Sijil Kontraktor Dec 2017

Total Page:16

File Type:pdf, Size:1020Kb

Sijil Kontraktor Dec 2017 SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 1. A-MAS CONTRACTOR I KA01, B01 8749773 07 Apr 2016 06 Apr 2018 P. O. Box 564 No 48 Kampong Sepakon Email : Pusat Memproses Mel Berakas B B 3577 Tanjong Maya Tutong T D 1141 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 2. A.LEEZIQ CONTRACTOR I KA01, B01 7134374 24 Jun 2017 23 Jun 2019 No 22 Simpang 14-6 Jalan C No 22 Simpang 14-6 Jalan C Email : Kampong Perpindahan Mentiri B U 2129 Kampong Perpindahan Mentiri B U 2129 Negara Brunei Darussalam Negara Brunei Darussalam 3. A.MALI CONTRACTOR I B01, KPB04, S02, S03 8909149 19 Aug 2016 18 Aug 2018 No 6 Simpang 64 No 6 Simpang 64 Email : Simpang 64/6 Jalan 60 Simpang 64/6 Jalan 60 Kampong Perpindahan Rimba Gadong B E Kampong Perpindahan Rimba Gadong B E 3319 3319 Negara Brunei Darussalam Negara Brunei Darussalam 4. A'R YANA CONSTRUCTION I B01 8801295 03 Jul 2017 02 Jul 2019 No 676 Kampong Pengkalan Mau No 676 Kampong Pengkalan Mau Email : Kiudang Tutong Kiudang Tutong julaihi.othman @outlook.com Negara Brunei Darussalam Negara Brunei Darussalam 5. ABA BIN OPAK DAN ANAK ANAK CONTRACTOR I KA01, B01, S03 8650010 16 Mar 2016 15 Mar 2018 Lot 4617 No 315 Lot 4617 No 315 Email : Kampong Sungai Taring Lumut Seria Kampong Sungai Taring Lumut Seria Kuala Belait K C 3135 Kuala Belait K C 3135 Negara Brunei Darussalam Negara Brunei Darussalam 6. ABD GHANI BAHAGIA JAYA CONTRACTOR I KA01, B01 8805491 18 Oct 2016 17 Oct 2018 No 25 Simpang 822 No 25 Simpang 822 Email : Kampong Luagan Dudok Kampong Luagan Dudok Tutong TB 1541 Tutong TB 1541 Negara Brunei Darussalam Negara Brunei Darussalam 7. ABU FAMILY'S ENTERPRISE I KA01, B01, M03, KPB02, 8775838 15 Aug 2017 01 Jun 2018 KPB04, KPB12, S01, S02, S03 P. O. Box 699 Email : Kuala Belait KA 1189 No 9 Simpang 64 Jalan Mumong [email protected] Negara Brunei Darussalam Kuala Belait Negara Brunei Darussalam 8. AD'DAM'S ENTERPRISE I KA01, B01, M03, KPB02, 8631789, 04 Nov 2016 03 Nov 2018 KPB04, KPB07 3236104 P. O. Box 434 Seria K B 1190 Lot 5344 Simpang 109 Email : Negara Brunei Darussalam Kampong Sungai Tali Lumut [email protected] Kuala Belait KC 3135 Negara Brunei Darussalam 9. AFWANIS CONTRACTOR I KA01, B01, S02 8814441 20 Dec 2016 19 Dec 2018 No 75 Jalan 64 No 75 Jalan 64 Email : Perumahan Negara Lambak Kanan BC 3115 Perumahan Negara Lambak Kanan BC 3115 Negara Brunei Darussalam Negara Brunei Darussalam 10. AJQAL CONTRACTOR I B01 8141439, 31 Jan 2017 30 Jan 2019 8151439 No 9 Jalan 99 Simpang 48-36 No 9 Jalan 99 Simpang 48-36 Rancangan Perumahan Negara Kampong Rancangan Perumahan Negara Kampong Rimba Email : Rimba Gadong BE 3319 [email protected] Gadong BE 3319 Negara Brunei Darussalam Negara Brunei Darussalam 11. AL KHAIR CONTRACTOR I B01 8311858 / 14 Dec 2017 13 Dec 2019 8669220 No 6 C Wisma Temanggong No 6 C Wisma Temanggong Bandar Seri Begawan B S 8411 Bandar Seri Begawan B S 8411 Email : Negara Brunei Darussalam Negara Brunei Darussalam 12. AL-FARITZKI CONTRACTOR I B01 8763842 04 May 2017 03 May 2019 No 19 Simpang 21 No 19 Simpang 21 Email : Jalan Kemangsi Barat Jalan Kemangsi Barat RPN Meragang Muara BT 2728 RPN Meragang Muara BT 2728 Negara Brunei Darussalam Negara Brunei Darussalam Muka surat..1 SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 13. ALIAZ CONTRACTOR I E01, E02 2457666 30 Aug 2016 01 Jun 2018 Unit No 4 2nd Floor Block A Sempurna Unit No 4 2nd Floor Block A Sempurna Complex Email : Complex Batu Bersurat Kampong Pengkalan Gadong [email protected] Batu Bersurat Kampong Pengkalan Gadong Negara Brunei Darussalam Negara