Road Circle Hazaribag

2019 2019-20 iFk izEk.My] gtkjhckx

0.00 4150.07829 4150.07829 0.00 3506.27266 0.00 3506.27266 643.80563

------

------

------

0.00 4150.07829 4150.07829 0.00 3506.27266 0.00 3506.27266 643.80563

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 -

0.00 - 0.00 0.00 0.00 0.00 0.00 0.00

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

SH/MDR Carriage wideth Equilateral Bridge Nos. of Remarks ODR/Others length Culverts Single Intermediate Double Fourth (I Km) No. Length RCC HP Lane lane in Km Lane lane In m (in in in Km Km) Kma

In NH-2 3.875 - - 3.875 - 7.75 - - - - tender process

NH-33 9.4 - - 9.40 - 18.8 01 - -- -

SH-07 47.05 - - 47.05 - 94.10 11 - 59 -

MDR-069 9.80 - - 9.80 - 14.37 1 - 21 -

MDR-070 29.20 - 29.20 - - 43.20 3 - 29 -

MDR-093 28.00 28.00 - - - 28.00 0 - 29 -

MDR-094 1.775 - - 1.775 - 3.55 0 - 03 -

MDR-096 9.60 - 9.60 - - 14.07 1 - 09 -

MDR-097 8.40 - 8.40 - - 12.32 0 - 17 -

MDR-098 7.25 7.25 - - - 7.25 0 - 09 -

MDR-099 25.92 25.92 - - - 25.92 0 - 66 - ODR 30.038 - 30.038 - - 45.06 - - 77 - (NH-33)

(NH-33) ODR 31.383 - 31.383 - - 47.07 - - 36 - (NH2) (SH-07) ODR 12.400 12.40 - - - 12.40 2 - 8 -

ODR 32.10 - 32.10 - - 48.15 - - 36 -

ODR 1.1 1.10 - - - 1.1 - - -

ODR 1.30 1.30 - - - 1.30 - - -

ODR 3.0 3.00 - - - 3.0 - - -

ODR 2.0 - - 2.00 - 4.0 - - -

ODR 1.55 - - 1.55 - 3.10 - - 3 -

ODR 2.25 - 2.25 - - 3.30 - - 2 -

NH-33

ODR 1.00 - 1.00 - - 1.77 - - 1 -

ODR 2.20 2.20 - - - 2.2 - - - - ODR 2.00 2.00 - - - 2.00 - - - -

ODR 1.30 1.30 - - - 1.30 - - - -

ODR 2.00 - 2.00 - - 3.00 - - - -

ODR 1.56 - - 1.56 - 3.12 - - 4. -

(NH-33) ODR 4.05 - 4.05 - - 6.075 - - 2 -

ODR 1.66 1.66 - - - 1.66 - - - -

NH- ODR 1.00 1.00 - - - 1.00 - - - - 100 NH-100 ODR 1.00 - 1.00 - - 1.5 - - - -

ODR 9.30 - 9.30 - - 14.10 - - ODR 1.21 - - 1.21 - 2.42 - - 2 - (NH-2)

ODR 2.34 - - 2.34 - 4.68 - - -

ODR 32.850 - - 32.85 - 74.17 - 50 19 5.56 ODR 3.50 - 3.50 ------

4.50 ODR 3.00 - 3.00 ------

(MDR-096) (MDR-069) ODR 10.480 - 10.48 - - 18.59 - - -

ODR 5.20 - - 5.20 - 11.74 3 - 4 - (MDR- 070)& (NH-33) ODR 7.965 - 7.965 - - 14.13 - - 6 - -

On going ODR 16.79 16.79 - - - 16.79 - - 27 - scheme

On going scheme 8.07 ODR 8.07 8.07 - - - 1 - 12 -

(SH-07) On going ODR 6.725 6.725 - - - 6.725 1 - 14 - scheme

On ODR 17.825 17.825 - - - 17.825 - - 41 - going MDR scheme On (NH-100 going (MDR-070) ODR 21.125 21.125 - - - 21.125 01 - 42 - scheme

- ODR 1.00 0.00 1.00 0.00 - 1.00 - - - -

- ODR 0.925 - 0.925 - - 1.64 - - 1 -

- ODR 1.525 - 1.525 - - 2.70 - - 2 -

- ODR 2.02 0.00 2.02 - - 2.02 - - - -

-

ODR 0.920 0.00 0.920 - - 0.920 - - - - - ODR 0.575 - 0.575 - - 1.02 - - - -

(NH 2) In tender ODR 22.93 22.93 - - - 22.93 - - - - Process (MDR 90)

TOP 3 (NH-100) In tender Process (NH-33) ODR 18.764 18.764 - - - 18.765 - - - -

510.20 669.447 22 555 Road Construction Department Road Circle, Hazaribag Physical & Financial Progress from 01.05.2019 to 31.05.2019 during 2019-20

