Details of Contract Awarded from 01/01/2021 to 31/03/2021

Total Page:16

File Type:pdf, Size:1020Kb

Details of Contract Awarded from 01/01/2021 to 31/03/2021 Details of Contract awarded from 01/01/2021 to 31/03/2021 Project / Site Work Description / Package NOS. AND NAMES OF PARTIES NOS. AND LOI No. NAME OF WHETHER Mode of QUALIFIED AFTER TECHNO- NAMES OF CONTRACTOR TYPE OF CONTRACT Tender DATE OF LAST DATE OF NO.OF COMMERCIAL EVALUATION PARTIES NOT VALUE OF SCHEDULE DATE BIDDING AWARDED TO Sl No Tender No. Enquiry PUBLICATION RECEIPT OF TENDRS QUALIFIED LOI Date CONTRACT OF COMPLETION (SINGLE /TWO LOWEST Floated OF NIT TENDER (TBO) RECEIVED AFTER TECHNO- (Is Rs) (Contract Period) BID SYSTEM) TENDERER / OT / LT / ST COMMERCIAL EVALUATED L1 EVALUATION 1 QAES various Sites FRAMEWORK AGREEMENT (RATE CONTRACT) 2325 OT 30-Oct-20 Two 17-Nov-20 8 M/s Archer Business Solutuion Pvt. Ltd. M/s BH AND KH L2 BHE/PW/PUR/WR 01-Jan-21 TUV RHEINLAND ₹ 55,34,440 24 Months FOR PROVIDING FIELD QUALITY ASSURANCE M/s Superintendence Company of India ENGINEERING SITES-QAE/2325/LOI-02 INDIA PRIVATE ENGINEER SERVICES AT PSWR SITES Pvt Ltd CONSULTANCY LIMITED (THERMAL/GAS BASED PROEJCTS). M/s Quality Evaluation And Systems SERVICES Team Pvt Ltd PRIVATE M/s TUV RHEINLAND INDIA PRIVATE LIMITED LIMITED M/s BUREAU VERITAS INDIA PVT LTD M/s IRCLASS Systems And Solutions Private Limited M/s RINA India Pvt Ltd 2 1X660 MW Bhusawal Construction of Railway Siding Works Consists 2310 OT 08-Sep-20 Two 10-Nov-20 5 ISC Projects Pvt. Ltd., URC L1 BHE/PW/PUR/BWT6- 31-Dec-20 ISC Projects Pvt. Ltd. ₹ 62,35,00,000 18 Months of P-Way Linking, Road Over Bridge (ROB), SRC Company Infra Private Limited, Construction CONST-RAILWAY- Over Head Electrification (OHE) and Signaling JCC Infraprojects Pvt. Ltd. Private Limited, SIDING/2310/LOI & Telecommunication (S&T) for MSPGCL, Mehrotra Buildcon Private Limited 1X660 MW Bhusawal Thermal Power Station, Unit-6, Distt- Jalgaon, Maharashtra. 3 1X660 MW Bhusawal DEPUTATION OF SERVICE ENGINEER FOR 2334 ST 23-Nov-20 Two 26-Nov-20 1 Konecranes and Demag Private Limited NIL L1 BHE/PW/PUR/BWT6-SE 04-Jan-21 Konecranes and ₹ 3,50,000 10 Days INSPECTION, COMMISSIONING AND INS /2334/WO Demag Private OPERATION OF 360MT PORTAL CRANE AT Limited BHEL SITE, 1X660MW MSPGCL, BHUSAWAL TPS, DEEPNAGAR, DISTT - JALGAON (MAHARASHTRA). 4 Korba FGD Package CARRYING OUT CONCRETE MIX DESIGN FROM 2326 ST 05-Nov-20 Two 07-Nov-20 1 Visvesvaraya National Institute of NIL L1 BHE/PW/PUR/ KNFGD- 10-Nov-20 Visvesvaraya National ₹ 1,61,600 40 Days VNIT FOR NTPC KORBA KSTPP STAGE-I, II & III Technology CONCRETE-MIX- Institute of (3X200 MW + 3X500 MW + 1X500 MW) FGD DESIGN/2326/LOA Technology PACKAGE. 