% 590.01 Kothegudem TPS Stage V - Unit 1 Stations Kothegudem TPS Stage V - Unit 2 250.00 200.00 44.54 Joint Sector 58.80 100% 13.09 Non-Conventional 420.00 336.00 74.83 304.06 100% 116.22 Vijayawada TPS-Stage I Energy # Vijayawada TPS-Stage II 420.00 336.00 74.83 NCL Tungabadra 6.60 100% 1.47 Vijayawada TPS-Stage III 420.00 336.00 74.83 Grand Total 10620.31 8496.248 2269.67 Ramagundam Thermal Station-B 62.50 50.00 11.14 Rayalseema TPP-Stage I 420.00 336.00 74.83 Total APGENCO (Thermal) 2962.50 2370.00 527.80 GVK-Jegrupadu 216.82 216.82 48.29 Capacity Installed % allocated 208.31 208.31 46.39 New Capacities Capacity Allocated to SPDCL (MW) Share Spectrum Power Generation Limited (MW) Lanco Kondapalli Power Private Limited @ 351.49 351.49 78.28 Konaseema EPS 220.00 220.00 48.99 445.00 100% 99.10 Oakwell Power Limited Reliance Energy Limited Gautami Power Private 36.80 36.80 0.00 470.00 100% 104.67 LVS Power Limited Limited Vemagiri Power 17.20 17.20 0.00 370.00 100% 82.40 Srivathsa Power Projects Limited Generation Limited 1050.62 1050.62 221.95 GVK Power Pvt. Limited 220.00 100% 48.99 Total Independent Power Plants Rayalaseema Thermal 1000.00 1000.00 222.70 420.00 80% 74.83 NTPC Simhadri TPP Power Plant Vijayawada Thermal 837.90 837.90 186.60 660.00 80% 117.59 NTPC Ramagundam STPS Power Station Future Non- Neyveli Lignite Corporation Limited TPS-II, 105.71 105.71 23.54 277.17 100% 94.66 Conventional Energy *** Stage-I Neyveli Lignite Corporation Limited TPS-II, 191.44 191.44 42.63 Jurala 117.00 100% 26.06 Stage-II

Madras Atomic Power Station 31.72 31.72 7.06 Total New Capacities 2979.17 648.29 NTPC-Kaiga Atomic Power Station* ------Eastern Region** ------NTPC-Talcher - II, Stage I 120.65 120.65 26.87 NTPC-Talcher - II, Stage II 120.65 120.65 26.87 NTPC-Talcher - II, Stage III 120.65 120.65 26.87 NTPC-Talcher - II, Stage IV 120.65 120.65 26.87 Total Central Generating Stations 2649.37 2649.37 590.01 Andhra Pradesh Gas Power Corporation 16.00 3.56 Limited - Stage-I 16.00 Andhra Pradesh Gas Power Corporation 42.80 9.53 Limited - Stage-II 42.80 Total Joint Sector 58.80 58.80 13.09 * Through the agreement is in force, the share has been allocated to TNEB **Subject to renewal of allocation by GoI *** The extent of vesting of capacity of generating station is in accordance with AP Transcos share under the agreement # Aggregate capacity allocated to the Discoms “@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no 24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of India, New Delhi,

NCE Capacities – Existing

APSPDCL:

Allocated Company Name District Capacity in MW M/s Jocil Limited* Guntur 2.40 M/s Matrix Power Pvt. Ltd Guntur 4.50 M/s Roshni Power Tech. Ltd. Krishna 6.00 M/s Satyakala Power Projects (P) Ltd. Krishna 3.60 M/s Veeraiah Non-Conventional Power Projects Ltd. Krishna 4.00 M/s Vijay Agro Products Pvt. Ltd.* Krishna 2.94 M/s SLS Power Ltd. Nellore 6.00 M/s Active Power Corporation Private Ltd. Krishna 1.40 M/s PMC Power Private Ltd. Guntur 0.65 M/s KMS Power Ltd. Guntur 6.00 M/s Rithwik Energy System Ltd. Chittoor 6.00 M/s Shree Vaani Sugars Ltd.* Chittoor 5.52 M/s Balaji Agro Oils Ltd.* Krishna 3.73 M/s Agri Gold Projects Ltd. Prakasham 4.00 M/s B. Seenaiah & Co. (Projects) Ltd. Nellore 5.52 M/s Sri Balaji Biomass Power Ltd. Cuddapah 5.40 M/s Jyothi Bio Energy Ltd. Prakasham 5.40 M/s Om Shakti renergies Ltd Chittoor 5.40 M/s Shriram Energies Ltd. Krishna 5.25 M/s NEDCAP Nellore 2.48 M/s Sathya Maharshi Power Corporation Ltd. Guntur 5.52 M/s Bhavani Hydro Guntur 0.54 M/s Sagar Sugars & Allied Products Ltd.* Chittoor 12.93 M/s Clarion Powr Corp. Ltd. Prakasham 11.04 Total Capacity 116.22

