NH/SH/ MDR Single Intermediate Double Lane Lane Lane

NH-2 3.875 7.75 -- -- NH-33 9.4 18.8 01 Nos --

SH-07 47.05 94.10 11 Nos. 59 Nos. MDR-069 9.80 14.37 1 No. 21 Nos. MDR-070 29.20 43.20 3 Nos. 29 Nos.

MDR-093 28.00 28.00 0 Nos. 29 Nos. MDR-094 1.775 3.55 0 No. 03 Nos.

MDR-096 9.60 14.07 1 No. 09 Nos. MDR-097 8.40 12.32 0 Nos. 17 Nos. MDR-098 7.25 7.25 0 Nos. 09 Nos. MDR-099 25.92 25.92 0 Nos. 66 Nos. ODR 30.038 45.06 - 77 Nos. (NH-33) (NH-33) (NH2) ODR 31.383 47.07 - 36 Nos. - (SH-07) ODR 12.400 12.40 2 Nos. 8 Nos.

ODR 32.10 48.15 - 36 Nos. ODR

ODR ODR

ODR

ODR - 3 Nos.

ODR - 2 Nos.

(NH-33) ODR - 1 No.

ODR -

ODR -

ODR -

ODR -

ODR - 4 Nos.

ODR - 2 Nos. (NH-33)

ODR -

ODR -

NH-100 NH-100 ODR - NH-100 ODR ODR - 2 Nos. (NH-2) ODR

ODR

-

ODR

-

ODR

(MDR-096) (MDR-069) ODR

ODR (MDR-070)& - 6 Nos. (NH-33) ODR

- 27 Nos. ODR 1 No. 12 Nos. ODR

(SH-07) 1 No. 14 Nos. ODR MDR - 41 Nos. ODR (NH-100 (MDR- 01 No. 42 Nos. 070) ODR

- - - ODR ODR - - -

ODR - - -

ODR - - -

ODR - - -

ODR - - -

468.588 628-152 22 Nos. 555 Nos.

(i) S/L (ii) I/L (iii) D/L

Page – 2 DPW-R ROAD CONSTRUCTION DEPARTMENT, (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March18 18-19 18-19 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Widening, - 32.100 5927.156 13.10.2014 6412.38500 Dt. 21.05.15 46310021 21(SBD) of 4622.90120 777.58009 663.91254 5286.81374 94.00% Strengthening 32.450 Dy. Secretary, Chief Engineer 15-16 (CDO) RCD Reconstruction of revised RCD, 06.08.15 Jharkhand, Suppl. Barkatha (NH-2) length Jharkhand Ranchi Lt. 02(SBD) of to Tetran Road for Ranchi's Lt. 638(Enc) 777.5800911 2016-17 dt. the Year 2014-15 No. 7631 (S) Rev. Lt. No. 228.48798 481 dt. 5637.06928 10.05.16 30.05.16 Supp P-II Revised 33SBD of 6882.906 16-17 dt. 30.12.16

2 Widening & - 32.50 8302.57 23.07.2015 8302.57000 08.05.15 6093.03124 08.12.15 5798.27885 451.19561 451.19561 6249.47446 96.00% Strenthening of Dy. Sec., RCD, C.E., CDO, Suppl. 40(SBD) of Mahto-Aahara- Jharkhand RCD, 450.19561 2015-16 Rampur- Ranchi Lt. No. Jharkhand, 6543.22685 (Chouparan) in KM 0 5158(S) Ranchi Lt. to 32.50 (Total No. 433 Length 32.50 Km) for the Year 2015-16 3 Widening & - 9.80 Km 6563.988 dt. 10.7.2015 6563.988 dt. 09.06.2015 1796.98 19.12.15 1729.78896 0.00000 0.00000 1729.78896 100.00% Strengthening work of Dy. Sec., RCD, CE.CDO, RCD, 45(SBD) of two lane with Pved Jharkhand Jharkhand, Ranchi Lt. No. 2015-16 shoulder in Jihu Itkhori Ranchi Lt. No. 563 Road from 0 to 9.8 Km 4824(S) (Total Road 9.801Km)

Page-3 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 4 Construction of - 441.254 05.11.2015 441.25400 Dt. 449.6091618 20.04.16 481.33634 0.00000 0.00000 481.33634 100.00% Rotary and Dy. Secretary, 04.11.15 01(SBD) of Development of RCD, Chief 16-17 Intersection at Jharkhand Engineer Barhi Chowk Ranchi's Lt. (CDO) (Hazaribag) at the No. 7633 (S) RCD Junction of NH-2, Jharkhand, NH-31, NH-33 for Ranchi Lt. the Year 2015-16 1271(Enc)

5 Widening and - 10.48 Km 2409.538 05.02.2016 2409.53800 Dt. 2186.38 4SBD of 1886.43184 0.000000 0.00000 1886.43184 100.00% strengthening/Rec Dy. Secretary, 11.12.15 2016-17 dt. onstruction of RCD, Chief 13.05.16 Gauriya Karma Jharkhand Engineer (MDR-096) to Ranchi's Lt. (CDO) Kewta Bridge No. 785 (S) RCD (MDR 069) in Km Jharkhand, 0.00 to 10.48 total Ranchi Lt. length 10.48Km) 1396(Enc) for the Year 2015- 16

