Road Construction Department, Jharkhand

Total Page:16

File Type:pdf, Size:1020Kb

Road Construction Department, Jharkhand Road Circle Hazaribag 2019 2019-20 iFk izEk.My] gtkjhckx 0.00 4150.07829 4150.07829 0.00 3506.27266 0.00 3506.27266 643.80563 - - - - - - - - - - - - - - - - - - - - - - - - - - - 0.00 4150.07829 4150.07829 0.00 3506.27266 0.00 3506.27266 643.80563 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 - 0.00 - 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 SH/MDR Carriage wideth Equilateral Bridge Nos. of Remarks ODR/Others length Culverts Single Intermediate Double Fourth (I Km) No. Length RCC HP Lane lane in Km Lane lane In m (in in in Km Km) Kma In NH-2 3.875 - - 3.875 - 7.75 - - - - tender process NH-33 9.4 - - 9.40 - 18.8 01 - -- - SH-07 47.05 - - 47.05 - 94.10 11 - 59 - MDR-069 9.80 - - 9.80 - 14.37 1 - 21 - MDR-070 29.20 - 29.20 - - 43.20 3 - 29 - MDR-093 28.00 28.00 - - - 28.00 0 - 29 - MDR-094 1.775 - - 1.775 - 3.55 0 - 03 - MDR-096 9.60 - 9.60 - - 14.07 1 - 09 - MDR-097 8.40 - 8.40 - - 12.32 0 - 17 - MDR-098 7.25 7.25 - - - 7.25 0 - 09 - MDR-099 25.92 25.92 - - - 25.92 0 - 66 - ODR 30.038 - 30.038 - - 45.06 - - 77 - (NH-33) (NH-33) ODR 31.383 - 31.383 - - 47.07 - - 36 - (NH2) (SH-07) ODR 12.400 12.40 - - - 12.40 2 - 8 - ODR 32.10 - 32.10 - - 48.15 - - 36 - ODR 1.1 1.10 - - - 1.1 - - - ODR 1.30 1.30 - - - 1.30 - - - ODR 3.0 3.00 - - - 3.0 - - - ODR 2.0 - - 2.00 - 4.0 - - - ODR 1.55 - - 1.55 - 3.10 - - 3 - ODR 2.25 - 2.25 - - 3.30 - - 2 - NH-33 ODR 1.00 - 1.00 - - 1.77 - - 1 - ODR 2.20 2.20 - - - 2.2 - - - - ODR 2.00 2.00 - - - 2.00 - - - - ODR 1.30 1.30 - - - 1.30 - - - - ODR 2.00 - 2.00 - - 3.00 - - - - ODR 1.56 - - 1.56 - 3.12 - - 4. - (NH-33) ODR 4.05 - 4.05 - - 6.075 - - 2 - ODR 1.66 1.66 - - - 1.66 - - - - NH- ODR 1.00 1.00 - - - 1.00 - - - - 100 NH-100 ODR 1.00 - 1.00 - - 1.5 - - - - ODR 9.30 - 9.30 - - 14.10 - - ODR 1.21 - - 1.21 - 2.42 - - 2 - (NH-2) ODR 2.34 - - 2.34 - 4.68 - - - ODR 32.850 - - 32.85 - 74.17 - 50 19 5.56 ODR 3.50 - 3.50 - - - - - - 4.50 ODR 3.00 - 3.00 - - - - - - (MDR-096) (MDR-069) ODR 10.480 - 10.48 - - 18.59 - - - ODR 5.20 - - 5.20 - 11.74 3 - 4 - (MDR- 070)& (NH-33) ODR 7.965 - 7.965 - - 14.13 - - 6 - - On going ODR 16.79 16.79 - - - 16.79 - - 27 - scheme On going scheme 8.07 ODR 8.07 8.07 - - - 1 - 12 - (SH-07) On going ODR 6.725 6.725 - - - 6.725 1 - 14 - scheme On ODR 17.825 17.825 - - - 17.825 - - 41 - going MDR scheme On (NH-100 going (MDR-070) ODR 21.125 21.125 - - - 21.125 01 - 42 - scheme - ODR 1.00 0.00 1.00 0.00 - 1.00 - - - - - ODR 0.925 - 0.925 - - 1.64 - - 1 - - ODR 1.525 - 1.525 - - 2.70 - - 2 - - ODR 2.02 0.00 2.02 - - 2.02 - - - - - ODR 0.920 0.00 0.920 - - 0.920 - - - - - ODR 0.575 - 0.575 - - 1.02 - - - - (NH 2) In tender ODR 22.93 22.93 - - - 22.93 - - - - Process (MDR 90) TOP 3 (NH-100) In tender Process (NH-33) ODR 18.764 18.764 - - - 18.765 - - - - 510.20 669.447 22 555 Road Construction Department Road Circle, Hazaribag Physical & Financial Progress from 01.05.2019 to 31.05.2019 during 2019-20 Expenditure (Rs. In Lakh) Physical (Km) No. of Completed Schemes Name of Bridge Roads Remarks Division Widening Rigid Road Bridge Total BM/DBM BC (Upto WMM) Pavement No. of Length Length Completed No. (m) (KM) Schemes 