ENVIRONMENTAL STATEMENT IN FORM-V (Under Rule-14, Environmental (Protection) Rules, 1986)

(2018-2019)

FOR CLUSTER NO. – 1 (GROUP OF MINES) Area Limited

Prepared at Regional Institute – I Central Mine Planning & Design Institute Ltd. (A Subsidiary of Ltd.) G. T. Road (West End) - 713 304

CMPDI

ISO 9001:2015 Company

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

ENVIRONMENTAL STATEMENT FOR CLUSTER NO. – 1 (GROUP OF MINES)

Environmental statement for the financial year ending 31st March, 2019

FOR THE YEAR: 2018-19

CONTENTS

SL NO. CHAPTER PARTICULARS PAGE NO. 1 CHAPTER-I INTRODUCTION 2-6 2 CHAPTER-II ENVIRONMENTAL STATEMENT FORM-V (PART A TO I) 7-17

LIST OF ANNEXURES

ANNEXURE NO. PARTICULARS PAGE NO. I AMBIENT AIR QUALITY 18-22 II NOISE LEVEL 23 III MINE AND GROUND WATER QUALITY REPORT 24-30 IV GROUNDWATER LEVEL 31

PLATES

I LOCATION PLAN II PLAN SHOWING LOCATION OF MONITORING STATIONS

1

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

CHAPTER – I

INTRODUCTION 1.1 GENESIS: The Gazette Notification vide G.S.R No. 329 (E) dated 13th March, 1992 and subsequently renamed to ‘Environmental Statement’ vide Ministry of Environment & Forests (MOEF), Govt. of India gazette notification No. G.S.R. No. 386 (E) Dtd. 22nd April’93 reads as follows. “Every person carrying on an industry, operation or process requiring consent under section 25 of the Water Act, 1974 or under section 21 of the Air Act, 1981 or both or authorisation under the Hazardous Waste Rules, 1989 issued under the Environmental Protection Act, 1986 shall submit an Environmental Audit Report for the year ending 31st March in Form V to the concerned State Control Board on or before the 30th day of September every year.” In compliance with the above, the work of Environmental Statement for Cluster No. 1 was entrusted to CMPDI by GM (Environment & Forest), Eastern Coalfields Limited.

1.2 PROJECT DESCRIPTION:

Overview of Cluster No. 1: Prior to 2014 – 15, a large number of taken over mines from pre – nationalization period, mostly underground mines, in the old coalfields of Raniganj and did not have environmental clearance from the MoEF&CC and were operating on the basis of “Consents’ received from the respective PCBs. It was felt that if these mines could be brought under the ambit of EC, several measures for environmental protection and pollution control could be put in place. However, the work of obtaining EC for such mines, individually, would have taken a lot of time. To circumvent the problem, it was mooted that since the environmental problems being faced were of regional nature and not confined to individual mines alone, cluster/groups of such mines could be identified for preparing cluster-wise integrated EIA & EMPs, addressing such environmental concerns comprehensively and ensuring effective co-ordination of environmental control measures within each cluster. 13 such clusters were identified in the of ECL and EC has been obtained on the cluster approach for 12 such clusters. Cluster of Mines No. 1 is one of the clusters for which EC has been granted vide letter no. J-11015/78/2011-IA-II. (M) Dated 16thJanuary, 2015 for a combined peak capacity of 3.30 MTY and within a ML area of 3692 Ha. Subsequent to changes in the individual capacities of the mines within the cluster (no change in overall area and capacity of the cluster), EC Amendment was granted vide even letter no. dated 18.12.2017. Cluster No. 1 is located in the western part of Raniganj Coalfield (west of River) in the Block of district of between latitudes 230, 44’ N & 230, 49’ N and longitudes 860, 39’ E & 860, 46’, 30” E. The area is well connected by roads and railways. N.H. – 2 and Eastern Railway Line pass through the cluster. The mines are administratively under of ECL. The cluster is situated close to the DVC Hydel and Thermal Projects of . Location of cluster – 1 is shown in plate no. – 1.

2

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Sl. Name of the Mine Type Lease Peak Production Life Production No. Area Capacity (MTY) (Years) during 2018-19 (Ha) (MT) 1 Hariajam UG UG 316 0.10 > 25 0.06 2 Badjna UG UG 676 0.15 > 25 0.06 3 Chapapur-II UG UG & OC 480 0.75 > 25 0.33 Chapapur OC Patch 4 Khoodia UG UG & OC 186 0.05 > 25 0.04 Khoodia OC Patch 5 Lakhimata UG UG & OC 217 0.95 20 0.08 Lakhimata OC Patch 6 Shampur-B UG UG & OC 368 0.10 >25 0.08 Shampur-B (Sangamahal) OC Patch 7 Mandman UG Amalgamated with UG 345 - - Lakhimata OC 8 Nirsha OC Patch OC 147 0.40 8 0.05 9 Shampur-A UG UG & OC 491 0.20 8 - Shampur-A OC Patch 10 Gopinathpur UG UG & OC 157 0.20 > 25 0.10 Gopinathpur OC Patch 11 Kapasara UG UG & OC 309 0.40 > 25 0.25 Kapasara OC Patch Total 3692 3.30 1.05

1. Hariajam UG In Hariajam UG mine, extraction of coal is being carried out in two seams, namely Brindabanpur (BP) seam and Gopinathpur (GP) Seam. The method of mining adopted in the two seams are development by Bord & Pillar method. In both the seams, SDLs have been deployed for loading of coal into coal tubs. Underground transportation of coal is done by means of haulages.