Page-5 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 6 Widening & - 5.10 Km 3454.7529 23.05.2016 3454.75200 Dt. 1482.03 11SBDof 1478.33260 158.58068 155.48603 1633.81863 100.00% Strengthening of Dy. Secretary, 28.03.16 16-17 dt. Charhi-Ghato RCD, Chief 20.10.16 Road (Total Jharkhand Engineer Length 5.20Km) Ranchi's Lt. (CDO) No. 3228 (S) RCD Jharkhand, Ranchi Lt. 160(Enc)

7 Widening & - 7.965 1338.66900 26.09.2016 1338.66900 Dt. 1295.2908841 01SBDof 1217.61866 213.00000 213.00000 1430.61866 95.00% Variation 17-18 dt. Strengthening/Rec Joint Secretary, 14.09.16 213.00209 05.05.17 onstruction of RCD, Chief 1508.29297 Kallu Chowk Jharkhand Engineer (MDR-07) to Ranchi's Lt. (CDO) Sindur (NH-33) No. 6193 (S) RCD Via Mandai Jharkhand, Khurd Road for Ranchi Lt. the Year 2016-17 918(Enc)

3210.47712 1303.62658 Page-7 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 8 Widening & - 8.070 1876.3510 27.02.2017 1876.35100 Dt. 1676.17365 44(SBD) 0.00000 150.00000 100.00000 100.00000 5.96% Strengthening of Joint Secretary, 11.08.16 of 2017-18 Road from 11th RCD, Chief dt. 14.12.17 Km of NH-33 Jharkhand Engineer Padma Mahal Ranchi's Lt. (CDO) Main Gate (Thana No. 1155 (S) RCD Chowk) to Padma Jharkhand, Bazar Via Hawa Ranchi Lt. Mahal, Block 810(Enc) Office, S. Railway Station with H.C. 9 Widening & - 6.725 1820.8400 28.02.2017 1820.84000 Dt. 1415.652 43(SBD) 440.53940 650.00000 300.00000 740.53940 52.30% Strengthing/Recon Joint Secretary, 14.10.16 dt. 2017-18 struction of RCD, Chief dt. 11.12.17 Shankarpur- Jharkhand Engineer Narsingh Asthan- Ranchi's Lt. (CDO) Kapasia Kundil No. 1187 (S) RCD Bagi (SH-07) with Jharkhand, H.L. Bridge for Ranchi Lt. the Year 216-17 1035(Enc)

Page-9 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 10 Widening & - 16.790 4706.4600 21.09.2016 4706.46000 Dt. 3208.28928 dt. 309.53247 450.00000 446.00000 755.53247 23.40% Strengthening/Rec Joint Secretary, 09.08.16 15.09.2017 onstruction of RCD, Chief 18 SBD of 2017-18 Palma Moskodih- Jharkhand Engineer Choubey- Ranchi's Lt. (CDO) Keshwari road for No. 6036 (S) RCD the Year 2016-17 Jharkhand, Ranchi Lt. 801(Enc)

11 Reconstruction of - 17.825 5877.10300 03.05.2017 5897.10300 Dt.28.11.1 4516.87944 dt. 135.31250 800.00000 421.71305 557.02555 12.33% Ichak more (NH- Joint Secretary, 6 31.10.2017 33) Dumraon RCD, Chief 34 SBD of 2017-18 Bahimar Chowk Jharkhand Engineer PWD Road from Ranchi's Lt. (CDO) Km 0.00 to No. 2440 (S) RCD 17.825 (Total Jharkhand, Length 17.825 Ranchi Lt. Km) under Road 1230(Enc) Divison, Hazaribag for the

Page-11 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 12 Reconstruction of 21.25 6931.03 Joint Secretary, 6931.028 C.E. 5070.72607 16.01.18 of 326.58526 700.00 700.0000 1026.58526 20.22% Ram Nagar to RCD., (CDO) 48(SBD) Charwa Via Jharkhand, Jharkhand, of 2017-18 Bishnupuri, Ranchi Lt. No. Ranchi Lt. Godokhar Salgawan 3055 (S) dt. 1208(Enc) Pelawal, Kasturikhap Sultana 05.06.17 dt. More Road for the 24.11.16 13 Consruction of H.L. 100m 5331.74 Joint Secretary, 5331.74 C.E. 4945.44994 dt. 0 800.00 800.0000 800.0000 16.17% Bridge with Approach RCD., (CDO) 09.11.17 approach road road Jharkhand, Jharkhand, 36(SBD) between Malkana & 7.0Km Ranchi Lt. No. Ranchi Lt. of 2017-18 Larahi at Barhi Revised 3251 (S) dt. 1168 dt. (Chauparan for the Year 2017-18 Length 7.2 13.06.17 13.11.16 Km 14 IRQP work of 1.775 Km 164.921 Dy. Secretary, 164.921 C.E. 146.8325 16.11.17 of 100.0000 46.0000 46.0000 146.0000 100.00% Hazaribag Bagodar RCD., (CDO) 39F2 of Road (MDR-94) (St. Jharkhand, Jharkhand, 2017-18 Columba's College Ranchi Lt. No. Ranchi Lt. to Korrah Chowk) 5049 (S) dt. 1025 (Enc.) from Km 0.00 to 1.775 for the Year 01.09.17 dt. 2016-17 07.10.16