5 NSPCL Bhilai FGD Package PROVIDING DESIGN AND DRAWING OF SLIP 2342 ST 07-Dec-20 Two 10-Dec-20 1 Structus Consultants NIL L1 BHE/PW/PUR/ BHFGD- 23-Dec-20 Structus Consultants ₹ 70,000 30 days FORM WORK SYSTEM/ARRANGEMENTS FOR SLIPFORM-SYSTEM- UNIT-1 CHIMNEY AT 2X250MW NSPCL BHILAI DESIGN/2342/LOA FGD PROJECT. SAS COH of HPT, IPT, LPT & Associated Work U#12, 2353 LT 31-Dec-20 Two 04-Jan-21 3 M/s Indwell Constructions Pvt Ltd. NIL BHE/PW/PUR/VNT- Eco Power services 500 MW, NTPC Vindhyachal. M/s Power Mech Projects Ltd TG COH/2353/LOI 6 L1 07-Jan-21 ₹ 69,97,089 28 Days M/s Eco Power services SAS COH of Generator & Associated Work U#12, 500 2355 LT 02-Jan-21 Two 05-Jan-21 4 M/s Indwell Constructions Pvt Ltd. NIL MW, NTPC Vindhyachal. M/s Power Mech Projects Ltd M/s Eco Power services BHE/PW/PUR/VNT- 7 L1 08-Jan-21 Eco Power services ₹ 38,00,000 25 Days M/s Biswas Engineering & Construction COH GEN/2355/LOI Services SAS Major Overhauling of TG Set including HPT, Two 1.M/s Biswas Engineering & NIL BHE/PW/PUR/KKRN Biswas Engineering & LPT1, LPT2, Generator & associated work U #4, Construction Services TGOH U4/2351 /LOI Construction Services 540 MW NPCIL Tarapur 2. M/s The Time Construction 8 2351 LT 29-Dec-20 31-Dec-20 4 L1 04-Jan-21 ₹ 1,13,00,000 35 Days 3. M/s A K Engineers 4. M/s Power Mech Projects Ltd UTC Carriers NIL TRANSPORTATION OF 01 No. 360 MT PORTAL Globe Ecologistics Pvt Ltd GANTRY CRANE FROM BHEL SITE, 4X270 MW CJ DARCL Logistics Ltd BHE/PW/PUR/TPT- Transport BHADRADRI, MANUGURU, KHAMMAM 8 Days + Grace 9 1X660 MW Bhusawal 2335 LT 05-Dec-20 Two 14-Dec-20 6 Transport corporation of India Limited L1 360MT-CRN- 04-Jan-21 Corporation of India ₹ 8,85,000 (TELANGANA) TO BHEL SITE, 1X660MW Period of 2 days Procam Logistics Pvt Ltd BWT6/2335/JOB-1/LOI Limited MSPGCL, BHUSAWAL TPS, DEEPNAGAR, DISTT - D N Roadways Corporation of India JALGAON (MAHARASHTRA) Details of Contract awarded from 01/01/2021 to 31/03/2021 Project / Site Work Description / Package NOS. AND NAMES OF PARTIES NOS. AND LOI No. NAME OF WHETHER Mode of QUALIFIED AFTER TECHNO- NAMES OF CONTRACTOR TYPE OF CONTRACT Tender DATE OF LAST DATE OF NO.OF COMMERCIAL EVALUATION PARTIES NOT VALUE OF SCHEDULE DATE BIDDING AWARDED TO Sl No Tender No. Enquiry PUBLICATION RECEIPT OF TENDRS QUALIFIED LOI Date CONTRACT OF COMPLETION (SINGLE /TWO LOWEST Floated OF NIT TENDER (TBO) RECEIVED AFTER TECHNO- (Is Rs) (Contract Period) BID SYSTEM) TENDERER / OT / LT / ST COMMERCIAL EVALUATED L1 EVALUATION UTC Carriers NIL TRANSPORTATION OF 01 No. 360 MT PORTAL Globe Ecologistics Pvt Ltd GANTRY CRANE FROM BHEL SITE, 1X660 MW CJ DARCL Logistics Ltd BHE/PW/PUR/TPT- BHUSAWAL TPS, DEEPNAGAR, DISTT - JALGAON Transport corporation of India CJ Darcl Logistics 10 Days + Grace 10 1X660 MW Bhusawal 2335 LT 05-Dec-20 Two 14-Dec-20 6 L1 360MT-CRN- 04-Jan-21 ₹ 11,83,187 (MAHARASHTRA) TO BHEL SITE 1X660 MW Limited Limited Period of 2 days BWT6/2335/JOB-2/LOI PANKI THERMAL POWER PROJECT, KANPUR Procam Logistics Pvt Ltd (UP). D N Roadways Corporation of India M/s 5419/Atul Kumar Pandey Security NIL Agency M/s 5717/Uma Nath Gore Security BHE/PW/PUR/RIHAN 5419/Atul Kumar 11 NTPC Rihand R&M Security & Allied Services 2344 LT 11-Dec-20 Two 18-Dec-20 3 Agency L1 D-SEC/2344/Work 19-Jan-21 Pandey Security ₹ 12,59,914 12 Months M/s 5514/Saish Sudhakar Shete Security Order