2. Badjna UG In Badjna UG mine, extraction of coal is being carried out in two seams, namely BP seam and Kalimati Seam. B & P development with SDLs is being done in both the seams. Coal are being loaded by the SDLs onto the coal tubs. Coal tubs are being hauled from underground to the surface by series of haulages.

3. Chapapur – II UG & OC Patch In Chapapur-II UG mine, extraction of coal is being carried out in two seams, namely Kalimati seam and Metadih seam. In both the seams, B & P development with SDLs is being carried out. SDLs load coal onto mine tubs which in turn transported to surface by number of rope haulages. The OC patch has started production using shovel-dumper combination.

4. Khoodia UG & OC Patch In Khoodia UG mine, BP top section is being developed through a pair of drift driven from BP bottom section by Bord and Pillar method maintaining superimposition with B.P. bottom section having a parting of 7m coal. Loading of coal into mine tubs is carried out by deployment of two SDLs. Coal from underground is being transported by a number of haulages. Main surface haulage bring the coal tubs up to the surface.

3

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

5. Lakhimata UG & OC Patch In Lakhimata UG mine, extraction of coal is being carried out in two seams, namely Mugma Special (MS) seam and Local – 1 Seam. Drifts have been driven from B.P.seam to Mugma Special seam and L-1 seam. The method of mining adopted in the two seams are development of panels by Bord & Pillar method. Loading of coal into mine tubs is carried out by deployment of SDLs. Transportation of coal is effected by means of tugger and main haulages. Coal from the underground coal face is hauled up to the surface by series of haulages. There was no production from OC patch during 2018-19.

6. Shampur – B UG & OC Patch In Shampur-B UG mine, extraction of coal is being carried out in GP Seam. At present development is being done in two districts namely East Section and West Section through 5 & 6 incline and 2 & 7 incline respectively. Two SDLs have been deployed in each of the districts. Transportation of coal is from underground to surface is being done by means of haulages.

7. Mandman UG This mine has been amalgamated with Lakhimata UG & OC.

8. Nirsha OC Patch Shovel dumper combination is being used for coal production and OB removal.

9. Shampur – A UG & OC Patch There was no mining activity in the mine during 2018-19.

10. Gopinathpur UG & OC Patch At present, there is no UG mining activity within the Colliery. The OC patch extracts coal from developed GP (T) & GP (B) seams. The conventional shovel dumper system of mining has been adopted for coal production and overburden removal through departmental mode.

11. Kapasara UG & OC Patch At present, there is no UG mining activity within the Colliery. The OC patch extracts coal from BP seam, Local Seam (L1 & L2) and Kalimati (Top & Bottom) Seams. The conventional shovel dumper system of mining has been adopted for coal production and over burden removal through outsourced mode.

4

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

1.3 ENVIRONMENTAL SCENARIO: CMPDI has been engaged to carry out routine Environmental monitoring of the clusters. The monitoring is carried out every fortnight by collecting 24 – hour samples for ambient air at 4 all - weather station, 3 pre-monsoon stations and 3 post-monsoon stations (based on local meteorology) and compared with NAAQS, 2009 for quality. The details of the sampling stations are given below: Cluster 1 Station Type of Station Name of Station Code 1A1 Permanent Air Station Nayadih village near Shampur – A UG 1A2 Permanent Air Station Near Mugma Village 1A3 Permanent Air Station Garphalbari Near Kapasara UG 1A4 Post monsoon Air Station Bharkunrabari village 1A5 Post monsoon Air Station Baraban village 1A6 Post monsoon Air Station Jhukundar village 1A7 Pre monsoon Sanbad village 1A8 Pre monsoon village 1A9 Pre monsoon Tiltoriya village 1A10 Permanent Air Station Mugma III A near Rly siding 9 nos. of samples of mine water are collected and analysed every fortnight and compared with the MoEF Schedule – VI for discharge of effluents into land / streams. A complete analysis of the mine discharge samples which includes heavy metals and salts is carried out twice in a year. Work-place daytime noise level is recorded at 9 locations from the mine pit top (in case of UG mine) and workshops (in case of OC mine) present within the cluster. Groundwater level in the cluster area is monitored by taking measurements at 6 earmarked dugwells in the months of January, May, August and November every year. Samples of groundwater from these wells, which are also utilized by the local population for drinking and other domestic purposes, are analysed once in a year during May and compared with the IS 10500:2012 standards for drinking water quality. Location of the monitoring stations of air, noise & water are shown in Plate- II. The environmental monitoring results for 24 fortnights ending 31st March, 2019 are appended as Annexures – I, II, III and IV. The environmental monitoring results for the year 2018-19 are summarized below:

AMBIENT AIR QUALITY 3 The PM10 concentration was found in the range of 83.1 to 109.7 µg/m and was within the limits as per standards. The PM2.5 concentration was found in the range of 22.6 to 58.7 3 µg/m and was within the standards of NAAQS, 2009.The SO2 concentration remained below 3 3 10.0 µg/m and NOX concentration was in the range of 11.6 to 24.8 µg/m and was within the limit as per the standards.