Page-13 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March18 18-19 18-19 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

15 IRQP work of Konar 9.40 Km 679.660 Dy. Secretary, 679.66 C.E. 649.26 15.02.18 of 0.0000 649.2600 649.2600 649.2600 100.00% Bridge to Hawai RCD., (CDO) 49(SBD) Adda road (NH-33) Jharkhand, Jharkhand, 2017-18 Town portion from Ranchi Lt. No. Ranchi Lt. Km 30.15 to 40.35 5473 (S) dt. 1147 (Enc.) for the Year 2016- 17 04.10.17 dt. 19.10.16

Page-15 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March18 18-19 18-19 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 W/S (i) Jack & Jill School 7.047 Km 2853.348 Dy. Secretary, 2853.348 C.E. 1900.27965 dt. 315.70053 800.00 300.0000 615.70053 32.34% to Bisheshwar Dayal Chowk Via Zakir Hussain RCD., (CDO) 21.12.17 Marg, Chhoti Gowal Toli, Jharkhand, Jharkhand, 45(SBD) Gilan Chowk Pustakayan Ranchi Lt. No. Ranchi Lt. of 2017-18 Chowk (1 Km) (ii) Main Road Drug House to 5658 (S) dt. 972 (Enc.) Karzan Statium road 11.10.17 dt. (0.925 Km) (iii) Dipugarha Irrigation 27.07.17 Colony to Canary residential colony Via RWD Circle Office, Divine Mercy Ashram, Police Acadmy on NH-33 (1.525 Km) (iv) Pagoda Chowk to Kallu Chowk Via New area and Jamun tree Lohsingna to Manna Singh Chowk (2.102 Km) (v) Krishnapuri NH-100 to Krishnapuri Talab peripheral road (0.920 Km) and (vi) Heera bag Chowk to Government B. Ed. College road via DVC Chowk (0.575 Km) under Road Division, Hazaribag for the Year 2017-18

6645.88638 5246.56723 Page-17 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 17 IRQP work of 2.00 91.99 Joint Secretary, 90.992 C.E. ------Ananda Chowk to RCD., (CDO) Hurhuru Via Old Jharkhand, Jharkhand, Bus stand Mission Ranchi Lt. No. Ranchi Lt. Hospital from Km 0 3842 (S) dt. 593(Enc) to 2.00 (Total Length 2.00Km) for 03.07.18 dt. the Year 2018-19) 26.04.18

18 IRQP work of Alka 2.00 88.075 Joint Secretary, 88.075 C.E. ------Hotel Chowk to RCD., (CDO) Badha Mahavir Jharkhand, Jharkhand, Mandir Chowk Ranchi Lt. No. Ranchi Lt. Round Via Jhanda 3843 (S) dt. 608(Enc) Chowk, Badha Akhara road from 03.07.18 dt. Km 0.00 to 2.00 07.05.18 (Total Length 2.00Km) for the Year 2018-19

Page-19 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 19 IRQP work of Post 0.525 68.934 Joint Secretary, 68.934 C.E. ------Office Chowk to RCD., (CDO) SBI Main Branch Jharkhand, Jharkhand, from Km 0.00 to Ranchi Lt. No. Ranchi Lt. 0.525 (Total Length 3844 (S) dt. 609(Enc) 0.525 Km) for the Year 2018-19 03.07.18 dt. 05.07.18

20 IRQP work of Lake 7.545 310.947 Joint Secretary, 31.947 C.E. ------Road (MDR 97) RCD., (CDO) (Total Length 7.548 Jharkhand, Jharkhand, KM) for the Year Ranchi Lt. No. Ranchi Lt. 2018-19 3845 (S) dt. 504(Enc) 03.07.18 dt. 19.04.18 21 IRQP work of PWD 2.25 210.26 Joint Secretary, 210.26 C.E. ------chowk to Circuit RCD., (CDO) House Via S.P. Jharkhand, Jharkhand, Residence from Km Ranchi Lt. No. Ranchi Lt. 0 to 2.25 (Total 3871 (S) dt. 601(Enc) Length 2.25Km) for the Year 2018-19 03.07.18 dt. 07.05.18

Page-21 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No

Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial till March18 18-19 18-19 Expenditure Ref No. Ref. No. Ref. No. (11+13) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 22 IRQP work of 7.75 115.404 Joint Secretary, 115.404 C.E. ------Mukundganj Harhad RCD., (CDO) Hupad Via Jharkhand, Jharkhand, Demotand (MDR Ranchi Lt. No. Ranchi Lt. 98) FROM Km 0.00 3873 (S) dt. 697(Enc) to 7.75) Total Length 7.75 Km) for 03.07.18 dt. the Year 2018-19 10.05.18

23 IRQP work of 1.30 37.024 Joint Secretary, 37.024 C.E. ------Kuwan Chowk to RCD., (CDO) Kumahar Toli Pipal Jharkhand, Jharkhand, Chowk from Km Ranchi Lt. No. Ranchi Lt. 0.00 to 1.30 (Total 3872 (S) dt. 629(Enc) Length 1.30 Km) for the Year 2018-19 03.07.18 dt. 10.05.18