Agency Agency SAS COH of Generator-Exciter & Associated Work M/s Indwell Constructions Pvt Ltd. NIL BHE/PW/PUR/SIPT- Eco Power services U#4, 500 MW at NTPC Sipat M/s Power Mech Projects Ltd GENOH U4/2360/LOI 12 2360 LT 15-Jan-21 Two 18-Jan-21 3 M/s Eco Power services L1 21-Jan-21 ₹ 38,16,122 30 Days 1. KMRS Sales & Services 2. New Jwalla Security Force 1. Berojgar 3. R Soni & Sons Magaswargiya 4. Reynold Security Service Charmakar 5. Strollout Services India Pvt. Ltd. Bahuuddeshiya 6. KHFM Hospitality & Facility Sanstha BHE/PW/PUR/NGP- R K Pest Control & Fixing of Housekeeping contract at BHEL PSWR 13 PSWR HQ Nagpur 2315 OT 30-Oct-20 Two 20-Nov-20 13 Management Services Ltd. 2. Chef L1 HK/2315/Work 22-Jan-21 Housekeeping ₹ 9,48,000 24 Months HQ, Nagpur for a period of 24 months 7. R K Pest Control & Housekeeping Hospitality Order Services Services Services 8. Sai A1 Services 3. City Care 9. Patil Multipurpose Services Foundation 10. Vidarbha Industrial Services Collection of materials from BHEL/Client’s 1. Alpha Power Engineering Services BHE/PW/PUR/BWT6- Alpha Power stores/Storage yard; Transportation to site; Private Limited STG/2318/LOI Engineering Services Erection, testing & commissioning, trial 2. Indwell Constructions Private Limited Private Limited 1. M/s S. V. operation and handing over of Steam turbine, 3. Jyoti Tturbo Power Services Private Infratech Condenser, Generator set, Integral piping, Limited HP/LP heater, Pumps and Motors, Tanks & Engineers vessels and associated equipments, DG set, Private Limited auxiliaries connected with the systems and 2. M/s Bhavani other BOIs, Insulation, including supply and Erectors Private application of final painting for 1x660MW, Limited 14 1X660 MW Bhusawal Collection of materials from BHEL/Client’s 2318 OT 22-Oct-20 Two 19-Nov-20 7 3. M/s Power L1 29-Jan-21 ₹ 7,90,00,000 20 Months stores/Storage yard; Transportation to site; Mech Projects Erection, testing & commissioning, trial Limited operation and handing over of Steam turbine, 4. M/s Brothers Condenser, Generator set, Integral piping, Engineering and HP/LP heater, Pumps and Motors, Tanks & Erectors Limited vessels and associated equipments, DG set, auxiliaries connected with the systems and other BOIs, Insulation, including supply and application of final painting for 1x660MW, Unit- 6 Bhusawal Project. 1X660 MW Bhusawal TPS TFA Service Contract to GE Power India Ltd GE Power India Ltd Contract Agreement GE Power India Ltd 15 2329 ST 04-Jan-21 Single 07-Jan-21 1 Nil L1 22-Jan-21 ₹ 2,11,14,000 17 Months (Formerly Known as Alstom) for SG works 2329 SAS COH of HPT, IPT, LPT, Generator & Associated M/s Indwell Constructions Pvt Ltd. BHE/PW/PUR/MAUDT POWER MECH Work U#1, 500 MW, NTPC Mauda. M/s Power Mech Projects Ltd COH U1/2359/LOI PROJECTS LTD 16 2359 LT 15-Jan-21 Two 18-Jan-21 3 Nil L1 22-Jan-21 ₹ 1,19,89,857 32 Days M/s Eco Power services Details of Contract awarded from 01/01/2021 to 31/03/2021 Project / Site Work Description / Package NOS. AND NAMES OF PARTIES NOS.
