Revised List ANM 2019 Advt. No. 03-2019 West Singhbhum, Chaibasa 1 - 35 Matric Inter Technical Qualification JNRC Registration No
Total Page:16
File Type:pdf, Size:1020Kb
Load more
Recommended publications
-
Central Coalfields Limited Office of the General Manager(A), Sirka M/S___Address
Central Coalfields Limited Office of the General Manager(A), Sirka LIMITED TENDER NOTICE No.: GM (A)/Mining /CT/GDC-SND/ 14/ 272 Dated: 17.07.2014 M/s_______________________________________ Address___________________________________ __________________________________________ Limited tenders in two parts are invited from all the working transport contractors of Argada Area, Kuju Area, Barka-Sayal Area, H.Bagh Area & Rajrappa Area for loading and transportation of coal from Gidi-C Pit head stock (Heap No. 4 & 6 of Grade G- 6 & G- 8) to Saunda siding/Feeder Breaker of Barka-Sayal Area by contractor’s pay loader and contractor’s tipping trucks, Distance 11.56 KM for a period of four months as under: Description of work Quantity in T e Earne st Money 1. Transportation of coal from Gidi - Rs .49,165 / - only ( Rupees forty nine C Pit head stock heap No. (4 & 6 of thousand one hundred sixty five ) only Grade 6 & G 8) to Saunda 50,000 Te to be deposited by way of Bank Draft / siding/Feeder breaker via Gidi-W, Banker’s Cheque payable in favor of Officer’s Club Bhurkunda, PO’s Central Coalfields Limited ARGADA AREA Office, Bhurkunda, Distance 11.56 payable at Ramgarh. KM weighment to be done at Gidi-C as well as Saunda Weighbridge. 2. Loading of coal by contractor’s pay loader into contractor’s tipping 50,000 Te. trucks. Estimated value of work: Rs. 49,16,500.00 only (Rupees forty nine lakh sixteen thousand five hundred and paise zero) only at the diesel price of @Rs. 59.25 as on 13.05.14 Requirement of tipping trucks -- 6 (Six) Nos. -
Road Construction Department, Jharkhand
Road Circle Hazaribag 2019 2019-20 iFk izEk.My] gtkjhckx 0.00 4150.07829 4150.07829 0.00 3506.27266 0.00 3506.27266 643.80563 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.00 4150.07829 4150.07829 0.00 3506.27266 0.00 3506.27266 643.80563 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SH/MDR Carriage wideth Equilateral Bridge Nos. of Remarks ODR/Others length Culverts Single Intermediate Double Fourth (I Km) No. Length RCC HP Lane lane in Km Lane lane In m (in in in Km Km) Kma In NH-2 3.875 - - 3.875 - 7.75 - - - - tender process NH-33 9.4 - - 9.40 - 18.8 01 - -- - SH-07 47.05 - - 47.05 - 94.10 11 - 59 - MDR-069 9.80 - - 9.80 - 14.37 1 - 21 - MDR-070 29.20 - 29.20 - - 43.20 3 - 29 - MDR-093 28.00 28.00 - - - 28.00 0 - 29 - MDR-094 1.775 - - 1.775 - 3.55 0 - 03 - MDR-096 9.60 - 9.60 - - 14.07 1 - 09 - MDR-097 8.40 - 8.40 - - 12.32 0 - 17 - MDR-098 7.25 7.25 - - - 7.25 0 - 09 - MDR-099 25.92 25.92 - - - 25.92 0 - 66 - ODR 30.038 - 30.038 - - 45.06 - - 77 - (NH-33) (NH-33) ODR 31.383 - 31.383 - - 47.07 - - 36 - (NH2) (SH-07) ODR 12.400 12.40 - - - 12.40 2 - 8 - ODR 32.10 - 32.10 - - 48.15 - - 36 - ODR 1.1 1.10 - - - 1.1 - - - ODR 1.30 1.30 - - - 1.30 - - - ODR 3.0 3.00 - - - 3.0 - - - ODR 2.0 - - 2.00 - 4.0 - - - ODR 1.55 - - 1.55 - 3.10 - - 3 - ODR 2.25 - 2.25 - - 3.30 - - 2 - NH-33 ODR 1.00 - 1.00 - - 1.77 - - 1 - ODR 2.20 2.20 - - - 2.2 - - - - ODR 2.00 2.00 - - - 2.00 - - - - ODR 1.30 1.30 - - - 1.30 - - - - ODR 2.00 - 2.00 - - 3.00 - - - - ODR 1.56 - - 1.56 - 3.12 - - 4. -
Coalmine Methane Under Indian Mining Scenario
Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations. -
Second Five-Year Plan Bihar