Page-23 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Bridge) RCPLWE BRIDGE WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Sanctioned Scheme Total length Administrative approval Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (In M) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure in Total % Financial Ref No. Ref. No. Ref. No. till March16 16-17 16-17 Expenditure Achieve- (11+13) ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 1 Construction of (i) 3 x 21.00 525.30 dt. 22.02.2018 736.39700 07.04.2018 HL Bridge (i) In (ii) 2 x 16.00 Govt. of , CE, CDO, Ranchi Vide Km 13th of Ichak- Ministry of Lt. No. 454 & Barkatha road Rural 453 over Furukka Development (Siwane) River Lt. No. 17.07.18 and (ii) In Km 17024/11(i) 483.05927 3 (SBD) of - - - - - 16th of Barkatha- 2017- 2018-19 Tetraon Road RC(358261) Over Dulki River under RCPLWE for the Year 2018- 19

Page-25 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date in Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 (Y/N)30 31 1 M/s Ganesh 32.25 32.25 32.25 32.25 31.25 - 35 N 98% 05.02.17 31.03.18 IP N iFk dk;Z iw.kZA dk dk;Z fnukad 18-07-2018 ls Yadav, 32.35 32.25 32.25 32.25 32.25 36 Drain izkjEHkA Anandnagar casted P.O.-ISM Drain- 5.8 , Km 6.5 Km Protection wall 1.20Km 1.8 Km

2 M.G. 32.78 32.78 32.78 31.364 31.364 1.416 67 Nos. Y 100% 07.08.17 - CP N Work Complete Contractor 31.364 31.364 1.416 71 Nos. 31.12.17 Land acquisition work in Process 32.78 32.78 32.78 completed Pvt. Ltd., HLB Punchkula, 2/4 Haryana Drain 4.80 5.545

3 M/s Hill 9.8 9.8 9.8 9.8 9.8 - - Y 100% 18.06.17 - CP Y Work Complete Trade R.K. Land acquisition work in Process (JV)

Page-4 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 4 M/s Puja 1.1 Km 1.1 Km 1.1 Km 1.1Km 1.1 Km - - Y 100% 19.08.16 06.12.16 CP N Work complete Enterprises, Agreemented work was done in time. Simaria, Extra work & Electric Shifting work was Chatra. started delayed when it was sanctioned by the department, actually work completed on dated 06.12.2016. Contractor has applied for Sanction of extention of time i.e. under Process..

5 R.K. Infra 10.48 Km 10.48 - 10.48 10.48 0.086 27.00 Y 100% 12.01.17 - CP Y Work complete Corporation 10.48 10.48 10.48 0.086 37.00 Land acquisition work in Process Pvt. Ltd., H. No. 1/172, Dwarka Nagar, Kadapa, Hydrabad

Page-6 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 6 Classic 5.20 5.20 5.20 5.20 5.20 - 3 Nos. Y 100% 19.10.17 - CP N Work complete Engicon Pvt. 5.20 5.20 5.20 5.20 5.20 3.Nos. 31.12.17 Land acquisition work in Process Ltd., Ranchi Culvert complete 3.00 3 No. HL Complete Drain 2.980 Km 2.900 7 M/s 6.834 7.24 6.234 8.09 8.09 1.131 Y 100% 04.11.17 - CP N Work Complete Samleshwari 6.834 7.24 Km 6.234 8.09 8.09 1.131 Road Builders, Bokaro

Page-8 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 8 M/s Sidhartha 2.00 2.00 0.00 - - - 7 - 20% 13.08.19 - IP - Earth work GSB and One Culvert in Construction, 8.07 8.07 8.07 12 Progress. Hazaribag.

9 M/s Sidhartha 5.725 5.700 3.017 2.911 2.53 1.133 9 - 70% 10.04.19 - IP - 9 Nos. Culvert complete, 2.911/4.642 Construction, 6.725 6.725 6.725 4.642 5.725 2.083 18 DBM and 2.53/5.725 BC, 1.133/2.083 Hazaribag. Culvert PQC done in HLB A2 up to Cap and P Complete (3lift) complete work in Progress 1481/4330 m Drain Complete

Page-10 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 10 Hills Trade- 12.00Km 12.00 Km 12.00 - - 6 - 46% 14.01.19 - IP - GSB & WMM work in Progress and RK(JV) 16.79 16.79 16.79 27 04 Nos. Culvert Stone Masonary in Gurgaon Progress

11 M & S 14.00 12.00 1.00 0 0 - 3/44 - 30% 30.01.19 - IP - GSB-12.00 Km, WMM-1.00 Km Company, 17.825 17.825 17.825 17.825 17.825 Culvert, and 5 Nos Culvert in Progress Dumka 0/1HLB

Page-12 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 12 M/s Sidhartha 11.50 11.50 7.70 5.50 0 0 22 - 45% 15.04.19 - IP - BM, WMM, Culvert and Drain, Guard Construction, 21.25 21.25 21.25 21.25 21.25 21.25 49 wall in Progress Hazaribag Drain 2.55 12.201