* The extent of vesting of capacity of the above generating stations to the Discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

NCE Capacity – To be commissioned

Allocated Company Name District Capacity in MW M/s The Kovur Co-operative Sugar Factor Ltd. Nellore 3.00 M/s KCP Sugar & Industries Corporation Ltd. Krishna 10.11 M/s KCP Sugar & Industries Ltd. Krishna 2.40 M/s Vani Power Projects Pvt. Ltd., Hyd. Guntur 4.05 M/s Velagapudi Power Generation Pvt. Ltd., Vijayawada Guntur 3.76 M/s CRST Powergen Pvt. Ltd Cuddapah 6.00 M/s Anatha Lakshmi Biomass Power Projects (P) Ltd. Guntur 6.00

M/s Hari Sai Biomass Power Projects Pvt. Ltd Chittoor 3.50 M/s Pinakini Power Projects (P) Ltd. Nellore 5.40

M/s Singaraya Hills Green Power Genco (P) Ltd. Prakasham 5.52 M/s Balaji Energy Ltd. Nellore 9.90 M/s Delta Agro Power Ltd. Krishna 2.50 M/s Vijayawada Municipal Corporation ** Krishna 2755 KWH Gayatri Sugar Complex Ltd Nellore 14.92 M/s Empee Power Company (India) Ltd. * Nellore 17.60 Total Capacity # 94.66

* The extent of vesting of capacity of the above generating stations to the Discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

** Installed Capacity is 0.143MW, sales to Discoms is 2755KWhrs as per the PPA

# Total Capacity does not include units purchased from M/s Vijayawada Muncipal Corporation

5. For Schedule “D”, under Part – 1 for Para 1 the following shall be substituted, namely -

Schedule “D”

PART-I

BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO APCPDCL

1. Bulk Supply Undertaking

Allocated Capacities

(a) All Assets, Liabilities, Proceedings and Personnel pertaining exclusively or primarily to the Bulk Supply Undertaking, as segregated herein below, which shall include but not be limited to the following:-

(i) Hydel energy from APGenco (including that from Jurala, at appropriate time of commissioning) will be allocated to each APDISCOM, in proportion to the capacities (in MW) allocated, as per the table set out below. (ii) NCEs have been allocated based on their geographical location to the APDISCOM (iii) The capacity allocation percentage of APCPDCL is 46.06%

Generating stations and their capacity, along with Power Purchase Agreements are as follows:

Allocated Capacity Capacity Installed Installed % Share to allocated to allocated Station Name Capacity Summary Capacity Allocated APDISCOMs CPDCL to CPDCL (MW) (MW) Share (MW) (MW) (MW) Kothegudem TPS "A" 240.00 192.00 88.44 APGENCO (Thermal) 2962.50 80% 1091.62 kothegudem TPS "B" 240.00 192.00 88.44 APGENCO (Hydel) 3588.36 100% 1652.80 Independent Power 240.00 192.00 88.44 1050.62 100% 459.04 Kothegudem TPS "C" Plants Central Generating 250.00 200.00 92.12 2649.37 100% 1220.30 Kothegudem TPS Stage V - Unit 1 Stations Kothegudem TPS Stage V - Unit 2 250.00 200.00 92.12 Joint Sector 58.80 100% 27.08 Non-Conventional 420.00 336.00 154.76 304.06 100% 86.72 Vijayawada TPS-Stage I Energy # Vijayawada TPS-Stage II 420.00 336.00 154.76 NCL Tungabadra 6.60 100% 3.04 Vijayawada TPS-Stage III 420.00 336.00 154.76 Grand Total 10620.31 8496.248 4540.61 Ramagundam Thermal Station-B 62.50 50.00 23.03 Rayalseema TPP-Stage I 420.00 336.00 154.76 Total APGENCO (Thermal) 2962.50 2370.00 1091.62 GVK-Jegrupadu 216.82 216.82 99.87 Capacity Installed % allocated 208.31 208.31 95.95 New Capacities Capacity Allocated to CPDCL (MW) Share Spectrum Power Generation Limited (MW) Lanco Kondapalli Power Private Limited @ 351.49 351.49 161.90 Konaseema EPS 220.00 220.00 101.33 445.00 100% 204.97 Oakwell Power Limited Reliance Energy Limited Gautami Power Private 36.80 36.80 0.00 470.00 100% 216.48 LVS Power Limited Limited Vemagiri Power 17.20 17.20 0.00 370.00 100% 170.42 Srivathsa Power Projects Limited Generation Limited 1050.62 1050.62 459.04 GVK Power Pvt. Limited 220.00 100% 101.33 Total Independent Power Plants Rayalaseema Thermal 1000.00 1000.00 460.60 420.00 80% 154.76 NTPC Simhadri TPP Power Plant Vijayawada Thermal 837.90 837.90 385.94 660.00 80% 243.20 NTPC Ramagundam STPS Power Station Future Non- Neyveli Lignite Corporation Limited TPS-II, 105.71 105.71 48.69 277.17 100% 115.02 Conventional Energy *** Stage-I Neyveli Lignite Corporation Limited TPS-II, 191.44 191.44 88.18 Jurala 117.00 100% 53.89 Stage-II

Madras Atomic Power Station 31.72 31.72 14.61 Total New Capacities 2979.17 1260.07 NTPC-Kaiga Atomic Power Station* ------Eastern Region** ------NTPC-Talcher - II, Stage I 120.65 120.65 55.57 NTPC-Talcher - II, Stage II 120.65 120.65 55.57 NTPC-Talcher - II, Stage III 120.65 120.65 55.57 NTPC-Talcher - II, Stage IV 120.65 120.65 55.57 Total Central Generating Stations 2649.37 2649.37 1220.30 Andhra Pradesh Gas Power Corporation 16.00 16.00 7.37 Limited - Stage-I Andhra Pradesh Gas Power Corporation 42.80 42.80 19.71 Limited - Stage-II Total Joint Sector 58.80 58.80 27.08 * Through the agreement is in force, the share has been allocated to TNEB **Subject to renewal of allocation by GoI *** The extent of vesting of capacity of generating station is in accordance with AP Transcos share under the agreement # Aggregate capacity allocated to the Discoms “@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad , SLP no 24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of India, New Delhi.

APCPDCL:

NCE Capacities – Existing Allocated Company Name District Capacity in MW M/s Saro Power & Infrastructures Ltd. Mahaboobnagar 6.00 M/s Suchand Power Gen (P) Ltd. Kurnool 6.00 M/s IL & FS Wind Farms Ltd. Ananthapur 6.50 M/s NCL Energy Ltd. Kurnool 7.50 M/s NEDCAP Kurnool 2.75 M/s BHEL * Ananthapur 2.55 M/s BHEL Ananthapur 3.00 M/s Srinivasa Power Pvt Ltd., Nalgonda 0.55

M/s Janapadu Hydro Power Projects Pvt. Ltd., Nalgonda 1.00 M/s KM Power Ltd. Kurnool 4.00 M/s KM Power Ltd. Kurnool 3.30 M/s KM Power Ltd. Kurnool 4.00 M/s Veeramani Biscuit Ind Ltd. Ananthapur 1.00 M/s Gayatri Agro Ind Power Ltd. Nalgonda 6.00 M/s NILE Limited Ananthapur 2.00 M/s Selco International Ltd. Mahaboobnagar 5.94

M/s Sree Rayalaseema Hi-Strength Hypo Ltd.* Kurnool 5.75 M/s Nagarjuna Green Power Ltd., (My Home Power Ltd.) Hyderabad 8.19 M/s Ganapathi Sugar Ind Ltd.* Medak 10.69 Total Capacity 86.72

* The extent of vesting of capacity of the above generating stations to the discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement.