Recommended publications
  • Annual Report 2 0 1 2 - 1 3
    Annual Report 2 0 1 2 - 1 3 Ministry of Power Government of India Shram Shakti Bhawan, Rafi Marg, New Delhi-110 001 Website : www.powermin.nic.in Shri Pranab Mukherjee, Hon’ble President of India with Shri Jyotiraditya M. Scindia, Hon’ble Union Minister of State for Power (Independent Charge) at the National Energy Conservation Day function CONTENTS Sl. No. Chapter Page No. (s) 1. Performance Highlights 5 2. Organisational Set Up and Functions of the Ministry of Power 9 3. Capacity Addition Programme in the XIIth Plan 11 4. Generation & Power Supply Position 23 5. Status of Ultra Mega Power Projects 35 6. Transmission 37 7. Status of Power Sector Reforms 41 8. Rural Electrification Programme 43 9. Re-Structured Accelerated Power Development and Reforms Programme (R-APDRP) 45 10. Energy Conservation 49 11. Renovation and Modernisation of Thermal Power Stations 53 12. Private Sector Participation in Power Sector 57 13. International Cooperation 59 14. Power Development Activities in North-Eastern Region 67 15. Central Electricity Authority 75 16. Central Electricity Regulatory Commission (CERC) 79 17. Appellate Tribunal for Electricity (APTEL) 83 Public Sector Undertakings: 18 NTPC Limited 85 19. NHPC Limited 105 20. Power Grid Corporation of India Ltd. (PGCIL) 111 21. Power Finance Corporation Ltd. (PFC) 115 22. Rural Electrification Corporation Ltd. (REC) 125 23. North Eastern Electric Power Corporation Limited (NEEPCO) 133 Joint Venture Corporations : 24. SJVN Limited (SJVNL) 135 25. THDC India Limited (THDCIL) 139 Statutory Bodies : 26. Damodar Valley Corporation (DVC) 143 27. Bhakra Beas Management Board (BBMB) 149 28. Bureau of Energy Efficiency (BEE) 155 Autonomous Bodies : 29.
    [Show full text]
  • Government of India Ministry of Power Rajya Sabha Unstarred Question No.2704 Answered on 17.03.2020
    GOVERNMENT OF INDIA MINISTRY OF POWER RAJYA SABHA STARRED QUESTION NO.244 ANSWERED ON 17.03.2020 POWER GENERATION FROM THERMAL AND HYDRO POWER PLANTS †*244. SHRI LAL SINH VADODIA: Will the Minister of POWER be pleased to state: (a) the quantum of power generated in terms of megawatts by hydro-power stations as on date; (b) the quantum of power generated in terms of megawatts by thermal power stations; and (c) the cost of per unit power generation by hydro-power stations and per unit cost of power generation by thermal power stations? A N S W E R THE MINISTER OF STATE (INDEPENDENT CHARGE) FOR POWER, NEW & RENEWABLE ENERGY AND THE MINISTER OF STATE FOR SKILL DEVELOPMENT & ENTREPRENEURSHIP ( SHRI R.K. SINGH) (a) to (c) : A Statement is laid on the Table of the House. ******* STATEMENT STATEMENT REFERRED TO IN REPLY TO PARTS (a) TO (c) OF STARRED QUESTION NO. 244 ANSWERED IN THE RAJYA SABHA ON 17.03.2020 REGARDINGPOWER GENERATION FROM THERMAL AND HYDRO POWER PLANTS. ********* (a) & (b): As on 29.02.2020, the installed generation capacity of hydro and thermal power stations are 45,699 megawatts (MW) and 2,30,190 MW respectively. The electricity generated from the hydro and thermal power plants during the current year 2019-20 (upto February, 2020) are about 146.7 Billion Units (BU) and about 960 BU respectively. (c): The cost of power generation from thermal and hydro to power projects depends upon various factors, which inter alia are: 1. Type of fuel – Coal, lignite, gas, naptha, diesel etc.