13 M/s Ganesh 4.50 4.00 - - - - 5 - 25% 08.11.19 - IP - GSB work and One Culvert in Yadav, Anand 7.20 7.20 13 Progress Nagar, Saraidhela, Dhanbad

14 M/s Puja - - - 1.775 1.775 - 1322 - 100% 15.02.18 - IP - Work Complete Enterprises, 1.775 1.775 1600 Simaria, Chatra

Page-14 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date in Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

15 M/s Puja - - - 9.40 9.40 - - - 100% 14.05.18 - IP - Work Complete Enterprises, 9.40 9.40 Simaria, Chatra

Page-16 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BUSG BC (In km) furniture physical Date Date in Progress Bill (In km) (In km) (In km) (Y/N) achievement (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 16 M/s 3.299 3.299 1.085 0.51 0.51 2.154 - - 45% 20.06.18 - IP - (i) In Dipugarha road 1.804/1.804 Shidhartha 7.047 7.047 7.047 PQC done & 0.636/0.636 DBM & BC Construction, done Hazaribag. (ii) Main road Drug House to Karjan Ground Bituminous work 0.570/0.570 and PQC 350/350 done (iii) Krishnapuri road 350m complete R/W Drain work in Progress 440/920 PQC compl. (iv) Heerabag road GSB & WMM, DBM/BC 0.515/0.515 Work complee (v) Jack & Jill Box culvert complete and WMM work in Progress

Page-18 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 17 ------Tender will be received on 13.08.2018

18 ------Tender will be received on 13.08.2018

Page-20 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 19 ------Tender will be received on 13.08.2018

20 ------Tender will be received on 16.08.2018

21 ------Tender will be received on 13.08.2018

Page-22 DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Roads-Plan) STATE PLAN ROAD WORKS Division :- Road Division, Hazaribag District :- Hazaribag

Circle :- Road Circle, Hazaribag Month :-July'18 Sl. Name of Physical Progres Completion Progress No. Contractor

Earth Work G S B WBM/ BM/ SDBC P.Q.C. C.D. (Nos.) Road % Scheduled Revised Completed/ Final Remarks (In km) (In km) WMM BC (In km) furniture Date Date in Progress Bill (In km) BUSG (In km) (Y/N) physical (CP/IP) paid (In km) achievement (Y/N) 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 22 ------Tender will be received on 13.08.2018

23 ------Tender will be received on 13.08.2018

Page-24

Executive Engineer RCD, Road Division, Hazaribag DPW-R ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Bridge-Plan) RCPLWE BRIDGE WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-June'18 Sl. Name of Physical Progres in % Completion Progress No. Contractor Founda- Flooring Pier/ Deck Wearing Railing Approach Bridge Ovell all Scheduled Revised Completed/ Final Remarks tion Abutment Slab Coat furniture Achievement Date Date in Progress Bill (Y/N) (CP/IP) paid 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31

Ramchandra Prasad, H. No. 4A, Mohalla- 1 Budhiadih, ------Agreement Done on 17.07.2018 P.O. & P.S.- Barkatha, Hazaribag.

Executive Engineer RCD, Road Division, Hazaribag

Page-26 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

1 Ordinary repair work in KM - - 10.000 dt. 23.05.18 9.99971 dt. 09.06.18 8.99974 ------2(P) to 5(P), 11(P) and Eng.-in-Chief, E.E., RCD, 21(P) at Dwari Roll road for RCD, Jharkhand Hazaribag ) the Year 2018-19 Ranchi's Lt. No. 3007(S)

2 Ordinary repair work in KM - - 8.000 dt. 23.05.18 7.99361 dt. 15.06.18 7.19425 ------0 to 9.30 of Ichak-Jhumra Eng.-in-Chief, E.E., RCD, road for the year 2018-19 RCD, Jharkhand Road Division, Ranchi's Lt. No. Hazaribag 3007(S)

3 Ordinary repair work in KM - - 15.000 dt. 23.05.18 14.87494 dt. 09.06.2018 13.3874 ------0 to 30.038 of Hazaribag Eng.-in-Chief, E.E., RCD, (St. Columbus College)- RCD, Jharkhand Road Divison, Church Hatyari Road for Ranchi's Lt. No. Hazaribag the Year 2018-19 3007(S)

Page-27 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

4 Ordinary repair work in KM - - 15.000 dt. 23.05.18 14.99944 dt. 09.06.18 13.4995 ------0 to 31.383 of Ichak Eng.-in-Chief, E.E., RCD, Barkatha road for the Year RCD, Jharkhand Road Div., 2018-19 Ranchi's Lt. No. Hazaribag 3007(S)

5 Surface renewal work of - - 18.000 dt. 23.05.18 17.99849 dt. 15.06.18 ------total Length 1.10 Km Eng.-in-Chief, S.E., RCD, Boddom Bzar Mahabir RCD, Jharkhand Road Circle, Mandir to Kallu Chowk for Ranchi's Lt. No. Hazaribag Lt. the Year 2018-19 3007(S) No. 346 (Encl.)