1 2 3 4 5 6 7 8 9 10 11 12 13 Hazaribag 3506.27427 - 3506.27266 2.58 5.50 25.05 0.3 - - 0 0 Executive Engineer, RCD, Road Divison, Hazaribag Page - 1 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March19 20 19-20 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Widening, - 32.100 5927.156 13.10.2014 6412.38500 Dt. 21.05.15 46310021 21(SBD) of 5398.40100 0.00000 0.00000 5398.40100 94% Strengthening 32.450 Dy. Secretary, Chief Engineer 15-16 (CDO) RCD Reconstruction of revised RCD, 06.08.15 Jharkhand, Suppl. Barkatha (NH-2) length Jharkhand Ranchi Lt. 02(SBD) of to Tetran Road for Ranchi's Lt. 638(Enc) 777.5800911 2016-17 dt. the Year 2014-15 No. 7631 (S) Rev. Lt. No. 228.48798 481 dt. 5637.06928 10.05.16 30.05.16 Supp P-II Revised 33SBD of 16- 6882.906 17 dt. 30.12.16 2 Widening & - 32.50 8302.57 23.07.2015 8302.57000 08.05.15 6093.03124 08.12.15 6249.47496 0.00000 0.00000 6249.47446 100% Strenthening of Mahto- Dy. Sec., RCD, C.E., CDO, Suppl. 40(SBD) of Aahara-Rampur- Jharkhand RCD, 450.19561 2015-16 Basaria (Chouparan) Ranchi Lt. No. Jharkhand, 6543.22685 in KM 0 to 32.50 5158(S) Ranchi Lt. (Total Length 32.50 No. 433 Km) for the Year 2015-16 3 Widening & - 9.80 Km 6563.988 dt. 10.7.2015 6563.988 dt. 09.06.2015 1796.98 19.12.15 1729.78896 0.00000 0.00000 1729.78896 100% Strengthening work of Dy. Sec., RCD, CE.CDO, RCD, 45(SBD) of two lane with Pved Jharkhand Jharkhand, Ranchi Lt. No. 2015-16 shoulder in Jihu Itkhori Ranchi Lt. No. 563 Road from 0 to 9.8 Km 4824(S) (Total Road 9.801Km) Page-2 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 4 Construction of - 441.254 05.11.2015 441.25400 Dt. 449.6091618 20.04.16 481.33634 0.00000 0.00000 481.33634 100.00% Rotary and Dy. Secretary, 04.11.15 01(SBD) of Development of RCD, Chief 16-17 Intersection at Jharkhand Engineer Barhi Chowk Ranchi's Lt. (CDO) (Hazaribag) at the No. 7633 (S) RCD Junction of NH-2, Jharkhand, NH-31, NH-33 for Ranchi Lt. the Year 2015-16 1271(Enc) 5 Widening and - 10.48 Km 2409.538 05.02.2016 2409.53800 Dt. 2186.38 4SBD of 1886.43184 0.000000 0.00000 1886.43184 100.00% strengthening/Rec Dy. Secretary, 11.12.15 2016-17 dt. onstruction of RCD, Chief 13.05.16 Gauriya Karma Jharkhand Engineer (MDR-096) to Ranchi's Lt. (CDO) Kewta Bridge No. 785 (S) RCD (MDR 069) in Km Jharkhand, 0.00 to 10.48 total Ranchi Lt. length 10.48Km) 1396(Enc) for the Year 2015- 16 Page-4 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 6 Widening & - 5.10 Km 3454.7529 23.05.2016 3454.75200 Dt. 1482.03 11SBDof 1633.81863 0.00000 0.00000 1633.81863 100% Strengthening of Dy. Secretary, 28.03.16 16-17 dt. Charhi-Ghato RCD, Chief 20.10.16 Road (Total Jharkhand Engineer Length 5.20Km) Ranchi's Lt. (CDO) No. 3228 (S) RCD Jharkhand, Ranchi Lt. 160(Enc) 7 Widening & - 7.965 1338.66900 26.09.2016 1338.66900 Dt. 1295.2908841 01SBDof 1454.26463 0.00000 0.00000 1454.26463 100% Variation 17-18 dt. Strengthening/Rec Revised Joint Secretary, 14.09.16 213.00209 05.05.17 onstruction of Length RCD, Chief 1508.29297 Kallu Chowk 8.09 Jharkhand Engineer (MDR-07) to Ranchi's Lt. (CDO) Sindur (NH-33) No. 6193 (S) RCD Via Mandai Khurd Jharkhand, Road for the Year Ranchi Lt. 2016-17 918(Enc) Page-6 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl.