5

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

ENVIRONMENTAL STANDARDS: Environmental Standards for Ambient Air Quality (AAQ): Environmental standard for Raniganj National Ambient Air Quality Coalfield vide MOEF, Govt. of India, Standards (NAAQS), 2009 for Gazette Notification No. GSR 742 (E) industrial, residential and Station dated 25.09.2000 for 24 hourly samples at rural areas for 24 hours Category 500 meters from dust generating point samples Pollutant Concentration (µg/m3) PM10 SO2 NOx PM2.5 Industrial 300.0 120.0 120.0 60.0 Residential 100.00 80.0 80.0

WATER QUALITY Ground water percolates into working area from the surrounding aquifers which have been exposed due to opencast mining. The mine is dewatered regularly to maintain dry working conditions. This mine discharge water is partly utilized for dust suppression by sprinkling at coal faces and on haul roads and the remainder is discharged onto adjoining cultivable lands for irrigation purposes. Part-B of the Environmental Statement proforma contains the detailed break-up of water consumption. The analysis results reveal that most of the parameters of effluent water are below permissible limits prescribed by Ministry of Environment & Forests (MOEF) as General Standards for Class-‘A’ effluent (Effluent discharged into inland surface water) and below permissible limits prescribed in IS:10500-2012 standards for groundwater quality.

NOISE LEVEL The work-place daytime noise level was found in the range of 60.1 to 71.4 dB (A). The noise level recorded is below permissible limit prescribed by Ministry of Environment and Forest (MOEF). Noise Level Standard as per Noise Pollution (Regulation and Control) Rules, 2000 for different station categories is given below:

Limits for noise (Leq dB (A)) Station Category Day Time (6am-10pm) Night Time (10pm-6am) Industrial 75.0 70.0 Commercial 65.0 55.0 Residential 55.0 45.0

6

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

CHAPTER - II ENVIRONMENTAL STATEMENT FORM– V Environmental statement for the financial year ending March, 2019

PART – A SL. NO. HEADING PARTICULARS (I) NAME AND ADDRESS OF THE PROJECT i Hariajam UG Project Officer, ECL, M/s Hariajam Colliery, P.O. – Nirsa, Dhanbad ii Badjna UG Project Officer, ECL, M/s Badjna Colliery, P.O. – Nirsa, Dhanbad iii Chapapur – II UG & OC Project Officer, ECL, M/s Chapapur Colliery, P.O. – Nirsa, Dhanbad iv Khoodia UG & OC Project Officer, ECL, M/s Khoodia Colliery, P.O. – Nirsa, Dhanbad v Lakhimata UG & OC Project Officer, ECL, M/s Lakhimata Colliery, P.O. – Nirsachatti, Dhanbad vi Shampur – B UG & OC Project Officer, ECL, M/s Shampur B Colliery, P.O. – Mugma, Dhanbad vii Mandaman UG Project Officer, ECL, M/s Mandman Colliery, P.O. – Mugma, Dhanbad viii Nirsha OC Project Officer, ECL, M/s Nirsa Colliery, P.O. – Nirsa, Dhanbad ix Shampur – A UG & OC Project Officer, ECL, M/s Shampur A Colliery, P.O. – Mugma, Dhanbad x Gopinathpur UG & OC Project Officer, ECL, M/s Gopinathpur Colliery, P.O. – Nirsa, Dhanbad xi Kapasara UG & OC Project Officer, ECL, M/s Kapasara Colliery, P.O. – Mugma, Dhanbad (II) INDUSTRY CATEGORY All mines of the cluster fall in red category (III) PRODUCTION CAPACITY 3.30 MTY (IV) YEAR OF ESTABLISHMENT All the mines within the cluster are taken over mines from pre- nationalisation period. (V) DATE OF THE LAST 29.09.2018 ENVIRONMENTAL STATEMENT SUBMITTED

PART – B WATER AND RAW MATERIAL CONSUMPTION (I) WATER CONSUMPTION (Cu.m/day) 1. Hariajam UG

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 5.0 5.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water and Bhar system) 150.0 150.0 TOTAL 155.0 155.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 0.07 0.08

7

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

2. Badjna UG

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 40.0 5.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water and well water) 265.0 265.0 TOTAL 323.0 270.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 0.68 0.08

3. Chapapur – II UG & OC

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 170.0 170.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water) 260.0 260.0 TOTAL 420.0 420.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 1.39 0.51