Brunei Darussalam 14. AMAN BINA ENTERPRISE I B01 8836118 16 Mar 2016 15 Mar 2018 P. O. Box 813 Unit No 3 2nd Floor Block A Seri Purnama Email : Pusat Memproses Mel Berakas B B 3577 Complex Negara Brunei Darussalam Kampong Kiulap Negara Burnei Darussalam 15. AMILLENNIUM HOLDINGS I B01 8874016, 19 Jun 2017 18 Jun 2019 8165192 No 6A Simpang 58 Jalan Mulaut No 6A Simpang 58 Jalan Mulaut Kampong Tanjong Nangka B G 2921 Kampong Tanjong Nangka B G 2921 Email : Negara Brunei Darussalam Negara Brunei Darussalam [email protected] 16. ARJEY CONTRACTOR I KA01, B01, S03 8752939 19 Jul 2016 18 Jul 2018 No 17 Simpang 49 Jalan Haji Halus Km 8 No 17 Simpang 49 Jalan Haji Halus Km 8 Email : Kampong Bunut B F 1320 Kampong Bunut B F 1320 Negara Brunei Darussalam Negara Brunei Darussalam 17. ARMASY CONTRACTOR I KA01, B01, KPB02, KPB12, S01, 7169196 - 19 Jun 2017 18 Jun 2019 S02, S03 No 24 Simpang 136-53-39-4 Email : Kampong Sengkurong No 24 Simpang 136-53-39-4 Jalan Jerudong Kampong Sengkurong Negara Brunei Darussalam Jalan Jerudong Negara Brunei Darussalam 18. ARQ CONSTRUCTION I KA01, B01, S01, S02 2338175, 2332621 29 Aug 2016 28 Aug 2018 8747675, 8915558 P. O. Box 465 No 5 Jalan Kamangsi Rancangan Perumahan Pusat Memproses Mel Berakas BB 2577 Negara Negara Brunei Darussalam Kampong Meragang Jalan Muara BT 2728 Email : Negara Brunei Darussalam 19. ASPZ CONSTRUCTION & ENGINEERING I KA01, B01, S03 8602292 2331941 22 May 2017 21 May 2019 P. O. Box 985 No 10 Simpang 320 Email : Pusat Memproses Mel Berakas BB 3577 Kampong Lambak Jalan Pasir Negara Brunei Darussalam Berakas BB 1714 Negara Brunei Darussalam 20. ASREENDA CONTRACTOR I KA01, KPB04, KPB10, S03 8259394 17 Sep 2017 16 Sep 2019 P. O. Box 361 No 1072 Email : Pejabat Pos Sengkurong BE 1121 Kampong Rambai Tutong Negara Brunei Darussalam Negara Brunei Darussalam 21. ATAULLAH ENTERPRISE I KA01, B01, S03 8647390 09 Jul 2017 08 Jul 2019 No 28 Simpang 415-73 No 28 Simpang 415-73 Email : Jalan Wasai Limuru Jalan Wasai Limuru [email protected] Rancangan Perumahan Negara Kampong Rancangan Perumahan Negara Kampong Tanah Tanah Jambu Jambu Jalan Muara BU 1129 Jalan Muara BU 1129 Negara Brunei Darussalam Negara Brunei Darussalam 22. ATRAR CONTRACTOR I KA01, B01, KPB12, S03 2337616 20 Sep 2016 19 Sep 2018 Email : P. O. Box 436 No 12 Simpang 11 [email protected] Pusat Memproses Mel Berakas B B 3577 Kampong Anggerek Desa Berakas 'A' B B 3713 Negara Brunei Darussalam Negara Brunei Darussalam 23. AULA RICH CONSTRUCTION I B01, KPB02, KPB04 8883800, 14 Apr 2017 13 Apr 2019 8852006 Lot 15100 Simpang 51 Jalan Manggis Satu Lot 15100 Simpang 51 Jalan Manggis Satu Kas Villa 2 Kas Villa 2 Email : Kampong Manggis BC 3615 Kampong Manggis BC 3615 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 24. AWIH CONTRACTOR I KA01, B01, M03, KPB02, 7184832 28 Feb 2017 27 Feb 2019 KPB04, KPB07 No 42 Jalan 26 Email : Perpindahan Rimba Gadong BE 3319 No 42 Jalan 26 [email protected] Negara Brunei Darussalam Perpindahan Rimba Gadong BE 3319 Negara Brunei Darussalam Muka surat..2 SENARAI SYARIKAT YANG BERDAFTAR SEBAGAI KONTRAKTOR DI KEMENTERIAN PEMBANGUNAN Tarikh Tarikh No Nama Syarikat Kelas Kategori Telefon Faksimili Berdaftar Mansuh 25. AZ SOUBORO JAYA CONTRACTOR I KA01, B01 8997155 02 Jun 2016 01 Jun 2018 No 7 Simpang 178 Jalan Paya Bunga Merah No 161 Email : Kampong Pasai Sengkurong B G 1221 Kampong Mulaut Sengkurong B G 2121 Negara Brunei Darussalam Negara Brunei Darussalam 26. AZ ZUKHRUF REEN CONTRACTOR I KA01, B01, M03, KPB04, S02, 8919708 25 Jul 2017 24 Jul 2019 S03 No 508 ' A ' Kampong Pelambaian Email : Jalan Kota Batu B D 2317 No 508 ' A ' Kampong Pelambaian [email