    [Show full text]
  • Final Draft of CEA Anual Report 2019-20
    CEA ANNUAL REPORT 2019-20 CENTRAL ELECTRICITY AUTHORITY GOVERNMENT OF INDIA MINISTRY OF POWER The AUTHORITY (As on 31.03.2020) Sh. Prakash Mhaske Chairperson & Addl. Charge of Member (Power System) Dr. Somit Dasgupta Sh. P.D. Siwal Member (E&C) Member (Thermal) (upto 31.12.2019) (upto 29.02.2020) Sh.Sandesh Kumar Sharma Sh. Dinesh Chandra Member (Planning) Member (Hydro) Addl.charge Member(E&C) Addl.Charge of Member (GO&D) ORGANIZATION CHART OF CEA (AS ON 31.03.2020) CHAIRPERSON (Prakash Mhaske) MEMBER MEMBER MEMBER MEMBER MEMBER MEMBER (THERMAL) (HYDRO) (POWER SYSTEM) (GRID OPN. & (ECONOMIC & COMM.) (PLANNING (P.D. Siwal) (Dinesh Chandra) Addl. Charge DISTN.) (Dr. Somit Dasgupta) (Sandesh Kumar Sharma) with Chairperson, CEA Addl. Charge with (प्रकाश मके) CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER (INTEGRATED (HYDRO (POWER SYSTEM (FINANCIAL CHIEF ENGINEER-I (THERMAL CHIEF ENGINEER–II SECERETARY RESOURCE ENGINEERING AND PLANNING & STUDIES & (Chander Shakhar) PROJECT (B.K. Sharma) (P.C. KUREEL) PLANNING) RENOVATION & APPRAISAL-I) ANALYSIS) MONITORING-I) MODERNIZATION) CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER (FUEL CHIEF ENGINEER CHIEF ENGINEER (GRID CHIEF ENGINEER (COORDINATION) MANAGEMENT) (THERMAL CHIEFI ENGINEER (POWER SYSTEM MANAGEMENT) (FINANCIAL & PROJECT APPRAISAL PROJECT (HYDRO PROJECT PLANNING & APPRAISAL) COMMERCIAL COMMITTEE MONITORING-II) APPRAISAL-II) CHIEF ENGINEER APPRAISAL) CHIEF ENGINEER CHIEF ENGINEER (POWER DATA MS (NRPC) (DISTRIBUTION (HUMAN CHIEF ENGINEER CHIEF
    [Show full text]
  • Amendment to the Third Transfer Scheme for Transfer of Procurement
    GOVERNMENT OF ANDHRA PRADESH ABSTRACT Energy Department - Amendment to the Third Transfer Scheme for transfer of Procurement and Bulk Supply of Electricity and Trading of Electricity and allocation of Power Purchase Agreements from Transmission Corporation of Andhra Pradesh Limited to Four Distribution Companies viz. EPDCL, SPDCL, CPDCL, and NPDCL – Notification – Orders – Issued. -------------------------------------------------------------------------------------- ENERGY (POWER.III) DEPARTMENT G.O.Ms.No.53 Dated.28-04-2008. Read the following:- 1. G.O.Ms.No.58, Energy (Power.III) Department, Dated 7-6-2005. 2. G.O.Ms.No.101, Energy (Power.III) Department, Dated 31-10.2005. 3. G.O.Ms.No.24, Energy (Power.III) Department, Dated 08-03-2006. 4. G.O.Ms.No.78, Energy (Power.III) Department, Dated 3-8-2007. 5. G.O.Ms.No.3, Energy (Pr.III) Department, Dated 3-1-2008. 6. From the C&MD, APTRANSCO, Lr.No.CMD/CE/RAC & Reforms/ Third Tr.Scheme/D.No.33/2008, Dated 27-3-2008. 7. G.O.Ms.No.52,Energy (Pr.III) Department, Dated.28-04-2008. -o0o- O R D E R:- In G.O.1 st read above, Government have issued orders publishing the Andhra Pradesh Electricity Reform (Transfer of Bulky Supply undertaking from the Transmission Corporation of Andhra Pradesh Limited to Distribution Companies) Scheme, 2005. 2. The Government have also issued certain amendments to the aforesaid A.P. Electricity Reform Scheme, 2005 vide G.Os. 2 nd to 5 th read above. 3. In the reference 6 th read above, the Chairperson & Managing Director, APTRANSCO has finalized the final allocation of capacities of DISCOMs and requested to issue an amendment to Third Transfer Scheme to that effect.
