Copy of PMW Tutong District (Press Release) Memo20 English Section Listed below are the designated areas for the planned maintenance work as for September, 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Kampong Bekiau, Installation of pole monted street light fitting at A part of Kampong Bekiau and its surrounding 1 09th September 2019 1.30 pm to 4.30 pm Mukim Kiudang. Low voltage overhead lines areas. Monday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 2 Replacement of Low voltage overhead lines. 09th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Tuesday 8.00 am to 12.00 noon Kampong Bekiau, A part of Kampong Bekiau and its surrounding 3 Installation of short arm street light fitting. 10th September 2019 1.30 pm to 4.30 pm Mukim Kiudang. areas. Tuesday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 4 Replacement of Low voltage overhead lines. 10th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Tuesday 8.00 am to 12.00 noon Kampong Sentol, Installation of pole monted street light fitting at A part of Kampong Sentol and its surrounding 5 10th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines areas. Tuesday 8.00 am to 11.30 am Kampong Bayong, 6 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 10th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 7 Replacement of ovehead lines. 10th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 8 Replacement of Low voltage overhead lines. 11th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Wednesday 8.00 am to 12.00 noon Kampong Sentol, Installation of pole monted street light fitting at A part of Kampong Sentol and its surrounding 9 11th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines areas. Wednesday 8.00 am to 12.00 noon Kampong Sembatang, Installation of pole monted street light fitting at A part of Kampong Sembatang and its 10 11th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Bayong, 11 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 11th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Page 1 Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 12 Replacement of ovehead lines. 11th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Thursday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 13 Replacement of Low voltage overhead lines. 12th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Thursday 8.00 am to 12.00 noon Kampong Sembatang, Installation of pole monted street light fitting at A part of Kampong Sembatang and its 14 12th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines surrounding areas. Thursday 8.00 am to 11.30 am Kampong Bayong, 15 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 12th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 16 Replacement of ovehead lines. 12th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Saturday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 17 Replacement of Low voltage overhead lines. 14th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Saturday 8.00 am to 11.30 am Kampong Bayong, 18 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 14th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Saturday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545 spg 633 Kampong 19 Replacement of ovehead lines. 14th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Bayong, 20 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 16th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 21 Replacement of ovehead lines. 16th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Long Mayan, Installation of pole monted street light fitting at Spg 2566 Kampong Long Mayan and its 22 16th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Bayong, 23 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 17th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Tuesday 8.00 am to 11.30 am Kampong Long Mayan Installation of pole monted street light fitting at A part of Kampong Long Mayan and its 24 17th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Page 2 Tuesday 8.00 am to 11.30 am Installation of pole monted street light fitting at A part of kampong Merimbun and its surrounding 25 Kampong Merimbun, Mukim Rambai 17th September 2019 1.30 pm to 4.30 pm Low voltage overhead lines areas. Tuesday 8.00 am to 11.30 am Kampong Bukit Installation of pole monted street light fitting at Spg 2314 to Spg 2132 Kampong Bukit and its 26 17th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 27 Replacement of ovehead lines. 17th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Bayong, 28 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 18th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 29 Replacement of ovehead lines. 18th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Bukit, Installation of pole monted street light fitting at Spg 2113 to spg 1841 Kampong Bukit and its 30 18th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Talad, Installation of pole monted street light fitting at A part of Kampong Talad and its surrounding 31 18th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines areas. Spg 1200 Jln Pak Bidang and its surrounding Thursday 8.00 am to 11.30 am Kampong Ukong Installation of pole monted street light fitting at areas. 32 19th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Low voltage overhead lines Spg 1084 Jln Piton Nambang and its surrounding areas. Thursday 8.00 am to 11.30 am Kampong Ukong, Installation of pole monted street light fitting at A part of Jln Piton Nambang, spg 800 Kampong 33 19th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines Sg Damit and its surrounding areas. Thursday 8.00 am to 11.30 am Kampong Bayong, 34 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 19th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Saturday 8.00 am to 11.30 am Kampong Bayong, 35 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 21th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Kampong Sungai Damit and Spg 591 Kampong Sg Damit and its surrounding Saturday 8.00 am to 11.30 am Installation of pole monted street light fitting at 36 Kampong Bukit Udal, Mukim areas. A part of Kampong Bukit Udal and its 21th September 2019 1.30 pm to 4.30 pm Low voltage overhead lines Tanjong Maya surrounding. Monday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 37 Replacement of ovehead lines. 23th September 2019 1.30 pm to 4.30 pm Mukim Rambai areas. Page 3 Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 38 Replacement of ovehead lines. 23th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 39 Replacement of ovehead lines.