protected] Negara Brunei Darussalam Jalan Kota Batu B D 2317 Negara Brunei Darussalam 27. AZHADIRAS CONTRACTOR I KA01, B01 8291318, 06 Sep 2017 05 Sep 2019 8899351 No 1 Simpang 318 Kampong Kapok No 1 Simpang 318 Kampong Kapok Jalan Muara Jalan Muara Email : Negara Brunei Darussalam Negara Brunei Darussalam [email protected] 28. BELAKO ELECTRICAL AND TRADING COMPANY I KA01, B01, E01, S03 8731897 2670867 12 Oct 2017 11 Oct 2019 P. O. Box 1564 Unit 10 Complex Rizqan Maisura Bandar Seri Begawan B S 8673 Kampong Tanjong Bunut B G 2920 Email : Negara Brunei Darussalam Negara Brunei Darussalam [email protected] 29. BUHAIRI CONSTRUCTION I KA01 8849665 07 Jan 2016 06 Jan 2018 No 44 Jalan 31 No 44 Jalan 31 Email : Kampong Perpindahan Lambak Kanan Berakas Kampong Perpindahan Lambak Kanan Berakas B B C 2915 C 2915 Negara Brunei Darussalam Negara Brunei Darussalam 30. BUKIT PERMATA CONTRACTOR & ENGINEERING I KA01, B01, M03 8200777 16 Mar 2016 15 Mar 2018 SERVICES Email : P. O. Box 234 No 9C 1st Floor Bengkurong Kompleks [email protected] Seri Complex Simpang 132 Jalan Bengkurong Masin B F 1920 Jalan Tutong B A 1779 Negara Brunei Darussalam Negara Brunei Darussalam 31. CAHAYA MAJA CONTRACTOR I KA01 8767274 01 Mar 2016 28 Feb 2018 No 8 Kampong Sengkurong A No 8 Kampong Sengkurong A Email : Jalan Jerudong B G 3122 Jalan Jerudong B G 3122 [email protected] Negara Brunei Darussalam Negara Brunei Darussalam 32. D.N ABDUL WAFI HUSAIN ENTERPRISE I KA01, B01 8607864 05 Oct 2016 04 Oct 2018 No 12 - 10 Simpang 339 No 12 - 10 Simpang 339 Email : Kampong Burong Lepas Kampong Burong Lepas [email protected] Jalan Bengkurong Masin B F 1720 Jalan Bengkurong Masin B F 1720 Negara Brunei Darussalam Negara Brunei Darussalam 33. DAHLIAH SALIUS CONTRACTOR I KA01, B01, KPB07, S03 8862574 07 Apr 2016 06 Apr 2018 No 615 Kampong Bebuloh No 615 Kampong Bebuloh Email : Jalan Wasan Limau Manis B H 3323 Jalan Wasan Limau Manis B H 3323 Negara Brunei Darussalam Negara Brunei Darussalam 34.
Recommended publications
  • Press Release
    English Section Listed below are the designated areas for the planned maintenance work as for February, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages 08.00 am to 4.00 pm Monday Substation Ikas Bandung, Kupang, Extension of 11kV network to New Industrial 1 (For info: Department of Electrical Service will supply Kampong Ikas Bandung and surrounding areas. 12th February 2018 temporary electricity to the affected areas through mobile Tutong. areas Kg Lugu. generator service at the substation) Thursday 08.30 am to 04.00 pm Kampong Pengkalan Pinang, Jln Spg 193 dan Spg 205 Kampong Pengkalan Pinang 2 Replacement of Distribution Feeder pillar. 15th February 2018 Penanjong. Tutong and surrounding areas. Thursday Wayleave clearing works for Low voltage Spg 1304, Spg 1274 Kampong Sungai Kelugos and surrounding 3 08.30 am to 09.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1048, Spg 1030 Kampong Sungai Kelugos and surrounding 4 09.30 am to 11.30 am Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines areas. Thursday Wayleave clearing works for Low voltage Spg 1179, Spg 1148, Spg 1080 Kampong Sungai Kelugos and 5 01.30 pm to 04.30 pm Kampong Sungai Kelugos, Tutong 15th February 2018 overhead lines surrounding areas. Monday 08.30 am to 04.00 pm Substation Sungai Damuan, Kupang, 6 Replacement of Distribution Feeder pillar. Part of Kampong Kupang, Tutong 19th February 2018 Tutong Monday 08.30 am to 11.30 am Wayleave clearing works for Low voltage Spg 935, Spg 873, Spg 861 Kampong Sungai Kelugos and 7 Kampong Sungai Kelugos, Tutong 19th February 2018 overhead lines surrounding areas.
