List of Candidates Under Para 9:3:0/9:4:0/9:5:0 to Be Published in CCL Website
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Central Coalfields Limited Office of the General Manager(A), Sirka M/S___Address
Central Coalfields Limited Office of the General Manager(A), Sirka LIMITED TENDER NOTICE No.: GM (A)/Mining /CT/GDC-SND/ 14/ 272 Dated: 17.07.2014 M/s_______________________________________ Address___________________________________ __________________________________________ Limited tenders in two parts are invited from all the working transport contractors of Argada Area, Kuju Area, Barka-Sayal Area, H.Bagh Area & Rajrappa Area for loading and transportation of coal from Gidi-C Pit head stock (Heap No. 4 & 6 of Grade G- 6 & G- 8) to Saunda siding/Feeder Breaker of Barka-Sayal Area by contractor’s pay loader and contractor’s tipping trucks, Distance 11.56 KM for a period of four months as under: Description of work Quantity in T e Earne st Money 1. Transportation of coal from Gidi - Rs .49,165 / - only ( Rupees forty nine C Pit head stock heap No. (4 & 6 of thousand one hundred sixty five ) only Grade 6 & G 8) to Saunda 50,000 Te to be deposited by way of Bank Draft / siding/Feeder breaker via Gidi-W, Banker’s Cheque payable in favor of Officer’s Club Bhurkunda, PO’s Central Coalfields Limited ARGADA AREA Office, Bhurkunda, Distance 11.56 payable at Ramgarh. KM weighment to be done at Gidi-C as well as Saunda Weighbridge. 2. Loading of coal by contractor’s pay loader into contractor’s tipping 50,000 Te. trucks. Estimated value of work: Rs. 49,16,500.00 only (Rupees forty nine lakh sixteen thousand five hundred and paise zero) only at the diesel price of @Rs. 59.25 as on 13.05.14 Requirement of tipping trucks -- 6 (Six) Nos. -
Coalmine Methane Under Indian Mining Scenario
Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations. -
Hazaribagh, District Census Handbook, Bihar
~ i ~ € :I ':~ k f ~ it ~ f !' ... (;) ,; S2 ~'" VI i ~ ~ ~ ~ -I fI-~;'~ci'o ;lO 0 ~~i~~s. R m J:: Ov c V\ ~ -I Z VI I ~ =i <; » -< HUm N 3: ~: ;;; » ...< . ~ » ~ :0: OJ ;: . » " ~" ;;; C'l ;!; I if G' l C!l » I I .il" '" (- l' C. Z (5 < ..,0 :a -1 -I ~ o 3 D {If J<' > o - g- .,. ., ! ~ ~ J /y ~ ::.,. '"o " c z '"0 3 .,.::t .. .. • -1 .,. ... ~ '" '"c ~ 0 '!. s~ 0 c "v -; '"z ~ a 11 ¥ -'I ~~ 11 CENSUS 1961 BIHAR DISTRICT CENSUS HANDBOOK 14 HAZARIBAGH PART I-INTRODUCTORY NOTE, CENSUS TABLES AND OFFICIAL STATISTICS -::-_'" ---..... ..)t:' ,'t" -r;~ '\ ....,.-. --~--~ - .... .._,. , . /" • <":'?¥~" ' \ ........ ~ '-.. "III' ,_ _ _. ~ ~~!_~--- w , '::_- '~'~. s. D. PRASAD 0 .. THE IlQ)IAJr AD:uJlIfISTBA'X'lVB SEBVlOE Supwtnundent 01 Oen.ua Operatio1N, B'h4r 1961 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Vol. no. IV) Central Government Publications PART I-A General Report PART I-B Report on Vital Statistics of Bihar, 1951-60 PART I-C Subsidiary Tables of 1961. PART II-A General Population Tables· PART II-B(i) Economic Tables (B-1 to B-IV and B-VU)· PAR't II-B(ii) Economic Tables (B-V, B-VI, B-VIII and B-IX)* PART II-C Social and Cultural Tables* PART II-D Migration Tables· PART III (i) Household Economic Tables (B-X to B-XIV)* PART III (ii) Household Economic Tables (B-XV to B-XVII)* PART IV-A Report on Housing and Establishments· PART IV-B Housing and Establishment Table:,* PART V-A Special Tables for Scheduled Castes and Scheduled Tribe&* PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Surveys •• (Monoglaphs on 37 selected villages) PART VII-A Selected Crafts of Bihar PART VII-B Fairs and Festivals of Bihar PART VIII-A Administration Report on Enumeration * } (Not for sale) PART VIII-B Administration Report on Tabulation PART IX Census Atlas of Bihar. -
Jainagar Coal Block Summary
JAINAGAR COAL BLOCK SUMMARY PART A Sr. Features Details No . 1. Location Coal Block Jainagar Latitude 23° 38' 34" N to 23° 39' 9" N (Provisional) Longitude 85° 17' 3" E to 85° 18' 12" E (Provisional) Topo Sheet No. 73 E/6 Coalfield South Karanpura Villages - Tehsil/Taluka Patratu District Ramgarh. State Jharkhand. 2. Connectivity with Block Ramgarh is a railway station on the Gomoh-Barkakhana section of the South Nearest Rail Head Eastern Railway and Patratu railway station is on the Gomoh-dehri-on-Sone loop of the Eastern Railway. A good motorable road has been constructed passing through the western of Road the area connecting Patratu railway station (3 km.) and Ramgarh (27 km.). Airport Ranchi Airport 3. Area Geological Block Area 1.3 sq.km. (As per shape file. Refer Note No. 3) Forest Area Approx. 15 % (As per FSI map) Non-Forest Area Approx. 85 % 4. Climate and Topography Average Annual Rainfall - Temperature (Min. — Max.) - Local Surface There are two nalas in the area, one on the eastern boundary – the Nalkari Drainage Channels Nala flowing towards north, the other on the northern portion of the area the Bawandhara nala flowing towards east. The later joins the former at the north-eastern corner of the area which in turn joins the Damodar river further north-east. These nalas are practically dry except during rains. Rivers Nalkari Nala/Nadi. 5. Exploration Status Regionally Explored. Exploration Agency GSI. Total Number of Boreholes with meterage 13 Boreholes; 3212.43 m. Borehole Density Approx. 10 Boreholes/sq.km. The dips of the Barakar vary from 20° to 45° towards north in the eastern General Dip of Seams part of the area and about 20° towards east in the western part of the area. -
Soil Erosion and Preventive Measures
SCIENTIFIC STUDY OF SOIL EROSION AND PREVENTIVE MEASURES FOR GIDI ‘C’ OPENCAST PROJECT (0.6 MTY) OF CENTRAL COALFIELDS LIMITED SEPTEMBER, 2012 SLOPE STABILITY CELL ENVIRONMENT DIVISION CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD. (A Subsidiary of Coal India Ltd.) GONDWANA PLACE RANCHI – 834008 SCIENTIFIC STUDY OF SOIL EROSION AND PREVENTIVE MEASURES FOR KARMA OPENCAST PROJECT (0.6 MTY) OF CENTRAL COALFIELDS LIMITED SEPTEMBER, 2012 SLOPE STABILITY CELL ENVIRONMENT DIVISION CENTRAL MINE PLANNING & DESIGN INSTITUTE LTD. (A Subsidiary of Coal India Ltd.) GONDWANA PLACE RANCHI – 834008 INDEX Chapter Name of Chapter Page No 1 Background 1 - 2 2 Project Profile 4 - 11 3 Soil Erosion 12 - 27 4 Control Measures 28- 38 5 Cost & conclusion 39- 41 CMPDI Prevention of soil erosion CHAPTER - I