4. Khoodia UG

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 30.0 5.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water) 100.0 102.0 TOTAL 130.0 107.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 0.85 0.12

8

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

5. Lakhimata UG & OC

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 18.0 6.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water) 205.0 105.0 TOTAL 205.0 111.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 0.23 0.07

6. Shampur – B UG & OC

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 3.0 2.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine water) 71.0 70.0 TOTAL 74.0 72.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 0.04 0.02

7. Nirsha OC

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) - 10.0 B. COOLING (in radiators of trucks/HEMM/workshop) - 0.0 C. DOMESTIC (Mine water) - 95.0 TOTAL - 105.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal - 0.18

8. Gopinathpur UG & OC

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 260.0 100.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water) 3290.0 4.0 TOTAL 3550.0 104.0

9

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 1.50 0.95

9. Kapasara UG & OC

Sl. No. Particulars 2017-18 2018-19 A. MINING (Dust suppression, Firefighting, Others) 94.0 44.0 B. COOLING (in radiators of trucks/HEMM/workshop) 0.0 0.0 C. DOMESTIC (Mine Water and DVC supply) 540.0 540.0 TOTAL 540.0 588.0

Name of Process water consumption Product per unit of product output (l/day/te) 2017-18 2018-19 Coal 0.30 0.20

(II) RAW MATERIAL CONSUMPTION : 1. Hariajam UG

Name of raw Name of Consumption of raw material per material products unit of product (2017-18) (2018-19) 1. Explosive Coal 0.565 kg/te 0.55 kg/te 2. Diesel 0.087 l/te 0.08 l/te 3. Lubricants 0.098 l/te 0.09 l/te

2. Badjna UG

Name of raw Name of Consumption of raw material per material products unit of product (2017-18) (2018-19) 1. Explosive 0.432 kg/te 0.44 kg/te 2. Diesel Coal 0.081 l/te 0.08 l/te 3. Lubricants 0.134 lte 0.09 lte

3. Chapapur – II UG & OC

Name of raw Name of Consumption of raw material per material products unit of product (2017-18) (2018-19) 1. Explosive 13.62 kg/te 3.14 kg/te 2. Diesel Coal 0.043 l/te 0.01 l/te 3. Lubricants 0.016 l/te 1625 litres* *Consumption for the whole year is given

10

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

4. Khoodia UG & OC

Name of raw Name of Consumption of raw material per material products unit of output (2017-18) (2018-19) 1. Explosive 0.49 kg/te 0.39 kg/te 2. Diesel Coal 0.012 l/te 0.05 l/te 3. Lubricants 0.071 l/te 0.50 g/te* *Lubricants (Grease)

5. Lakhimata UG & OC

Name of raw Name of Consumption of raw material per material products unit of output (2017-18) (2018-19) 1. Explosive 0.357 kg/te 0.33 kg/te 2. Diesel Coal 0.041 l/te 0.04 l/te 3. Lubricants 0.02 l/te 0.53 g/te* *Lubricants (Grease)

6. Shampur – B UG & OC

Name of raw Name of Consumption of raw material per material products unit of output (2017-18) (2018-19) 1. Explosive 0.39 kg/te 0.35 kg/te 2. Diesel Coal 0.017 l/te 0.08 l/te 3. Lubricants 0.007 l/te 0.96 g/te* *Lubricants (Grease)

7. Nirsha OC

Name of raw Name of Consumption of raw material per material products unit of output (2017-18) (2018-19) 1. Explosive - 1.08 kg/te 2. Diesel Coal - - 3. Lubricants - -

8. Gopinathpur UG & OC

Name of raw Name of Consumption of raw material per material products unit of output (2017-18) (2018-19) 1. Explosive Coal 1.57 kg/te 1.35 kg/te 2. Diesel 0.45 l/te 0.78 l/te 3. Lubricants 0.04 l/te 0.04 l/te

11

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

9. Kapasara UG & OC

Name of raw Name of Consumption of raw material per material products unit of output (2017-18) (2018-19) 1. Explosive 0.211 kg/te 1.69 kg/te 2. Diesel Coal Hired OC Patch 3. Lubricants