    [Show full text]
  • National Housing Programmes (15/5/2015)
    NATIONAL HOUSING PROGRAMMES (15/5/2015) One of the national housing schemes in Brunei Terrace types housing scheme Darussalam One of the national housing schemes in Brunei Darussalam The Resettlement Programme The Government of His Majesty The Sultan and Yang Di-Pertuan of Brunei Darussalam in implementing its policy in providing all its citizen with proper accommodation in a pleasant environment, with the citizen households owning their own houses, various schemes have been introduced as early as the 1950s. The resettlement programmes began as early as 1951 when the residents of Kampung Bendahara Lama of Kampung Ayer were resettled to Bunut Resettlement Area in Mukim Kilanas of the Brunei- Muara District. Two years later, in 1953, similar resettlement was also carried out for residents of Kampung Burong Pingai Berakas, Kampung Pancha Delima, Kampung Pengiran SiRaja Muda, Kampung Anggerek Desa and Kampung Orang Kaya Besar Imas, all of which are in Mukim Berakas of the same district. In 1954, resettlement was also carried out for Kampung Jaya Setia and Kampung Jaya Bakti, both in Mukim Berakas. In the 1960s, the government built two-housing estates in Berakas, namely Kampung Setia Bakti and Kampung Jaya Bakti for some of Kampung Ayer (water village) residents who accepted government offers to resettle them to the mainland. Terrace types housing scheme Survey A nationwide survey was conducted in 1970s to identify the peoples housing needs. Hence as a result, the first of many housing schemes, the Lambak Kanan National Housing Scheme in the Brunei-Muara District was introduced covering a site of about 810 hectares where 84 houses under Phase One had been completed and allocated to the successful applicants in early 1986.
    [Show full text]
  • Susur Galur Sept 2013.Indb
    SUSURGALUR: Jurnal Kajian Sejarah & Pendidikan Sejarah, 1(2) September 2013 HAJI TASSIM BIN HAJI ABU BAKAR Pendidikan dari Balai di Kampong Ayer ke Sekolah Moden di Darat, 1906 – 1941: Kajian Sejarah Pendidikan di Negara Brunei Darussalam IKHTISAR: Kampong Ayer telah menjadi pusat penyebaran agama Islam yang berkembang pesat kerana terdapat ramai pendakwah Islam yang menyampaikan pelajaran agama Islam kepada penduduk di persekitarannya. Sistem pembelajaran di balai-balai di Kampong Ayer begitu popular sebelum tahun 1906, kerana menteri-menteri agama mempunyai balai masing- masing di rumah mereka. Kegiatan pembelajaran agama berterusan sehingga awal abad ke-20 dengan munculnya beberapa tokoh ulama di beberapa buah kampung di Kampong Ayer sehingga bangunan sekolah kekal dibangunkan ke kawasan daratan. Peralihan pembelajaran ilmu agama Islam dari balai di rumah-rumah di Kampong Ayer ke bangunan kekal di kawasan darat telah memberikan ruang dan peluang kepada penduduk Brunei untuk mengetahui ilmu membaca dan menulis berserta dengan kegiatan dan kemahiran- kemahiran yang bermanfaat. Akhirnya, pendidikan formal di Brunei telah diperkenalkan dalam sistem pendidikan Brunei menjadi empat aliran, iaitu aliran agama Islam, aliran Melayu, aliran Inggeris, dan aliran Cina. KATA KUNCI: Kampong Ayer, penyebaran agama Islam, pembelajaran di balai, sekolah di daratan, dan sistem pendidikan Brunei moden. ABSTRACT: This paper entitled “Education from the Home Station in Kampong Ayer (Water Village) to Modern School in the Land, 1906 - 1941: Study on History Education in Brunei Darussalam”. Kampong Ayer, has become the center spread of Islam, is growing rapidly because there are many Islamic preachers who deliver education to the people of Islam in the region. Learning systems at home stations in Kampong Ayer so popular before 1906, due to the ministers of religion have their stations in their homes.