Recommended publications
  • Coalmine Methane Under Indian Mining Scenario
    Coalmine Methane Under Indian Mining Scenario CMM under Indian Mining Scenario • In India coal is a reliable energy resource due to limited availability of petroleum and natural gas. • Coal based non-conventional energy is poised to play a major role in India as : 9 It would bridge the gap between demand and availability of conventional energy source 9 International trading scenario in energy sector has been stormy 9 Environmental concerns has given impetus to clean coal technologies. • Under the scenario, Coalbed Methane (CBM) and its subsets like Coal Mine Methane (CMM) and Abandoned Mine Methane (AMM) may find important place in Indian Energy scenario in coming years. CMM under Indian Mining Scenario Development of CBM in India • Out of different sub-sets of Coalbed Methane (CBM), CBM from the deep lying coal deposits (VCBM) has been pursued. • So far 16 Coalbed Methane (VCBM) blocks have been allotted under CBM policy of GoI covering an area of 7807 sq. km and prognosticated CBM resource of 825 BCM. • 10 more blocks have been opened for global bidding. • Several core wells/pilot wells have been drilled in the allotted blocks and are giving encouraging results. • Few operators are planning commercial production from 2007- 08. • The total production potentiality in the allotted blocks is 23 MMSCMD, which is about 10% of the existing Natural Gas demand. CMM under Indian Mining Scenario Coal Mine Methane and Abandoned Mine Methane • Coal Mine Methane (CMM)/ Abandoned Mine Methane (AMM) also subset of CBM is related to mining activities and as per MOU between MoC and MoP&NG, coal producing companies have right of CBM exploitation in their working mines including pre and post mining operations.
    [Show full text]
  • Government of Jharkhand Office of the Accountant General (Audit)
    Annual Technical Inspection Report on Local Bodies for the year ended 31 March 2016 Government of Jharkhand Office of the Accountant General (Audit), Jharkhand, Ranchi TABLE OF CONTENTS Reference to Paragraph Page Preface v Overview vii PART – A CHAPTER – I AN OVERVIEW OF THE FUNCTIONING, ACCOUNTABILITY MECHANISM AND FINANCIAL REPORTING ISSUES OF PANCHAYATI RAJ INSTITUTIONS Introduction 1.1 1 Organisational setup of Panchayati Raj Institutions 1.2 2 Functioning of Panchayati Raj Institutions 1.3 3 Formation of various committees 1.4 4 Audit arrangement 1.5 5 Response to Audit Observations 1.6 6 Ombudsman 1.7 7 Social Audit 1.8 7 Submission of Utilisation Certificates 1.9 8 Internal Audit and Internal Control System of Panchayati Raj 1.10 8 Institutions Financial Reporting Issues 1.11 8 CHAPTER – II COMPLIANCE AUDIT – PANCHAYATI RAJ INSTITUTIONS RURAL DEVELOPMENT DEPARTMENT (PANCHAYATI RAJ) Audit on Construction activities by the Panchayati Raj Institutions in 2.1 15 the State of Jharkhand PART – B CHAPTER – III AN OVERVIEW OF THE FUNCTIONING, ACCOUNTABILITY MECHANISM AND FINANCIAL REPORTING ISSUES OF URBAN LOCAL BODIES Introduction 3.1 37 Orgnisational setup of Urban Local Bodies 3.2 37 Functioning of Urban Local Bodies 3.3 39 Formation of various committees 3.4 41 Audit arrangement 3.5 42 Response to Audit Observations 3.6 43 Ombudsman 3.7 44 Social Audit 3.8 44 Submission of Utilisation Certificates 3.12 45 Internal Audit and Internal Control System of Urban Local Bodies 3.13 45 Financial Reporting Issues 3.14 46 CHAPTER – IV PERFORMANCE
    [Show full text]
  • Revised List ANM 2019 Advt. No. 03-2019 West Singhbhum, Chaibasa 1 - 35 Matric Inter Technical Qualification JNRC Registration No