GOVERNMENT OF BIHAR SECOND FIVE-YEAR PLAN IN BIHAR A Review of Progress in the Third Year (1958-59) PRINTED BY TKii SUPERINTENDENT SECRETARIAT PRESS, BIHAR, PATNA I960 CONTENTS. I. General appraisal II. Agi'icultural Production 2-3 III. Minor Irrigation 4'5 IV. Soil Conservation 5 Land Development 5-7 VI. Marketing 8 VII. Animal Husbandry 8 - ^ 0 VIII. Dairy and Milk Supply 10-11 IX. Forest U -12 X. Fisheries .. .. .. 12-13 'AJ. Community Development and X. E. S. 13-15 XII. Co-operation 15-17 XIIT. Major and Medium Irrigation Projects 17-18 XIV. Kosi Project ia-19 XV. Power ^ ■ 19^21 X V I. Major and Medium Industries 21-22 XVII. Industrial Estates and Village and Small-seal 22 Industries. XVIII. Roads 22-23 XIX. Road Transport 23 24 XX. Education.. 24-26 XXI. Technical Education .. 26 XXII HealtJi 2o~28 XXIII. Housing .. 28-2f> X X IV . Labour Welfare 39-30 XXV. Welfare of Scheduled Castes, Scheduled Tribes 30-32 and other Backward Gasses. XXVI. Social Welfare 32-33 XXVII. Jail Department, 33-34 XXVIII. Publicity and Propaganda 34-36 XXIX. Statistics .. 3fi XXX. Bihar Panchayat Raj Schemes 37 APPENDIX 38-40 P D - ^ Division lOD ' 3 ' g 6 l'v ( *-cr \%- n -" )) r :' , r or ‘ '-i Checked D it ; f TranJer REVIEW OF THE PROGRESS OF THE SECOND FIVE-YEAR PLAN FOR BIHAR DURING 1958-59 (THIRD YEAR). Tiie Second Five-Year Plan of Biliar originally comprised 487 schemes with a total outlay of Rs. 190.22 crores. But conse quent upon the reduction in the size of the National Plan from Rs. -
Environmental Statement in Form-V Cluster No
ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986) (2018-2019) FOR CLUSTER NO. – 1 (GROUP OF MINES) Mugma Area Eastern Coalfields Limited Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Coal India Ltd.) G. T. Road (West End) Asansol - 713 304 CMPDI ISO 9001:2015 Company Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19 ENVIRONMENTAL STATEMENT FOR CLUSTER NO. – 1 (GROUP OF MINES) Environmental statement for the financial year ending 31st March, 2019 FOR THE YEAR: 2018-19 CONTENTS SL NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-6 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 7-17 LIST OF ANNEXURES ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 18-22 II NOISE LEVEL 23 III MINE AND GROUND WATER QUALITY REPORT 24-30 IV GROUNDWATER LEVEL 31 PLATES I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS 1 Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19 CHAPTER – I INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R. No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Pollution Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement for Cluster No. -
Hazaribagh, District Census Handbook, Bihar
~ i ~ € :I ':~ k f ~ it ~ f !' ... (;) ,; S2 ~'" VI i ~ ~ ~ ~ -I fI-~;'~ci'o ;lO 0 ~~i~~s. R m J:: Ov c V\ ~ -I Z VI I ~ =i <; » -< HUm N 3: ~: ;;; » ...< . ~ » ~ :0: OJ ;: . » " ~" ;;; C'l ;!; I if G' l C!l » I I .il" '" (- l' C. Z (5 < ..,0 :a -1 -I ~ o 3 D {If J<' > o - g- .,. ., ! ~ ~ J /y ~ ::.,. '"o " c z '"0 3 .,.::t .. .. • -1 .,. ... ~ '" '"c ~ 0 '!. s~ 0 c "v -; '"z ~ a 11 ¥ -'I ~~ 11 CENSUS 1961 BIHAR DISTRICT CENSUS HANDBOOK 14 HAZARIBAGH PART I-INTRODUCTORY NOTE, CENSUS TABLES AND OFFICIAL STATISTICS -::-_'" ---..... ..)t:' ,'t" -r;~ '\ ....,.-. --~--~ - .... .._,. , . /" • <":'?¥~" ' \ ........ ~ '-.. "III' ,_ _ _. ~ ~~!