Minutes/30 Minutes

Total Page:16

File Type:pdf, Size:1020Kb

Minutes/30 Minutes Appendix 3 – Written Answers Report Questions to the Mayor 15 October, 2020 ANSWERED QUESTIONS PAPER Subject: MQT on 15 October, 2020 Report of: Executive Director of Secretariat Healthy Streets Programme Question No: 2020/3250 Caroline Pidgeon In answer to question 2020/2550 in response to my request to list all TfL schemes under the Healthy Streets Programme that are currently paused, you instead published a list of Healthy Streets schemes which TfL intends to progress with. As requested in question 2020/2550 please list the schemes under the TfL Healthy Streets Programme that are currently paused. Answer for Healthy Streets Programme The Mayor Last updated: 20 October, 2020 Officers are drafting a response Brownhill Road/Torridon Road Junction Question No: 2020/3251 Caroline Pidgeon In answer to Question 2020/0990 you stated: “Transport for London (TfL) has plans to improve the junction between Brownhill Road and Torridon Road. Design work on a new pedestrian crossing at this junction is almost complete and there will be engagement with local people in the coming months, ahead of construction starting later this year.” Please can you give an update to the local community as to when exactly this junction will be made safer and accessible for pedestrians. Please also provide an exact date for construction work. Answer for Brownhill Road/Torridon Road Junction The Mayor Last updated: 20 October, 2020 Officers are drafting a response Waterloo and City Line Question No: 2020/3252 Caroline Pidgeon Please provide an update as to when this London Underground line will re-open and the continued grounds for its closure? Answer for Waterloo and City Line The Mayor Last updated: 20 October, 2020 Officers are drafting a response Two-mile rule for free school travel Question No: 2020/3253 Caroline Pidgeon Many young people and parents would welcome clarification concerning the proposed ‘2 mile rule’, if the under 18s free travel is scrapped due to an imposed policy by central Government. Can you confirm the two miles will be measured by ‘safe walking route’ and not ‘as the crow flies’? Could you also explain what calculation will be used to determine what is the shortest safe walking route from a child’s home to their school? Can you further confirm that, until a safe walking/cycling crossing has been constructed, Hammersmith Bridge will not be considered a possible walking route under these new rules? Answer for Two-mile rule for free school travel The Mayor Last updated: 20 October, 2020 Officers are drafting a response TfL staff providing sighted guided assistance for people with a sight loss Question No: 2020/3254 Caroline Pidgeon While recognising that TfL is changing their policy later this month, please state why TfL withdrew the provision of providing sighted guiding assistance for people with sight loss at the outset of the Covid pandemic, which was a totally different approach to train operators across the UK who introduced an operational policy that enabled staff to continue to provide sighted guiding assistance from the start of the pandemic in a safe way for both passengers and staff. Answer for TfL staff providing sighted guided assistance for people with a sight loss The Mayor Last updated: 20 October, 2020 Officers are drafting a response Publication of information on the TfL website (1) Question No: 2020/3255 Caroline Pidgeon For many years TfL regularly published weekly passenger numbers on its website for the use of the cable car, however at present the most recent published figures by TfL are for the week ending 13 June 2020 and show 3341 people using it in the previous seven days. Will you ensure that TfL continues to publish this information on a regular basis. Please provide the latest weekly figures. Answer for Publication of information on the TfL website (1) The Mayor Last updated: 20 October, 2020 Officers are drafting a response Publication of information on the TfL website (2) Question No: 2020/3256 Caroline Pidgeon TfL’s website on the page ‘Underground services performance’ currently only publishes performance figures for Period 9 - 2019/20 (from 10 November to 7 December 2019). Will you ensure that TfL provides up to date information on its website? Answer for Publication of information on the TfL website (2) The Mayor Last updated: 20 October, 2020 Officers are drafting a response Thames cable car Question No: 2020/3257 Caroline Pidgeon The previous Mayor announced on the 7 October 2011 a ten-year sponsorship deal for the Thames cable car. Since the commencement of the cable car passenger numbers have been dismal after its temporary popularity during the 2012 Olympic and Paralympic Games. Ahead of the renewal of any sponsorship deal will you make a commitment to a totally different ticket pricing policy which actually encourages people to use it on a regular basis, such as charging regular users no more than a bus fare. Do you further