WARD 17 2014 - 2018 CONSTRUCTION PROJECTS (Note that the 2014 construction projects are subject to approval through the capital budget process. The 2015-2018 construction projects represent the projects that are anticipated to proceed to construction based on funding projections and current understanding of competing priorities; these remain to be confirmed as part of the annual budget cycle.) Structure Project Delivered Planned WIP Project From To Description Ward Comments No. Interest By

2014 1982 RIDEAU RIVER ROAD AVENUE ROAD Sewer Network Improvements David Chernushenko - 17 ISD

2014 298 QUEEN ELIZABETH LAND DEVELOPMENT New Parks David Chernushenko - 17 ISD Retender 2013 - Construction Summer 2014

2014 60 ELLIOT AVE CORNER OF BULLOCK AVE Sewer Network Improvements David Chernushenko - 17 ISD

TRANSITWAY RESURFACING, West Curb 2014 2013 ACCESS RAMP AT CENTRAL LEES AV Transitway Renewal David Chernushenko - 17 ISD and Sidewalk Renewal

2014 ALTA VISTA CORRIDOR RIVERSIDE RIVERSIDE New Roads David Chernushenko - 17 ISD

NEW GRADE SEPARATED STRUCTURES, 2014 ALTA VISTA CORRIDOR AT TRANSITWAY New Road Structures David Chernushenko - 17 ISD CONST WITH NEW ROAD NEW GRADE SEPARATED STRUCTURES, 2014 ALTA VISTA CORRIDOR AT RIVERSIDE New Road Structures David Chernushenko - 17 ISD CONST WITH NEW ROAD David Chernushenko - 17, Peter 2014 2013 ALTA VISTA CORRIDOR AT RR TRACKS New Road Structures ISD UNDERPASS AT THE CN RAIL Hume - 18 Peter Hume - 18, David 2014 ALTA VISTA CORRIDOR RIVERSIDE HOSPITAL New Roads ISD Chernushenko - 17 , Pedestrian. Deck coatd with epoxy 2006. BILLINGS BRIDGE BRT STATION - PED BRIDGE TO MALL - 2014 58100 Transitway Structure Renewal David Chernushenko - 17 ISD Moved need yr from 2002 to 2012 06nov07 (SN058100) wpj. BILLINGS BRIDGE P.S. FUEL SYSTEM 2014 Water P.S. Renewal David Chernushenko - 17 ISD DECOMMISSIONING

2014 BROADWAY AVE RALPH TORRINGTON Road, Sewer, Water David Chernushenko - 17 OOTM ISD

2014 2013 BRONSON AVE. - 774 BRONSON Work By Others David Chernushenko - 17 DEV DEV 12 storey tower

David Chernushenko - 17, Maria 2014 2013 BROOKFIELD JUNCTION AVE MULTI-USE PATHWAY New Sidewalks ISD McRae - 16 ,

2014 BROOKFIELD (SOUTH SIDE) JUNCTION DEAD END New Sidewalks David Chernushenko - 17 ISD

2014 2013 CA TWY U/P QUEENSWAY - (SN014010) 14010 Transitway Structure Renewal David Chernushenko - 17 LRT

2014 CENTRAL TRANSITWAY LEES STATION Transitway Renewal David Chernushenko - 17 ISD

180m SOUTH OFLAURIER David Chernushenko - 17, Mathieu 2014 CENTRAL TRANSITWAY LEES STATION Transitway Renewal ISD AV Fleury - 12 , David Chernushenko - 17, Diane NO SCOPING RECIEVED BY DC - END OF 2014 CHAMPAGNE PH2 YOUNG PRINCE OF WALES Multi-Use Pathways OOTM ISD Holmes - 14 , SUMMER 2013 ? WATER ONLY PART OF FIRST AVE 2014 CHRYSLER (THROUGH GREEN SPACE) GLEBE FIRST Road, Sewer, Water David Chernushenko - 17 ISD SCOPE.