Expenditure (Rs. In Lakh) Physical (Km) No. of Completed Schemes

Name of Bridge Roads Remarks Division Widening Rigid Road Bridge Total BM/DBM BC (Upto WMM) Pavement No. of Length Length Completed No. (m) (KM) Schemes

1 2 3 4 5 6 7 8 9 10 11 12 13 Hazaribag 3506.27427 - 3506.27266 2.58 5.50 25.05 0.3 - - 0 0

Executive Engineer, RCD, Road Divison, Hazaribag

Page - 1 DPW-R ROAD CONSTRUCTION DEPARTMENT, (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March19 20 19-20 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Widening, - 32.100 5927.156 13.10.2014 6412.38500 Dt. 21.05.15 46310021 21(SBD) of 5398.40100 0.00000 0.00000 5398.40100 94% Strengthening 32.450 Dy. Secretary, Chief Engineer 15-16 (CDO) RCD Reconstruction of revised RCD, 06.08.15 Jharkhand, Suppl. Barkatha (NH-2) length Jharkhand Ranchi Lt. 02(SBD) of to Tetran Road for Ranchi's Lt. 638(Enc) 777.5800911 2016-17 dt. the Year 2014-15 No. 7631 (S) Rev. Lt. No. 228.48798 481 dt. 5637.06928 10.05.16 30.05.16 Supp P-II Revised 33SBD of 16- 6882.906 17 dt. 30.12.16

2 Widening & - 32.50 8302.57 23.07.2015 8302.57000 08.05.15 6093.03124 08.12.15 6249.47496 0.00000 0.00000 6249.47446 100% Strenthening of Mahto- Dy. Sec., RCD, C.E., CDO, Suppl. 40(SBD) of Aahara-Rampur- Jharkhand RCD, 450.19561 2015-16 Basaria (Chouparan) Ranchi Lt. No. Jharkhand, 6543.22685 in KM 0 to 32.50 5158(S) Ranchi Lt. (Total Length 32.50 No. 433 Km) for the Year 2015-16

3 Widening & - 9.80 Km 6563.988 dt. 10.7.2015 6563.988 dt. 09.06.2015 1796.98 19.12.15 1729.78896 0.00000 0.00000 1729.78896 100% Strengthening work of Dy. Sec., RCD, CE.CDO, RCD, 45(SBD) of two lane with Pved Jharkhand Jharkhand, Ranchi Lt. No. 2015-16 shoulder in Jihu Itkhori Ranchi Lt. No. 563 Road from 0 to 9.8 Km 4824(S) (Total Road 9.801Km)

Page-2 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 4 Construction of - 441.254 05.11.2015 441.25400 Dt. 449.6091618 20.04.16 481.33634 0.00000 0.00000 481.33634 100.00% Rotary and Dy. Secretary, 04.11.15 01(SBD) of Development of RCD, Chief 16-17 Intersection at Jharkhand Engineer Barhi Chowk Ranchi's Lt. (CDO) (Hazaribag) at the No. 7633 (S) RCD Junction of NH-2, Jharkhand, NH-31, NH-33 for Ranchi Lt. the Year 2015-16 1271(Enc)

5 Widening and - 10.48 Km 2409.538 05.02.2016 2409.53800 Dt. 2186.38 4SBD of 1886.43184 0.000000 0.00000 1886.43184 100.00% strengthening/Rec Dy. Secretary, 11.12.15 2016-17 dt. onstruction of RCD, Chief 13.05.16 Gauriya Karma Jharkhand Engineer (MDR-096) to Ranchi's Lt. (CDO) Kewta Bridge No. 785 (S) RCD (MDR 069) in Km Jharkhand, 0.00 to 10.48 total Ranchi Lt. length 10.48Km) 1396(Enc) for the Year 2015- 16

Page-4 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 6 Widening & - 5.10 Km 3454.7529 23.05.2016 3454.75200 Dt. 1482.03 11SBDof 1633.81863 0.00000 0.00000 1633.81863 100% Strengthening of Dy. Secretary, 28.03.16 16-17 dt. Charhi-Ghato RCD, Chief 20.10.16 Road (Total Jharkhand Engineer Length 5.20Km) Ranchi's Lt. (CDO) No. 3228 (S) RCD Jharkhand, Ranchi Lt. 160(Enc)

7 Widening & - 7.965 1338.66900 26.09.2016 1338.66900 Dt. 1295.2908841 01SBDof 1454.26463 0.00000 0.00000 1454.26463 100% Variation 17-18 dt. Strengthening/Rec Revised Joint Secretary, 14.09.16 213.00209 05.05.17 onstruction of Length RCD, Chief 1508.29297 Kallu Chowk 8.09 Jharkhand Engineer (MDR-07) to Ranchi's Lt. (CDO) Sindur (NH-33) No. 6193 (S) RCD Via Mandai Khurd Jharkhand, Road for the Year Ranchi Lt. 2016-17 918(Enc)