    Office of the Civil Surgeon, West Singhbhum, Chaibasa Rejected Candidate (Revised) List - Application for the Post of ANM, Advt. No. 03/2019 Matric Inter Technical Qualification JNRC Registration No. Home District Sl. Form (With Catego Caste Experience Name Father's Name Permanent Address Present Address Date of Birth Contect No. Remarks No. No Residential ry certificat Total Marks Total Marks Total Marks Registrati (in Month) % % % Valid Upto Institute Certificate) Marks Obtained Marks Obtained Marks Obtained on No. VILLAGE-GADHA TOLI, PO+THANA-LOHARDAGA , LOHARDAG YES JNRC, 8292264957 REJECTED OTHER DISTRICT 1 1 ASHA KHALKHO BANDHU DRAON DISTRICT- DO SC 19-May-1992 500 253 50.60 500 258 51.60 1400 1194 85.29 N-7583 25 MONTHS A (SDO) RANCHI 7061880717 RESIDENTIAL LAOHARDAGA,PIN NO- 835302 BAHSURDA, POST- ITAGARH, THANA- KISHORI MOHAN GAMHARIA, DISTRICT- YES JNRC, REJECTED OTHER DISTRICT 2 2 BHAWANI MAHTO DO SARAIKELA SC 28-Sep-1985 700 381 54.43 900 525 58.33 1400 1268 90.57 N-10164 7488663932 MAHTO SARAIKELA- (CO) RANCHI RESIDENTIAL KHARSAWAN, PIN NO- 831002 VILL-NAWADIH, P.O- YAGIYARA, P.S- YES REJECTED OTHER DISTRICT 3 5 PRIYANKA KUMARI KAILASH YADAV PRATAPPUR DISTRICT- DO CHATRA OBC 1-Sep-1995 500 314 62.80 500 290 58.00 600 491 81.83 6-Mar-2023 NA NA 9162034487 (SDO) RESIDENTIAL CHATRA STATE JHARKHAND PIN 825404 TUILADUNGRI, HOUSE NO- 57, LINE NO-04, B/ BLOCK, P.O-GOLMURI, P.S- EAST YES REJECTED OTHER DISTRICT 4 6 BIREN HANSDS LATE-SONGA HANSDS GOLMURI, JAMSHEDPUR, DO ST 16-Jan-1992 500 206 41.20 500 201 40.20 #DIV/0! NA NA NA YES
    [Show full text]
  • A Regional Assessment of the Potential for Co2 Storage in the Indian Subcontinent
    A REGIONAL ASSESSMENT OF THE POTENTIAL FOR CO2 STORAGE IN THE INDIAN SUBCONTINENT Technical Study Report No. 2008/2 May 2008 This document has been prepared for the Executive Committee of the IEA GHG Programme. It is not a publication of the Operating Agent, International Energy Agency or its Secretariat. INTERNATIONAL ENERGY AGENCY The International Energy Agency (IEA) was established in 1974 within the framework of the Organisation for Economic Co-operation and Development (OECD) to implement an international energy programme. The IEA fosters co-operation amongst its 26 member countries and the European Commission, and with the other countries, in order to increase energy security by improved efficiency of energy use, development of alternative energy sources and research, development and demonstration on matters of energy supply and use. This is achieved through a series of collaborative activities, organised under more than 40 Implementing Agreements. These agreements cover more than 200 individual items of research, development and demonstration. The IEA Greenhouse Gas R&D Programme is one of these Implementing Agreements. ACKNOWLEDGEMENTS AND CITATIONS This report was prepared as an account of the work sponsored by the IEA Greenhouse Gas R&D Programme. The views and opinions of the authors expressed herein do not necessarily reflect those of the IEA Greenhouse Gas R&D Programme, its members, the International Energy Agency, the organisations listed below, nor any employee or persons acting on behalf of any of them. In addition, none of these make any warranty, express or implied, assumes any liability or responsibility for the accuracy, completeness or usefulness of any information, apparatus, product of process disclosed or represents that its use would not infringe privately owned rights, including any parties intellectual property rights.