2014 2012 CLEGG (FLOW MONITORING) New Sewers David Chernushenko - 17 ORAP ISD FLOW MONITORING

2014 CRAIG ST FINDLAY BROADWAY Road, Sewer, Water David Chernushenko - 17 OOTM ISD

E TRANSITWAY O/P RIVERSIDE DR NEXT TO CNR O/P - Transitway Structure David Chernushenko - 17, Peter 2014 56650 ISD (SN056650) Maintenance Hume - 18 NO ROAD - ROAD CLOSURE YWP- 2014 2012 ELGIN ST PRETORIA AVE ISABELLA ST Road, Sewer, Water David Chernushenko - 17 ISD CHANGED TO 2013 AS PER J. VALEE FIFTH AVE/CLEGG ST RIDEAU CANAL BIKE/PED BRIDGE 2014 FITH GLEGG Multi-Use Pathways David Chernushenko - 17 ISD (SN018580) 1 of 5 Revision Date: 10 April, 2014 WARD 17 2014 - 2018 CONSTRUCTION PROJECTS (Note that the 2014 construction projects are subject to approval through the capital budget process. The 2015-2018 construction projects represent the projects that are anticipated to proceed to construction based on funding projections and current understanding of competing priorities; these remain to be confirmed as part of the annual budget cycle.) Structure Project Delivered Planned WIP Project From To Description Ward Comments No. Interest By

2014 FIRST BRONSON O'CONNOR Road, Sewer, Water David Chernushenko - 17 OOTM ISD

4.76 m Ht limit. Police report (GO#2005- 2014 2013 HERON RD U/P RAMP D - (SN056100) 56100 Bridge Renewal David Chernushenko - 17 OOTM ISD 3103) rec'd 11JAN05 re exp jnt. Tim Tierney - 11, Peter Clark - 13, Peter Hume - 18, David SOUTHERN ONTARION EXPANSION 2014 HIGHWAY 417 SIX TO EIGHT LANE WIDENING LEES AVE RR 174 Work By Others LRT Chernushenko - 17, Mathieu Fleury - PROJECT 12 Peter Hume - 18, David 2014 KILBORN AV BANK ST (OR 31) 30 M S OF KILBORN PL Road Resurfacing/Renewal OOTM ISD RESURFACING Chernushenko - 17 ,

2014 2012 LANDSDOWNE PARK New Buildings & Facilites David Chernushenko - 17 ISD

ROAD RECONSTRUCTION PART OF 2014 LEES MAIN CHESTNUT Road Resurfacing/Renewal David Chernushenko - 17 OOTM ISD INTEGRATED Transitway Structure 2014 LEES AV - CA TWY - LEES AV O/P TRANSITWAY(016050) 16050 David Chernushenko - 17 ISD Maintenance

2014 2013 LEES AVE/HWY 417 ON RAMP- RAMP CLOSURE Work By Others David Chernushenko - 17 MTO

2014 2013 NICHOLAS SB ON RAMP NICHOLAS HWY 417 Work By Others David Chernushenko - 17 MTO

Peter Clark - 13, David Chernushenko 2014 ORLEANS WATERMAIN WEST LINK (COVENTRY RD) HURDMAN PUMP STATION WRIGHT Watermain Renewal OOTM-EXT ISD - 17 , Tendered and awarded in 2013 - 2014 2013 WINDSOR PARK TENNIS COURT REDEV. New Parks David Chernushenko - 17 ISD Construction in 2014 ROAD RESURFACING ONLY PART OF 2014 PERCY GLEBE CLEMOW Road, Sewer, Water David Chernushenko - 17 ISD THE FIRST AVE SCOPING WATERMAIN & RESURFACING PART OF 2014 PERCY - INTERATED WATER & RESURFACING GLEBE SECOND Road, Sewer, Water David Chernushenko - 17 ISD THE FIRST AVE SCOPING

2014 POPES LANE RALPH ST UID000341 Road, Sewer, Water David Chernushenko - 17 ISD

2014 2013 PRETORIA LIFT BRIDGE - (SN012270-2) 012270-2 Bridge Maintenance Repair David Chernushenko - 17 ISD