6 Surfce renewal work of - - 50.000 dt. 23.05.18 49.95407 dt. 15.06.18 49.954 ------Total Length 3.00 Km of in Eng.-in-Chief, S.E., RCD, Jain Middle School Chowk RCD, Jharkhand Road Circle, to Bishnupuri chowk Via Ranchi's Lt. No. Hazaribag Lt. Ramnagar Masjid Chowk 3007(S) No. 351 for the Year 2018-19 (Encl.)

Page-29 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

7 Ordinary Repair work in KM - - 15.000 dt. 23.05.18 14.99912 dt. 15.06.18 13.49921 ------0 to 28 of Banaso Eng.-in-Chief, E.E., RCD, Budgadda via Galaobar RCD, Jharkhand Road Div., Penk road for the Year Ranchi's Lt. No. Hazaribag 2018-19 3007(S)

8 Special repair work in - - 40.000 dt. 23.05.18 39.95975 dt. 15.06.18 35.96378 ------Nilamber Pitamber chowk Eng.-in-Chief, S.E., RCD, to SBI Road (230m Length RCD, Jharkhand Road Circle, between Post Office Ranchi's Lt. No. Hazaribag Lt. Chowk to PWD Chowk) for 3007(S) No. 349 the Year 2018-19 (Encl.)

9 Surface renewal work in - - 18.000 dt. 23.05.18 15.19610 dt.15.06.18 13.69649 ------Nilamber Pitamber chowk Eng.-in-Chief, S.E., RCD, to SBI Road (650 m Length RCD, Jharkhand Road Circle, between Nilamber Pitamber Ranchi's Lt. No. Hazaribag Lt. chowk to PWD Chowk) 3007(S) No. 348 (Encl.)

Page-31 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

10 Special repair work in West - - 10.000 dt. 23.05.18 9.97793 dt. 15.06.18 8.98014 ------side and North side Eng.-in-Chief, S.E., RCD, Boundary wall of RCD, Jharkhand Road Circle, Barkagaon Rest Shed for Ranchi's Lt. No. Hazaribag Lt. the Year 2018-19 3007(S) No..347 (Encl.)

11 Special repair work in - - 10.000 dt. 23.05.18 9.99391 dt. 15.06.18 8.16202 ------Barkagaon Rest shed and Eng.-in-Chief, S.E., RCD, Staff quarter for the Year RCD, Jharkhand Road Circle, 2018-19 Ranchi's Lt. No. Hazaribag Lt. 3007(S) No. 350 (Encl.)

12 Special repair work in - - 8.000 dt. 23.05.18 7.99896 dt. 15.06.18 7.19896 ------South side and East side Eng.-in-Chief, S.E., RCD, Boundary wall of Road Sub- RCD, Jharkhand Road Circle, division 2 Office and Ranchi's Lt. No. Hazaribag Lt. Superitendent Engineer 3007(S) No.345 (Encl.) Office, for the Year 2018- 19

Page-33 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

13 Special repair work in - - 8.000 dt. 23.05.18 7.90615 dt. 15.06.18 7.11523 ------Boundary wall of RCD Eng.-in-Chief, S.E., RCD, Hazaribag Inspection RCD, Jharkhand Road Circle, Bunglow for the Year 2018- Ranchi's Lt. No. Hazaribag Lt. 19 3007(S) No. 343 (Encl.)

14 Speical repair work in - - 5.000 dt. 23.05.18 4.99931 dt. 15.06.18 4.49928 ------Kitchen, Pump House and Eng.-in-Chief, S.E., RCD, Garriage of RCD Hazaribag RCD, Jharkhand Road Circle, Inspection Bunglow for the Ranchi's Lt. No. Hazaribag Lt. Year 2018-19 3007(S) No.344 (Encl.)

15 Ordinary repair work in - - 3.500 dt. 23.05.18 3.49764 dt. 15.06.18 3.49764 ------Government Residence of Eng.-in-Chief, E.E., RCD, Executive Engineer, RCD, RCD, Jharkhand Road Div., Road Division, Hazaribag Ranchi's Lt. No. Hazaribag for the Year 2018-19 3007(S)

Page-35 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

16 Special - - 26.927 dt. 23.05.18 26.92700 dt. 15.06.18 24.22593 ------repair/Reconstruction of Eng.-in-Chief, S.E., RCD, Ç'type Quarter Doubl story RCD, Jharkhand Road Circle, Approach road and Ranchi's Lt. No. Hazaribag Lt. Garriage at Zulu Park 3007(S) No. 353 Lakra Godown for the Year (Encl.) 2018-19 17 Special repair work in care - - 8.000 dt. 23.05.18 7.96302 dt.15.06.18 7.96302 dt. - - - - - taker Quarter of RCD, Eng.-in-Chief, S.E., RCD, 17.07.18 Hazaribag Inspection RCD, Jharkhand Road Circle, 6F2 of Bunglow for the Year 2018- Ranchi's Lt. No. Hazaribag Lt. 2018-19 19 3007(S) No. 352 (Encl.)