Background 1.0 Purpose CCL had submitted a proposal to concern department for the release of 237.300Ha. of forest land for the Gidi ‘c’ open-cast project to MoEF, GoI through DFO, East Division, Hazaribagh. Stage – II clearance has been accorded by MoEF vide letters no. 8 -114/2003 -FC- dated 30.10.08 of Sr. Assistant Inspector General of forest MoEF, Govt. of India with certain conditions. As per clause no. 3 (I, II, III, IV & V) of the said letter the user agency has to comply with;- Preparation of a scheme for the proper mitigation measures to minimize soil erosion and choking of stream and shall be implemented; Planting of adequate drought hardy plant species and sowing of seeds to arrest soil erosion; The area shall be reclaimed keeping in view of the international practice or stabilizing the dump grading/benching so that the angle of repose (normally less than 280 at any given point) are maintained; The top soil management plan should be strictly adhered; The study of soil erosion/soil flow from the overburden area with the help of GIS in consultation of forest department. -
LIST of REPORTS SENT to the SPONSORER from 1St JANUARY, 2016 to MARCH, 2021
LIST OF REPORTS SENT TO THE SPONSORER FROM 1st JANUARY, 2016 TO MARCH, 2021 SL.NO. DATE OF SENDING PROJECT PROJECT NO. PROJECT TITLE SPONSOR SUBMISSION FINANCIAL FINANCIAL TO THE YEAR YEAR SPONSOR 1 08.01.16 2015-16 2013-14 CNP/3714/2013-14 Study and advice on safety of Patal Archaeological Survey of India, Bhubaneswar Cave Pithoragarh, Dehradun Uttarakhand 2 08.02.16 2015-16 2015-16 CNP/4312/2015-16 Assessment of winding ropes of Narwapahar Mines,UCIL, Narwapahar Mines, UCIL by Singhbhum (East) nondestructive method 3 19.02.16 2015-16 2011-12 CNP/2928/2011-12 Study and failure analysis of 32mm 10/12 Pits Colliery, BCCL, diameter guide rope of K.B. 10/12 pits Dhanbad colliery, BCCL, Dhanbad”. 4 23.03.16 2015-16 2015-16 CNP/4212/2015-16 In-Situ study and advice on the present Asia Resorts Limited, Parwanoo condition of four nos of track ropes and (H.P.) two nos. Of haulage ropes of passenger cable car aerial ropeway installation of M/s Timber Trail, Asia Resorts Limited, Parwanoo (H.P.) – Two visits 5 23.03.16 2015-16 2014-15 CNP/4121/2014-15 Scientific study and advice for status of The Singareni Collieries Company goaf atmosphere during extraction of Limited, Kothagudam Collieries- blasting gallery panel No.BG-J(3) in 507101, Bhadrachalam Road No.3 seam at GDK 11 Incline, Railway Station, Dist-Khammam Ramagundam Area -I, SCCL (A.P.) 6 28.03.16 2015-16 2015-16 CNP/4345/2015-16 Investigation into drop and spark Block II Area, BCCL, Nawagarh, sensitivity of Nonel tubes and VOD, Dhanbad Sensitivity and density parameters of cast boosters involved in the accidental initiation at Amalgamated Block-II OCP 7 05.05.16 2016-17 2010-11 CNP/2859/2010-11 Studies on failure of 25mm diameter Bastacolla Area-IX, BCCL, 6X8 FS construction winding rope of Dhanbad victory 2 pit (south side) Bastacolla Area,”. -
Land Use/Vegetation Cover Mapping of North and South Karanpura Coalfields Based on Satellite Data for the Year- 2012
Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 CMPDI A Miniratna Company Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi CMPDI Restricted Report on Vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data of the Year‐ 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi RSC-561410027 [ Page i of iv] CMPDI Document Control Sheet (1) Job No. RSC/561410027 (2) Publication Date March 2013 (3) Number of Pages 28 (4) Number of Figures 7 (5) Number of Tables 7 (6) Number of Plates 1 (7) Title of Report Land use /vegetation cover mapping of North & South Karanpura Coalfield based on satellite data of the year 2012. (8) Aim of the Report To prepare Land use / vegetation cover map of North & South Karanpura Coalfield on 1:50000 scale based on IRS R-2 L4FMX satellite data for assessing the impact of coal mining on land use pattern and vegetation cover (9) Executing Unit Remote Sensing Cell, Geomatics Division Central Mine Planning & Design Institute Limited, Gondwana Place, Kanke Road, Ranchi 834008 (10) User Agency Central Coalfields Ltd. (11) Authors Mr A. K. Singh Chief Manager (Remote Sensing) Mr. N.P.Singh, General Manager(Geomatics) (12) Security Restriction Restricted Circulation (13) No. of Copies 8 (14) Distribution Statement Official RSC-561410027 [ Page ii of iv] CMPDI Contents Page No. Document -
Ramgarh District, Jharkhand State
भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Open cast mines at Ramgarh district केन्द्रीय भसू िजल बो셍ड Central Ground water Board Ministry of Water Resources जल िंिाधन िंत्रालय (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाालय, रााँची Mid-Eastern Region म鵍य-पूर्वी क्षेत्र Patna पटना सितंबर 2013 September 2013 भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Prepared By रोज अनीता कू जूर (वैज्ञाननक ग ) Rose Anita Kujur (Scientist C) रा煍य एकक कायाालय, रााँची म鵍य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna GROUND WATER INFORMATION BOOKLET OF RAMGARH DISTRICT, JHARKHAND STATE CONTENTS Sl.No. Details Page No. RAMGARH DISTRICT AT A GLANCE 1.0 INTRODUCTION 1.1 Administration 1 1.2 Drainage 4 1.3 Studies/Activities Carried Out By CGWB 4 2.0 HYDROMETEROLOGY 2.1 Rainfall 4 2.2 Climate 4 3.0 GEOMORPHOLOGY AND SOIL TYPES 3.1 Geomorphology 4 3.2 Soil 5 4.0 GROUND WATER SCENARIO 4.1 Hydrogeology 5 4.2 Depth to Water Level 5 4.3 Water Level Trend 6 4.4 Aquifer Parameters 10 4.5 Ground Water Quality 10 4.6 Ground Water Resource 10 5.0 GROUND WATER MANAGEMENT STRATEGY 5.1 Ground Water Development 15 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS 15 7.0 AWARENESS AND TRAINING ACTIVITY 7.1 Mass Awareness Program(MAP) & Water 16 Management Programme(WMTP) by CGWB 8.0 AREAS NOTIFIED BY CGWB / CGWA 16 9.0 RECOMMENDATIONS 16 Figure.No. -
Annual Report & Accounts 2017-2018