2014 RALPH ST BROADWAY HOLMWOOD Road, Sewer, Water David Chernushenko - 17 OOTM ISD

2014 SENECA ST GROVE AV SUNNYSIDE AV Road Resurfacing/Renewal David Chernushenko - 17 ISD SELECTIVE RESURFACING

2014 SLOAN SUNNYSIDE 101 SLOAN Watermain Renewal David Chernushenko - 17 ISD

2014 SOUTH EAST TRANSITWAY SMYTH STATION Transitway Renewal David Chernushenko - 17 ISD

2014 SOUTH EAST TRANSITWAY HERON STATION HERON RD (OR 16) Transitway Renewal David Chernushenko - 17 ISD

BILLINGS BRIDGE STATION, 2014 SOUTHEAST TRANSITWAY BANK ST Transitway Renewal David Chernushenko - 17 ISD TRANSITWAY RESURFACING SOUTH LIMIT NARROWINGS,PAINTED CROSSWALKS, 2014 2013 SUNNYSIDE BRONSON BANK Traffic Safety David Chernushenko - 17 ISD ON STREET PARKING

2014 SUNNYSIDE AVE BRONSON PL BRONSON AVE Sewer Renewal David Chernushenko - 17 ISD

BANK ST - (PAVING, STREET LIGHTING, TRAFFIC 2015-2018 HOLMWOOD RIDEAU CANAL BRIDGE Road Resurfacing/Renewal David Chernushenko - 17 ISD SIGNALS)

2 of 5 Revision Date: 10 April, 2014 WARD 17 2014 - 2018 CONSTRUCTION PROJECTS (Note that the 2014 construction projects are subject to approval through the capital budget process. The 2015-2018 construction projects represent the projects that are anticipated to proceed to construction based on funding projections and current understanding of competing priorities; these remain to be confirmed as part of the annual budget cycle.) Structure Project Delivered Planned WIP Project From To Description Ward Comments No. Interest By

2015-2018 DOW'S LAKE RD CARLING AVE KIPPEWA DR Road, Sewer, Water David Chernushenko - 17 ISD

Peter Hume - 18, David 2015-2018 EAST TRANSITWAY HURDMAN STATION TREMBLAY RD Transitway Renewal ISD TRANSITWAY PRESERVATION Chernushenko - 17 ,

2015-2018 HURDMAN BRIDGE P.S. UPGRADE - ZONE 2C New Water P.S. David Chernushenko - 17 ISD

2015-2018 MAIN ST ECHO DR HAZEL Road, Sewer, Water David Chernushenko - 17 OOTM ISD

2015-2018 MAIN ST HAZEL ST RIDEAU RIVER Road, Sewer, Water David Chernushenko - 17 OOTM ISD

INCOMPLETE INVENTORY, PHOTO MCILRAITH BRIDGE O/P RIDEAU RIVER [SMYTH RD/MAIN David Chernushenko - 17, Peter LOOKING ALONG RIVERSIDE DR. Some 2015-2018 13330 Bridge Renewal OOTM ISD ST] - (SN013330) Hume - 18 soffit not visible in summer. Condition survey & structural analysis, OSIM done fall 05.

Diane Holmes - 14, David 2015-2018 METCALFE ST (OR 89) ISABELLA ST (OR 62) CATHERINE ST (OR 60) Sidewalk & Curb Renewal ISD SIDEWALK Chernushenko - 17 , David Chernushenko - 17, Diane 2015-2018 O'CONNOR BIKE LANES (WELLINGTON TO ISABELLA) WELLINGTON ISABELLA Cycling Routes OOTM ISD Holmes - 14 , Diane Holmes - 14, David 2015-2018 O'CONNOR ST (OR 87) ISABELLA ST (OR 62) SOMERSET ST (OR 36) Road Resurfacing/Renewal OOTM ISD RESURFACING Chernushenko - 17 ,

2015-2018 OSBORNE CAMERON DEAD END Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 OSSINGTON AVE BANK ST UID000254 Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 OSSINGTON AVE GROSVENOR AVE UID000389 Road, Sewer, Water David Chernushenko - 17 ISD