18 Paver Block work in 1(P) - - 100.000 dt. 23.05.18 99.99709 dt. 13.06.18 89.99738 ------and 2(P) of Hazaribag- Eng.-in-Chief, C.E., RCD, Barkagaon-Tandwa road RCD, Jharkhand Ranchi Lt. No. (Town Portion) for the Year Ranchi's Lt. No. 1051 (Encl.) 2018-19 3007(S)

Page-37 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

19 Paver Block in Bagodar- - - 90.000 dt. 23.05.18 89.94661 dt.13.06.18. 80.95195 ------Hazaribag Road (Korra Eng.-in-Chief, C.E., RCD, Chowk to St. Columbus RCD, Jharkhand Ranchi Lt. No. College More) for the Year Ranchi's Lt. No. 1052 (Encl.) 2018-19 3007(S)

20 Ordinary repair work in - - 15.000 dt. 23.05.18 14.97260 dt.02.07.18 ------town road under Sub Eng.-in-Chief, E.E., RCD, division No. 1 for the Year RCD, Jharkhand Road Div., 2018-19 Ranchi's Lt. No. Hazaribag 3007(S)

21 Ordinary Repair work in - - 16.000 dt. 23.05.18 15.92223 dt. 28.06.18 ------town road under Sub Eng.-in-Chief, E.E., RCD, Division no. 2 for the Year RCD, Jharkhand Road Div., 2018-19 Ranchi's Lt. No. Hazaribag 3007(S)

Page-39 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Sanctioned Scheme Total length Sanctioned Technical Sanction Agreement Financial Progress (In lakh) No Name ID. No. (KM) Amount Date/ Amount Date/ Amount Date/ Expenditure Allotment in Expenditure Total % till March1'8 18-19 in 18-19 Expenditure Financial Ref No. Ref. No. Ref. No. (9+11) Achieve- ment 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15

Under Vivekadhin 1 Painting of Guard wall, Culvert, - - 30.000 dt. 10.05.18 1.28362 Dt. 12.05.18 1.28362 01F2 - 1.28362 1.28362 100% Bridge and Bushes cutting of Secretary, RCD, EE,RCD, ofv2018- Ichak More to Barkatha Road Jharkhand Hazaribag from Km 29 & 30 Under 19 dt. Ranchi's Lt. No. Vivekadhin for the Year 2018- 04.06.18 19 80(S)A

2 Tree reflector in Ichak More - - - dt. 10.05.18 2.42740 Dt. 15.06.18 2.42740 02F2 of - - - - - NH 33 to Barkatha road in Km Secretary, RCD, EE,RCD, 2018-19 21.383 to 31.383 and NH 33 Jharkhand Hazaribag Hawai Adda to Konar Bridge dt. Ranchi's Lt. No. with tree painting under 03.07.18 Vivekadhin for the Year 2018- 80(S)A 19

3 Laying of Paaver block in Flag - - - dt. 10.05.18 2.49507 Dt. 26.06.18 2.49504 05F2 of - - - - - Post Area and infornt of Secretary, RCD, EE,RCD, 2018-19 Portico with approach road of Jharkhand Hazaribag Carrige in Devisional Permises dt. Ranchi's Lt. No. of RCD, Hazaribag of under 17.07.18 Vivekadhin for the Year 2018- 80(S)A 19

Page-41 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

1 M/s Akriti Construction ------,djkjukek dh izfØ;k esaA S/o Suresh Saw, Simaria, Pundra, District-Chatra

2 Sri Sanjay Kumar ------,djkjukek dh izfØ;k esaA S/o Kedarnath Gupta, P.O. & P.S.-Barkatha, Hazaribag.

3 M/s Bisheshwar Yadav & ------,djkjukek dh izfØ;k esaA Construction, Village-Kedarut, P.O.-Devchanda, District-Hazaribag