Recommended publications
  • PMW Tutong District (Press Release) Memo25
    English Section Listed below are the designated areas for the planned maintenance work as for October and November , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Lubuk Ubar, Tuesday 8.00 am to 12.00 noon 1 Jln Kuru-Benutan, Wayleave Clearing A part of Kampong Lubuk Ubar and surrounding area. 16th Oct 2018 2.00 pm to 4.00 pm Mukim Rambai, Tutong Tuesday Kampong Sebakit Atas, Mukim Tanjong Maya 2 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. Spg 49 Kampong Sebakit Atas and surrounding area. 16th Oct 2018 tutong Wednesday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 3 Wayleave Clearing 17th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Wednesday Kampong Sulap Samat, Jalan Panchong, Mukim A part of Kampong Sulap Samat, Jln Panchong and surrounding 4 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 17th Oct 2018 Lamunin area. Thursday 8.00 am to 12.00 noon Kampong Benutan and Kampong kerancing, A part of Kampong Benutan,Kampong kerancing and surrounding 5 Wayleave Clearing 18th Oct 2018 2.00 pm to 4.30 pm Mukim Rambai, Tutong area. Thursday 6 8.00 am to 4.30 pm Kampong Penabai, Mukim Pekan Tutong Maintenance works for Distribution Transformer. A part of Kampong Penabai and surrounding area. 18th Oct 2018 Kampong Benutan and Kampong kerancing, Saturday 8.00 am to 12.00 noon A part of Kampong Benutan,Kampong kerancing and surrounding 7 Mukim Rambai, Tutong Wayleave Clearing 20th Oct 2018 2.00 pm to 4.30 pm area.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • Persidangan Dewan Majlis
    PAGI HARI KHAMIS, 2 RABIULAKHIR 1431 / 18 MAC 2010 206 DEWAN MAJLIS Khamis, 2 Rabiulakhir 1431 / 18 Mac 2010 YANG DI-PERTUA Duli Yang Teramat Mulia DAN AHLI-AHLI MAJLIS Paduka Seri Pengiran Muda Mahkota MESYUARAT NEGARA Pengiran Muda Haji Al-Muhtadee Billah ibni Kebawah Duli Yang Maha Mulia Paduka Seri HADIR: Baginda Sultan Haji Hassanal Bolkiah Mu’izzaddin Waddaulah, DKMB., DPKT., YANG DI-PERTUA: King Abdul Aziz Ribbon, First Class (Saudi Arabia), The Order of the Renaissance (First Yang Amat Mulia Degree) (Jordan), Medal of Honour (Lao), Pengiran Indera Mahkota Pengiran Anak DSO (Singapore), Order of Lakandula with (Dr.) Kemaludin Al-Haj ibni Al-Marhum the Rank of Grand Cross (Philippines), DSO Pengiran Bendahara Pengiran Anak Haji (Military) (Singapore), PHBS., Mohd. Yassin, PSLJ., SPMB., POAS., Menteri Kanan di Jabatan Perdana Menteri, PHBS., PBLI., PJK., PKL., Negara Brunei Darussalam. Yang Di-Pertua , Negara Brunei Darussalam. Duli Yang Teramat Mulia Paduka Seri Pengiran Perdana Wazir AHLI-AHLI RASMI KERANA JAWATAN Sahibul Himmah Wal-Waqar Pengiran (PERDANA MENTERI DAN MENTERI- Muda Mohamed Bolkiah ibni Al-Marhum MENTERI): Sultan Haji Omar ‘Ali Saifuddien Sa’adul Khairi Waddien, DKMB., DK., PHBS., PBLI., Kebawah Duli Yang Maha Mulia PJK., Paduka Seri Baginda Sultan Haji Hassanal Menteri Hal Ehwal Luar Negeri dan Bolkiah Mu’izzaddin Waddaulah ibni Perdagangan, Negara Brunei Darussalam. Al-Marhum Sultan Haji Omar ‘Ali Saifuddien Sa’adul Khairi Waddien, Sultan dan Yang Yang Berhormat Di-Pertuan Negara Brunei Darussalam, Pehin Orang Kaya Seri Lela Dato Seri Setia Perdana Menteri, Menteri Pertahanan dan Haji Awang Abdul Rahman bin Dato Setia Menteri Kewangan, Negara Brunei Haji Mohamed Taib, PSNB., SLJ., PHBS., Darussalam.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 Kampong Padnunuk, Mukim Kiudang, Tutong A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. 08th Oct 2018 2.00 pm to 4.30 pm lines. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 8.30 am to 4.30 pm A part of Hospital Building and the surrrounding area. 08th Oct 2018 Haji Al-Muhtadee Billah, Tutong Transformer#3. Monday 8.00 am to 12.00 noon 3 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 08th Oct 2018 2.00pm to 4.30 pm Tuesday Maintenance works for Distribution 4 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong. Earth satellite Building and the surrounding area. 09th Oct 2018 Transformer#1. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 Kampong Padnunuk, Mukim Kiudang, Tutong, Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. 09th Oct 2018 2.00pm to 4.30 pm lines. Tuesday 8.00 am to 12.00 noon 6 Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. 09th Oct 2018 2.00 pm to 4.30 pm Wednesday Maintenance works for Distribution 7 8.30 am to 4.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah Binti