NCE Capacities – To be commissioned

Allocated Company Name District Capacity in MW M/s Lepakshi Power Projects Ltd. Anantapur 5.50 M/s Sri Power Company Ltd. Kurnool 6.00 M/s B.S.R. Bio-Energy (P) Ltd. Nalgonda 4.50

M/s Mata Energy Ltd., (M/s Mata Cements Ltd.) Nalgonda 5.40 M/s Venkatraya Fibres (P) Ltd. Mahaboobnagar 5.52 M/s AP Power Projects (P) Ltd Anantapur 2.00 M/s Fivess Ltd. Anantapur 6.00 M/s Mahitha Power Projects Pvt. Ltd Nalgonda 0.40 M/s Kakitiya Alloys Ltd. Medak 6.00 M/s Shravana Power Projects Ltd. Mahaboobnagar 5.40 M/s PSR Green Power Projects (P) Ltd. Mahaboobnagar 5.70

M/s SLT Power & Infrastructure Projects (P) Ltd. Nalgonda 2.70 M/s Alpha Energy Systems Ltd., Hyd, CPDCL Medak 40.00 M/s RDF Power Projects Ltd, CPDCL Hyderabad 9.90 M/s Budhadeva Power Ltd. * Nalgonda 6.00 M/s Usha Gowthami Industries Ltd.* Anantapur 4.00 Total Capacity 115.02

* The extent of vesting of capacity of the above generating stations to the discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

6. For Schedule “E”, under Part – 1 for Para 1 the following shall be substituted, namely -

Schedule “E”

BULK SUPPLY UNDERTAKING OF APTRANSCO AS TRANSFERRED TO APNPDCL

1. Bulk Supply Undertaking

(a) All Assets, Liabilities, Proceedings and Personnel pertaining exclusively or primarily to the Bulk Supply Undertaking, as segregated herein below, which shall include but not be limited to the following:-

Allocated Capacities

(i) Hydel energy from APGenco (including that from Jurala, at appropriate time of commissioning) will be allocated to each APDISCOM, in proportion to the capacities (in MW) allocated, as per the table set out below. (ii) NCEs have been allocated based on their geographical location to the APDISCOM (iii) The capacity allocation percentage of APNPDCL is 15.87%

Generating stations and their capacity, alongwith Power Purchase Agreements are as follows: Allocated Capacity Capacity Installed Installed % Share to allocated to allocated Station Name Capacity Summary Capacity Allocated APDISCOMs NPDCL to NPDCL (MW) (MW) Share (MW) (MW) (MW) Kothegudem TPS "A" 240.00 192.00 30.47 APGENCO (Thermal) 2962.50 80% 376.12 kothegudem TPS "B" 240.00 192.00 30.47 APGENCO (Hydel) 3588.36 100% 569.47 Independent Power 240.00 192.00 30.47 1050.62 100% 158.16 Kothegudem TPS "C" Plants Central Generating 250.00 200.00 31.74 2649.37 100% 420.46 Kothegudem TPS Stage V - Unit 1 Stations Kothegudem TPS Stage V - Unit 2 250.00 200.00 31.74 Joint Sector 58.80 100% 9.33 Non-Conventional 420.00 336.00 53.32 304.06 100% 38.66 Vijayawada TPS-Stage I Energy # Vijayawada TPS-Stage II 420.00 336.00 53.32 NCL Tungabadra 6.60 100% 1.05 Vijayawada TPS-Stage III 420.00 336.00 53.32 Grand Total 10620.31 8496.248 1573.25 Ramagundam Thermal Station-B 62.50 50.00 7.94 Rayalseema TPP-Stage I 420.00 336.00 53.32 Total APGENCO (Thermal) 2962.50 2370.00 376.12 GVK-Jegrupadu 216.82 216.82 34.41 Capacity Installed % allocated 208.31 208.31 33.06 New Capacities Capacity Allocated to NPDCL (MW) Share Spectrum Power Generation Limited (MW) Lanco Kondapalli Power Private Limited @ 351.49 351.49 55.78 Konaseema EPS 220.00 220.00 34.91 445.00 100% 70.62 Oakwell Power Limited Reliance Energy Limited Gautami Power Private 36.80 36.80 0.00 470.00 100% 74.59 LVS Power Limited Limited Vemagiri Power 17.20 17.20 0.00 370.00 100% 58.72 Srivathsa Power Projects Limited Generation Limited 1050.62 1050.62 158.16 GVK Power Pvt. Limited 220.00 100% 34.91 Total Independent Power Plants Rayalaseema Thermal 1000.00 1000.00 158.70 420.00 80% 53.32 NTPC Simhadri TPP Power Plant Vijayawada Thermal 837.90 837.90 132.97 660.00 80% 83.79 NTPC Ramagundam STPS Power Station Future Non- Neyveli Lignite Corporation Limited TPS-II, 105.71 105.71 16.78 277.17 100% 25.30 Conventional Energy *** Stage-I Neyveli Lignite Corporation Limited TPS-II, 191.44 191.44 30.38 Jurala 117.00 100% 18.57 Stage-II