O-TRAIN - O-TRAIN O/P SE TRANSITWAY [ELLWOOD Maria McRae - 16, David 2015-2018 55930 Transitway Structure Renewal ISD DIAMOND](055930) Chernushenko - 17 Q E DRIVE @ # 620 - NE CORNER Q E DRIVE & 2015-2018 10307 Retaining Wall Renewal David Chernushenko - 17 ISD LAKEVIEW, RF CON B LOT K(SN010307)

2015-2018 SOUTHERN RIVERDALE TORONTO Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 BANK ST CANAL BRIDGE - (SN012010) 12010 Bridge Maintenance Repair David Chernushenko - 17 ISD

2015-2018 BECKWITH RD MARLOWE CR UID000034 Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 BURNHAM RD (EASEMENT) ONSLOW CRES RRI Road, Sewer, Water David Chernushenko - 17 ISD

CENTRAL AREA TRANSITWAY - CA TRANSITWAY RET 2015-2018 19230 Transitway Structure Renewal David Chernushenko - 17 ISD WALL BTWN 0605-0301 (W)(019230)

2015-2018 GLENGARRY RD MARLOWE CRES UID000368 Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 GLENGARRY RD (EASEMENT) ONSLOW CR RRI Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 IMPERIAL AVE CHAMBERLAIN RENFREW Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 LEES TRANSITWAY STATION LEES AVE - 00191 Transit Station Renewal David Chernushenko - 17 ISD

Mathieu Fleury - 12, David 2015-2018 MANN AVE. MAIN ST (OR 72) KING EDWARD AV (OR 99) Road Resurfacing/Renewal ISD RESURFACING Chernushenko - 17 ,

3 of 5 Revision Date: 10 April, 2014 WARD 17 2014 - 2018 CONSTRUCTION PROJECTS (Note that the 2014 construction projects are subject to approval through the capital budget process. The 2015-2018 construction projects represent the projects that are anticipated to proceed to construction based on funding projections and current understanding of competing priorities; these remain to be confirmed as part of the annual budget cycle.) Structure Project Delivered Planned WIP Project From To Description Ward Comments No. Interest By NICHOLAS ST - NICHOLAS ST O/P MANN AV/GREENFIELD David Chernushenko - 17, Mathieu 2015-2018 16960 Bridge Renewal RIO AV(016960) Fleury - 12

2015-2018 ONLSOW CR CLEGG ST ELLIOT AVE Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 RENFREW AVE BRONSON LYON Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 RENFREW AVE LYON DEAD END Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 RIVERDALE AV AVENUE RD MAIN ST (OR 72) Sidewalk & Curb Renewal David Chernushenko - 17 ISD SIDEWALK (COORDINATE WITH WATER)

David Chernushenko - 17, Peter 2015-2018 SE TRANSITWAY O/P BANK ST(056150) 56150 Transitway Structure Renewal ISD Hume - 18

2015-2018 SUNNYSIDE AV BRONSON AV (OR 79) BANK ST (OR 31) Road Resurfacing/Renewal David Chernushenko - 17 ISD RESURFACING

Ret Walls SN055330-1 & -2. Ret walls lined Maria McRae - 16, David up w/ E abut to be removed as part of NS 2015-2018 WALKLEY RD O/P O-TRAIN LINE - (SN055330) 55330 Transitway Structure Renewal ISD Chernushenko - 17 LRT. Ex CPR Ellwood SD mi 0.72. ROW purchsd 05. Part of EW LRT.

2015-2018 AYLMER AVE BRONSON BANK Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 BARTON ST AYLMER EUCLID Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 CARLYLE AVE COLONEL BY WOODBINE Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 CONCORD ST N ECHO HAVELOCK Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 ECHO DR HAWTHORNE 178M S OF GRAHAM Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 ECHO DR MAIN CONCORD Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 ECHO DR/COLONEL BY DR MAIN HWY417 OVERPASS Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 FULTON AVE BRONSON WOODBINE Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 GREENFIELD AVE MAIN NICHOLAS OVERPASS Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 HARVEY ECHO MAIN Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 HAWTHORNE AVE COLONEL BY MAIN Road, Sewer, Water David Chernushenko - 17 ISD