_~--- w , '::_- '~'~. s. D. PRASAD 0 .. THE IlQ)IAJr AD:uJlIfISTBA'X'lVB SEBVlOE Supwtnundent 01 Oen.ua Operatio1N, B'h4r 1961 CENSUS PUBLICATIONS, BIHAR (All the Census Publications of this State will bear Vol. no. IV) Central Government Publications PART I-A General Report PART I-B Report on Vital Statistics of Bihar, 1951-60 PART I-C Subsidiary Tables of 1961. PART II-A General Population Tables· PART II-B(i) Economic Tables (B-1 to B-IV and B-VU)· PAR't II-B(ii) Economic Tables (B-V, B-VI, B-VIII and B-IX)* PART II-C Social and Cultural Tables* PART II-D Migration Tables· PART III (i) Household Economic Tables (B-X to B-XIV)* PART III (ii) Household Economic Tables (B-XV to B-XVII)* PART IV-A Report on Housing and Establishments· PART IV-B Housing and Establishment Table:,* PART V-A Special Tables for Scheduled Castes and Scheduled Tribe&* PART V-B Ethnographic Notes on Scheduled Castes and Scheduled Tribes PART VI Village Surveys •• (Monoglaphs on 37 selected villages) PART VII-A Selected Crafts of Bihar PART VII-B Fairs and Festivals of Bihar PART VIII-A Administration Report on Enumeration * } (Not for sale) PART VIII-B Administration Report on Tabulation PART IX Census Atlas of Bihar. -
Jainagar Coal Block Summary
JAINAGAR COAL BLOCK SUMMARY PART A Sr. Features Details No . 1. Location Coal Block Jainagar Latitude 23° 38' 34" N to 23° 39' 9" N (Provisional) Longitude 85° 17' 3" E to 85° 18' 12" E (Provisional) Topo Sheet No. 73 E/6 Coalfield South Karanpura Villages - Tehsil/Taluka Patratu District Ramgarh. State Jharkhand. 2. Connectivity with Block Ramgarh is a railway station on the Gomoh-Barkakhana section of the South Nearest Rail Head Eastern Railway and Patratu railway station is on the Gomoh-dehri-on-Sone loop of the Eastern Railway. A good motorable road has been constructed passing through the western of Road the area connecting Patratu railway station (3 km.) and Ramgarh (27 km.). Airport Ranchi Airport 3. Area Geological Block Area 1.3 sq.km. (As per shape file. Refer Note No. 3) Forest Area Approx. 15 % (As per FSI map) Non-Forest Area Approx. 85 % 4. Climate and Topography Average Annual Rainfall - Temperature (Min. — Max.) - Local Surface There are two nalas in the area, one on the eastern boundary – the Nalkari Drainage Channels Nala flowing towards north, the other on the northern portion of the area the Bawandhara nala flowing towards east. The later joins the former at the north-eastern corner of the area which in turn joins the Damodar river further north-east. These nalas are practically dry except during rains. Rivers Nalkari Nala/Nadi. 5. Exploration Status Regionally Explored. Exploration Agency GSI. Total Number of Boreholes with meterage 13 Boreholes; 3212.43 m. Borehole Density Approx. 10 Boreholes/sq.km. The dips of the Barakar vary from 20° to 45° towards north in the eastern General Dip of Seams part of the area and about 20° towards east in the western part of the area. -
For the Year Ended 31 March 2014
Report of the Comptroller and Auditor General of India on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 Government of Jharkhand Report No. 2 of the year 2015 TABLE OF CONTENTS Reference to Paragraph Page Preface v Overview vii CHAPTER – 1 INTRODUCTION Budget profile 1.1.1 1 Application of resources of the State Government 1.1.2 1 Persistent savings 1.1.3 2 Funds transferred directly to the State implementing agencies 1.1.4 2 Grants-in-aid from Government of India 1.1.5 3 Planning and conduct of audit 1.1.6 3 Lack of responsiveness of Government to Inspection Reports 1.1.7 3 Follow-up on Audit Reports 1.1.8 4 Government response to significant audit observations (draft 1.1.9 5 paragraphs/reviews) Status of placement of Separate Audit Reports of Autonomous Bodies 1.1.10 6 in the State Assembly CHAPTER – 2 PERFORMANCE AUDIT DRINKING WATER & SANITATION DEPARTMENT Total Sanitation Campaign/Nirmal Bharat Abhiyan 2.1 7 LABOUR, EMPLOYMENT & TRAINING DEPARTMENT AND SCIENCE AND TECHNOLOGY DEPARTMENT Establishment and Upgradation of Government Women ITIs and 2.2 25 Government Women Polytechnics in Jharkhand HUMAN