Page-6 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 8 Widening & - 6.725 1820.8400 28.02.2017 1820.84000 Dt. 1415.652 43(SBD) 1181.64600 232.06222 0.00000 1181.64600 83.47% Strengthing/Recon Joint Secretary, 14.10.16 dt. 2017-18 struction of RCD, Chief dt. 11.12.17 Shankarpur- Jharkhand Engineer Narsingh Asthan- Ranchi's Lt. (CDO) Kapasia Kundil No. 1187 (S) RCD Bagi (SH-07) with Jharkhand, H.L. Bridge for Ranchi Lt. the Year 216-17 1035(Enc) 9 IRQP work of 1.775 Km 164.921 Dy. Secretary, 164.921 C.E. (CDO) 146.83245 16.11.17 of 124.9749 0.0000 0.0000 124.9749 100.00% Hazaribag Bagodar RCD., Jharkhand, 39F2 of Road (MDR-94) (St. Jharkhand, Ranchi Lt. 2017-18 Columba's College to Ranchi Lt. No. 1025 (Enc.) Korrah Chowk) from 5049 (S) dt. dt. 07.10.16 Km 0.00 to 1.775 for the Year 2016-17 01.09.17

10 IRQP work of Konar 9.40 Km 679.660 Dy. Secretary, 679.66 C.E. (CDO) 649.26 15.02.18 of 649.2600 0.0000 0.0000 649.2600 100.00% Bridge to Hawai RCD., Jharkhand, 49(SBD) Adda road (NH-33) Jharkhand, Ranchi Lt. 2017-18 Town portion from Ranchi Lt. No. 1147 (Enc.) Km 30.15 to 40.35 5473 (S) dt. dt. 19.10.16 for the Year 2016-17 04.10.17

Page-8 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 11 W/S (i) Jack & Jill School 7.047 Km 2853.348 Dy. Secretary, 2853.348 C.E. (CDO) 1900.27965 dt. 1264.70053 100.00 60.00000 1324.70053 69.71% to Bisheshwar Dayal Chowk Via Zakir Hussain RCD., Jharkhand, 21.12.17 Marg, Chhoti Gowal Toli, Jharkhand, Ranchi Lt. 45(SBD) of Gilan Chowk Pustakayan Ranchi Lt. No. 972 (Enc.) 2017-18 Chowk (1 Km) (ii) Main Road Drug House to 5658 (S) dt. dt. 27.07.17 Karzan Statium road 11.10.17 (0.925 Km) (iii) Dipugarha Irrigation Colony to Canary residential colony Via RWD Circle Office, Divine Mercy Ashram, Police Acadmy on NH-33 (1.525 Km) (iv) Pagoda Chowk to Kallu Chowk Via New area and Jamun tree Lohsingna to Manna Singh Chowk (2.102 Km) (v) Krishnapuri NH-100 to Krishnapuri Talab peripheral road (0.920 Km) and (vi) Heera bag Chowk to Government B. Ed. College road via DVC Chowk (0.575 Km) under Road Division, Hazaribag for the Year 2017-18

Page-10 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 12 Widening & - 8.070 1876.3510 27.02.2017 1876.35100 Dt. 1676.17365 44(SBD) 1187.37480 100.00000 65.00000 1252.37485 74.71% Strengthening of Joint Secretary, 11.08.16 of 2017-18 Road from 11th RCD, Chief dt. 14.12.17 Km of NH-33 Jharkhand Engineer Padma Mahal Ranchi's Lt. (CDO) Main Gate (Thana No. 1155 (S) RCD Chowk) to Padma Jharkhand, Bazar Via Hawa Ranchi Lt. Mahal, Block 810(Enc) Office, S. Railway Station with H.C. Bridge for the Year 2016-17

13 Widening & - 16.790 4706.4600 21.09.2016 4706.46000 Dt. 3208.28928 dt. 1695.50970 300.00000 123.72399 1819.23369 57.00% Strengthening/Rec Joint Secretary, 09.08.16 15.09.2017 onstruction of RCD, Chief 18 SBD of 2017-18 Palma Moskodih- Jharkhand Engineer Choubey- Ranchi's Lt. (CDO) Keshwari road for No. 6036 (S) RCD the Year 2016-17 Jharkhand, Ranchi Lt. 801(Enc)

Page-12 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March19 20 19-20 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 14 Reconstruction of - 17.825 5877.10300 03.05.2017 5897.10300 Dt.28.11.16 4516.87944 dt. 3132.81250 1200.00000 1196.17078 4328.98328 95.84% Ichak more (NH- Joint Secretary, Chief 31.10.2017 33) Dumraon RCD, Engineer 34 SBD of 2017-18 Bahimar Chowk Jharkhand (CDO) PWD Road from Ranchi's Lt. RCD Km 0.00 to 17.825 No. 2440 (S) Jharkhand, (Total Length Ranchi Lt. 17.825 Km) under 1230(Enc) Road Divison, Hazaribag for the Year 2017-18