Madras Atomic Power Station 31.72 31.72 5.03 Total New Capacities 2979.17 419.83 NTPC-Kaiga Atomic Power Station* ------Eastern Region** ------NTPC-Talcher - II, Stage I 120.65 120.65 19.15 NTPC-Talcher - II, Stage II 120.65 120.65 19.15 NTPC-Talcher - II, Stage III 120.65 120.65 19.15 NTPC-Talcher - II, Stage IV 120.65 120.65 19.15 Total Central Generating Stations 2649.37 2649.37 420.46 Andhra Pradesh Gas Power Corporation 16.00 Limited - Stage-I 16.00 2.54 Andhra Pradesh Gas Power Corporation 42.80 Limited - Stage-II 42.80 6.79 Total Joint Sector 58.80 58.80 9.33 * Through the agreement is in force, the share has been allocated to TNEB **Subject to renewal of allocation by GoI *** The extent of vesting of capacity of generating station is in accordance with AP Transcos share under the agreement

# Aggregate capacity allocated to the Discoms “@” Subject to the result of O.P no 2996 of 2003 filed by the M/s Lanco Kondapalli Power Private Limited ( LKPPL) pending in the city civil court, Hyderabad, SLP no 24857 of 2004 filed by the AP Transco, pending in the Hon’ ble Supreme Court of India, New Delhi,

NCE Capacities – Existing Allocated Company Name District Capacity in MW M/s Rithwik Power Projects Ltd. Khammam 5.52 M/s Gowthami Bio-Energies Ltd. Khammam 5.52 M/s NCS Gayatri Sugars Ltd. Nizamabad 6.00 M/sShalivahana Constructions Ltd. Adilabad 5.46 M/s Kallam Spinning Mills Ltd.* Khammam 0.72 M/s Saraswathi Power & IND Ltd. Karimnagar 2.00 M/s Indur Green Power Private Ltd. Nizamabad 6.00 M/s Kakatiya Cements Ltd.* Khammam 7.44 Total Capacity 38.66

* The extent of vesting of capacity of the above generating stations to the discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

NCE Capacities – To be commissioned

Allocated Company Name District Capacity in MW M/s Sainath Power Concepts (P) Ltd Adilabad 6.00 M/s Krishna Priya Power Projects Ltd. Khammam 3.96 Nizam Deccan Sugars Ltd Nizamabad 13.89 Saraswati Power & Industries (P) Ltd Karimnagar 0.99 Kallam Spinning Mills Limited Khammam 0.46 Total Capacity 25.30

* The extent of vesting of capacity of the above generating stations to the discoms is restricted to the share of AP Transco under the applicable Power Purchase Agreement

(BY ORDER AND IN THE NAME OF THE GOVERNOR OF ANDHA PRADESH)

A.K. GOYAL SPECIAL CHIEF SECRETARY TO GOVERNMENT To The Commissioner, Printing & Stationery Department, Chenchalguda, Hyderabad (with a request to Publish the Notification in the Extra-ordinary Andhra Pradesh Gazette, dated.28-04-2008 and supply 2000 copies to this Department immediately)