    [Show full text]
  • (Impact Assessment Division) (Coal Mining Sector) ***
    GOVERNMENT OF INDIA MINISTRY OF ENVIRONMENT, FOREST AND CLIMATE CHANGE (IMPACT ASSESSMENT DIVISION) (COAL MINING SECTOR) *** SUMMARY RECORD OF 54th MEETING OF THE EXPERT APPRAISAL COMMITTEE THROUGH VIDEO CONFERENCING FOR ENVIRONMENTAL APPRAISAL OF COAL MINING PROJECTS CONSTITUTED UNDER THE EIA NOTIFICATION, 2006, HELD ON 17th APRIL, 2020. The 54th meeting of the Expert Appraisal Committee (EAC) for coal mining projects was held on 17th April, 2020 through video conferencing with support NIC team due to Covid-19 lockdown. The following members were present: 1. Dr. Navin Chandra - Chairman 2. Dr. N. P. Shukla - Member 3. Shri. S. D. Vora - Member 4. Dr. J.K. Pandey - Member 5. Shri G.P. Kundargi - Member 6. Shri S.K Paliwal - Member 7. Shri Manoj Kumar Gangeya Director, MoEFCC - Member Secretary MoEF&CC 8. Shri Munna Kumar Shah, Scientist ‘D’ - MoEFCC Confirmation of Minutes of 53rd meeting of EAC No comment was made from any member of the Committee on the minutes of the 53rd meeting of the EAC held on during 20th February, 2020, therefore the Minutes of the Meeting (MoM) was confirmed in the presence of the members who were present in the 54th meeting of the EAC(coal mining). Agenda No. 54.1 Prakasham Khani Opencast Coal Mine (Amalgamation of Manuguru OC II Expansion & Manuguru OC IV Extension) of 9.75 MTPA capacity in mine lease area of 2402.40 ha. (2214.84 ha is Forest Land and 187.56 ha is Non Forest Land) located in Village & Mandal Manuguru, District Bhadradri Kothagudem (Telangana) - For Environmental Clearance – reg [Proposal No. IA/TG/CMIN/117465/2019; F.No.
    [Show full text]
  • Officename Chanda B.O Mirzachowki S.O Boarijore B.O Bahdurchak B.O
    pincode officename districtname statename 813208 Chanda B.O Sahibganj JHARKHAND 813208 Mirzachowki S.O Sahibganj JHARKHAND 813208 Boarijore B.O Godda JHARKHAND 813208 Bahdurchak B.O Godda JHARKHAND 813208 Beniadih B.O Godda JHARKHAND 813208 Bhagmara B.O Godda JHARKHAND 813208 Bhagya B.O Godda JHARKHAND 813208 Chapri B.O Godda JHARKHAND 813208 Mandro B.O Sahibganj JHARKHAND 813208 Maniarkajral B.O Godda JHARKHAND 813208 Mordiha B.O Godda JHARKHAND 813208 Rangachak B.O Godda JHARKHAND 813208 Sripurbazar B.O Sahibganj JHARKHAND 813208 Thakurgangti B.O Godda JHARKHAND 814101 Bandarjori S.O Dumka JHARKHAND 814101 S.P.College S.O Dumka JHARKHAND 814101 Dumka H.O Dumka JHARKHAND 814101 Dumka Court S.O Dumka JHARKHAND 814102 Amarapahari B.O Dumka JHARKHAND 814102 Bhaturia B.O Dumka JHARKHAND 814102 Danro B.O Dumka JHARKHAND 814102 Sinduria B.O Dumka JHARKHAND 814102 Ramgarah S.O Dumka JHARKHAND 814102 Gamharia B.O Dumka JHARKHAND 814102 Bandarjora B.O Dumka JHARKHAND 814102 Bariranbahiyar B.O Dumka JHARKHAND 814102 Bhalsumar B.O Dumka JHARKHAND 814102 Chhoti Ranbahiyar B.O Dumka JHARKHAND 814102 Ghaghri B.O Dumka JHARKHAND 814102 Kakni Pathria B.O Dumka JHARKHAND 814102 Khudimerkho B.O Dumka JHARKHAND 814102 Kairasol B.O Godda JHARKHAND 814102 Lakhanpur B.O Dumka JHARKHAND 814102 Mahubana B.O Dumka JHARKHAND 814102 Piprakarudih B.O Dumka JHARKHAND 814102 Sushni B.O Dumka JHARKHAND 814103 Kathikund S.O Dumka JHARKHAND 814103 Saldaha B.O Dumka JHARKHAND 814103 Sarsabad B.O Dumka JHARKHAND 814103 Kalajhar B.O Dumka JHARKHAND 814103 T. Daldali B.O Dumka JHARKHAND 814103 Astajora B.O Dumka JHARKHAND 814103 Pusaldih B.O Dumka JHARKHAND 814103 Amgachi B.O Dumka JHARKHAND 814103 B.