PART – C POLLUTION GENERATED Mine Pollution Quantity of pollutants discharged Concentration of Percentage variation (mass/day) pollutants discharged from prescribed (mass/volume) standards with reasons Hariajam UG WATER* - AIR** Total pollutant load of PM10 is 8.48 kg/day while it is around 1.78 kg/day for PM2.5. Badjna UG WATER* Average concentration of 19.0 mg/l. Mine water discharged is 1000 KL/day. Hence, total load is 19.0 kg/day. AIR** Total pollutant load of PM10 is 13.35 kg/day while it is 2.80 kg/day for PM2.5. Chapapur – II UG WATER* - & OC AIR** Total pollutant load of PM10 is 245.27 1. The analysis results kg/day while it is around 51.51 kg/day for reveal that most of the PM2.5. parameters are below Khoodia UG & OC WATER* - 1. Mine water discharge permissible limits AIR** Total pollutant load of PM10 is 1.77 kg/day Analysis results are given prescribed by MoEF as while it is around 0.37 kg/day for PM2.5. in Annexure-III. General Standards for class Lakhimata UG & WATER* - 2. The main air pollutant is ‘A’ effluent (Effluent OC AIR** Total pollutant load of PM10 is 5.50 kg/day suspended PM10 and discharged into inland while it is around 1.15 kg/day for PM2.5. PM2.5. The air quality surface water). Shampur – B UG & WATER* - results are appended as 2. Ambient air quality OC AIR** Total pollutant load of PM10 is 7.68 kg/day Annexure-I. results show that the while it is around 1.16 kg/day for PM2.5. values of PM10, PM2.5, SO2 Nirsha OC WATER* - and NOx are well within the AIR** Total pollutant load of PM10 is 61.77 prescribed standards. kg/day while it is around 12.97 kg/day for PM2.5. Gopinathpur UG & WATER* - OC AIR** Total pollutant load of PM10 is 180.36 kg/day while it is around 37.88 kg/day for PM2.5. Kapasara UG & OC WATER* - AIR** Total pollutant load of PM10 is 218.89 kg/day while it is 45.97 kg/day for PM2.5. *Water discharged from the mine contains pollutants in the form of suspended solids (mostly fine coal dust). **PM10 and PM2.5 estimation has been done using empirical formula by using Emission Factors derived from S&T studies done by CMPDI.

12

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

PART – D HAZARDOUS WASTE (As specified under Hazardous Waste (Management and Handling) Rules, 1989) 1. Hariajam UG

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 3210 litres 2530 litres ii)Lead-Acid Batteries a. Automobile batteries Nil - Dealt in Part – F b. Cap-lamp batteries 50 nos. Nil iii) Used Cotton waste 10 kg 15 kg iv) Metal Scrap Nil -

2. Badjna UG

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 6000 litres 282 litres ii)Lead-Acid Batteries a. Automobile batteries 03 nos. - Dealt in Part – F b. Cap-lamp batteries 495 nos. 100 Nos. iii) Used Cotton waste 20 kg 10 kg iv) Metal Scrap Nil -

3. Chapapur – II UG & OC Patch

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 870 litres 1624 litres ii)Lead-Acid Batteries a. Automobile batteries 2 nos. - Dealt in Part – F b. Cap-lamp batteries 200 nos. 65 Nos. iii) Used Cotton waste 15 kg 18 kg iv) Metal Scrap Nil -

4. Khoodia UG & OC

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 1850 litres 511 litres ii)Lead-Acid Batteries a. Automobile batteries Nil - Dealt in Part – F b. Cap-lamp batteries 120 nos. 45 nos. iii) Used Cotton waste Nil 1.10 kg iv) Metal Scrap Nil Nil

13

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

5. Lakhimata UG & OC

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 2350 litres 547 litres ii)Lead-Acid Batteries a. Automobile batteries Nil - Dealt in Part – F b. Cap-lamp batteries Nil Nil iii) Used Cotton waste Nil 1.20 kg iv) Metal Scrap Nil Nil

6. Shampur – B UG & OC

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 2800 litres 584 litres ii)Lead-Acid Batteries a. Automobile batteries Nil - Dealt in Part – F b. Cap-lamp batteries Nil Nil iii) Used Cotton waste 10 kg 1 kg iv) Metal Scrap Nil Nil

7. Nirsha OC

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil - ii)Lead-Acid Batteries c. Automobile batteries - - Dealt in Part – F d. Cap-lamp batteries Nil iii) Used Cotton waste 5 kg iv) Metal Scrap -

8. Gopinathpur UG & OC

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil 2473 litres - ii)Lead-Acid Batteries a. Automobile batteries 2 nos. 7 nos. Dealt in Part – F b. Cap-lamp batteries Nil Nil iii) Used Cotton waste 250 kg - iv) Metal Scrap 16 T -

14

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

9. Kapasara UG & OC

Hazardous waste Total quantity Disposal method (2017-18) (2018-19) A) From process i)Used oil Nil ii)Lead-Acid Batteries a. Automobile batteries Nil - Dealt in Part – F b. Cap-lamp batteries Nil iii) Used Cotton waste Nil iv) Metal Scrap Nil Approximate values may be given where actual values are not available. Note: a) The detail of used oil is to be given to concerned Pollution Control Board in Form- 13 as per time mentioned in HW (M & H), Amendment Rules, 2003. b) The detail of disposal of Lead Acid batteries is to be given to concerned State Pollution Control Board in Form-VIII as per time mentioned in Batteries (M&H) Rules, 2001.