RESOURCES DEPARTMENT (HIGHER EUUCATION) Functioning of State Universities in Jharkhand 2.3 38 FOREST AND ENVIRONMENT DEPARTMENT Compliance with Environmental Laws in Dhanbad district including 2.4 66 Dhanbad Agglomeration SOCIAL WELFARE, WOMEN & CHILD DEVELOPMENT DEPARTMENT AND PLANNING & DEVELOPMENT DEPARTMENT Implementation of Schemes for Welfare and Protection of Girls in 2.5 77 Jharkhand HOME DEPARTMENT Information Technology Audit on preparedness of Crime and 2.6 94 Criminal Tracking Network System HUMAN RESOURCE DEVELOPMENT DEPARTMENT AND HEALTH, MEDICAL EDUCATION & FAMILY WELFARE DEPARTMENT Tribal Sub Plan (Education and Health Sectors) 2.7 105 ENERGY DEPARTMENT Implementation of Solar Energy programmes in Jharkhand 2.8 116 Audit Report on General, Social and Economic (Non-PSUs) Sectors for the year ended 31 March 2014 CHAPTER – 3 COMPLIANCE AUDIT Non-Compliance with the Rules, Orders, etc. -
Government of Jharkhand Office of the Accountant General (Audit)
Annual Technical Inspection Report on Local Bodies for the year ended 31 March 2016 Government of Jharkhand Office of the Accountant General (Audit), Jharkhand, Ranchi TABLE OF CONTENTS Reference to Paragraph Page Preface v Overview vii PART – A CHAPTER – I AN OVERVIEW OF THE FUNCTIONING, ACCOUNTABILITY MECHANISM AND FINANCIAL REPORTING ISSUES OF PANCHAYATI RAJ INSTITUTIONS Introduction 1.1 1 Organisational setup of Panchayati Raj Institutions 1.2 2 Functioning of Panchayati Raj Institutions 1.3 3 Formation of various committees 1.4 4 Audit arrangement 1.5 5 Response to Audit Observations 1.6 6 Ombudsman 1.7 7 Social Audit 1.8 7 Submission of Utilisation Certificates 1.9 8 Internal Audit and Internal Control System of Panchayati Raj 1.10 8 Institutions Financial Reporting Issues 1.11 8 CHAPTER – II COMPLIANCE AUDIT – PANCHAYATI RAJ INSTITUTIONS RURAL DEVELOPMENT DEPARTMENT (PANCHAYATI RAJ) Audit on Construction activities by the Panchayati Raj Institutions in 2.1 15 the State of Jharkhand PART – B CHAPTER – III AN OVERVIEW OF THE FUNCTIONING, ACCOUNTABILITY MECHANISM AND FINANCIAL REPORTING ISSUES OF URBAN LOCAL BODIES Introduction 3.1 37 Orgnisational setup of Urban Local Bodies 3.2 37 Functioning of Urban Local Bodies 3.3 39 Formation of various committees 3.4 41 Audit arrangement 3.5 42 Response to Audit Observations 3.6 43 Ombudsman 3.7 44 Social Audit 3.8 44 Submission of Utilisation Certificates 3.12 45 Internal Audit and Internal Control System of Urban Local Bodies 3.13 45 Financial Reporting Issues 3.14 46 CHAPTER – IV PERFORMANCE -
Damodar Valley Corporation Tender Documents
DAMODAR VALLEY CORPORATION (ESTABLISHED BY THE ACT XIV OF 1948) MAITHON P.O. Maithon Dam, Dist : Dhanbad , Jharkhand TENDER DOCUMENTS Construction of individual toilets 50 units at village Nawatar and 2 units at village Achaljamo under CSR, DVC, Konar Dam. The contractors enlisted in Class-I (All Valley) for Civil Engineering Works are entitled to participate in this tender. NIT NO DVC/Tender/MAITHON/KONAR CIVIL/C&M Purchase & Contract/Works and Service/00040 Dated 03/01/2020 (THROUGH e-TENDERING PROCESS ONLY) Page 1 of 31 TENDER DOCUMENT FOR Construction of individual toilets 50 units at village Nawatar and 2 units at village Achaljamo under CSR, DVC, Konar Dam. The contractors enlisted in Class-I (All Valley) for Civil Engineering Works are entitled to participate in this tender. The document consists of the following : 1) Instruction : Submission of Tender Paper 2) Annexure-I: Material Details and Techno-Commercial Terms & Conditions 3) Annexure-II: Instructions to the Bidders 4) Annexure -III : Eligibility criteria for selection of tenderers (Qualifying Requirement) 5) Annexure-A: Format for Commercial Terms & Conditions 6) Annexure- B: Format for Price Bid 7) Annexure -C: Techno-commercial deviation schedule 8) Annexure -D: Cost of withdrawal of deviations 9) Annexure -E : Format for BG towards EMD 10) Annexure -F: Bank Guarantee Verification Check List 11) Annexure - G: Format for Letter of Bid. 12) Annexure - H: Format for Details Of Banker For Making Payment Through RTGS/NEFT. 13) Annexure - I: Format for Proforma For Affidavit. 