Final Draft of CEA Anual Report 2019-20
Total Page:16
File Type:pdf, Size:1020Kb
CEA ANNUAL REPORT 2019-20 CENTRAL ELECTRICITY AUTHORITY GOVERNMENT OF INDIA MINISTRY OF POWER The AUTHORITY (As on 31.03.2020) Sh. Prakash Mhaske Chairperson & Addl. Charge of Member (Power System) Dr. Somit Dasgupta Sh. P.D. Siwal Member (E&C) Member (Thermal) (upto 31.12.2019) (upto 29.02.2020) Sh.Sandesh Kumar Sharma Sh. Dinesh Chandra Member (Planning) Member (Hydro) Addl.charge Member(E&C) Addl.Charge of Member (GO&D) ORGANIZATION CHART OF CEA (AS ON 31.03.2020) CHAIRPERSON (Prakash Mhaske) MEMBER MEMBER MEMBER MEMBER MEMBER MEMBER (THERMAL) (HYDRO) (POWER SYSTEM) (GRID OPN. & (ECONOMIC & COMM.) (PLANNING (P.D. Siwal) (Dinesh Chandra) Addl. Charge DISTN.) (Dr. Somit Dasgupta) (Sandesh Kumar Sharma) with Chairperson, CEA Addl. Charge with (प्रकाश मके) CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER PRINCIPAL CHIEF ENGINEER (INTEGRATED (HYDRO (POWER SYSTEM (FINANCIAL CHIEF ENGINEER-I (THERMAL CHIEF ENGINEER–II SECERETARY RESOURCE ENGINEERING AND PLANNING & STUDIES & (Chander Shakhar) PROJECT (B.K. Sharma) (P.C. KUREEL) PLANNING) RENOVATION & APPRAISAL-I) ANALYSIS) MONITORING-I) MODERNIZATION) CHIEF ENGINEER CHIEF ENGINEER CHIEF ENGINEER (FUEL CHIEF ENGINEER CHIEF ENGINEER (GRID CHIEF ENGINEER (COORDINATION) MANAGEMENT) (THERMAL CHIEFI ENGINEER (POWER SYSTEM MANAGEMENT) (FINANCIAL & PROJECT APPRAISAL PROJECT (HYDRO PROJECT PLANNING & APPRAISAL) COMMERCIAL COMMITTEE MONITORING-II) APPRAISAL-II) CHIEF ENGINEER APPRAISAL) CHIEF ENGINEER CHIEF ENGINEER (POWER DATA MS (NRPC) (DISTRIBUTION (HUMAN CHIEF ENGINEER CHIEF ENGINEER PLANNING AND MANAGEMENT) ADMINISTARATION RESOURCE CHIEF ENGINEER (HYDRO PROJECT (POWER SYSTEM TECHNOLOGY) (THERMAL MS (WRPC) CHIEF ENGINEER DEVELOPMENT) MONTORING) ENGINEERING & PROJECT (LEGAL AFFAIRS) CHIEF ENGINEER TECHNOLOGY RENOVATION & DEVELOPMENT) MS (SRPC) (RENEWABLE CHIEF ENGINEER MODERNIZATION) PROTOCOL PROJECT CHIEF ENGINEER (DISTRIBUTION MS (ERPC) MR MONITORING) POLICY AND CHIEF ENGINEER (HYDRO PROJECT REGULATIONS) UMPP(ULTRA PLANNING & CHIEF ENGINEER CHIEF ENGINEER MS (NERPC) MEGA PROJECT) INVESTIGATION) (POWER SYSTEM (REGULAORY PROJECT CHIEF ENGINEER AFFAIRS) BUDGET AND MONITORING) CHIEF ENGINEER CVO (RESEARCH & ACCOUNTS (OPERATION DEVELOPMENT CHIEF ENGINEER CHIEF ENGINEER (Part-time) PERFOMANCE (THERMAL (HYDRO ELECTRIC MONITORING) ADVISOR PFORMANCE POTENTIAL CHIEF ENGINEER (ECONOMY POLICY) CHIEF ENGINEER EVALUATION & REASSESSMENT) (RENEWABLE (POWER CLIMATE COMMUNICATION CHIEF ENGINEER DS Vigilance TECHNOLOGY & CHANGE_) DEVELOPMENT) NATIONAL INTEGRATION) CHIEF ENGINEER ( CHIEF ENGINEER (HYDRO POWER DY. DIRECTOR (THERMAL CIVIL ENGINEERING & COMMITTEE) GENERAL (DDG) CHIEF ENGINEER DESIGN) TECHNOLOGY CHIEF ENGINEER (POWER SURVEY DEVELOPMENT) (CHIEF ELECTRICAL CHIEF ENGINEER & LOAD INSEPECTORATE) (DISTRIBUTION FORECASST) CHIEF EINGNEER (THERMAL MANAGEMENT ) ENGINEERING & CHIEF ENINEER TECHNOLOGY SE, RIO (N) (INFORMATON DEVELOPMENT) TECHNOLOGY) SE, RIO (W) CHIEF ENGINEER SE, RIO (S) (THERMAL PROJECT PLANNING & DEVELOPMENT) SE, RIO (E) SE, RIO (NE) DD [RPSO (N)] DD [RPSO (W)] DD [RPSO(S)] DD [RPSO (E)] Central Electricity Authority ANNUAL REPORT 2019-2020 CENTRAL ELECTRICITY AUTHORITY Sewa Bhawan, R.K. Puram, New Delhi – 110066 CEA Website: www.cea.nic.in Sub ordinate Offices: Regional Power Committees: 1. Member Secretary, Eastern Regional Power Committee, 14 Golf Club Road, Tollygunge, Kolkata – 700033. 