    [Show full text]
  • Schools for Class-VIII in All Districts of Jharkhand State School CODE UDISE NAME of SCHOOL
    Schools for Class-VIII in All Districts of Jharkhand State School CODE UDISE NAME OF SCHOOL District: RANCHI 80100510 20140117617 A G CHURCH HIGH SCHOOL RANCHI 80100376 20140105605 A G CHURCH MIDDLE SCHOOL KANKE HUSIR 80100383 20140106203 A G CHURCH SCHOOL FURHURA TOLI 80100806 20140903803 A G CHURCH SCHOOL 80100917 20140207821 A P E G RESIDENTIAL SCHOOL RATU 80100808 20140904002 A Q ANSARI URDU MIDDLE SCHOOL IRBA 80100523 20140119912 A S PUBLIC SCHOOL 80100524 20140120009 A S T V S ZILA SCHOOL 80100411 20140109003 A V K S H S 80100299 20140306614 AADARSH GRAMIN PUBLIC SCHOOL TANGAR 80100824 20140906303 ADARSH BHARTI PUBLIC HIGH SCHOOL MANDRO 80100578 20142401811 ADARSH H S MCCLUSKIEGANJ 80100570 20142400503 ADARSH HIGH SCHOOL SANTI NAGAR KHALARI 80100682 20142203709 ADARSH HIGH SCHOOL KOLAMBI TUSMU 80100956 20141108209 ADARSH UCHCHA VIDYALAYA MURI 80100504 20140116916 ADARSHA VIDYA MANDIR 80100846 20140913601 ADARSHHIGH SCHOOL PANCHA 80100214 20140603012 ADIVASI BAL VIKAS VIDYALAYA JINJO THAKUR GAON 80100911 20140207814 ADIVASI BAL VIKAS VIDYALAYA RATU 80100894 20140202702 ADIVASI BAL VIKAS VIDYALAYA TIGRA GURU RATU 80100119 20140704204 ADIVASI BAL VIKAS VIDYALAYA TUTLO NARKOPI 80100647 20140404507 ADIWASI VIKAS HIGH SCHOOL BAJRA 80101106 20140113028 AFAQUE ACADEMY 80100352 20140100813 AHMAD ALI MORDEN HIGH SCHOOL 80100558 20140123620 AL-HERA PUBLIC SCHOOL 80100685 20142203716 AL-KAMAL PLAY HIGH SCHOOL 80100332 20142303514 ALKAUSAR GIRLS HIGH SCHOOL ITKI RANCHI 80100741 20140803807 AMAR JYOTI MIDDLE CUM HIGH SCHOOL HARDAG 80100651 20140404516
    [Show full text]
  • Royite, a New Variety of Quartz, from the Jharia Coal-Field by N
    ROYITE, A NEW VARIETY OF QUARTZ, FROM THE JHARIA COAL-FIELD BY N. L. SHARMA (Indian School of Mines, Dhanbad) Received July 10, 1940 Introduction THE mineral occurs in more or less reticulated or radiating blades (Fig. 1), deposited along the joint planes of the laminated sandstones and shales of the eastern portion of the Jharia Coal-field. It was first discovered by the author along the joint plane of a bed of ferruginous shaly sandstone, behind Rao Bahadur D. D. Thacker's Labourers' School at Pure Jharia Colliery. Subsequently, a specimen of the same mineral was collected by the author from the debris of the IX seam incline of Messrs. Dana and Premji in Tisra area. Here the mineral occurs along the joint plane of a carbonaceous and micaceous shale. Later on, Mr. G. C. Chattopadhyay found a specimen of this mineral in the debris from the shaft of Ghansadih Colliery in Godhur area. The mineral at this locality is deposited along the joint plane of carbonaceous shale. Recently, the author (with his geology students) has noticed the same mineral in the debris from the incline of VI and VII seam, Basaria Colliery, on the western bank of the Bansjor stream. At this locality, the mineral occurs as beautiful radiating blades along the joint planes of carbonaceous or micaceous shales and ferruginous sand- stone. Thus the mineral has been found all over the eastern portion of the Jharia Coal-field, though always in very limited quantity. Chemically, the mineral is composed mostly of silica. Physically, how- ever, it is so unlike ordinary quartz that it is difficult to identify it correctly, unless one knows its chemical composition.