15 Reconstruction of 21.25 6931.03 Joint Secretary, 6931.028 C.E. (CDO) 5070.72607 16.01.18 of 2924.58526 1000.00 981.27938 3905.86464 77.00% Ram Nagar to RCD., Jharkhand, 48(SBD) of Charwa Via Jharkhand, Ranchi Lt. 2017-18 Bishnupuri, Ranchi Lt. No. 1208(Enc) Godokhar Salgawan 3055 (S) dt. dt. 24.11.16 Pelawal, Kasturikhap Sultana More Road 05.06.17 for the Year 2017-18

Page-14 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March19 20 19-20 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

16 Consruction of H.L. 100m 5331.74 Joint Secretary, 5331.74 C.E. (CDO) 4945.44994 dt. 1787.5130 500.00 500.00000 2287.51530 46.25% Bridge with Approach RCD., Jharkhand, 09.11.17 approach road road 7.0Km Jharkhand, Ranchi Lt. 36(SBD) of between Malkana & Revised Ranchi Lt. No. 1168 dt. 2017-18 Larahi at Barhi Length 7.2 3251 (S) dt. 13.11.16 (Chauparan for the Year 2017-18 Km 13.06.17

17 W/S work of 3.30 2080.00 Joint Secretary, 2080.13 C.E. (CDO) ------Dhobiyadih Dhamna RCD., Jharkhand, Road (NH 2 Old Portion except Ch. Jharkhand, Ranchi Lt. 2050 m to 3200m near Ranchi Lt. No. 1364(Enc) Barhi Chowk) (Total 1137 (S) dt. dt. Length 3.30 Km) for 22.02.19 20.11.2018 the Year 2018-19

Page-16 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

18 Reconstruction work of 18.764 5622.094 Joint Secretary, 5622.094 C.E. (CDO) ------TOP 3 (NH 100) to RCD., Jharkhand, Mukundganj Via Lalpur Oriya road (Total Jharkhand, Ranchi Lt. Length 18.764 Km) for Ranchi Lt. No. 1520(Enc) the Year 2018-19 1248 (S) dt. dt. 31.12.18 27.02.2019

19 Reconstruction work of 27.85 6890.945 Joint Secretary, 6890.945 C.E. (CDO) ------Jhurjhuri to Pipcho H.-22.93 RCD., Jharkhand, road (Total Length 27.85 Km) under Road K 4.92 Jharkhand, Ranchi Lt. Division, Ranchi Lt. No. 1362(Enc) Hzaribag/Koderma for 1239 (S) dt. dt. the Year 2018-19 27.02.2019 19.11.2018

Page-18 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 20 IRQP work of 2.00 90.99 Joint Secretary, 90.992 C.E. (CDO) 91.47009 dt. 25.00 66.47009 66.03077 91.03077 100.00% Ananda Chowk to RCD., Jharkhand, 25.09.18 Hurhuru Via Old Jharkhand, Ranchi Lt. 28F2 of Bus stand Mission Ranchi Lt. No. 593(Enc) 2018-19 Hospital from Km 0 3842 (S) dt. dt. 26.04.18 to 2.00 (Total Length 2.00Km) for the 03.07.18 Year 2018-19)

21 IRQP work of Alka 2.00 88.075 Joint Secretary, 88.075 C.E. (CDO) 88.71578 dt. 25.00 63.71578 63.71578 88.71578 100.00% Hotel Chowk to RCD., Jharkhand, 25.09.18 Badha Mahavir Jharkhand, Ranchi Lt. 29F2 of Mandir Chowk Ranchi Lt. No. 608(Enc) 2018-19 Round Via Jhanda 3843 (S) dt. dt. 07.05.18 Chowk, Badha Akhara road from 03.07.18 Km 0.00 to 2.00 (Total Length 2.00Km) for the Year 2018-19

Page-20 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 22 IRQP work of Post 0.525 68.934 Joint Secretary, 67.81159 C.E. (CDO) 67.81159 dt. 25.00 42.81159 42.81159 67.81159 100.00% Office Chowk to SBI RCD., Jharkhand, 01.10.18 Main Branch from Jharkhand, Ranchi Lt. 30F2 of Km 0.00 to 0.525 Ranchi Lt. No. 609(Enc) 2018-19 (Total Length 0.525 3844 (S) dt. dt. 05.07.18 Km) for the Year 2018-19 03.07.18

23 IRQP work of Lake 7.545 310.947 Joint Secretary, 310.947 C.E. (CDO) 306.50008 dt. 15.00 291.50008 291.50008 306.50008 100.00% Road (MDR 97) RCD., Jharkhand, 24.01.19 (Total Length 7.548 Jharkhand, Ranchi Lt. 43(SBD) of KM) for the Year Ranchi Lt. No. 504(Enc) 2018-19 2018-19 3845 (S) dt. dt. 19.04.18 03.07.18