    [Show full text]
  • Final Environmental Impact Assessment Report for Telangana Super Thermal Power Project Stage-I (2X800 MW) at Ramagundam, Karimnagar District, Telangana State
    Final Environmental Impact Assessment Report for Telangana Super Thermal Power Project Stage-I (2x800 MW) at Ramagundam, Karimnagar District, Telangana State Project Proponent : NTPC Limited (A Government of India Enterprise) New Delhi Environmental Consultant : Vimta Labs Limited 142, IDA, Phase-II, Cherlapally, Hyderabad–500 051, Telangana State (Approved Consultant) www.vimta.com, [email protected] (NABL/ISO 17025 Certified Laboratory, Recognized by MoEF, New Delhi) October, 2015 FINAL REPORT M/s. NTPC Limited Ramagundam, Telangana ENVIRONMENTAL IMPACT ASSESSMENT STUDY FOR TELANGANA SUPER THERMAL POWER PROJECT STAGE-I (2X800 MW) AT RAMAGUNDAM, KARIMNAGAR DISTRICT, TELANGANA STATE For and on behalf of VIMTA Labs Limited Approved by : M. Janardhan Signed : Position : HOD & Vice President (Env) Date : October 9, 2015 The report has been prepared inline with the prescribed TORs issued vide No.J- 13012/112/2010-IA.II (T) dated 16.09.2014 and its amendment dated 12.12.2014 of Ministry of Environment and Forests, New Delhi. This report has been prepared by Vimta Labs Limited with all reasonable skill, care and diligence within the terms of the contract with the client, incorporating our General Terms and Conditions of Business and taking account of the resources devoted to it by agreement with the client. Table of Contents Final Environmental Impact Assessment Doc No.9591/999/GEG/S/001 Report for Rev No. 0 Telangana Super Thermal Power Project Issue Date: 09.10.2015 Stage-I (2 X 800 MW) Page 1 of 8 Table of Contents _______________________________________________________________
    [Show full text]
  • Explain the Importance of Agriculture in Telangana. Explain the TS Govt Measures to Promote Agriculture
    www.OnlineIAS.com [email protected] Explain the importance of agriculture in Telangana. Explain the TS govt measures to promote agriculture. Introduction Agriculture plays a pivotal role in the economy of Telangana and the better performance of this sector is vital for inclusive growth. Telangana went in for the Green Revolution in rice cultivation in the 1970s. There have been significant changes in the structure and performance of the agrarian economy in the state in the recent years. Telangana State is endowed with bountiful resources having good soils, diversified cropping pattern and major irrigation systems fed by rivers like Godavari and Krishna. Agriculture is a way of life, a tradition that has shaped the culture and economic life of the people of Telangana. Therefore, it will continue to be central to all strategies for planned socio-economic development of the State. The State Government has emphasized the need to achieve 6% growth rate and increased returns on investment to farmers through improved technology, effective extension reach, efficient input delivery, mechanisation, marketing tie up, adequate credit and crop insurance. The total Geographical area of the State is 114.84 lakh ha with a Gross Cropped Area of 62.88 lakh ha in the year 2013-14. 1. Total Geographical Area 114.84 Lakh Ha 2. Gross Cropped Area 62.88 3 Lakh Ha 3. Net Cropped Area 49.61 4 Lakh Ha 4. Gross Irrigated Area 31.64 Lakh Ha 5. Net Irrigated Area 22.89 Lakh Ha 6. No. of Farm holdings 55.54 Lakh Nos. www.OnlineIAS.com 9246365622 www.OnlineIAS.com [email protected] 7 .Average Farm Holding size 1.12 Ha 8.
    [Show full text]
  • Retirement, Renewables and Rationalisation
    [ 1 ] The 3Rs of Discom Recovery: Retirement, Renewables and Rationalisation The 3Rs of DISCOM Recovery Retirement, Renewables and Rationalisation Discoms and state governments can save thousands of crores by retiring old power plants, tapping cheaper renewable energy and freezing expenditure on new coal plants [ 2 ] The 3Rs of Discom Recovery: Retirement, Renewables and Rationalisation Authors About Climate Risk Horizons ————————————————————————————————————————— ————————————————————————————————————————— Ashish Fernandes Climate Risk Horizons’ (CRH) work highlights the systemic CEO & Lead Analyst, Climate Risk Horizons risks that disruptive climate change poses to investors, lenders [email protected] and infrastructure investments. Through a data-driven, research- oriented approach that incorporates a holistic understanding of Harshit Sharma climate policy, energy infrastructure and regulatory processes, Lead Researcher, Climate Risk Horizons CRH provides advice on risk management strategies to [email protected] minimise stranded, non-performing assets and economic disruption in the face of climate change. Suggested Citation Ashish Fernandes & Harshit Sharma. The 3Rs of Discom Learn more about our work at www.climateriskhorizons.com Recovery: Retirement, Renewables & Rationalisation. Climate Risk Horizons. August 2020. This report is for information and educational purposes only and based upon a variety of public information sources which have been cited. CRH believes such information to be reliable
    [Show full text]
  • Case Study on Use of Decant Water for Cultivation Near
    ISSN 2277-2685 IJESR/May 2019/ Vol-9/Issue-5/14-21 Arti Pasi et. al., / International Journal of Engineering & Science Research CASE STUDY ON USE OF DECANT WATER FOR CULTIVATION NEAR NTPC RAMAGUNDAM SUPER THERMAL POWER PLANT TELANGANA (ANDHRA PRADESH) Arti Pasi*1, RK Srivastava1, Avinash Jain1 1Dept. of Environmental Science, Govt. Science College, Department Of Ecology TFRI Jabalpur (M.P), India. ABSTRACT The present study encompassed the contamination of water by the fly ash released from Ramagundam Super Thermal Power Plant(TPPs), the current largest Thermal Power Plant in south India, it is a 2600 MW Thermal Power Station situated in Peddapalli district in the Indian state of Telangana, Fly ash is a by-product of the combustion of pulverized coal in power station. Fly ash is an amorphous glassy material consisting of silica, aluminum, iron and calcium oxides plus other minor constituents. Basically the releasing of huge amount of fly ash affects the water resources. Detected higher concentration of Ca, Mg, Na, K and many more element in the sample of some sites while detected minimum in some site in all the collected samples. Keywords: Fly ash, amorphous, pulverized, Ramagundam (TPPs), Peddapalli. INTRODUCTION Since coal contains trace levels of trace elements (e.g. arsenic, barium, beryllium, boron, cadmium, chromium, thallium, selenium, molybdenum and mercury), fly ash obtained after combustion of this coal contains enhanced concentrations of these elements, and therefore the potential of the ash to cause groundwater and surface water pollution needs to be evaluated. Environmental pollution by the coal based TPP all over the globe is cited to be one of the major sources of pollution affecting the general aesthetics of our environment in terms of air, soil, water and vegetation pollution.