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for December, 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Saturday 8.00 am to 12.00 noon Kampong Bukit Udal, Mukim Tanjong Maya 1 Wayleave Clearing A part of Kampong Bukit Udal Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Tutong Saturday 8.00 am to 12.00 noon 2 Kampong Long Mayan, Mukim Ukong Tutong Wayleave Clearing A part of Kampong Long Mayan Tutong and surrounding areas. 1st Dec 2018 1.30 pm to 4.30 pm Jalan Sekolah Rendah Penapar, Mukim Tanjong Monday 8.00 am to 12.00 noon A part of Kampong Penapar, Jalan Sekolah Rendah Penapar and 3 Maya Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm surrounding area. Monday 8.00 am to 12.00 noon A part of Kampong Birau, Pertanian Birau Office and surrounding 4 Pertanian Birau, Mukim Kiudang Tutong. Wayleave Clearing 3rd Dec 2018 1.30 pm to 4.30 pm area. Monday Perumahan Baitul Mal Keriam, Mukim Keriam A whole of Perumahan Baitul Mal, a part of Kampong Keriam and 5 8.00 am to 4.30 pm Maintenance works for Distribution Transformer. 3rd Dec 2018 Tutong. surrounding area. Tuesday 8.00 am to 12.00 noon Kampong Serambangun, Mukim Tanjong Maya A whole Spg 333-37-39-16 Kampong Serambangun and 6 Wayleave Clearing 4th Dec 2018 1.30 pm to 4.30 pm Tutong. surrounding areas. Tuesday 8.00 am to 12.00 noon A part of Kampong Birau and Pertanian Birau Office and 7 Pertanian Birau, Mukim Kiudang Tutong.
    [Show full text]
  • 8/14/2010 Pelitabrunei Nama-Nama Amil Keluaran 14 Ogos Pelita1
    2 HARI SABTU 14 OGOS 2010 ZAKAT FITRAH BAGI TAHUN 1431H BERSAMAAN 2010M SENARAI NAMA-NAMA AMIL BAGI SELURUH NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431-1432H / 2010-2011M BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR KERAMAIAN AMIL-AMIL DAN KAWASAN-KAWASAN BAGI SELURUH 31. Jalan Tasek Lama hingga NEGARA BRUNEI DARUSSALAM BAGI TAHUN 1431 - 1432H / 2010 - 2011M Terrace Hotel 32. Jalan Stoney Yang Mulia, Mudim Awang KERAMAIAN AMIL 33. Jalan Dato Ibrahim Haji Amran bin Haji Mohd. JABATAN / DAERAH KAWASAN 34. Jalan Istana Darussalam Salleh JABATAN MAJLIS UGAMA ISLAM 29 ORANG 4 35. Kg. Pengiran Pemanca Lama 36. Kg. Sungai Kedayan A dan B Masjid Omar 163 ORANG BRUNEI / MUARA 75 37. Kg. Kianggeh dan Sekitarnya 'Ali Saifuddien BELAIT 27 ORANG 15 38. Kg. Ujong Tanjong 39. Kg. Kuala Sg. Peminyak Yang Mulia, Mudim Awang TUTONG 55 ORANG 30 40. Kg. Ujong Bukit Haji Ahmad Kasra bin Haji 41. Kg. Limbongan Ibrahim TEMBURONG 17 ORANG 12 42. Kg. Bukit Salat JUMLAH 291 ORANG 136 43. Kg. Sumbiling Lama Yang Mulia Ustaz Haji Adanan Surau Ibu Pejabat SENARAI NAMA-NAMA AMIL JABATAN MAJLIS UGAMA ISLAM Balai Bomba Bandar Seri Begawan bin Haji Ahmad Perkhidmatan Bomba 2. Brunei (Khas untuk Pegawai dan (Ketua Guru Agama Jabatan dan Penyelamat, BAGI TAHUN 1431-1432H / 2010-2011M Kakitangan serta keluarganya) Perkhidmatan Bomba dan Lapangan Terbang Penyelamat) Lama Berakas, Brunei BIL LANTIKAN ATAS NAMA JAWATAN BIL LANTIKAN ATAS NAMA BATANG TUBUH 2. BANDAR SERI BEGAWAN 'B' mengandungi: BIL KAWASAN NAMA AMIL TEMPAT MEMBAYAR 1. Setiausaha Majlis Ugama Islam, Brunei 1. Awang Haji Abd. Wahab bin Haji Sapar (Awang Haji Harun bin Haji Junid) (Pegawai Ugama Kanan Kumpulan 2) Awang Haji Ahmad bin Haji 2.