ANNUAL REPORT & ACCOUNTS 2017-2018 CENTRAL COALFIELDS LIMITED A Miniratna Company www.centralcoalfields.in Annual Report & Accounts 2017-18 CENTRAL COALFIELDS LIMITED A Miniratna Company (A Subsidiary of Coal India Limited) (CIN: U10200JH1956GOI000581) Regd. Office : Darbhanga House, Ranchi - 834 029 JHARKHAND CENTRAL COALFIELDS LIMITED ANNUAL REPORT 2017-18 VISION/MISSION & OBJECTIVES 1.1 VISION To emerge as a National player in the Primary Energy Sector, committed to provide energy security to the Country, by attaining environmentally and Socially Sustainable Growth , through best practices from Mine to Market. MISSION The Mission of Central Coalfields Limited (CCL) is to produce and market the planned quantity of Coal and Coal products efficiently and economically in Eco-Friendly manner, with due regard to Safety, Conservation and Quality. 1.2 OBJECTIVES The major objectives of Central Coalfields Limited (CCL) are — 1. To optimize generation of internal resources by improving productivity of resources, prevent wastage and to mobilize adequate external resources to meet investment need. 2. To maintain high standards of Safety and strive for an accident free mining of Coal. 3. To lay emphasis on afforestation, protection of Environment and control of Pollution. 4. To undertake detailed exploration and plan for new Projects to meet the future Coal demand. 5. To modernize existing Mines. 6. To Develop technical know-how and organizational capability of Coal mining as well as Coal beneficiation and undertake, wherever necessary, applied research and development work related to Scientific exploration for greater extraction of Coal. 7. To improve the quality of life of employees and to discharge the corporate obligations to Society at large and the community around the Coalfields in particular. -
(Gidi-A Colliery), Argada Area Po: Gidi-A, Dist.: Hazaribagh, Pin-829108
CENTRAL COALFIELDS LIMITED OFFICE OF THE PROJECT OFFICER (GIDI-A COLLIERY), ARGADA AREA PO: GIDI-A, DIST.: HAZARIBAGH, PIN-829108 Ref No.: CCL/ Argada /GDA/E&M/NIQ/20-21/ 190 Date: 25/10/2020 NOTICE INVITING QUOTATION (NIQ) 01. Sealed Quotation in one part is invited from eligible contractors for the following work:- Sl. Description of work Estimated Earnest Money Period of No. Cost of (Rs.) Completion work (Rs.) @1.25% of (in days) ESTIMATED COST. 1 Maintenance & Repairing of 93,633.00 1170.00 07(Seven days) 400Amp,3.3Kv,L&C make OCB at substation of Gidi-A Colliery. 2 Supply & Fixing of pole mounting kits 1,21,096.32 1514.00 05(Five days) at different points of Gidi-A main substation ,CHP, Quarry & Colony of Gidi-A colliery. 3 Complete rewinding /repairing of 2nos 41,032.64 513.00 07(Seven days) LT motors of durga mandap pani tanki & filter plant of Gidi-A Colliery. 4 Repairing & rewinding of 63Kva 51,389.19 642.00 10(Ten days) transformer ,Make: synergy power equipment of Gidi-A Colliery 03. “Earnest money can be deposited in the form of bank draft drawn in favour of “CCL ARGADA AREA” on any Nationalized Bank payable at RAMAGRH. The Earnest Money can also be deposited through RTGS/NEFT mode in CCL Argada Area Account as detailed below: Title of Account CC LTD A/C AREA Name of Bank and Branch SBI, Branch : SIRKA,P.O-ARGADA, P.S -RAMGARH DIST:HAZARIBAGH, JHARKHAND Payee’s Account Number 11447812016 IFSC Code SBIN0004896 The date of issuance of Demand Draft and /or Payment receipt(Through RTGS/NEFT mode) should be on or after the date of issue of quotation Notice . -
Page 1 of 11