    [Show full text]
  • Case Study on Use of Irrigated Soil by Decant Water for Cultivation Near NTPC Ramagundam Super Thermal Power Plant Telangana (Andhra Pradesh)
    Global Journal of Science Frontier Research: H Environment & Earth Science Volume 19 Issue 2 Version 1.0 Year 2019 Type: Double Blind Peer Reviewed International Research Journal Publisher: Global Journals Online ISSN: 2249-4626 & Print ISSN: 0975-5896 Case Study on use of Irrigated Soil by Decant Water for Cultivation Near NTPC Ramagundam Super Thermal Power Plant Telangana (Andhra Pradesh) By Aarti Pasi, Dr. R.K. Srivastava & Dr. Avinash Jain Abstract- The present study was conducted around the ash disposal sites of Ramagundam Super thermal power Plant (TPPs) Surrounding agricultural lands. It is situated in Peddapalli Telangana. Fly ash is produced as a result of coal combustion in thermal power station and discharged in ash ponds. Basically the releasing of huge amount of flay ash affects the soil quality. Detected higher concentration of Ca, Mg, Na, K and many more element in the sample of some sites while recorded minimum concentration in some site in all the collected samples. Keywords: fly ash, amorphous, pulverized, ramagundam (tpps), peddapalli. GJSFR-H Classification : FOR Code: 050399 CaseSt udyonuseofIrrigatedSoilbyDecantWaterforCultivationNearNTPCRamagundamSuperThermalPowerPlantTelanganaAndhraPradesh Strictly as per the compliance and regulations of: © 2019. Aarti pasi, Dr. R.K. Srivastava & Dr. Avinash Jain. This is a research/review paper, distributed under the terms of the Creative Commons Attribution-Noncommercial 3.0 Unported License http://creativecommons.org/licenses/by-nc/3.0/), permitting all non commercial use, distribution, and reproduction in any medium, provided the original work is properly cited. Case Study on use of Irrigated Soil by Decant Water for Cultivation Near NTPC Ramagundam Super Thermal Power Plant Telangana (Andhra Pradesh) Aarti pasi α, Dr.
    [Show full text]
  • !E"? (Y.S.GUPTA) Additional General Manager (EMG)
    ffi#rgrffi RAMAGUT{DAM Ref. No :oelEMG I ALI 2017 / 6 63 Date: 20.05.20L7 To THE DIRECTOR RegionalOffice (SEz) Ministry of Environment Forests & Climate Change l-st and 2nd Floors, Handloom Export Promotional Council 4 Cathedral Garden Road Nungambakkam, Chennai -560 034 Dear Sir Sub: Six Monthly Compliance report of EC issued to NTPC Ramagundam STPP Stage-lll (1xs00MW) -Reg We are herewith submitting the six monthly compliance reports for Environmental Clearance given to our station pertaining to the period October 2016 to March 2017. Also we are submitting the stack data, ambient air quality data and dust ) concentration data for the period along with report. Also please find enclosed the Soft copy of the report in CD. Thanking you Yours faithfully For NTPC Ltd !e"? (Y.S.GUPTA) Additional General Manager (EMG) Ramagundam Super Thermal Power Station, PO: Jyothinagar, Dist: Peddapalli, TS- 5O5 215 : Telephone no.O87 28-27 2962 F ax: O87 28-27 2L5L Regd. Office:NTPC Limited, NTPC Bhawan, Scope Complex, 7 lnstitutional Area, Lodhi Road, New Delhi-110 OO3 No. 140101D11975GO1007966 www.ntpc.co.in STATUS OF IMPLEMENTATION OF CONDITIONS STIPULATED IN ENVIRON M ENTAL CLEARANCE NAME OF THE PROJECT: RAMAGUNDAM STPP STAGE-III (lXSOOMW) LETTE R NO : OM NO J- LSOL I 20 I 9 4-tA-ll DATED 2s I 09 I L99s. s. STIPULATIONS STATUS AS ON 31.03.2017 No. 1. All the conditions stipulated by the All the conditions stipulated by the State Pollution Control Board shall be Telangana State Pollution Control Board i m plemented effectively. (TSPCB) are being implemented effectively.