    [Show full text]
  • Trade Mark Journal Brunei Darussalam
    MAY 2020 Issue No. 005/2020 TRADE MARK JOURNAL BRUNEI DARUSSALAM Brunei Darussalam Intellectual Property Office (BruIPO) Attorney General’s Chamber Knowledge Hub, Level 2, Anggerek Desa Technology Park Jalan Berakas BB3713, Brunei Darussalam Tel: +673 2380966 Email: [email protected] Brunei Darussalam Intellectual Property Office (BruIPO) © 2020. All rights reserved. Modification or reproduction of this Journal without the permission of BruIPO is prohibited. Page | 1 MAY 2020 Issue No. 005/2020 CONTENTS General Information 3 Operating Hours 3 Submission of Application 3 Enquiries 3 Trademarks Legislation 4 Forms and Fee 4 INID Codes 5 Trade Marks (Amendment) Rules, 2017 8 First Schedule – Fees 9 Second Schedule – Forms 14 Third Schedule – Classification of Goods and Services 16 New Trade Mark Applications Filed 19 Trade Mark Renewed 34 Trade Mark Renewed and Change of Agent 36 Trade Mark Unpaid Renewal Fee (6 months grace period after expiration date) 38 Trade Mark Pending for Renewal (6 months before expiration date) 63 Trade Mark Registered 85 New Trade Mark Applications Filed Under The Madrid Protocol 88 Trade Mark Registered Under The Madrid Protocol 220 Corrigenda 223 ******* Page | 2 MAY 2020 Issue No. 005/2020 General Information The Brunei Darussalam Intellectual Property Office (BruIPO) is an Office under the Attorney General’s Chamber and its premises with effect from the 1 April, 2019 and is situated at the following address: Brunei Darussalam Intellectual Property Office (BruIPO) Attorney General’s Chamber Knowledge Hub, Level 2, Anggerek Desa Technology Park Jalan Berakas BB3713, Brunei Darussalam Tel: +673 2380966 Opening Hours With effect from 1 January, 2020, the Brunei Intellectual Property Office (BruIPO) counter will operate as follows: Monday to Thursday : 8.00am to 12.00am 2.00pm to 3.00pm Saturday : 8.00am to 11.00am Friday and Sunday : CLOSED Submission of Applications 1.
    [Show full text]
  • PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for October , 2018: No. Day & Date Time Location Work Description Affected Areas for Outages Monday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 1 08th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong lines. A part of Jln Kecil Padnunuk , Jln Andaru and surrounding area. Monday Hospital Pengiran Muda Mahkota Pengiran Muda Maintenance works for Distribution 2 08th Oct 2018 8.30 am to 04.30 pm Haji Al-Muhtadee Billah, Tutong Transformer#3. A part of Hospital Building and the surrrounding area. Monday 8.00 am to 12.00 noon 3 08th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Tuesday Maintenance works for Distribution 4 09th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong. Transformer#1. Earth satellite Building and the surrounding area. Tuesday 8.00 am to 12.00 noon Maintenance works for low voltage overhead 5 09th Oct 2018 2.00pm to 4.30 pm Kampong Padnunuk, Mukim Kiudang, Tutong, lines. Jln Andaru, a part of Jln Kecil Padnunuk and surrounding areas. Tuesday 8.00 am to 12.00 noon 6 09th Oct 2018 2.00pm to 4.30 pm Kg Ukong, Mukim Ukong Wayleave Clearing for overhead lines A part of Kg Ukong and the surrrounding area. Wednesday Maintenance works for Distribution 7 10th Oct 2018 8.30 am to 04.30 pm Earth Satellite, Telisai, Tutong.
    [Show full text]
  • 12Th. APRIL, 2008 BANDAR SERI BEGAWAN MUNICIPAL BOARD
    12th. APRIL, 2008 No. S 50 MUNICIPAL BOARDS ACT (CHAPTER 57) BANDAR SERI BEGAWAN MUNICIPAL BOARD (BOUNDARIES OF MUNICIPAL BOARD AREA) DECLARATION, 2008 ARRANGEMENT OF PARAGRAPHS Paragraph 1. Citation and commencement. 2. Boundaries of Municipal Board Area. 3. Continuation of certain applications and proceedings. 4. Areas in Development Control Area. 5. Enabling power. 6. Revocation of S 10/57. 437 BRUNEI DARUSSALAM GOVERNMENT GAZETTE MUNICIPAL BOARDS ACT (CHAPTER 57) BANDAR SERI BEGAWAN MUNICIPAL BOARD (BOUNDARIES OF MUNICIPAL BOARD AREA) DECLARATION, 2008 In exercise of the powers conferred by sections 3(1) and 3(5) of the Municipal Boards Act, His Majesty the Sultan and Yang Di-Pertuan in Council hereby makes the following Declaration- Citation and commencement. 1. This Declaration may be cited as the Bandar Seri Begawan Municipal Board (Boundaries of Municipal Board Area) Declaration, 2008 and shall be deemed to have commenced on the 1st. August, 2007. Boundaries of Municipal Board Area. 2. The Municipal Board area of the Bandar Seri Begawan Municipal Board for the purposes of the Act is hereby declared to be the areas described in the Schedule. Continuation of certain applications and proceedings. 3. (1) Any application for a permit or licence made under the Miscellaneous Licences Act (Chapter 127] which was pending and had not been concluded immediately prior to the commencement of this Declaration shall be continued as if this Declaration had not been made. (2] Any enforcement proceedings made under the Town and Country Planning (Development Control) Act (Chapter 143) which were pending and had not been concluded immediately prior to the commencement of this Declaration shall be continued as if this Declaration had not been made.