accept that running the cable car as a form of public transport and not a tourist attraction is the only way to ensure a reasonable number of people regularly use the cable car? Answer for Thames cable car The Mayor Last updated: 20 October, 2020 Officers are drafting a response Possible correlation between Covid cases and the London Underground Question No: 2020/3258 Caroline Pidgeon Recent mapping of Covid cases in London shows an overlap with London Underground lines. While recognising there might be many reasons for explaining the overlap, is any investigation being undertaken into whether Tube journeys and changes at Tube stations might be a contributory factor to the number of Covid cases in specific boroughs? Possible correlation between Covid cases and the London Underground The Mayor Last updated: 19 October, 2020 Research is being undertaken by a number of different universities into possible transmission of coronavirus and presence of coronavirus on public transport. I am not aware of research looking into whether Tube journeys and changes at Tube stations are a contributory factor to the number of coronavirus cases in specific boroughs. As you acknowledge, the number of cases in a borough is influenced by a number of different factors, such as levels of deprivation and population demographics. Transport for London has commissioned Imperial College London to carry out air and surface sampling on a ‘passenger journey’ using the Tube and bus. The first sampling took place on 23 September and no coronavirus was detected. TfL contract for extension of the Ultra Low Emission Zone Question No: 2020/3259 Caroline Pidgeon While accepting the need for some redactions, will you publish the contract with Capita for the enforcement of the extension of the Ultra Low Emission Zone? Answer for TfL contract for extension of the Ultra Low Emission Zone The Mayor Last updated: 20 October, 2020 Officers are drafting a response London bridges and tunnels Question No: 2020/3260 Caroline Pidgeon Are you content with the overall inspection, monitoring, collection of information and long- term investment plans for all of the bridges and tunnels that cross the Thames in the Greater London Authority area? Is sufficient information about the state of all these crossings being published and made accessible to the public? Answer for London bridges and tunnels The Mayor Last updated: 20 October, 2020 Officers are drafting a response Use of electric scooters in dedicated cycle lanes Question No: 2020/3261 Caroline Pidgeon Electric scooters are currently not legally permitted in dedicated cycle lanes. What steps are being taken to address what many people would consider a legal anomaly? Should ending this anomaly be a far higher priority than trials to allow electric scooters to be used on roads? Answer for Use of electric scooters in dedicated cycle lanes The Mayor Last updated: 20 October, 2020 Officers are drafting a response Bakerloo Line extension Question No: 2020/3262 Caroline Pidgeon TfL’s website provided an update on 7 April 2020 relating to the latest consultation on the extension of the Bakerloo Line stating “We recently consulted on our proposals to extend the Bakerloo line beyond Elephant & Castle to Lewisham, serving Old Kent Road and New Cross Gate. We also sought to understand the level of support for a further extension beyond Lewisham to Hayes and Beckenham Junction. Thank you to all those who took part. We are considering all the consultation responses we received. We will publish our analysis of the consultation and our response to issues raised later this year.” When will this analysis be published? Bakerloo Line extension The Mayor Last updated: 19 October, 2020 Transport for London will publish the Consultation Report and Response to Issues Raised Report from its autumn 2019 Public Consultation on the proposed Bakerloo line extension by the end of the year. Noise camera technology Question No: 2020/3263 Caroline Pidgeon Does TfL have any plans to implement noise camera technology on sections of TfL controlled roads where noise complaints from traffic are a regular occurrence? Answer for Noise camera technology The Mayor Last updated: 20 October, 2020 Officers are drafting a response Pedestrian fatalities Question No: 2020/3264 Caroline Pidgeon The most recent published statistics show that in 2019 there were 68 people killed while walking on London’s roads, up from 57 in 2018. What assurances can be given that these statistics will be turned around in 2020 and subsequent years? Answer for Pedestrian fatalities The Mayor Last updated: 20 October, 2020 Officers are drafting a response Balham Park Road Question No: 2020/3265 Caroline Pidgeon I have recently been contacted by a blind resident who highlights that Balham Park Road was recently made one way, leading onto Balham High Road. My constituent crosses at this junction frequently on the tactile crossing and despite the one-way system cars are continuing to breach this restriction.