    3-5 February 2014- Istanbul, Turkey Proceedings of INTCESS14- International Conference on Education and Social Sciences Proceedings 1053 The Vitality & Revitalisation of a Minority Language: The Case of Dusun in Brunei Darussalam Hjh. Dyg. Fatimah binti Hj. Awg. Chuchu (Dr.) & Najib Noorashid Universiti Brunei Darussalam; Brunei Darussalam [email protected]; [email protected]. Keywords: Language vitality, language revitalisation, language extinction, ethnic minority, Dusun, Brunei. Abstract. Language extinction or language death is a sociolinguistic phenomenon which concerns and is often discussed among linguists or members of speaker in general (Aitchison, 2001; Crystal, 2000; Dalby, 2003; Mufwene, 2004; Nelson, 2007; Fishman, 2002; 2007). Due to rapid globalisation, the effect of linguistic "superstratum-substratum" is inevitable (Crystal, 2003), in particular to those languages of ethnic minorities; those in Brunei Darussalam are not the exclusion (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are inclined to endangeredment due to urbanisation, education system, migrations and others, which lead to language shift and consequently, extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous in Brunei under the Citizenship Status laws 1961 of the Constitution of Negari Brunei 1959, Dusun ethnic is alleged to have and practice its own code of dialect. All dialects and languages spoken by indigenous ethnics are regarded as minority languages, except for the dialect of Brunei Malay. By focusing on Dusun dialect, this paper discusses the current situation of its language use and perceptions among the native speakers.
    [Show full text]
  • Copy of MEMO 028 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • MEMO 029 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Tuesday 8.30 am to 11.30 am Kampong Rambai, 1 Wayleave clearing A part of Kg Rambai and its surrounding areas. 26th November 2019 1.30 pm to 4.30 pm Mukim Rambai Tuesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 2 Wayleave clearing 26th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 3 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 4 Wayleave clearing 27th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Wednesday 8.30 am to 11.30 am Kampong Rambai, 5 Wayleave clearing A part of Kg Rambai and its surrounding areas. 27th November 2019 1.30 pm to 4.30 pm Mukim Rambai Wednesday Kampong Luagan Dudok, Replacement of Ring Main Unit at substation A part of Kg Luagan Duduk and its surrounding 6 8.30 am to 4.30 pm 27th November 2019 Mukim Keriam Haji Abdul Azim Mosque areas. Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 28th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]
  • Copy of Copy of PMW Tutong District (Press Release) Memo14 19
    English Section Listed below are the designated areas for the planned maintenance work as for July , 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 1 01st July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. 545 to 633 Kg Ukong and surrounding area. Spg 66, Spg 88, Spg 104, Spg 114 and Spg116 Kg Monday 8.00 am to 12.00 noon Kampong Tanah Burok, Maintenance works for low voltage overhead Tanah Burok, Jln Penanjong and surrounding 2 01st July 2019 1.30pm to 4.30 pm Mukim Pekan Tutong. lines. area. Tuesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 3 02nd July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. 545 to 633 Kg Ukong and surrounding area. Spg 66, Spg 88, Spg 104, Spg 114 and Spg116 Kg Tuesday 8.00 am to 12.00 noon Kampong Tanah Burok, Maintenance works for low voltage overhead Tanah Burok, Jln Penanjong and surrounding 4 02nd July 2019 1.30pm to 4.30 pm Mukim Pekan Tutong. lines. area. Wedesday 8.00 am to 12.00 noon Kampong Ukong, Maintenance works for low voltage overhead Spg 418 to 519 Jln Penapar Ukong and From Spg 5 03rd July 2019 1.30pm to 4.30 pm Mukim Ukong. lines. 545 to 633 Kg Ukong and surrounding area.