2. Member Secretary, Northern Regional Power Committee, 18-A, Shaheed Jeet Singh Marg, New Delhi – 110016. 3. ember Secretary, Southern Regional Power Committee, 29 Race Course Cross Road, Near Anand Rao Circle, Bangaluru – 560009. 4. Member Secretary,Western Regional Power Committee, Plot No. F-3, Opposite SEEPZ Complex, MIDC Area Marol, Andheri (East), Mumbai – 400093. 5. Member Secretary, North-Eastern Regional Power Committee, Meghalaya NERPC Complex, 3rd Floor, Dong Parmaw, Lapulang, Shillong-793006. Regional Power Survey Offices (RPSOs): 1. Dy. Director, Regional Power Survey Office (East), Room No. 201, C.G.O. Complex, ‘DF’- Block, Salt Lake City, Kolkata – 700064. 2. Dy. Director, Regional Power Survey Office (North), 224, 2nd Floor, Sewa Bhawan, R.K. Puram, New Delhi– 110066. 3. Dy. Director, Regional Power Survey Office (South), Post Box No. – 38, 6th Floor, ‘F’ – Wing, Kendriya Sadan, Koramamgala, Bangaluru – 560034. 4. Dy. Director, Regional Power Survey Office (West), 5th Floor, Plot No. F-3, Opposite SEEPZ Complex, MIDC Area Marol, Andheri (East), Mumbai – 400093. Regional Inspectorial Organisations: 1. Superintending Engineer, Regional Inspectorial Organisation (East), 14 Golf Club Road, Tollygunge, Kolkata – 700033. 2. Superintending Engineer, Regional Inspectorial Organisation (North), 18-A, Shaheed Jeet Singh Marg, Katwaria Sarai, New Delhi – 110016. 3. Superintending Engineer, Regional Inspectorial Organisation (South), Block- IV, Floor-III, Shastri Bhawan, Chennai – 600006. 4. Superintending Engineer, Regional Inspectorial Organisation (West), Ground Floor, WRPC Building, F-3, MIDC Area Marol, Andheri (East), Mumbai – 400093. 5. Superintending Engineer, Regional Inspectorial Organisation (North-East), NERPC Complex, 3rd Floor, Dong Parmaw, Lapulang, Shillong-793006. Central Electricity Authority ANNUAL REPORT 2019-2020 INDEX CHAPTER DESCRIPTION P. NO. CHAPTER-1 CEA as an Organisation 1 CHAPTER-2 Planning for Power and Development 11 CHAPTER-3 Power Systems Planning and Development 36 CHAPTER-4 Grid Management 62 CHAPTER-5 Hydro Power Development 71 CHAPTER-6 Thermal Power Development 81 CHAPTER-7 Distribution and Rural Electrification 107 CHAPTER-8 Design & Engineering Services 123 CHAPTER-9 Economic and Commercial Aspects of Power Industry 126 CHAPTER-10 Power Generation 137 CHAPTER-11 Power Development in North-Eastern Region 146 CHAPTER-12 Training and Human Resource Development 161 ANNEXURE P. NO. ANNEXURE-2A Plant-wise Coal Receipt and Consumption during 2019-20 165 ANNEXURE-3A Details of Inter-Regional Transmission Lines as on 31-03-2020 171 ANNEXURE-3B Issues Pertaining to Transmission System Planning taken up 173 during 2019-20 ANNEXURE-3C Details of the Schemes notified through Tariff Based 183 Competitive Bidding (TBCB) during 2019-20 ANNEXURE-3D Issues Pertaining to Transmission System Planning taken up in 184 National Committee on Transmission during 2019-20 ANNEXURE-3E The cost