Peter Hume - 18, David 2015-2018 HERON RD (OR 16) BANK ST (OR 31) ALTA VISTA DR Road Resurfacing/Renewal ISD RESURFACING Chernushenko - 17 , Diane Holmes - 14, David 2015-2018 KENT ST (OR 83) CHAMBERLAIN AV (OR 62) WELLINGTON ST (OR 36) Road Resurfacing/Renewal ISD RESURFACING Chernushenko - 17 ,

2015-2018 MONTCALM ST MONTCALM 79M EAST OF CONCORD Road, Sewer, Water David Chernushenko - 17 ISD

SOUTH CUL-DE-SAC NORTH CUL-DE-SAC 2015-2018 OLD RIVERSIDE DR Road Resurfacing/Renewal David Chernushenko - 17 ISD RESURFACING THIN LIFT (SOUTH OF FROBISHER (NORTH OF HINKS LANE) LANE) Peter Hume - 18, David RESURFACING - MAJOR REHAB 2015-2018 RIVERSIDE DR (OR 19) BANK ST (OR 31) HIGHWAY 417 Road Resurfacing/Renewal ISD Chernushenko - 17 , CHANGED DATE TO 2017 AS PER DOUG

4 of 5 Revision Date: 10 April, 2014 WARD 17 2014 - 2018 CONSTRUCTION PROJECTS (Note that the 2014 construction projects are subject to approval through the capital budget process. The 2015-2018 construction projects represent the projects that are anticipated to proceed to construction based on funding projections and current understanding of competing priorities; these remain to be confirmed as part of the annual budget cycle.) Structure Project Delivered Planned WIP Project From To Description Ward Comments No. Interest By RIVERSIDE DR U/P RAILWAY - INDUSTRIAL AV U/P David Chernushenko - 17, Peter 2015-2018 55970 Transitway Structure Renewal ISD CNR(055970) Hume - 18

2015-2018 ROSEDALE AVE AYLMER AVE UID000373 Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 WILTON CR QUEEN ELIZABETH PL. MONK ST Road Resurfacing/Renewal David Chernushenko - 17 ISD RESURFACING

2015-2018 WILTON CRES MONK ST RALPH ST Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 WILTON LANE MONK ST WOODLAWN AVE Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 WOODBINE PL GROSVERNOR EUCLID Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 BANK ST BELANGER AVE HERON RD Road, Sewer, Water David Chernushenko - 17 ISD

BANK ST - BILLINGS BRIDGE BANK ST OVER RIDEAU David Chernushenko - 17, Peter 2015-2018 13020 Bridge Renewal ISD RIVER(013020) Hume - 18 David Chernushenko - 17, Maria 2015-2018 BASELINE TRANSIT CORRIDOR BILLING BRIDGE New Transit ISD McRae - 16, Rick Chiarelli - 8

2015-2018 BRONSON AVE SECOND RIDEAU CANAL Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 CLAREY AVE BANK ST UID000329 Road, Sewer, Water David Chernushenko - 17 ISD

2015-2018 CLEMENTINE BLVD HERON RD (OR 16) BELANGER AV Road Resurfacing/Renewal David Chernushenko - 17 ISD RESURFACING

INCOMPLETE INVENTORY. Milage 1.7 CONFEDERATION HGHTS BRIDGE [A/P PKWY O/P HERON Maria McRae - 16, David Ellwood subdivision. NCC Contract 6712 2015-2018 56610 Transitway Structure Renewal ISD RD/O-TRA* - (SN056610) Chernushenko - 17 added as series 4A by MLA 13Jan05. SN056030 included in contract. Diane Holmes - 14, David 2015-2018 ELGIN ST GLOUCESTER ISABELLA Road, Sewer, Water ISD Chernushenko - 17 , O-TRAIN - O-TRAIN BRIDGE OVER SAWMILL CRK N OF Maria McRae - 16, David 2015-2018 55200 Transitway Structure Renewal ISD PED CROSSING(055200) Chernushenko - 17

5 of 5 Revision Date: 10 April, 2014