    [Show full text]
  • Provisional Population Totals, Paper-2, Series-21, Jharkhand
    CENSUS OF INDIA 20-01 SERIES-21 JHARKHAND PAPER 2 OF 2001 PROVISIONAL POPULATION TOTALS Rural-urban Distribution of Population SUDHIR KUMAR RAKESH Director of census operations, Jharkhand CONTENTS PARTICULARS PAGE NO. Preface v Acknowledgement w Figures at a Glance IX State Highlights • XI Introduction 3 ANALYSIS OF RESULT Urbanisation - Rural and Urban Composition 7 Sex ratio in Districts and Community Development Blocks 19 Literacy rates by Sex and Rural-Urban break up in Districts 23 and Community Development Blocks Cities having one million plus population 33 TABLES Table-l Population, child population in the age-group 0:-6 and literates 42 by residence and Sex - State, District, VA/CitylTown, 2001 Table-2 Population, child population in the age-group 0-6 and literates 54 by residence and Sex - State, District, Community Development Block, 2001 Table-3 Percentage decadal growth, percentage of child population in the _72 age-group 0-6 by residence and percentage of urban population to total population - State and District, 200 I Table-4 Sex ratio of population and sex ratio of child population in 75 the age-group 0-6 - State, District, Community Development Block, 2001 Table-5 Literacy rates by residence and Sex - State, District, Community 82 Development Block, 2001 Table-6 Population, percentage decadal growth 1991-2001, Sex ratio, Literacy by Sex - VAs, Cities and Towns by size class in the State, 2001 Appendix-I Population, child popUlation in the age-group 0-6 and literates ." 98 to Table-6 by Sex - Independent cities and Towns arranged in Alphabetical Order, 2001 Appendix-2 List of towns of 1991 declassified in 2001 and Towns of 1991 105 to Table-6 merged with other Towns in 2001 Table-7 Growth of urban population, 1981-2001 106 PAGE NO.
    [Show full text]
  • Charges for Service Provided As Under: 1) Two Transactions in a Month Are Free
    Charges for service provided as under: 1) Two transactions in a month are free. 2) If service provided is more than twice then charges of Rs.100/- + GST to be recovered from the respective customer. BRANC OD Agent ID ZONE State District BRANCH NAME H SSAName Agent Name Agen DEVICE ID BC TYPE AccountNo Bank CODE t id 0522021000885 751030585 FI805220709 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 ARABINDANAGAR RAJESH BANIK 7097 INDIVIDUAL 0 1 7 0522021000889 751030719 FI805221034 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 GAJARIA BISWAJIT SUTRADHAR 10343 INDIVIDUAL 8 4 3 PRABAL 0522021000882 751030589 FI805220714 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 CHENIKHOLA 7146 INDIVIDUAL CHAKRABORTY 9 2 6 0522021000883 751030589 FI805220714 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 GHANIAMARA BISWAJIT ROY 7147 INDIVIDUAL 6 3 7 0522021000884 751030589 FI805220714 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 GOUTAMNAGAR SUJIT DEBNATH 7148 INDIVIDUAL 3 4 8 0522021000881 751030589 FI805220714 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 PURATHAL PINTU DEBNATH 7149 INDIVIDUAL 2 5 9 0522021000880 751030589 FI805220715 AGARTALA TRIPURA Sepahaijala BISHALGARH 0522 SUTARMURA AMRITA DEBBARMA 7150 INDIVIDUAL 5 6 0 LEICHONBAM JYOTIN 0551021000159 897030700 FI805510889 AGARTALA MANIPUR Imphal west BISHALGARH 0551 Along Khuman 8890 INDIVIDUAL SINGH 2 8 0 LONGJAM 0551021000160 897030700 FI805510889 AGARTALA MANIPUR Imphal west Imphal 0551 Lairenkabi Awang KRISHNACHANDRA 8891 INDIVIDUAL 8 9 1 SINGH MOIRANGTHEM DILIP 0854021000137 752030585 FI808540710