Recommended publications
  • Transport for London Investment Programme Report Extended Quarter 1 2020/21 (1 April 2020 – 1 August 2020) Contents
    Transport for London investment programme report Extended Quarter 1 2020/21 (1 April 2020 – 1 August 2020) Contents 3 Introduction 17 London Underground 32 Other 17 Stations 32 Technology and data 18 Accessibility 35 Growth Fund 5 Mayor’s Transport Strategy themes 19 Track renewals 36 Elizabeth line 19 Power, cooling and energy 38 Crossrail 20 Rolling stock renewals 6 Business at a glance 21 Signalling and control 39 Appendix 39 2020/21 strategic milestone performance 7 2020/21 strategic milestone performance strategy 22 Surface 22 Healthy Streets 25 Air quality 8 Major projects 27 Asset investment 8 Line upgrades 28 Public transport 11 Network extensions 30 Surface technology 16 Future projects Please note that safety and sustainability information will no longer be referenced in this report. There is a quarterly Safety, Sustainability and Human Resources Report published on our website, which provides an overview of health, safety and environmental performance for London Underground, TfL Rail, Surface Transport and Crossrail services. Transport for London quarterly performance report 2 Introduction This report provides an update on a range of projects that will create world-class transport services in London The quarterly investment programme Financial records of spend to date, We also include cumulative EFC Each programme or project also has an report gives a progress update on the authority and Estimated Final Costs movements for savings and efficiencies overall RAG milestone status, which major projects and sub-programmes (EFC) represent the entire duration of that have been embedded since our 2018 represents the average forecast date that seek authority each year (unless each separate project or programme, Business Plan, while protecting safety, variance against plan for 2020/21 extraordinary approvals are needed) to the except for annual portfolios where services and reliability.
    [Show full text]
  • Dear Sir/Madam, RE: Merton Local Plan 2020, 1St Stage Consultation Thank You for Consulting Transport for London (Tfl) on the L
    Date: 8th January 2018 Commercial Development Transport for London 3rd Floor Wing Over Station 55 Broadway By email London SW1H 0BD Phone: 020 7126 4468 Email: [email protected] Dear Sir/Madam, RE: Merton Local Plan 2020, 1st stage consultation Thank you for consulting Transport for London (TfL) on the London Borough of Merton’s draft Local Plan 2020. The following comments represent the views of officers in TfL Commercial Development Planning Team (TfL CD) in its capacity as a significant landowner and are separate from any representations that may be made by TfL in its statutory role as the strategic transport authority for London. TfL CD has been set an ambitious target by the Mayor to commence the development of 10,000 new homes in London by 2021; at least 50% of these new homes must be genuinely affordable. TfL CD has identified a number of sites in the borough for residential led, mixed-use development which will make a significant contribution towards meeting borough and TfL housing targets, as well as improved public transport infrastructure. Our representations in respect of the Call for Sites and the various topics set out in your consultation are set out below. Call for Sites 1. Morden Town Centre Morden has been identified as one of the major growth and housing opportunity areas in south west London by the Mayor of London, TfL and the London Borough of Merton (LBM). There are currently a series of adopted documents which together establish the regeneration context of Morden town centre and specific sites within it.