24 IRQP work of PWD 2.25 210.26 Joint Secretary, 210.26 C.E. (CDO) 208.72031 Dt. 25.00 183.72031 47.57398 72.57398 34.77% chowk to Circuit RCD., Jharkhand, 12.10.18 House Via S.P. Jharkhand, Ranchi Lt. 33F2 of Residence from Km Ranchi Lt. No. 601(Enc) 2018-19 0 to 2.25 (Total 3871 (S) dt. dt. 07.05.18 Length 2.25Km) for the Year 2018-19 03.07.18

Page-22 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial till March19 20 19-20 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 25 IRQP work of 7.75 115.404 Joint Secretary, 115.404 C.E. (CDO) 118.28022 Dt. 01.1.18 70.00 48.28022 42.64309 112.64309 100.00% Mukundganj Harhad RCD., Jharkhand, 36F2 of Hupad Via Jharkhand, Ranchi Lt. 2018-19 Demotand (MDR Ranchi Lt. No. 697(Enc) 98) FROM Km 0.00 3873 (S) dt. dt. 10.05.18 to 7.75) Total Length 7.75 Km) for the 03.07.18 Year 2018-19

26 IRQP work of 1.30 37.024 Joint Secretary, 37.024 C.E. (CDO) 41.51800 Dt23.10.18 20.00 21.51800 21.51800 41.51800 100.00% Kuwan Chowk to RCD., Jharkhand, 34F2 of Kumahar Toli Pipal Jharkhand, Ranchi Lt. 2018-19 Chowk from Km Ranchi Lt. No. 629(Enc) 0.00 to 1.30 (Total 3872 (S) dt. dt. 10.05.18 Length 1.30 Km) for the Year 2018-19 03.07.18

Page-24 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Bridge) RCPLWE BRIDGE WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (In M) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in 19- Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March19 20 19-20 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Construction of HL Bridge (i) In Km 16th of 07.04.2018 Barkatha-Tetraon CE, CDO, Road Over Dulki 2 x 16.00 Ranchi Vide 215.40597 53.13449 53.13449 24.66% dt. 22.02.2018 333.81000 River under Lt. No. 453 Govt. of , RCPLWE for the (WE) Ministry of Year 2018-19 Rural 17.07.18 525.30 Development 3 (SBD) of - 300.00000 (ii) In Km 13th of Lt. No. 2018-19 Ichak-Barkatha 17024/11(i) road over Furukka 2017- 07.04.2018 (Siwane) River RC(358261) CE, CDO, and 3 x 21.00 402.58700 Ranchi Vide 267.6533 0.00000 0.00000 0.00% Lt. No. 454 (WE)

TOTAL 736.39700 483.05927 53.13449 53.13449

Page-26 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Expected Completed/ in Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Y/N)30 31 1 M/s Ganesh 32.25 32.25 32.25 32.25 32.25 - 35 N 98% 05.02.17 31.03.18 IP N Work Complete, Yadav, 32.25 32.25 32.25 32.25 32.25 36 Land acquisition work in Progress Anandnagar casted P.O.-ISM Drain- 5.8 , Km 9304624925 6.5 Km Protection wall 1.30Km 1.8 Km

2 M.G. 32.78 32.78 32.78 31.364 31.364 1.416 69 Nos. Y 100% 07.08.17 - CP N Work Complete Contractor Pvt. 31.364 31.364 1.416 71 Nos. 31.12.17 Land acquisition work in Process 32.78 32.78 32.78 completed Ltd., HLB Punchkula, 4/4 Haryana Drain 5.5 5.545

3 M/s Hill Trade 9.80 9.80 9.80 9.80 9.80 - - Y 100% 18.06.17 - CP Y Work Complete R.K. (JV) 9.80 9.80 9.80 9.80 9.80 Land acquisition work in Process

Page-3 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 M/s Puja 1.1 Km 1.1 Km 1.1 Km 1.1Km 1.1 Km - - Y 100% 19.08.16 06.12.16 CP N Work complete Enterprises, Simaria, Chatra.

5 R.K. Infra 10.48 Km 10.48 10.394 10.394 10.394 0.086 27/37 Y 100% 12.01.17 - CP Y Work complete Corporation 10.48 10.394 10.394 10.394 0.086 Land acquisition work in Process Pvt. Ltd., H. No. 1/172, Dwarka Nagar, Kadapa, Hydrabad

Page-5 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 6 Classic 5.20 5.20 5.20 5.20 5.20 - 3 Nos. Y 100% 19.10.17 - CP N Work complete Engicon Pvt. 5.20 5.20 5.20 5.20 5.20 3.Nos. 31.12.17 Land acquisition work in Process Ltd., Ranchi Culvert complete 3.00 3 No. HL Complete Drain 2.980 Km 2.900