    [Show full text]
  • 2018082587.Pdf
    NH/SH/ MDR Single Intermediate Double Lane Lane Lane NH-2 3.875 7.75 -- -- NH-33 9.4 18.8 01 Nos -- SH-07 47.05 94.10 11 Nos. 59 Nos. MDR-069 9.80 14.37 1 No. 21 Nos. MDR-070 29.20 43.20 3 Nos. 29 Nos. MDR-093 28.00 28.00 0 Nos. 29 Nos. MDR-094 1.775 3.55 0 No. 03 Nos. MDR-096 9.60 14.07 1 No. 09 Nos. MDR-097 8.40 12.32 0 Nos. 17 Nos. MDR-098 7.25 7.25 0 Nos. 09 Nos. MDR-099 25.92 25.92 0 Nos. 66 Nos. ODR 30.038 45.06 - 77 Nos. (NH-33) (NH-33) (NH2) ODR 31.383 47.07 - 36 Nos. - (SH-07) ODR 12.400 12.40 2 Nos. 8 Nos. ODR 32.10 48.15 - 36 Nos. ODR ODR ODR ODR ODR - 3 Nos. ODR - 2 Nos. (NH-33) ODR - 1 No. ODR - ODR - ODR - ODR - ODR - 4 Nos. ODR - 2 Nos. (NH-33) ODR - ODR - NH-100 NH-100 ODR - NH-100 ODR ODR - 2 Nos. (NH-2) ODR ODR - ODR - ODR (MDR-096) (MDR-069) ODR ODR (MDR-070)& - 6 Nos. (NH-33) ODR - 27 Nos. ODR 1 No. 12 Nos. ODR (SH-07) 1 No. 14 Nos. ODR MDR - 41 Nos. ODR (NH-100 (MDR- 01 No. 42 Nos. 070) ODR - - - ODR ODR - - - ODR - - - ODR - - - ODR - - - ODR - - - 468.588 628-152 22 Nos. 555 Nos. (i) S/L (ii) I/L (iii) D/L Page – 2 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl.
    [Show full text]
  • Appendix-1.1 (Refer: Paragraph-1.3.1; Page 3)
    Appendix-1.1 (Refer: Paragraph-1.3.1; page 3) Statement showing powers and functions of PRIs Authority Powers and Functions Zila Parishad Zila Parishad (ZP) is the first tier of Panchayat at the district level. The ZP is required to prepare the budget for the planned development of the district and utilisation of resources. The ZP is responsible for the drawing up of annual plans for the economic development of district and social justice and ensuring their implementation; co- ordination , evaluation and monitoring of the activities of PSs and GPs; ensuring implementation of any schemes entrusted by the Central or State Governments; appropriation or the grants received from the Central or State Governments to the PSs and GPs in accordance with the specified criteria; taking steps to ensure procurement of resources and any other functions entrusted by the State Government under special or general orders. Panchayat Samiti Panchayat Samiti (PS) is the intermediate tier of PRIs at the Block level. The PSs undertake development works at the block level. It is their duty to make suitable arrangements for rural development, agriculture, social forestry, animal husbandry and pisciculture, health and hygiene, adult education, cooperative work, cottage industries, social welfare, family planning, rural employment programmes; arranging emergency assistance in cases of fire, flood, drought, earthquake and other natural calamities; and any other works entrusted to them by the State Government or the ZP. Gram Panchayat Gram Panchayat (GP) is the last tier of PRIs at the grass root level. It is the duty of the GPs to maintain cleanliness and hygiene, maintenance and upkeep of water resources, lighting and construction of village roads, promotion of youth welfare, family welfare and sports activities, implementing programmes for social welfare and any other activities entrusted by the State Government, ZP or PS.
    [Show full text]