Copy of PMW Tutong District (Press Release) Memo20
Total Page:16
File Type:pdf, Size:1020Kb
English Section Listed below are the designated areas for the planned maintenance work as for September, 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Kampong Bekiau, Installation of pole monted street light fitting at A part of Kampong Bekiau and its surrounding 1 09th September 2019 1.30 pm to 4.30 pm Mukim Kiudang. Low voltage overhead lines areas. Monday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 2 Replacement of Low voltage overhead lines. 09th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Tuesday 8.00 am to 12.00 noon Kampong Bekiau, A part of Kampong Bekiau and its surrounding 3 Installation of short arm street light fitting. 10th September 2019 1.30 pm to 4.30 pm Mukim Kiudang. areas. Tuesday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 4 Replacement of Low voltage overhead lines. 10th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Tuesday 8.00 am to 12.00 noon Kampong Sentol, Installation of pole monted street light fitting at A part of Kampong Sentol and its surrounding 5 10th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines areas. Tuesday 8.00 am to 11.30 am Kampong Bayong, 6 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 10th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 7 Replacement of ovehead lines. 10th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 8 Replacement of Low voltage overhead lines. 11th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Wednesday 8.00 am to 12.00 noon Kampong Sentol, Installation of pole monted street light fitting at A part of Kampong Sentol and its surrounding 9 11th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines areas. Wednesday 8.00 am to 12.00 noon Kampong Sembatang, Installation of pole monted street light fitting at A part of Kampong Sembatang and its 10 11th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Bayong, 11 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 11th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Page 1 Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 12 Replacement of ovehead lines. 11th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Thursday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 13 Replacement of Low voltage overhead lines. 12th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Thursday 8.00 am to 12.00 noon Kampong Sembatang, Installation of pole monted street light fitting at A part of Kampong Sembatang and its 14 12th September 2019 1.30 pm to 4.30 pm Mukim Keriam. Low voltage overhead lines surrounding areas. Thursday 8.00 am to 11.30 am Kampong Bayong, 15 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 12th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Thursday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 16 Replacement of ovehead lines. 12th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Saturday 8.00 am to 12.00 noon Kampong Bebuloh, A part of Kampong Bebuloh and its surrounding 17 Replacement of Low voltage overhead lines. 14th September 2019 1.30 pm to 4.30 pm Mukim Pengkalan Batu. areas. Saturday 8.00 am to 11.30 am Kampong Bayong, 18 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 14th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Saturday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545 spg 633 Kampong 19 Replacement of ovehead lines. 14th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Bayong, 20 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 16th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 21 Replacement of ovehead lines. 16th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Monday 8.00 am to 11.30 am Kampong Long Mayan, Installation of pole monted street light fitting at Spg 2566 Kampong Long Mayan and its 22 16th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Bayong, 23 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 17th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Tuesday 8.00 am to 11.30 am Kampong Long Mayan Installation of pole monted street light fitting at A part of Kampong Long Mayan and its 24 17th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Page 2 Tuesday 8.00 am to 11.30 am Installation of pole monted street light fitting at A part of kampong Merimbun and its surrounding 25 Kampong Merimbun, Mukim Rambai 17th September 2019 1.30 pm to 4.30 pm Low voltage overhead lines areas. Tuesday 8.00 am to 11.30 am Kampong Bukit Installation of pole monted street light fitting at Spg 2314 to Spg 2132 Kampong Bukit and its 26 17th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 27 Replacement of ovehead lines. 17th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Bayong, 28 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 18th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Wednesday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 29 Replacement of ovehead lines. 18th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Bukit, Installation of pole monted street light fitting at Spg 2113 to spg 1841 Kampong Bukit and its 30 18th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines surrounding areas. Wednesday 8.00 am to 11.30 am Kampong Talad, Installation of pole monted street light fitting at A part of Kampong Talad and its surrounding 31 18th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines areas. Spg 1200 Jln Pak Bidang and its surrounding Thursday 8.00 am to 11.30 am Kampong Ukong Installation of pole monted street light fitting at areas. 32 19th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Low voltage overhead lines Spg 1084 Jln Piton Nambang and its surrounding areas. Thursday 8.00 am to 11.30 am Kampong Ukong, Installation of pole monted street light fitting at A part of Jln Piton Nambang, spg 800 Kampong 33 19th September 2019 1.30 pm to 4.30 pm Mukim Ukong Low voltage overhead lines Sg Damit and its surrounding areas. Thursday 8.00 am to 11.30 am Kampong Bayong, 34 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 19th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Saturday 8.00 am to 11.30 am Kampong Bayong, 35 Replacement of ovehead lines. Kampong Bayong and its surrounding areas. 21th September 2019 1.30 pm to 4.30 pm Mukim Lamunin Kampong Sungai Damit and Spg 591 Kampong Sg Damit and its surrounding Saturday 8.00 am to 11.30 am Installation of pole monted street light fitting at 36 Kampong Bukit Udal, Mukim areas. A part of Kampong Bukit Udal and its 21th September 2019 1.30 pm to 4.30 pm Low voltage overhead lines Tanjong Maya surrounding. Monday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 37 Replacement of ovehead lines. 23th September 2019 1.30 pm to 4.30 pm Mukim Rambai areas. Page 3 Monday 8.00 am to 11.30 am Kampong Ukong, Spg 418, Spg 519, spg 545, spg 633 Kampong 38 Replacement of ovehead lines. 23th September 2019 1.30 pm to 4.30 pm Mukim Ukong Ukong and its surrounding areas. Tuesday 8.00 am to 11.30 am Kampong Rambai, A part of Kampong Rambai and its surrounding 39 Replacement of ovehead lines.