7 M/s 8.09 8.09 6.959 6.959 6.959 1.131 Y 100% 04.11.17 - CP N Work Complete Samleshwari 8.09 8.09 9.960 9.961 9.962 1.131 Road Builders, Bokaro

Page-7 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 8 M/s Sidhartha 6.75 4.798 4.798 4.798 5.831 2.156 11 - 100% 10.04.19 - CP - Work Completed Construction, 6.75 4.798 4.798 4.798 5.831 2.156 18 Land acquision work in Progress Hazaribag. Culvert Complete 1717 4330 Drain Complete

9 M/s Puja - - - 1.775 1.775 - 1322 - 100% 15.02.18 - CP - Work Complete Enterprises, 1.775 1.775 1600 Simaria, Chatra

10 M/s Puja - - - 9.40 9.40 - - - 100% 14.05.18 - CP - Work Complete Enterprises, 9.40 9.40 Simaria, Chatra

Page-9 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 11 M/s Shidhartha 7.047 7.047 3.991 3.991 7.047 3.056 150 M - 90% 20.06.18 - CP - work Complete Construction, 7.047 7.047 3.991 3.991 7.047 3.056 Drain Hazaribag. 50M/GW

Page-11 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 12 M/s Sidhartha 7.00 7.00 6.70 6.00 5.10 - 11 - 75% 13.08.19 - IP - GSB, WMM DBB & BC work in Construction, 8.07 8.07 8.07 8.07 8.07 12 Progress in HLB A2, P3 Gurder Hazaribag. Drain reinforcement in Process, P & P2 1.40 foundation in Progress 3.60km 0/1 HZB 0.195 0.333 G.W.

13 Hills Trade- 15.00Km 15.00 Km 15.00 11.00 8.00 0.300 15 - 75% 14.01.19 - IP - GSB, WMM, DBM work in Progress RK(JV) 16.79 16.79 16.79 16.79 16.79 0.890 27 and 03 Nos. Culvert Stone Masonary Gurgaon Work in Progress

Page-13 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Y/N)30 31 14 M & S 17.400 17.40 17.400 17.00 17.00 - 40/41 - 97% 30.01.19 - IP - H.L. Bridge Gurder work in Progress Company, 17.825 17.825 17.825 17.825 17.825 Culvert, Dumka 4.39 4.39 G/W 0/1 HLB

15 M/s Sidhartha 20.80 18.50 15.50 14.50 12.50 2.00 37 - 92% 15.04.19 - IP - DBM-14.50 Km, BC-12.50 Km Construction, 21.845 18.70 18.70 19.845 19.00 6.50 49 Complete, Hazaribag Drain Work in Progress 8.50 In HLB A1 Shaft three lift progress and 12.20Km A2 foundation casted. G/W 2.20m 4.00 0/1 HLB

Page-15 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Y/N)30 31

16 M/s Ganesh 6.50 6.50 6.375 - - - 8 - 60% 08.11.19 - IP - A1 & A2 up to Cap, P1 Yadav, Anand 7.20 7.20 7.20 8 foundation casting in Progress Nagar, 0/ HLB Saraidhela, and P2 in Cutting Position. Dhanbad

17 ------C/S of Technical Bid sent to Engineer- in-Chief, RCD, Jharkhand Ranchi Vide Lt. No. 446(W/E) dated 13.05.2018

Page-17 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

18 ------C/S of Technical Bid sent to Eng.-in- Chief, vide Lt. No. 449(W/E) dated 15.05.2019

19 ------C/S of Technical Bid sent to Eng.-in- Chief, Vide Letter No. 447 (W/E) dated 13.05.2019

Page-19 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 20 M/s Ajanta - - - - 2.00 - - - 100% 24.12.18 - CP Y Work Complete Construction, 2.00 Bimla Complex, Bansilal Chowk, Hazaribag 9304623496

21 Sri Mahesh - - - - 2.00 - - - 100% 24.12.18 - CP - Work Complete Prasad, Village- 2.00 Parbata, Barkatha, Hazaribag 9801348593

Page-21 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 22 M/s Ajay 0.525 0.525 0.525 0.525 0.525 - - - 100% 31.12.18 - CP - Work Complete Quality 0.525 0.525 0.525 0.525 Construction Pvt. Ltd., Mission School, Hazaribag 8002630197

23 Amitabh - - - 7.545 7.545 - - - 100% 23.05.19 - CP - Work Complete Construction 7.545 7.545 Pvt. Ltd., Koderma

24 M/s Archna - - - 0.800 - - - - 60% 11.01.19 - IP - DBM Work and Paver Construction, 2.25 Work In Progress Matwari, Hazaribag 8340634638

Page-23 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ in Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 25 Mukesh - - - 7.25 7.25 - - - 100% 31.01.19 - CP Y Work Complete Kumar, 7.25 7.25 Hurhuru, Hazaribag 7352254047