    [Show full text]
  • Underground News Index 1996
    UNDERGROUND NEWS ISSN 0306-8617 INDEX 1996 Issues 409-20 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY 554 555 INDEX TO 1996 ISSUES OF UNDERGROUND NEWS A (continued) Aldwych station, 13 Notes (i) Page entries with * are photographs Alperton station, 390 (ii) Page entries for an individual station may include developments in the general vicinity of the station. Amersham station, 400 Arnos Grove station, 100,429 A Arsenal station, 375 Attlee, Mr.C, Metropolitan passenger, 253 ACCIDENTS - COLLISIONS Auction of relics including 1962 stock 5.12.95, 88,90,103,125 Baker Street, bufferstops, 9.6.96, 340 Charing Cross, District, 8.5.38, 330 B Lorry with Debden canopy, 6.2.96, 196 Baker Street station, 68,78,132,294 tyloorgate, 28.2.75, 66,67,330 BAKERLOO LINE Road vehicles with South Ruislip bridge, 467,469 Closure south of Piccadilly Circus, 45,125,126,129,483,497,535 Royal Oak. Thames Trains, November 1995, 84,103,106 Dot Matrix indicators display rude messages, 21 Toronto Underground, 9.8.1995, 121,256 Features when extended to Elephant in 1906, 467 Train with tool storage bin, near Hampstead, 375 Baku, metro train fire disaster, 19,20,66 Train, with engineers' trolley, nr.Belsize Park, 537 Balham station, 106,370 Watford, North London Railways, 8.8.96, 452,468 Bank station, 19,32,93,100,222,231,370 ACCIDENTS - DERAILMENTS Barbican station, 26,500 Finchley Central, 1.6.96, 339 Barcelona metro, 189,535 Golders Green, 16.7.96, 405 Barking station, 185,282,534' Hainault depot, 11.5.96, 271 Barons Court station, 108 Match wagon, Ruislip connection.
    [Show full text]
  • London Underground
    Safety, Sustainability and Human Resources Panel Date: 17 November 2016 Item: Quarterly Health, Safety and Environment Performance Reports 2016/17 1 Summary 1.1 The TfL Health, Safety and Environment (HSE) Performance report describes the HSE performance across London Underground, Surface Transport and London Rail for Quarter 2 2016/17, 26 June – 17 September inclusive and performance across Crossrail for Quarter 1 2016/17 1 April – 25 June. 1.2 The Panel’s input on the development of the content of the report and identification of any topics for more in depth discussion at future meetings for inclusion of the forward planner is also sought. 2 Recommendation 2.1 The Panel is asked to note this paper. 3 Background 3.1 There were no accidental customer fatalities on the TfL public transport network. A total of 13 fatalities are attributed to; suicide (nine) and pre existing medical issues (four). There were no employee or contractor fatalities in the quarter. 3.2 Slips, trips and falls continue to be the main cause of customer injury across the network, with incidents continuing to occur on escalators, stairs, the platform train interface (PTI), and on buses. Programmes to militate against customer injury remain on target and within budget. 3.3 For London Underground, PTI performance continues as modelled. This is as a result of a change in the PTI profile due to the introduction of new rolling stock and increase in customers. The majority of incidents result in minor injury. Our mitigation programmes continue on plan and within budget. 3.4 The overall figure for employee injury continues to improve, however, slips, trips and falls resulting in musculoskeletal injury remain as the main cause of injury.
    [Show full text]
  • I,S.S.N. UNDERGROUND NEWS O306-8617 Second S C R I E S
    I,S.S.N. UNDERGROUND NEWS O306-8617 Second Scries Nmiber 193 THE TIMETABLE for period beginning 12th May 1978 Friday 12 May Talk by Ibr» Piers Connor» The Development of Train Equip.Tient on London's Underground, 19OO to 193Be I9OO for I915 at Kammsrsmith Town Hallo Saturday 20 May Morning visit to Neasden Depots Restricted numbers. Applications, with SAE to ilr.G.A.Finch, 16I Valetta Road, London W3 7TA. Tuesday 6 June Library evening, l8,30o The Society's library open for inspection at 9A Durjr-obin Court, 339 Finchley Road, London mi3 6HE. Talk by Mr,D.G,Jobling, Design and Construction Engineer (Civil Engineering) London Transport, on L.T. Railvray Bridges. I9OO for 1915 at Hammersmith Town Hall, Night of Friday'- 9 June/Saturday 10 Juno Ail night visit to Permanent Way night vrork. Restricted mrmberso Applications, with SAE to Mr.G,A,Finch, I6I Valetta Road, London W3. Wednesday 3 July Library evening, l8»30. Other details as for 6 June. Morniiig visit to Parsons Green Works and Building depot. Restricted nvunbers. Applications, with EAS to ^MroG,A.Flnch, I61 Valetta Road, London ¥5 7TA, Friday ik July Talk by MroP.Cassell, Vegetation Control on London Transport. I9OO for 1915 at Hammersmith Town Hall, Friday 11 August Talk by MrcFcG,Rutty, Traction Engineer, London Transport. Train performance and testing on London Transpcrto I9OO for 1915 at Hammersmith Tovrn Hall, Published 12 times a year by the London Underground Railway Society, Correspondence to Assistant Editor, 13 Castleton Road, Eastcote, Ruislip, Middlesex, HA'i 9QQ. Opinions expressed are those of contributors and not necessarily endorsed by the Society.