Page-28 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

4 Sri Jai Prakash Singh, ------,djkjukek dh izfØ;k esaA Nutan Nagar, Jabra, Korra, Hazaribag

5 ------fufonk fuLrkj dh izfØ;k esaA

6 Sri Gaurav Kumar Yadav, ------,djkjukek dh izfØ;k esaA Bara Bazar, Gowaltoli, Hazaribag

Page-30 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

7 Neha Enterprises, ------,djkjukek dh izfØ;k esaA Village-Hethli, P.O.-Chotha, P.S.-Birugarha, District Hazaribag

8 Sri Rakesh Kumar, ------,djkjukek dh izfØ;k esaA Village & P.O.-Korambey, Thana- Gola, District-Ramgarh

9 Vinod Kumar Yadav, ------,djkjukek dh izfØ;k esaA Village-Chichutiya, P.O.-Birani, District Giridih

Page-32. DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

10 M/s Sudama Construction, ------,djkjukek dh izfØ;k esaA Yashwant Nagar, Hazaribag

11 Sri Rakshpal Dangi, ------,djkjukek dh izfØ;k esaA Banshidhar Colony, PTC Chowk, Hazaribag

12 Sri Shankar Dayal Singh, ------,djkjukek dh izfØ;k esaA Village-Kanshar, P.S.-Katkamsandi, Hazaribag

Page-34 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

13 Sri Rajendra Prasad Yadav ------,djkjukek dh izfØ;k esaA Banadag, Sultana, Hazaribag

14 Sri Shambhu Prajapati, Pugmil Road, ------,djkjukek dh izfØ;k esaA Noora, Hazaribag

15 Sri Khemlal Kumar, - - - 16.09.18 - - dk;Z izkjEHkA Pugmil Road, Okni,Hazaribag

Page-36 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

16 Sindhu Construction, ------,djkjukek dh izfØ;k esaA Village-Lutta, P.O.-Kadma, District-Hazaribag.

17 Sri Prabhat Kumar Singh, - - - 16.10.18 - - dk;Z izkjEHkA Suresh Colony, Hazaribag

18 M/s Raj Construction Company, ------,djkjukek dh izfØ;k esaA Birsa Chowk, Hinoo, Ranchi.

Page-38 DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

19 Sri Pankaj Kumar Jha, ------,djkjukek dh izfØ;k esaA H. No. 59, Dipupara, Ranchi

20 ------fufonk fuLrkj dh izfØ;k esaA

21 ------fufonk fuLrkj dh izfØ;k esaA

Page-40

Executive Engineer, RCD, Road Division, Hazaribag DPW-N ROAD CONSTRUCTION DEPARTMENT, JHARKHAND (State Highways Wing) Progress Report of On-going works (Non-Plan) STATE NON-PLAN WORKS Division :- Road Division, Hazaribag District :- Hazaribag Circle :- Road Circle, Hazaribag Month :-July'18

Sl. Name of Contractor Physical Progres Completion Progress Remarks No. Discription of Achievement (Y/N) Road/ % Scheduled Revised Completed/ in Final Bill Bridges Date Date Progress paid (Y/N) furniture physical (CP/IP) achievement 16 17 18 19 20 21 22 23 24 25

Under Vivekadhin 1 Sri Rajendra Yadav, - - 100% 10.06.18 CP Y Work completed Banadag, Hazaribag

2 Sri Virendra Rajak, Hazaribag - - 100% 10.07.18 CP Y Work completed

2 Sri Ravishankar Singh, - - 100% - CP Y Work completed PTC Road, Matwari, Hazaribag

Page-42 Executive Engineer, RCD, Road Division, Hazaribag izi= & 3 egkys[kkdkj dks lefiZr ys[kk ,oa iqujhf{kr QkeZ & 51 dh v|ru fLFkfr ¼foÙkh; o"kZ 2018&19½ ize.My dk uke %& iFk fuekZ.k foHkkx] iFk ize.My] gtkjhckxA Øñlañ ekfld ys[kk dh fooj.kh egkys[kkdkj dk;kZy; ls QkeZ& 51 dh fooj.kh ekgokjh O;; dh fooj.kh 'ks"k jkf'k dh fooj.kh ¼:ñ vH;qfDr ekfld ys[kk dk lR;kiu ¼:ñ yk[k esa½ yk[k esa½ ekg izlax ekg izlax 'kh"kZ 5054 'kh"kZ 3054 'kh"kZ 5054 'kh"kZ 3054 1 2 3 4 5 6 7 8 9 10 11 1- twu*2018 iñ&821-vuqñ ekpZ*2018 rd ebZ*18 iñ&768¼vuq-½ 5257.97523 1.28362 1399.12115 28.71638 - fnñ 09-07-2018 fnñ&27-06-2018 dk;Z en esa izkIr vkoaVu ,oe C;; %& izkIr vkoaVu C;; 'ks"k jkf'k ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼iqy dk;Z½& 0.00000 0.00000 0.00000 ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼iFk dk;Z½& 6657.09638 5257.97523 1399.12115 ;kstuk en&'kh"kZ&5054&iFkksa ds D.P.R. 0.00000 0.00000 0.00000 6657.09638 5257.97523 1399.12115 Utility shifting of Hazaribag-Katkamsandi in KM 4 to 32.2 0.00000 0.00000 0.00000 Utility shifting of Hazaribag-Barkagaon-Tandwa Road in KM 0 to 47.05 0.00000 0.00000 0.00000 5054 Construction of Ring Road 0.00000 0.00000 0.00000 ¼5054½ dqy 6657.09638 5257.97523 1399.12115 ;kstuk en& 'kh"kZ & 5054&lM+ds ,oa iqy ¼csyh czht½& 0.00000 0.00000 0.00000 xSj ;kstuk en & 'kh"kZ & 3054& lM+ds ,oa iqy ,oa ¼foosdk/khu½ 30.00000 1.28362 28.71638 ¼3054½ dqy 30.00000 1.28362 28.716380 LFkkiuk en esa izkIr vkoaVu ,oe C;; izkIr vkoaVu C;; 'ks"k jkf'k 3054 & lM+ds vkSj iqy & osru & 300.00000 86.60053 213.39947 ;k=k C;; & 0.40000 0.06335 0.33665 dk;kZy; C;; & 0.40000 0.40000 0.00000 eksVjxkMh & 0.40000 0.40000 0.00000 nwjHkk"k & 0.15000 0.09982 0.05018 fo|qr & 0.00000 0.00000 0.00000 dk;Zikyd vfHk;ark] ,yñ Vhñ lhñ & 0.00000 0.00000 0.00000 iFk fuekZ.k foHkkx] onhZ & 0.80000 0.00000 0.80000 iFk ize.My] gtkjhckx e'khu ,oa miLdj 0.00000 0.00000 0.00000 Page- 43 lafonk HkÙkk 3.15600 1.92580 1.23020 fof/k izHkkj 0.00000 0.00000 0.00000