26 Prerna - - - 1.30 1.30 - - - 100% 20.01.19 - CP - Work Complete Construction, 1.30 1.30 Bhusai, Ichak, Hazaribag 7903355390

Page-25

Executive Engineer RCD, Road Division, Hazaribag DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Bridge-Plan) RCPLWE BRIDGE WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19 Sl. Name of Physical Progres in % Completion Progress No. Contractor Founda- Flooring Pier/ Deck Wearing Railing Approach Bridge Ovell all Scheduled Revised Completed/ in Final Remarks tion Abutment Slab Coat furniture Achievement Date Date Progress Bill (Y/N) (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Y/N)30 31

In Barkatha-Tetroun HL Bridge 100% - 100% - - - - - 40% IP - A1, P and A2 shaft complete Sri Gurder Rod binding in Progress Ramchandra Yadav, H. No. 4A, Mohalla- 1 Budhiadih, 16.07.19 - P.O. & P.S.- Barkatha, In Ichak Barkatha HL Bridge A1, Hazaribag. 2 Lift casting complete and P1 9431163506 4th lift casting complete, P2 50% - 50% - - - - - 20% IP - foundation excavation complete A2 Excavation of foundatin Progress Work in Progress

Executive Engineer RCD, Road Division, Hazaribag

Page-27 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March19 19-20 in 19-20 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Ordinary Repair work in KM - - 15.000 dt. 23.05.18 14.99912 dt. 15.06.18 13.49921 10 F2 of 2.02488 0.00000 0.00000 2.02488 15.00% 0 to 28 of Banaso Eng.-in-Chief, E.E., RCD, 2018-19 Budgadda via Galaobar RCD, Jharkhand Road Div., 02.08.2018 Penk road for the Year Ranchi's Lt. No. Hazaribag 2018-19 3007(S)

2 Special repair/ - - 26.927 dt. 23.05.18 26.92700 dt. 15.06.18 24.22593 24 F2 of 16.17655 0.00000 0.00000 16.17655 66.77% Reconstruction of Ç'type Eng.-in-Chief, S.E., RCD, 2018-19 Quarter Doubl story RCD, Jharkhand Road Circle, 21.08.2018 Approach road and Ranchi's Lt. No. Hazaribag Lt. Garriage at Zulu Park Lakra 3007(S) No. 353 Godown for the Year 2018- (Encl.) 19 3 Road furniture and shoulder - - 25.000 dt. 13.02.19 25.00000 dt.11.02.189 24.99596 44 F2 of 3.74933 24.99596 0.00000 3.74933 15.00% dressing work in Around Eng.-in-Chief, S.E., RCD, 2018-19 Gandhi Maidan road RCD, Jharkhand Road Circle, 25.02.2019 (Length 1 Km) NH 3 old Ranchi's Lt. No. Hazaribag Lt. road, Surajkund road 965(S) No. 187 (W/E.) Barkatha, Korra chowk to St. Columbus college more, St. Columbus more- Churchu-Hatyari more road, Defferent road of town portion udner Non Plan for the Year 2018-19

Page-28 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March19 19-20 in 19-20 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

4 Construction Pedestral in - - 90.000 dt. 13.02.19 90.00000 dt.02.07.18 89.09937 46 F2 of 13.36491 0.00000 0.00000 13.36491 15.00% with paver block in front of Eng.-in-Chief, E.E., RCD, 2018-19 Mtwari Gandhi Maidan (Left RCD, Jharkhand Road Div., 26.02.2019 side of PWD road under Ranchi's Lt. No. Hazaribag RCD, Road Non Plan for 965(S) the Year 2018-19

5 Construction of NH 100 - - 55.000 dt. 13.02.19 54.97448 dt. 28.06.18 54.97433 45 F2 of 8.24615 0.00000 0.00000 8.24615 15.00% road Bagodar-Hazaribag Eng.-in-Chief, E.E., RCD, 2018-19 Chatra road in CA 40.29 to RCD, Jharkhand Road Div., 26.02.2019 51.6 (Matwari Gandhi Ranchi's Lt. No. Hazaribag Maidan to District Board 965(S) Chowk) for smooth 6 Specialmovementrepair of Trafficwork for thein - - 10.000 dt. 23.05.18 9.99391 dt. 15.06.18 8.16202 13 F2 of 8.14033 0.00000 0.00000 8.14033 100% Barkagaon Rest shed and Eng.-in-Chief, S.E., RCD, Quotation 2018-19 staff quarter for the Year RCD, Jharkhand Road Circle, 0.9250 04.08.2018 2018-19 Ranchi's Lt. No. Hazaribag 3007(S) Lt. No. 250(Encl.( Page-30 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March19 19-20 in 19-20 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

7 Construction of Paver Block - - 66.000 dt. 07.03.19 65.63152 dt.20.02.19 ------in West side DDC Awas Eng.-in-Chief, S.E., RCD, Near District Board Chowk RCD, Jharkhand Road Circle, (NH-33) and S/R of District Ranchi's Lt. No. Hazaribag Lt. Hospital & Approach road of 1594(S) No. 187 (W/E.) College Under Non Plan under RCD, Road Division, Hazaribag for the Year 2018-19