NATIONAL LOK ADALAT CAUSELIST For Saturday The 8th February 2020 COURT NO. 2 SINGLE BENCH (BENCH ID-24731) AT 11:00 AM HON'BLE MR. JUSTICE B. B. MANGALMURTI Lok Adalat 1 MA/73/2010 ISHRAIL MIAN AND ANR VISHAL KUMAR TRIVEDI P.C.SINHA VS ALOK LAL AJAY KUMAR SHARMA AND ORS. IA NO, 1402/2010 (For 0) MOTOR VEHICLES ACT, 1988 2 MA/149/2010 SMT.SUBHADRA DEVI AND ORS ARVIND KUMAR LALL HARENDRA KUMAR SINGH VS ASHOK KUMAR SAW AND ORS MOTOR VEHICLES ACT, 1988 3 MA/90/2011 SAHNAJ KHATOON AND ORS ARVIND KUMAR LALL PRATYUSH KUMAR VS MANISH KUMAR BHAGWAN RAY AND ORS MOTOR VEHICLES ACT, 1988 4 MA/131/2011 BR.MANAGER, ORIENTAL INSURANCE ALOK LAL MANOJ KUMAR SAH VS VIVEK KUMAR JUHLANI DEVI AND ORS IA NO, 1904/2011 (For 0) MOTOR VEHICLE-00 5 MA/177/2011 HASIN KHAN MD.SAMSUDDIN ARVIND KUMAR LALL D.C.GHOSE VS CHETAN K. NAGESH ARUN KUMAR VERMA AND ANR MOTOR VEHICLES ACT, 1988 6 MA/198/2011 SMT.SUNITA CHOUDHARY AND ORS ARVIND KUMAR LALL GANESH C. JHA VS MD.AKHTAR AND ANR MOTOR VEHICLES ACT, 1988 wt7 MA/185/2011 ORIENTAL INSURANCE CO.LTD. ALOK LAL CHANDRA S. PRASAD VS SANTOSH KUMAR ARVIND KR LALL SUNITA CHOUDHARY AND ORS CHETAN K. NAGESH MOTOR VEHICLE-00 8 MA/93/2012 KALOSTICA KUJUR S.K.SHARMA HARENDRA KR SINGH VS ASHOK KR JHA PAWAN KUMAR MANTRI AND ORS. BASAV CHATTERJEE RAHUL SABOO MOTOR VEHICLE-00 9 MA/224/2012 ORIENTAL INSURANCE COMPANY BIBHASH SINHA MANOJ KUMAR SAH LIMITED THROUGH ITS INCHARGE RAUNAK SAHAY VIVEK KUMAR LEGAL CELL SRI A K GUPTA AJAY KUMAR SAH VS KAUSHALYA DEVI AND OTHERS MOTOR VEHICLES ACT, 1988 10 MA/163/2013 ORIENTAL INSURANCE COMPANY PRATYUSH KUMAR MANISH KUMAR LIMITED REPRESENTED THROUGH ITS J.P.PANDEY DIVISIONAL MANAGER JITENDRA TRIPATHI VS ANJU DEVI AND ORS MOTOR VEHICLES ACT, 1988 11 MA/265/2013 ORIENTAL INSURANCE COMPANY LTD GANESH C. -
Argada Area Central Coalfields Limted Ranchi
CENTRAL COALFIELDS LIMTED RANCHI ANNEXURE-IV DETAILS CONTRACTS/TENDERS/PURCHASES CONCLUDED DURING THE MONTH OF JULY 2011 Tender No. Item/nature Mode of Date of Type of Last dt.of Nos.of tender Nos.&Name Nos.&Name Whether Contract Name of Value of Scheduled Actual date Actual date Reasons for of work tender Publ.of Bidding receipt received of parties of parties not contract No.& Date Contractor Contract date of of start of of completion delay if any enquiry tender (Single/Two tender qualified after qualified after awarded to (Rs.lakhs) completion of work/ of Bid system) tech.evaluatio tech.evaluati Lowest supplies/ supplies work/supplie n on tender/ work s evaluation L1 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 ARGADA AREA DEPTT.MINING 1 Coal loading Open Tender 10.01.2010 Two Bid 01.02.2010 Three 1. Shri Raju 1. Sri. Babulal YES Agreement Shri Raju 218.76 22.07.2013 23.07.2010 NA Not Applicable &Transportatio through News System Gupta, Gidi-'A' Gupta, Gidi-A No.GM(A)/SO( Gupta, Gidi-'A' n Papers & CCL 2. Sri.Dhiraj M)(A)/CT/GDA/ Website Singh 10-13/29 Dt.28.08.2010 2 Coal loading Open Tender 11.12.2009 Two Bid 04.01.2010 Three 1. Shri Raju NIL YES Agreement Shri Babulal 476.16 17.10.2013 18.10.2010 NA Not Applicable &Transportatio through News System Gupta, Gidi-'A' No.GM(A)/CT/ Gupta, Gidi-'A' n Papers & CCL 2. Shri. Babulal GDC/10-13/45 Website Gupta, Gidi-A.