FINANCE AND ECONOMIC 128 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 17 RAPPORT 17 14 SEPTEMBER 2016 LE 14 SEPTEMBRE 2016

Document 1 Government of Canada‘s Public Transit Infrastructure Fund

Mann Avenue Transit $2,500,000 April 1, 2016 Structure Replacement

Transit operator crew room at Ottawa $750,000 April 1, 2016

Ottawa Tunneys Pasture Bus Loop $1,500,000 April 1, 2016

Carleton Siding - Spring Ottawa switch replacement with new $1,250,000 April 1, 2016 powered switches

Walkley rail intersection track Ottawa $5,500,000 April 1, 2016 improvements

Customer waiting areas at Ottawa major $1,000,000 April 1, 2016 stations

Modern signalling and control Ottawa system for O-Train Trillium $1,000,000 April 1, 2016 Line

Ottawa Elevator at $500,000 April 1, 2016

Multi-Use Pathway (Michael Ottawa $100,000 April 1, 2016 St. to St-Laurent)

Ottawa Booth Street Bike Track from $1,000,000 April 1, 2016 Sir John A MacDonald to FINANCE AND ECONOMIC 129 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 17 RAPPORT 17 14 SEPTEMBER 2016 LE 14 SEPTEMBRE 2016

Albert

Bicycle shelters at Ottawa stations to encourage $75,000 April 1, 2016 multimodal travel

Enclosed bicycle parking areas at Transitway stations Ottawa $250,000 April 1, 2016 to encourage multimodal travel

Park and ride lot Ottawa $1,250,000 April 1, 2016 improvements

Ottawa Rural bus stop improvements $200,000 April 1, 2016

Ottawa Bus shelters $375,000 April 1, 2016

Ottawa Concrete bus pads $175,000 April 1, 2016

Emergency phone upgrades Ottawa $1,000,000 April 1, 2016 at Transitway stations

Passenger information Ottawa $1,000,000 April 1, 2016 displays

Smartbus infrastructure on Ottawa $2,250,000 April 1, 2016 board buses

OC Transpo - Merivale Ottawa Garage - Driver facility and $750,000 April 1, 2016 elevator FINANCE AND ECONOMIC 130 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 17 RAPPORT 17 14 SEPTEMBER 2016 LE 14 SEPTEMBRE 2016

OC Transpo - Pinecrest Ottawa Garage, sewer line $750,000 April 1, 2016 replacement

Transitway (Busway) Ottawa $1,500,000 April 1, 2016 Pavement Resurfacing

Fare gate entrances at Ottawa $875,000 April 1, 2016 Transitway stations

Transit operator crew room at Ottawa $250,000 April 1, 2016 Hawthorne loop

Ottawa Acquisition of 2 train sets $20,000,000 April 1, 2016

LRT Stage 2 - Early works Ottawa $45,000,000 April 1, 2016 and preliminary engineering

LRT Stage 2 - Bridge to grade Ottawa separate VIA/O-Train Elwood $1,250,000 April 1, 2016 diamond

Kanata LRT Extension - Ottawa $1,500,000 April 1, 2016 Environmental Assessment

Aboriginal consultation Ottawa (including other transit and $100,000 April 1, 2016 active transportation projects)

Cost sharing for improvements of cycling and Ottawa $1,000,000 April 1, 2016 pedestrian links at MTO overpasses FINANCE AND ECONOMIC 131 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 17 RAPPORT 17 14 SEPTEMBER 2016 LE 14 SEPTEMBRE 2016

Advanced Renewal Projects Ottawa $1,550,000 April 1, 2016 Supporting LRT Stage 2

Baseline Transit Corridor - Ottawa $6,000,000 April 1, 2016 Bayshore to Billings- Design

Ottawa Transit Priority Projects $4,350,000 April 1, 2016

Ottawa Acquisition of 17 new buses $6,800,000 April 1, 2016

Chapman Mills transit corridor Ottawa $1,500,000 April 1, 2016 - Beatrice to Longfields

Rideau River Crossing - Confederation Heights to Ottawa $775,000 April 1, 2016 Carleton University - pedestrian/cycling

Rideau River Crossing - Bank Ottawa at Riverside (near Billings $1,025,000 April 1, 2016 Bridge), pedestrian/cycling

Rural cycling routes (misc Ottawa $2,025,000 April 1, 2016 locations)

Heron Road (Data Centre/Heron Station to Ottawa $325,000 April 1, 2016 Bank), EB and WB bike tracks

Heron Rd (Colbert Pathway to Ottawa east of Jefferson)-EB bike $275,000 April 1, 2016 tracks only FINANCE AND ECONOMIC 132 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 17 RAPPORT 17 14 SEPTEMBER 2016 LE 14 SEPTEMBRE 2016

Richmond Rd - south side sidewalk reconstruction Ottawa $550,000 April 1, 2016 around Croydon for cycle track

Kanata North cycle link Ottawa $400,000 April 1, 2016 (Carling at March Rd)

Kanata North cycle link Ottawa $525,000 April 1, 2016 (Herzberg at March Rd)

Trillium Pathway extension Ottawa phase 3 (Carling to Dows $275,000 April 1, 2016 Lake)

AODA Enhancements of Ottawa $1,500,000 April 1, 2016 Intersections

Hunt Club Cycling Links Ottawa $275,000 April 1, 2016 (Riverside to Paul Benoit)

Queen Elizabeth Drive - Crossings at Commissioner's Ottawa $375,000 April 1, 2016 Park and at Queen Elizabeth Place - pedestrian/cycling

Rideau River Pathway - Ottawa $625,000 April 1, 2016 lighting and link through park

New sidewalk links to improve Ottawa $775,000 April 1, 2016 connections with public transit

Ottawa McArthur Street Bike Lane $175,000 April 1, 2016 FINANCE AND ECONOMIC 133 COMITÉ DES FINANCES ET DU DEVELOPMENT COMMITTEE DÉVELOPPEMENT ÉCONOMIQUE REPORT 17 RAPPORT 17 14 SEPTEMBER 2016 LE 14 SEPTEMBRE 2016

Trans Orleans Pathway Ottawa $500,000 April 1, 2016 alignment modification

Cardinal Creek Park 18A Ottawa $650,000 April 1, 2016 multiuse pathway

Manotick – Multi-Use Pathway between Main St Ottawa $600,000 April 1, 2016 and River rd and addition of MUP to two bridges

Multi-Use Pathway Renewal Ottawa $2,150,000 April 1, 2016 (misc locations)

Sidewalk Renewal (misc Ottawa $1,750,000 April 1, 2016 locations)

TDM (Bus detours) during Ottawa $15,000,000 April 1, 2016 LRT construction

Rideau Canal Crossing (Fifth Ottawa $10,500,000 April 1, 2016 to Clegg)