PART – E SOLID WASTE

Particulars Name of Mine Total quantity (In Million Cu.m) During previous During current financial year financial year (2017-18) (2018-19) Chapapur – II OC 0.505 1.61 a) From process Gopinathpur OC 0.517 0.62 (Mining) Kapasara OC 0.396 0.83 Nirsha OC - 0.18 Chapapur – II OC - - b) From pollution Gopinathpur OC Nil Nil control facilities Kapasara OC Nil Nil Nirsha OC - - Chapapur – II OC 0.476 - c) Quantity recycled or Gopinathpur OC 0.403 0.52 reutilized/back filled Kapasara OC 0.396 0.20 Nirsha OC - -

PART – F PLEASE SPECIFY THE CHARACTERISTICS (IN TERMS OF CONCENTRATION AND QUANTUM) OF HAZARDOUS AS WELL AS SOLID WASTE AND INDICATE THE DISPOSAL PRACTICE ADOPTED FOR BOTH THESE CATEGORIES OF WASTE. Hazardous waste generated is given in the table PART-D which has been deposited at area store disposal stock yard. Used oil is re-used as lubricants of pulleys, wheel and axle of coal tubs. Cap lamp batteries, HEMM batteries and metal scrap are stored at area store and auctioned to authorized recyclers. Cotton waste are re-used for other purposes, if required.

15

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

PART – G IMPACT OF POLLUTION CONTROL MEASURES ON CONSERVATION OF NATURAL RESOURCES AND CONSEQUENTLY ON COST OF PRODUCTION. In order to carry out mining in an eco-friendly manner following pollution control measures have been implemented. 1. CONTROL MEASURES: a) Wet coal transport, road maintenance is being done. b) Trucks carrying coal to the railway sidings are covered with tarpaulin to avoid spillage. c) Regular sprinkling of water at coal loading & discharge points with the help of stand post at Railway siding. d) Regular water sprinkling is done along the haul road and coal transport route to reduce dust. e) Total plantation carried out in the cluster till 2018-19 is 168.70 Ha covering ML areas and external & internal dumps. f) Routine monitoring of air quality is being done by CMPDI and based on the results, additional mitigation measures will be taken, if required. g) Plantation will be carried out as per the proposed programme in future.

2. WATER POLLUTION CONTROL MEASURES: (for Mine/CHP/Workshop/Colony discharge water) a) Pressure filter plant is installed for supply of mine water to colonies of Badjna UG. After settling in pond, the remaining mine water is being discharged to nearby Pusai River. b) In Hariajam UG, underground sump is used as settling tank for mine water. c) Excess mine water is stored in abandoned quarries and then discharged to the nearby river after settling in Mandman UG & Gopinathpur OC. d) Filter plant has been installed at Lakhimata colliery for supplying water to local inmates. e) Filter plant is under construction at Khoodia colliery for supplying filtered water to the attached colonies for domestic uses. f) Settling tank has been provided in Chapapur – II colliery for sedimentation of mine discharge water. g) The waste water discharged from the colonies are routed through pipelines to Reliance quarry which is used as septic tank in Kapasara colliery. h) Routine monitoring of mine discharge water and groundwater is being carried out by CMPDI.

3. NOISE POLLUTION CONTROL MEASURES: a) Regular maintenance of machines and other equipment at Bunker and workshop including mine fan. b) Providing green belt around core activity area, along road side in colony and in other vacant space. c) All HEMM & light vehicle are provided with silencers. d) Noise monitoring is being carried out regularly.

4. LAND RESOURCE MANAGEMENT: a) Part of OB generated during mining activities is being backfilled and technical reclamation is done. After completion of technical reclamation, biological reclamation will be done.

16

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

PART – H ADDITIONAL INVESTMENT PROPOSAL FOR ENVIRONMENTAL PROTECTION INCLUDING ABATEMENT OF POLLUTION. a) Plantation will be carried out as per proposed plan in future. b) Solar lighting have been provided in Badjna UG, Hariajam UG, Shyampur – B UG and Lakhimata UG. c) Rainwater harvesting is being undertaken at some of the mines within the cluster. d) The Environmental monitoring of the cluster will be continued fortnightly as per the guidelines of Ministry of Environment, Forests & Climate Change (MoEF& CC).

PART – I ANY OTHER PARTICULAR IN RESPECT OF ENVIRONMENTAL PROTECTION AND ABATMENT OF POLLUTION. The Environmental Monitoring is carried out fortnightly for the project by CMPDI, RI-I as per the guideline of Ministry of Environment and Forest (MOEF) and based on the result thereof; colliery takes necessary action if needed.

17

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Annexure – I AMBIENT AIR QUALITY