    [Show full text]
  • The Case of Dusun in Brunei Darussalam
    IJASOS- International E-Journal of Advances in Social Sciences, Vol. I, Issue 1, 2015 THE VITALITY AND REVITALISATION OF MINORITY LANGUAGES: THE CASE OF DUSUN IN BRUNEI DARUSSALAM Hjh. Dyg. Fatimah binti Hj Awg. Chuchu1*, Najib Noorashid2 1Dr., Universiti Brunei Darussalam, Brunei Darussalam, [email protected] 2 Mr., Radio Televisyen Brunei, Brunei Darussalam, [email protected] *Corresponding author Abstract Language extinction or language death is a sociolinguistic phenomenon that is often discussed among linguists or speakers in general (Crystal, 2000; Aitchison, 2001; Dalby, 2003; Fishman, 2002; 2007; Mufwene, 2004; Nelson, 2007). Due to rapid globalisation, the effect of ‘superstratum and substratum’ languages is inevitable (Crystal, 2003), particularly with regard to the languages of ethnic minorities; those in Brunei Darussalam are no exception (Martin, 1995; Noor Azam, 2005; David, Cavallaro & Coluzzi, 2009; Clynes, 2012; Coluzzi, 2012). These minority languages are susceptible to becoming endangered due to urbanisation, the educational system, migration and other factors; all of these factors lead to language shift and, consequently, to extinction. Brunei Darussalam is a multilingual country that has a diverse population and cultures which generate variations of language and dialect (Nothofer, 1991; Fatimah Chuchu & Poedjosoedarmo, 1995; Azmi Abdullah, 2001; Jaludin Chuchu, 2005; David, Cavallaro & Coluzzi, 2009). Recognised as one of the seven indigenous ethnic groups in Brunei under the Citizenship Status Laws 1961 of the Constitution of Negari Brunei 1959, the Dusun ethnic group are alleged to have and practise their own code of dialect. In Brunei Darussalam, all dialects and languages spoken by indigenous ethnic groups are regarded as minority languages, except for Brunei Malay.
    [Show full text]
  • PMW 22 20 Tutong District (Autosaved)
    English Section Listed below are the designated areas for the planned maintenance work as for August and September 2020: No. Day & Date Time Location Work Description Affected Areas for Outages Kampong Benutan dan Kampong Thursday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 1 Keranching, Replacement of ovehead line 20th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Kampong Kiudang and Jalan Thursday 8.00 am to 04.00 pm Installation of the "Pole Mounted" on the A part of Jalan Kampong Kiudang and overall 2 Piasan, Mukim Kiudang and Mukim 20th August 2020 Electric pole Jalan Piasan Lamunin Kampong Benutan dan Kampong Monday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 3 Keranching, Replacement of ovehead line 24th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Monday 8.00 am to 04.00 pm Kampong Panchong, Installation of the "Pole Mounted" on the A part of Kampong Panchong and Jalan Sulap 4 24th August 2020 Mukim Lamunin Electric pole Samat Monday 8.30 am to 11.30 am Kampong Maraburong, 5 Replacement of ovehead line Overall Small Road Kampong Maraburong 24th August 2020 1.30 pm to 4.30 pm Mukim Keriam Kampong Benutan dan Kampong Tuesday 8.30 am to 04.30 pm A part of Kampong Benutan and Kampong 6 Keranching, Replacement of ovehead line 25th August 2020 Keranching, Mukim Rambai, Tutong Mukim Rambai Tuesday 8.00 am to 04.00 pm Kampong Ukong, Installation of the "Pole Mounted" on the A part of Jalan Bang Pangan dan Jalan Penapar 7 25th August 2020 Mukim Ukong Electric pole Ukong Tuesday 8.30 am
    [Show full text]
  • 11. Fatimah Chuchu & Najib Noorashid.Cdr
    Indonesian Journal of Applied Linguistics, Vol. 5 No. 1, July 2015, pp. 86 - 94 CODE CHOICE WITHIN INTERCULTURAL COMMUNICATION AMONG ETHNIC MINORITY IN BRUNEI Fatimah Chuchu Najib Noorashid Universiti Brunei Darussalam [email protected]; [email protected] Article received: 13 October 2014 Final draft received: 30 June 2015 Abstract The influences of globalisation and multilingualism have caused linguistic diversity and emergence of interesting and unique sociolinguistic phenomena, for instance, language contact in intercultural communication. As the study of intercultural communication has yet to be studied at large, this research takes the opportunity to embark on a descriptive study of code choice within intercultural communication, relating to the ethnic minorities in Brunei Darussalam. This investigation aims to identify these ethnics' preferable code choice within intercultural communication, and their needs and motivations practising those codes in a shared multilingual setting. Involving empirical investigation, this study was conducted to 60 native Brunei ethnic groups in Mukim Ukong, Tutong District. The research found code choice in multilingual settings and intercultural communications is a relatively complex sociolinguistic phenomenon, where speakers will employ different dialects or languages at an episode of communication, but still mutually understand by each other. To some extent, some speakers also accommodate their speech styles or languages to ease communication process between parties. The hegemony of globalisation, local vernacular, speakers' background and setting, among others, influence the selection of their everyday code choice. Keywords: multiligualism, code choice, intercultural communication, language contact The belief of 'a language for a people' might seem closely related to the selection of a specific code.