    [Show full text]
  • Cartometro London Edition
    © 2011 - Franklin JARRIER Contact : [email protected] http://carto.metro.free.fr ThisDocument is cop A B C D E F G H I J o.free.fr Former goods yard 22/08/1856 London Underground : 25/09/1949 removed from London Underground : 30/03/1994 2 1 Blake Hall Closed 31/10/1981 North Weald Version 2.0 Ongar Metropolitan h t tp Chesham : 1 / r 2 Goods yard May 2011 /c f a . GREATER LONDON rto ree .metro.f 1 yrighted,you arenot 27 com http://carto.metr Central 1 Epping 2 Underground, Overground, DLR 1 Tracks map with platforms, connections & depots 25/09/1949 allowed tous import, 24/04/1865 &Tramlink Map London Underground : to Brill & VerneyJunction (part of the metropolitan © 2011 - Franklin JARRIER - Reproduction prohibited without the permission of the author - [email protected] - http://carto.metro.free.fr from 1892 to 1936) Metropolitan Amersham : carto.metro@gmail. 31 32 3 2 34 1 01/09/1892 2 Theydon Bois 1 Chalfont & Latimer 3 2 1 Overground Watford Junction 11 10 7 6 9 8 3 1 4 2 08/07/1889 e or extractany data Metropolitan 21 22 1 Watford 23 2 24 lin JARRIERlin Contact 2 Chorleywood Watford 1 High Street Piccadilly 2 Cockfosters 1 3 4 24 23 25 2 Croxley Green 26 1 22 22 27 23 34 28 High Barnet Watford High Street 21 35 36 29 21 30 26 Northern 2 31 02/11/1925 3 Junction 1 Sidings 31/07/1933 27 30 28 31 32 29 33 53 54 High Barnet 29A 51 52 50 48 49 Goods yard 46 47 45 43 44 41 42 39 40 Colne 37 38 36 32 33 34 35 15/06/1906 Junction 1 Watford Oakwood 2 Croxley 1 2 Croxley West Junction Closed 30/03/2003 Cockfosters Depot 22 Loughton
    [Show full text]
  • Programmes and Investment Committee, 11/12/2018
    Agenda Meeting: Programmes and Investment Committee Date: Tuesday 11 December 2018 Time: 10.15am Place: Conference Rooms 1 and 2, Ground Floor, Palestra, 197 Blackfriars Road, London, SE1 8NJ Members Prof Greg Clark CBE (Chair) Dr Alice Maynard CBE Dr Nelson Ogunshakin OBE (Vice-Chair) Dr Nina Skorupska CBE Heidi Alexander Dr Lynn Sloman Ron Kalifa OBE Ben Story Copies of the papers and any attachments are available on tfl.gov.uk How We Are Governed. This meeting will be open to the public, except for where exempt information is being discussed as noted on the agenda. There is access for disabled people and induction loops are available. A guide for the press and public on attending and reporting meetings of local government bodies, including the use of film, photography, social media and other means is available on www.london.gov.uk/sites/default/files/Openness-in-Meetings.pdf. Further Information If you have questions, would like further information about the meeting or require special facilities please contact: Jamie Mordue, Senior Committee Officer; Tel: 020 7983 5537; email: [email protected]. For media enquiries please contact the TfL Press Office; telephone: 0845 604 4141; email: [email protected] Howard Carter, General Counsel Monday 3 December 2018 Agenda Programmes and Investment Committee Tuesday 11 December 2018 1 Apologies for Absence and Chair's Announcements 2 Declarations of Interests General Counsel Members are reminded that any interests in a matter under discussion must be declared at the start of the meeting, or at the commencement of the item of business.