Cluster Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX No No Sampling 1 1A1 In Nayadih village near April First 04-Apr-18 93.2 36.8 <10.0 15.6 Shampur - A 1 1A1 In Nayadih village near April Second 28-Apr-18 93.4 36.6 <10.0 15.8 Shampur - A 1 1A1 In Nayadih village near May First 03-May-18 94.5 36.9 <10.0 15.9 Shampur - A 1 1A1 In Nayadih village near May Second 24-May-18 94.6 36.7 <10.0 15.8 Shampur - A 1 1A1 In Nayadih village near June First 08-Jun-18 93.5 36 <10.0 15.4 Shampur - A 1 1A1 In Nayadih village near June Second 25-Jun-18 93.3 35.5 <10.0 15.2 Shampur - A 1 1A1 In Nayadih village near July First 05-Jul-18 92.2 33.7 <10.0 14.4 Shampur - A 1 1A1 In Nayadih village near July Second 17-Jul-18 91.3 33.2 <10.0 14.1 Shampur - A 1 1A1 In Nayadih village near August First 04-Aug-18 89 31.7 <10.0 13.2 Shampur - A 1 1A1 In Nayadih village near August Second 16-Aug-18 89 31.7 <10.0 13.2 Shampur - A 1 1A1 In Nayadih village near September First 01-Sep-18 88.2 30.8 <10.0 13 Shampur - A 1 1A1 In Nayadih village near September Second 25-Sep-18 88.4 30.6 <10.0 12.6 Shampur - A 1 1A1 In Nayadih village near October First 01-Oct-18 89.6 30.8 <10.0 13.4 Shampur - A 1 1A1 In Nayadih village near October Second 23-Oct-18 90.2 31.2 <10.0 13.5 Shampur - A 1 1A1 In Nayadih village near November First 08-Nov-18 91.4 32.3 <10.0 13.8 Shampur - A 1 1A1 In Nayadih village near November Second 21-Nov-18 91.8 32.4 <10.0 13.6 Shampur - A 1 1A1 In Nayadih village near December First 03-Dec-18 92.5 33.3 <10.0 14.5 Shampur - A 1 1A1 In Nayadih village near December Second 18-Dec-18 92.8 33.7 <10.0 14.8 Shampur - A 1 1A1 In Nayadih village near January First 03-Jan-19 93.2 35.6 <10.0 16.4 Shampur - A 1 1A1 In Nayadih village near January Second 30-Jan-19 93.3 39.8 <10.0 17.8 Shampur - A 1 1A1 In Nayadih village near February First 04-Feb-19 93.4 43.6 <10.0 19.8 Shampur - A 1 1A1 In Nayadih village near February Second 19-Feb-19 93.5 41.7 <10.0 21.7 Shampur - A 1 1A1 In Nayadih village near March First 04-Mar-19 94.4 48.2 <10.0 22.6 Shampur - A 1 1A1 In Nayadih village near March Second 18-Mar-19 94.6 51.3 <10.0 23.1 Shampur - A 1 1A10 Mugma III A near April First 03-Apr-18 109.6 48.4 <10.0 18.2 Railway siding 1 1A10 Mugma III A near April Second 30-Apr-18 108.8 49 <10.0 18 Railway siding 1 1A10 Mugma III A near May First 07-May-18 109.7 49.7 <10.0 18.6 Railway siding

18

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX No No Sampling 1 1A10 Mugma III A near May Second 24-May-18 109.6 49.8 <10.0 18 Railway siding 1 1A10 Mugma III A near June First 15-Jun-18 108.4 48 <10.0 17.6 Railway siding 1 1A10 Mugma III A near June Second 25-Jun-18 108.2 48.1 <10.0 17.2 Railway siding 1 1A10 Mugma III A near July First 05-Jul-18 99.6 43.7 <10.0 16.1 Railway siding 1 1A10 Mugma III A near July Second 23-Jul-18 97.3 41.2 <10.0 15.3 Railway siding 1 1A10 Mugma III A near August First 13-Aug-18 93.5 36.8 <10.0 14.5 Railway siding 1 1A10 Mugma III A near August Second 17-Aug-18 93.5 36.8 <10.0 14.5 Railway siding 1 1A10 Mugma III A near September First 06-Sep-18 93.2 35.4 <10.0 14.7 Railway siding 1 1A10 Mugma III A near September Second 18-Sep-18 93.6 35.2 <10.0 14.2 Railway siding 1 1A10 Mugma III A near October First 09-Oct-18 95.9 36.8 <10.0 14.8 Railway siding 1 1A10 Mugma III A near October Second 30-Oct-18 97.4 37.2 <10.0 15 Railway siding 1 1A10 Mugma III A near November First 05-Nov-18 98.2 37.5 <10.0 15.3 Railway siding 1 1A10 Mugma III A near November Second 21-Nov-18 98.5 37.8 <10.0 15.5 Railway siding 1 1A10 Mugma III A near December First 03-Dec-18 99.6 37.4 <10.0 15.8 Railway siding 1 1A10 Mugma III A near December Second 19-Dec-18 99.8 37.7 <10.0 17.1 Railway siding 1 1A10 Mugma III A near January First 01-Jan-19 99.7 38.4 <10.0 14.3 Railway siding 1 1A10 Mugma III A near January Second 31-Jan-19 99.5 35.8 <10.0 15.4 Railway siding 1 1A10 Mugma III A near February First 01-Feb-19 99.6 41.3 <10.0 18.6 Railway siding 1 1A10 Mugma III A near February Second 20-Feb-19 99.7 41.7 <10.0 17.4 Railway siding 1 1A10 Mugma III A near March First 06-Mar-19 105.6 55.8 <10.0 21.3 Railway siding 1 1A10 Mugma III A near March Second 19-Mar-19 106.2 58.7 <10.0 22.6 Railway siding 1 1A2 Near Mugma Village April First 05-Apr-18 92.8 36.5 <10.0 15 1 1A2 Near Mugma Village April Second 28-Apr-18 93 36.4 <10.0 15.2 1 1A2 Near Mugma Village May First 11-May-18 94.1 36.6 <10.0 15.4 1 1A2 Near Mugma Village May Second 25-May-18 94.2 36.4 <10.0 15.2 1 1A2 Near Mugma Village June First 15-Jun-18 93.2 36.1 <10.0 15.2 1 1A2 Near Mugma Village June Second 22-Jun-18 93 35.8 <10.0 15 1 1A2 Near Mugma Village July First 05-Jul-18 91.4 33.2 <10.0 14.1 1 1A2 Near Mugma Village July Second 17-Jul-18 90.2 31.7 <10.0 13.8 1 1A2 Near Mugma Village August First 04-Aug-18 88.1 30.2 <10.0 13 1 1A2 Near Mugma Village August Second 16-Aug-18 88.1 30.2 <10.0 13 1 1A2 Near Mugma Village September First 01-Sep-18 87.6 30 <10.0 12.8 1 1A2 Near Mugma Village September Second 26-Sep-18 87.2 30.2 <10.0 12.5 1 1A2 Near Mugma Village October First 01-Oct-18 88.5 30.6 <10.0 13.2 1 1A2 Near Mugma Village October Second 23-Oct-18 89.1 30.8 <10.0 13.4 1 1A2 Near Mugma Village November First 08-Nov-18 90.2 31.3 <10.0 13.7 1 1A2 Near Mugma Village November Second 21-Nov-18 90.5 31.5 <10.0 13.8