committee constituted for this purpose has met two times i.e. on 14.03.2019 and 06.06.2019 and estimated the cost 185 of the following transmission schemes: ANNEXURE-3F Progress under Green Energy Corridor during 2019-20 138 ANNEXURE-3G Details of failure of EHV transmission line towers (220 kV and 139 above) reported to CEA by various utilities ANNEXURE-3H Details of failure of EHV transformers and reactors (220 kV and 190 above) reported to CEA by various utilities: ANNEXURE-3I Transmission Lines Completed During FY- 2019-20 200 ANNEXURE-3J Sub-Stations Completed During FY - 2019-20 - ANNEXURE-4A Power Supply Position for 2019-20 211 ANNEXURE-4B Allocation from Conventional Central Generating Stations as on 213 31.03.2020 ANNEXURE-5A PFRS under 50 000 MW Hydroelectric Initiative State-wise List 214 of Scheme ANNEXURE-5B Hydro Capacity addition during 2018-19 220 ANNEXURE-5C Hydro Capacity Addition Programme for 2019-20 221 ANNEXURE-5D Hydro Capacity Addition Programme for 2020-21 223 ANNEXURE-5E State-wise List of Hydro RMU&LE schemes completed upto the - VIII Plan ANNEXURE-5F State-wise List of Hydro RMU&LE schemes completed in the IX 224 Plan ANNEXURE-5G State-wise List of Hydro RMU&LE schemes completed in the X 226 Plan Central Electricity Authority ANNUAL REPORT 2019-2020 ANNEXURE-5H State-wise List of Hydro RMU&LE schemes completed in the 229 XI Plan ANNEXURE-5I State-wise list of Hydro RMU&LE schemes completed in the XII 231 Plan ANNEXURE-5J State-wise list of Hydro RMU&LE schemes programmed for 233 completion during 2017-22 ANNEXURE-5K State-wise List of Hydro RMU&LE schemes programmed 237 for completion during 2022-27 ANNEXURE-6A Thermal Capacity Addition Programme (RFD) for the year 242 2018-19 ANNEXURE-6B Thermal Capacity Addition Programme (RFD) for the year 2019- 244 20 ANNEXURE-9A Outstanding Dues (More than 45 days) Of Power Utilities (Principal and Surcharge) Payable to Central Public Sector 245 Undertakings (CPSU) ANNEXURE-9B Statement Showing Estimated Average rates of Electricity (upto 251 01.04.2019) (Provisional) ANNEXURE-10A All India Sector wise/Organisation wise Target, Actual 252 Generation & PLF (%) for the year 2019-20 ANNEXURE-10B All India Installed Capacity (In MW) of Power Stations located 260 in the Regions of main land and islands (As on 31.03.2020) ANNEXURE-11A 1st meeting of North Eastern Regional Power Committee (Transmission Planning) [NERPC(TP)] 269 ANNEXURE-12A Details of Foreign Tours Performed During 2019-20 270 Central Electricity Authority ANNUAL REPORT 2019-2020 From the Chairperson Electricity is one of the most vital components of infrastructure for the inclusive economic growth and development of the nations. The sustained growth with continuous transformation according to new challenges has been characteristic of Indian power sector. Central Electricity Authority (CEA) has played key role in this process since many decades. The journey of power sector on growth trajectory has continued in the year 2019-20 with focus on reliable, economic and quality power to all. CEA, as one of the apex organizations in the country, has been carrying out statutory functions including planning, specifying technical regulations, facilitating