    [Show full text]
  • Written Submissions on Behalf of the Appellant
    1 BEFORE THE NATIONAL GREEN TRIBUNAL SOUTHERN ZONE BENCH AT CHENNAI APPEAL NO. 46 OF 2016 IN THE MATTER OF: UMA MAHESWAR DAHAGAMA …APPELANT VERSUS UNION OF INDIA & ORS …RESPONDENTS WRITTEN SUBMISSIONS ON BEHALF OF THE APPELLANT MOST RESPECTFULLY SHOWETH: 1. That the Appellant is filing these written submissions in the above-mentioned Appeal. The appeal has been filed against the environmental clearance dated 20.1.2016 granted by Respondent No. 1 (Hereinafter called as “MoEF&CC”) to the proposed 2x800 MW NTPC (Hereinafter called as “Project Proponent”) Thermal Power Plant at Ramagundam, Karimnagar district, Telanagana State. 2. It is submitted that the Appellant has raised various critical issues such as Characteristic analysis of fuel not being done, its Radio Activity and Heavy metal content testing not being done and their impacts not being studied, False Ambient Air Quality (AAQ) monitoring being done, False results of AAQ being presented, Cumulative Impact Assessment not being done, Hydro-geological impacts not being considered, Health impacts not being studied, Various TOR not being complied and various environmental clearance conditions of existing plant not being complied by the Project Proponent. The Appellant has also submitted that the Expert Appraisal Committee (Hereinafter called as “EAC”) and MoEF&CC have not considered the above issues and have granted the environmental clearance for the above-said project without the application of mind and without any reasons. 2 3. The following substantial questions arise out of the present Appeal: I. Whether the non-compliance of Terms of Reference (TOR) completes and fulfils the objective and necessity of Environmental Impact Assessment (EIA) Study, Public Hearing and Appraisal under the EIA Notification, 2006, Environmental (Protection) Act, 1986 and Principles of Precaution and Sustainable Development? II.
    [Show full text]
  • Estimation of Renewable Energy Resources for Establishment of Green Microgrids
    International Journal of Science Technology & Management www.ijstm.com Volume No.04, Special Issue No.01, February 2015 ISSN (Print) 2394-1529, (Online) 2394-1537 ESTIMATION OF RENEWABLE ENERGY RESOURCES FOR ESTABLISHMENT OF GREEN MICROGRIDS S.Venkateshwarlu1, Harini.V2, Sruthi DVS3, Prudhvi Sonnati4 1,2,3,4 CVR College of Engineering, Hyderabad, (India) ABSTRACT The current Indian Power economy poses a great challenge to the dynamics of energy security of the power hungry 21st century. As technology is the roost there is an urgent need to eliminate energy poverty. The major source of power in India is through conventional energy sources like coal, fossil fuels etc. The perishable nature of these primary fuels brings in the need to tap energy from unexplored avenues. Some of the well-known and well established sources such as wind, biomass potentials have already been estimated. However newer sources are available whose potential is not estimated. This paper attempts to estimate the potential of such sources like Ocean Thermal Energy Conversion (OTEC), Biomass etc. As technology progresses commercial extraction of this energy can be made possible. The case studies of the states of Andhra Pradesh and Telangana in India has been taken and the current challenges and possible solutions have been presented here. In a nutshell the solution promotes the establishment of renewable micro grids to address local energy needs. Keywords: Bio-Mass, Micro Grid, OTEC, Renewable Energy, Solar Energy, Wave Energy I INTRODUCTION The Indian power economy is characterized by a number of technical and economical challenges where the grid is not extremely reliable.
    [Show full text]