    [Show full text]
  • 12 Disember 2001
    'X ♦» UAt&WfA 9AAN PETIKAN TTTAH seUAOA dan aaniaara- hOALAM amatan barpuaaa, ^ kasKi bag* ewwa* Kita bukan sa}a diamal dan t^aiats AM^aoar iaMw d< diiattti untuk merahan did -r>T—----" ■ j ari melafcukan dari nsart se'sv,^^ twataw iv- arlura-perkara yang di- Anr acAan Ramadan.* kegah malahan juga dl- =et*a8art SaAa*- lanlurtcan untuk aentlaaa Ki^rs Weaaflaae yirvg icart kacamertangan da- apa {uga bldang dan fartanynkan o*ah Ai-^ m yang tdts lakuKan." • cnxri dafi A/sy^ Raoa^ aampana Hari Raya ihutetii- Hri200a BRUNEI TAHUN 46 BILANCAN 50 RABU 12 DISEMBER. 2001/1422 ^vOWaaj 26 jjlj DITERBITKAN PAOA SETIAP HARI RABU PERCUMA )UN]UNG ZIARAH HARI RAYA AIDILFITR! YANG 1422 HIJRAH NARIK MENJUNJUNG lilah Kebawah Duli Yang Maha Muliu Paduka Scri Baginda Sultan Haji Hassanal uan: Bolkiah Mu'izzaddin Waddaulah, Sultan dan Yang Oi-Pcrtuan Negara Brunei Darussaiont. Yang Amai Muiia Pengiran Penggawa Laita SentaiB Istiadai Pelbagai prodiik dan Diraja Dalam Istana, Grand Chamberlain meng- perkhidmatan umumkan bahawa sempena Hari Raya Aidilfitri Thhun 1422 Hijrah, Istana Nuiul Iman akan dibuka - Muka 2 selama tiga hari. mulai dari Hari Raya Kedua dari jam 10.00 pagi hingga 12.00 tengah han dan dari jam 2.00 petang hingga 4.00 petang. bagi membolehkan elirik Masa Silam : orang ramai mengadap dan menziarahi Kebawah Duli Yang Maha Mulia Paduka Seri Baginda Sultan Terkenang tempat dan Yang Di-Pertuan Negara Brunei Darussalom dan kerabat dtraja. jatuh • Muka 3 Penglihatan ■Mempelbagaikan KPaawAH Dull Yang Maha Mulls Paduka Serl Baginda Sultan Haji Hassanal Bolkiah Mu'izzaddin Waddaulah, Sultan dan lekonomi menjadi Vang CM-Partuan Negara Brunei Darussalam ketika berkenan menerlma mengadap dua setiausaha tetap yang baru dllantlk laitu Awang Ha)l DIrIa, Setiausaha Tetap Kementerlan Perindustrlan dan Sumber-Sumber Utama dan Oslo Paduka Awang Ikeperluan utama Hilal Syawal HaJI Dtnl, Setiausaha Tetap Kementerlan tCrttudayaan, Bella dan Sukan.
    [Show full text]
  • KNK 2015.Pdf
    KNKNegara Brunei Darussalam OMPILASI KRENCANA KNK 2015 Terbitan: Unit Penerbitan Melayu Bahagian Penerbitan dan Seni Grafik Jabatan Penerangan Jabatan Perdana Menteri Negara Brunei Darussalam Cetakan Pertama 2018 Penyelaras: Hajah Rosidah binti Haji Ismail Taip Set/Kompilasi/Susunan: Zawiyatun Ni’mah binti Mohamad Akir Muhammad Fawzan bin Abu Kasim Muhammad Nazih bin Haji Zaini Reka Letak/Kulit luar: Syahi bin Haji Ludin Penyemak: Ramlah binti Md.Nor Norhafilah binti Rosli Nurafizah@Nurul Shadah Samat 1 2 J a sabtu, 10 januari 2015 n Menyusur Kampung u Sungai Teraban a Rencana dan foto: r Dk. Hajah Saidah Pg. Haji Omaralli i 3 JALAN menuju ke Kampung dan Masjid Sungai Teraban, antara kemudahan yang disediakan oleh kerajaan. PROGRAM Sua Muka Jabatan Penerangan telah menyelusur ke Kampung Sungai Teraban yang terletak dalam Mukim Kuala Belait. Jarak dari Pekan Belait ke Kampung Sungai Teraban lebih kurang 15 kilometer. Rombongan pegawai dari Jabatan Penerangan, Jabatan Perdana Menteri Cawangan Daerah Belait yang diketuai oleh Pemangku Ketua Penerangan Belait, Awang Eddy Iswandy bin Haji Ismail tiba di rumah Ketua Kampung Sungai Teraban, Awang Mohd. Mersidi bin Haji Mohd Shara yang siap menanti dan mengalu-alukan rombongan dengan mesra. Kampung Sungai Teraban terletak di Tebing Barat Muara Sungai Belait. Kampung ini bersempadan Laut China Selatan sebelah Utara, Sungai Belait ke Timur, Rasau ke Selatan dengan kampung-kampung di Kampung Sungai Tiga dan sempadan Malaysia di Sungai Tujoh sebelah Barat. 4 LATAR BELAKANG Kampung Sungai Teraban pada mulanya dikenali sebagai ‘Kampung Seberang’ dan penduduk asli yang tinggal di situ merupakan Puak Melayu Belait yang kebanyakan nelayan. Menurut ketua kampung, nama kampung berasal dari bahasa Puak Belait ‘Terabin’ bermaksud tempat berehat dan perhentian menunggu kapal, perahu atau bot kerana Pusat Pentadbiran Kuala Belait pada zaman dahulu letaknya di Kuala Balai dan orang pertama yang datang ke kampung tersebut berasal dari Melanau, Sarawak dan juga Puak Belait yang membuka kampung berkenaan.