8 Construction of Paver Block - - 58.000 dt. 07.03.2019 57.85633 dt.22.02.19 ------Near District Board chowk Eng.-in-Chief, S.E., RCD, East side DIG Awas, Tree RCD, Jharkhand Road Circle, Painting, Hazaribag Lake Ranchi's Lt. No. Hazaribag Road and road Safety work 1594(S) Lt.No. 231 under Non Plan, RCD, Road Division, Hazaribag for the Year 2018-19

Page-32 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

1 Neha Enterprises, Work Complete - 100% 01.11.2018 CP - Work Complete Village-Hethli, P.O.-Chotha, P.S.-Birugarha, District Hazaribag 9708518886

2 M/s Sindhu Construction, Plaster work in Progress - 100% 20.01.19 CP - Work Complete Village-Lutta, P.O.-Kadma, District-Hazaribag. 825264748

3 M/s Kumar Construction, Work Complete - 100% 24.03.19 CP - Work Complete Hazaribag

Page-29 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

4 Ajanta Construction, Work Complete - 100% 25.03.19 CP - Work Complete Bansilal Chowk, Hazaribag

5 M/s Sidhartha Engicon Pvt. Ltd., Work Complete - 100% 25.03.19 CP - Work Complete Hazaribag

6 Sri Rakshpal Dangi Work Complete - 100% 3.022019 CP - Work Complete Banshidhar Colony, PTC Chowk, Hazaribag 9905288705

Page-31 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :- May'19

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

7 - - - - - c - In Agreement Process

8 ------Retender will be opened on 12.06.2019

Page-33 Executive Engineer RCD, Road Division, Hazaribag izi= & 3 egkys[kkdkj dks lefiZr ys[kk ,oa iqujhf{kr QkeZ & 51 dh v|ru fLFkfr ekg % ebZ 2019 ize.My dk uke %& iFk fuekZ.k foHkkx] iFk ize.My] gtkjhckxA ¼foÙkh; o"kZ 2019&20½ Øñlañ ekfld ys[kk dh fooj.kh egkys[kkdkj dk;kZy; ls QkeZ& 51 dh fooj.kh ekgokjh O;; dh fooj.kh 'ks"k jkf'k dh fooj.kh vH;qfDr ekfld ys[kk dk lR;kiu ¼:ñ yk[k esa½ ¼:ñ yk[k esa½ ekg izlax ekg izlax 'kh"kZ 5054 'kh"kZ 3054 'kh"kZ 5054 'kh"kZ 3054 1 2 3 4 5 6 7 8 9 10 11 1- vizSy*2019 iñ&427-vuqñ ekpZ*2019 rd vizSy*19 iñ&454¼vuq-½ 3506.27266 0.00000 643.80563 0.00000 - fnñ 03-05-2019 fnñ&17-05-2019 dk;Z en esa izkIr vkoaVu ,oe C;; %& izkIr vkoaVu C;; 'ks"k jkf'k % O;; ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼iqy dk;Z½& 0.00000 0.00000 0.00000 ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼iFk dk;Z½& 4150.07829 3506.27266 643.80563 ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼4@2 ysu iFk dk eqvkotk½& 0.00000 0.00000 0.00000 ;kstuk en&'kh"kZ&5054&izkjfEHkd losZ{k.k ,oa feêh losZ{k.k 0.00000 0.00000 0.00000 Total 4150.07829 3506.27266 643.80563 xSj ;kstuk en& 'kh"kZ & 3054&lM+ds ,oa iqy 0.00000 0.00000 0.00000 xSj ;kstuk en& 'kh"kZ & 3054&lM+ds ,oa iqy ¼foosdk/khu½ 0.00000 0.00000 0.00000 xSj ;kstuk en& 'kh"kZ & 3054&lM+ds ,oa iqy ¼jksM QfuZpj½ 0.00000 0.00000 0.00000 Total 0.00000 0.00000 0.00000 LFkkiuk en esa izkIr vkoaVu ,oe C;; izkIr vkoaVu C;; 'ks"k jkf'k 3054 & lM+ds vkSj iqy & osru & 330.00000 42.304810 287.69519 ;k=k C;; & 0.40000 0.00000 0.40000 dk;kZy; C;; & 0.60000 0.00000 0.60000 eksVjxkMh & 0.50000 0.50000 0.00000 nwjHkk"k & 0.20000 0.01399 0.18601 fof/k izHkkj 0.10000 0.00000 0.10000 dk;Zikyd vfHk;ark] onhZ & 0.80000 0.00000 0.80000 iFk fuekZ.k foHkkx] lafonk HkÙkk 3.15600 0.52900 2.62700 iFk ize.My] gtkjhckx Page- 32