    [Show full text]
  • London Underground
    ______________________________________ Technical Specification for London Underground Railway Timetable Data - Common User Format File ______________________________________ LU/ED Version 4.1 Issue Dated 20 April 2016 Implementation Date 15 May 2016 Alterations up to and including 15 April 2016 Common User Format File 4.0 Table of Contents 1. DETAILED REVISION HISTORY .............................................................................................................5 1.1 Revisions starting from version 4.0 ................................................................................................5 2. GENERAL ................................................................................................................................................6 2.1 File Naming Conventions................................................................................................................6 2.2 File Content and Format .................................................................................................................7 2.2.1 ID File .........................................................................................................................................7 2.2.2 The Header (HDR) File ..............................................................................................................9 2.2.3 The CUF Event (EVT) File ...................................................................................................... 11 2.2.4 The Checksum (CHK) File .....................................................................................................
    [Show full text]
  • Cartometro London Edition
    @g A B C How Wood (Herts) D E F G H I J Level crossing Pad 22/08/1865 London Underground : 25/09/1949 removed from London Underground : 30/03/1994 2 1 1 2 Blake Hall Closed 31/10/1981 North Weald Loco Pit Ron's Siding Spur Version 3.9 3 2 1 Ongar Metropolitan h Kings Langley t tp Chesham Bricket Wood : King's Cross - St. Pancras Detail 1 / 2 Goods yard April 2020 /c GREATER LONDON ar m t o York Road o Level crossing Redland Road metro.c Stone Siding Cheshunt Overground y g y Cheshunt Junction Hotel Curve 1 Up Goods Loop Underground, Central 27 1 Epping Theobalds Grove 2 1 York Road Curve Level crossing Maiden Lane Transport Tracks Map Overground, DLR, Curve Kings Cross Tunnel Level crossing Garston (Hertfordshire) Radlett Kings Cross loop Tracks map with platforms, connections & depots Tramlink & National Rail Waltham Cross Watford Tunnels 24/04/1865 London Underground : 25/09/1949 to Brill & VerneyJunction © 2020 - Franklin JARRIER - Reproduction prohibited without the permission of the author - [email protected] - http://cartometro.com (part of the metropolitan from 1892 to 1936) Metropolitan Amersham Radlett Junction 31 32 Watford North 3 2 34 NR / LUL 1 Turkey Street boundary 01/09/1892 Hadley Wood North tunnels 2 Theydon Bois 1 Level crossing Enfield Lock Chalfont & Latimer Hadley Wood 3 2 1 Watford north Junction Hadley Wood South tunnels 11 10 Gordon Hill 7 6 9 8 Overground Watford Yard 3 5 1 4 Watford Junction 2 Watford 08/07/1889 south Junction Metropolitan 21 22 1 Watford 23 2 24 Level crossing Elstree & Borehamwood Brimsdown
    [Show full text]
  • Underground News Index
    UNDERGROUND NEWS ISSN 0306-8617 INDEX 1997 Issues 421-432 PUBLISHED MONTHLY BY THE LONDON UNDERGROUND RAILWAY SOCIETY INDEX TO 1997 ISSUES OF UNDERGROUND NEWS Page entries marked * are photographs. Accidents, collisions, engineer's train, East London Line, 6.8.97, 331 with wall, Northumberiand Park depot, 22.2.97, 110 1995 stock in coupling. South Ealing, 17.2.97, 110,160 Accidents, derailments, Amersham, 27 battery loco, Finchley Central, 3.7.97, 272 King's Cross St.Pancras, 17.2.97, 110 Morden depot, 26.5.97, 235 Piccadilly Circus, 4, 75*, 76* tunnel deaning train, Bakerloo Line, 4.3.97, 160 Unimog derailed twice, 6.5.97, 233 Walthamstow Central, 27.8.97, 334 Waterioo W & C, 17.10.97, 417 Acddents, fire, cable at Watertoo Railtrack, 13.3.97, 161 on train, Bethnal Green, 225 on train. King's Cross SLPancras, 22.8.97, 333 power surge, Metropolitan Line, 20.3.97, 162 Willesden Junction, 24.10.96, 23 Acddents, miscellaneous, displaced rail, H & C, 22.8.97, 333 ducks hit, Chesham branch, 14.6.97, 271 exploding light fitting. Green Park, 23.9.97, 337 falling roof panel. Hammersmith, 19.9.97, 337 Kew railway bridge hit by tug, 5.9.97, 336 landslide, Metropolitan Line. 19.8.97, 332 Acddents, personal, boy dragged and killed, Holbom, 21.10.97, 417 children skateboarding, Hounslow Central, 7.9.97, 336 compensation for track wori<er, 92 death, Oxford Circus, 5.12.96, 29 drunk falling down escalator, Kentish Town, 28.2.97, 111 electric shock. Monument, 27.6.97, 272 fall between cars, Baker Street, 31.7.97, 319 fall between train and platfomi, Eastcote, 31.12.96, 92 fall, Eari's Court, 24.9.97, 337 fall, Greenwich DLR site, 266 fall on escalator, Southgate, 11.11.98, 26 fall on to track, Famngdon, 3.9.97, 336 fall on train, Covent Garden, 29.8.97, 334 family falling on escalator.