14) Annexure - J: Proforma for Power of Attorney 15) Annexure - K: List of Commercial Banks as per RBI (Source RBI Website dt. -
Land Use/Vegetation Cover Mapping of North and South Karanpura Coalfields Based on Satellite Data for the Year- 2012
Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 CMPDI A Miniratna Company Land use/vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data for the Year- 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi CMPDI Restricted Report on Vegetation cover mapping of North and South Karanpura Coalfields based On Satellite Data of the Year‐ 2012 March-2013 Remote Sensing Cell Geomatics Division CMPDI, Ranchi RSC-561410027 [ Page i of iv] CMPDI Document Control Sheet (1) Job No. RSC/561410027 (2) Publication Date March 2013 (3) Number of Pages 28 (4) Number of Figures 7 (5) Number of Tables 7 (6) Number of Plates 1 (7) Title of Report Land use /vegetation cover mapping of North & South Karanpura Coalfield based on satellite data of the year 2012. (8) Aim of the Report To prepare Land use / vegetation cover map of North & South Karanpura Coalfield on 1:50000 scale based on IRS R-2 L4FMX satellite data for assessing the impact of coal mining on land use pattern and vegetation cover (9) Executing Unit Remote Sensing Cell, Geomatics Division Central Mine Planning & Design Institute Limited, Gondwana Place, Kanke Road, Ranchi 834008 (10) User Agency Central Coalfields Ltd. (11) Authors Mr A. K. Singh Chief Manager (Remote Sensing) Mr. N.P.Singh, General Manager(Geomatics) (12) Security Restriction Restricted Circulation (13) No. of Copies 8 (14) Distribution Statement Official RSC-561410027 [ Page ii of iv] CMPDI Contents Page No. Document -
Ramgarh District, Jharkhand State
भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Open cast mines at Ramgarh district केन्द्रीय भसू िजल बो셍ड Central Ground water Board Ministry of Water Resources जल िंिाधन िंत्रालय (Govt. of India) (भारि सरकार) State Unit Office,Ranchi रा煍य एकक कायाालय, रााँची Mid-Eastern Region म鵍य-पूर्वी क्षेत्र Patna पटना सितंबर 2013 September 2013 भूजल सूचना पस्ु तिका रामगढ़ स्जला, झारखंड Ground Water Information Booklet Ramgarh District, Jharkhand State Prepared By रोज अनीता कू जूर (वैज्ञाननक ग ) Rose Anita Kujur (Scientist C) रा煍य एकक कायाालय, रााँची म鵍य-पूर्वी क्षेत्र,पटना State Unit Office, Ranchi Mid Eastern Region, Patna GROUND WATER INFORMATION BOOKLET OF RAMGARH DISTRICT, JHARKHAND STATE CONTENTS Sl.No. Details Page No. RAMGARH DISTRICT AT A GLANCE 1.0 INTRODUCTION 1.1 Administration 1 1.2 Drainage 4 1.3 Studies/Activities Carried Out By CGWB 4 2.0 HYDROMETEROLOGY 2.1 Rainfall 4 2.2 Climate 4 3.0 GEOMORPHOLOGY AND SOIL TYPES 3.1 Geomorphology 4 3.2 Soil 5 4.0 GROUND WATER SCENARIO 4.1 Hydrogeology 5 4.2 Depth to Water Level 5 4.3 Water Level Trend 6 4.4 Aquifer Parameters 10 4.5 Ground Water Quality 10 4.6 Ground Water Resource 10 5.0 GROUND WATER MANAGEMENT STRATEGY 5.1 Ground Water Development 15 6.0 GROUND WATER RELATED ISSUES AND PROBLEMS 15 7.0 AWARENESS AND TRAINING ACTIVITY 7.1 Mass Awareness Program(MAP) & Water 16 Management Programme(WMTP) by CGWB 8.0 AREAS NOTIFIED BY CGWB / CGWA 16 9.0 RECOMMENDATIONS 16 Figure.No.