    [Show full text]
  • Buku Poskod Edisi Ke 2 (Kemaskini 26122018).Pdf
    Berikut adalah contoh menulis alamat pada bahgian hadapan sampul surat:- RAJAH PERTAMA PENGGUNAAN MUKA HADAPAN SAMPUL SURAT 74 MM 40 MM Ruangan untuk kegunaan pengirim Ruangan untuk alamat penerima Ruangan 20 MM untuk kegunaan Pejabat Pos 20 MM 140 MM Lebar Panjang Ukuran minimum 90 mm 140 mm Ukuran maksimum 144 mm 264 mm Bagi surat yang dikirim melalui pos, alamat pengirim hendaklah ditulis pada bahagian penutup belakang sampul surat. Ini membolehkan surat berkenaan dapat dikembalikan kepada pengirim sekiranya surat tersebut tidak dapat diserahkan kepada si penerima seperti yang dikehendaki. Disamping itu. ianya juga menolong penerima mengenal pasti alamat dan poskod awda yang betul. Dengan cara ini penerima akan dapat membalas surat awda dengan alamat dan poskod yang betul. Berikut adalah contoh menulis alamat pengirim pada bahagian penutup sampul surat:- RAJAH DUA Jabatan Perkhidmatan Pos berhasrat memberi perkhidmatan yang efesien kepada awda. Oleh itu, kerjasama awda sangat-sangat diperlukan. Adalah menjadi tugas awda mempastikan ketepatan maklumat-maklumat alamat dan poskod awda kerana ianya merupakan kunci bagi kecepatan penyerahan surat awda GARIS PANDU SKIM POSKOD NEGARA BRUNEI DARUSSALAM Y Z 0 0 0 0 Kod Daerah Kod Mukim Kod Kampong / Kod Pejabat Kawasan Penyerahan Contoh: Y Menunjukan Kod Daerah Z Menunjukan Kod Mukim 00 Menunjukan Kod Kampong/Kawasan 00 Menunjukan Kod Pejabat Penyerahan KOD DAERAH BIL Daerah KOD 1. Daerah Brunei Muara B 2. Daerah Belait K 3. Daerah Tutong T 4. Daerah Temburong P POSKOD BAGI KEMENTERIAN- KEMENTERIAN
    [Show full text]
  • Copy of MEMO 028 Copy of PMW Tutong District
    English Section Listed below are the designated areas for the planned maintenance work as for November and December 2019: No. Day & Date Time Location Work Description Affected Areas for Outages Wednesday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 1 Wayleave clearing 20th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Thursday 8.30 am to 11.30 am Kampong Rambai, 2 Wayleave clearing A part of Kg Rambai and its surrounding areas 21th November 2019 1.30 pm to 4.30 pm Mukim Rambai Thursday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 3 Wayleave clearing 21th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Saturday 8.30 am to 11.30 am Kampong Rambai, 4 Wayleave clearing A part of Kg Rambai and its surrounding areas 23th November 2019 1.30 pm to 4.30 pm Mukim Rambai Saturday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 5 Wayleave clearing 23th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu. surrounding areas Monday 8.30 am to 11.30 am Kampong Rambai, 6 Wayleave clearing A part of Kg Rambai and its surrounding areas 25th November 2019 1.30 pm to 4.30 pm Mukim Rambai Monday 8.30 am to 11.30 am Kampong Bebuloh, Spg 604 to Spg 450 Kg Bebuloh and its 7 Wayleave clearing 25th November 2019 1.30 pm to 4.30 pm Mukim Pangkalan Batu.
    [Show full text]