    [Show full text]
  • Inventory of Signal Cabins and Other Interlockings 1863 – 2020
    London Transport Railways Inventory of Signal Cabins and Other Interlockings 1863 – 2020 Interlocking frames, signal boxes, control rooms and other signal controls on London Underground lines and their predecessors. Mike Horne © M.A.C. Horne Version 9.55 – 20 February 2020 Criteria for inclusion. 9. Where a change happens overnight the expression 'closed after [whatever date is]' is used. This means the change happened 1. A Signalbox or other interlocking (a) provided by LU, (b) taken over by immediately after the last train of the day (which chronologically can LU, or (c) in certain cases 'fringing' on locations that are (a) or (b). It mean early morning the following day). LT practice is used here such does not generally include boxes on main lines that came and went that (for example) the last Saturday night train is counted as running prior to LU takeover. on Saturday, even if it is actually early on Sunday morning. Note main 2. ‘Signalbox’ means any location at which control of signals or points line practice is different. (or both) are concentrated and includes ground frames and control 10. Colour - entries in GREEN are non LU installations, Entries in rooms. MAGENTA are training equipment and entries in BLUE are still extant. 3. Interlocking means any device or apparatus, whether electrical or Abbreviations used in Status column mechanical, whereby signals and points are interlocked to preserve safety and includes any other arrangements to prevent one or more C = Signalbox continuously open or opened regularly at published times signals giving a proceed indication if equipment intended to detect safe conditions is operated (or fails to operate) or where apparatus E = Signalbox broadly open as required (either for shunting or in intended for use by staff are operated.
    [Show full text]
  • Agenda and Papers for Programmes and Investment Committee, 05/03
    Agenda Meeting: Programmes and Investment Committee Date: Thursday 5 March 2020 Time: 10.15am Place: Conference Rooms 1 and 2, Ground Floor, Palestra, 197 Blackfriars Road, London, SE1 8NJ Members Prof Greg Clark CBE (Chair) Mark Phillips Dr Nelson Ogunshakin OBE (Vice-Chair) Dr Nina Skorupska CBE Heidi Alexander Dr Lynn Sloman Ron Kalifa OBE Ben Story Dr Alice Maynard CBE Copies of the papers and any attachments are available on tfl.gov.uk How We Are Governed. This meeting will be open to the public, except for where exempt information is being discussed as noted on the agenda. There is access for disabled people and induction loops are available. A guide for the press and public on attending and reporting meetings of local government bodies, including the use of film, photography, social media and other means is available on www.london.gov.uk/sites/default/files/Openness-in-Meetings.pdf. Further Information If you have questions, would like further information about the meeting or require special facilities please contact: Jamie Mordue, Senior Committee Officer; Tel: 020 7983 5537; email: [email protected]. For media enquiries please contact the TfL Press Office; telephone: 0845 604 4141; email: [email protected] Howard Carter, General Counsel Wednesday 26 February 2020 Agenda Programmes and Investment Committee Thursday 5 March 2020 1 Apologies for Absence and Chair's Announcements 2 Declarations of Interests General Counsel Members are reminded that any interests in a matter under discussion must be declared at the start of the meeting, or at the commencement of the item of business.
    [Show full text]