19

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX No No Sampling 1 1A2 Near Mugma Village December First 03-Dec-18 91.2 32.5 <10.0 14.8 1 1A2 Near Mugma Village December Second 18-Dec-18 91.4 32.9 <10.0 14.9 1 1A2 Near Mugma Village January First 03-Jan-19 92.6 38.9 <10.0 15.8 1 1A2 Near Mugma Village January Second 30-Jan-19 92.7 37.4 <10.0 19.3 1 1A2 Near Mugma Village February First 04-Feb-19 92.8 41.6 <10.0 18.7 1 1A2 Near Mugma Village February Second 19-Feb-19 92.9 42.8 <10.0 20.6 1 1A2 Near Mugma Village March First 04-Mar-19 93.5 49.9 <10.0 21.3 1 1A2 Near Mugma Village March Second 18-Mar-19 93.8 54.2 <10.0 22.3 1 1A3 In Garphalbari Near April First 04-Apr-18 90.4 35.7 <10.0 14.9 Kapasara UG 1 1A3 In Garphalbari Near April Second 30-Apr-18 90.6 35.8 <10.0 15 Kapasara UG 1 1A3 In Garphalbari Near May First 03-May-18 91.2 36 <10.0 15.1 Kapasara UG 1 1A3 In Garphalbari Near May Second 25-May-18 91.6 36.2 <10.0 15 Kapasara UG 1 1A3 In Garphalbari Near June First 15-Jun-18 90.4 35.7 <10.0 15 Kapasara UG 1 1A3 In Garphalbari Near June Second 30-Jun-18 90.2 35.6 <10.0 14.8 Kapasara UG 1 1A3 In Garphalbari Near July Second 17-Jul-18 87.3 32 <10.0 13.2 Kapasara UG 1 1A3 In Garphalbari Near August First 04-Aug-18 84.8 30.3 <10.0 12.8 Kapasara UG 1 1A3 In Garphalbari Near August Second 17-Aug-18 84.8 30.3 <10.0 12.8 Kapasara UG 1 1A3 In Garphalbari Near September First 03-Sep-18 84.1 29.7 <10.0 12.5 Kapasara UG 1 1A3 In Garphalbari Near September Second 17-Sep-18 84 29.5 <10.0 12.3 Kapasara UG 1 1A3 In Garphalbari Near October First 15-Oct-18 87.3 30.2 <10.0 13.3 Kapasara UG 1 1A3 In Garphalbari Near October Second 30-Oct-18 87.9 30.9 <10.0 13.8 Kapasara UG 1 1A3 In Garphalbari Near November First 05-Nov-18 88.5 31.2 <10.0 14.1 Kapasara UG 1 1A3 In Garphalbari Near November Second 17-Nov-18 88.7 31.6 <10.0 14.2 Kapasara UG 1 1A3 In Garphalbari Near December First 03-Dec-18 90.3 34.6 <10.0 15.1 Kapasara UG 1 1A3 In Garphalbari Near December Second 18-Dec-18 90.5 35.2 <10.0 15.6 Kapasara UG 1 1A3 In Garphalbari Near January First 03-Jan-19 91.2 41.3 <10.0 17.2 Kapasara UG 1 1A3 In Garphalbari Near January Second 31-Jan-19 91.4 40.6 <10.0 18.6 Kapasara UG 1 1A3 In Garphalbari Near February First 04-Feb-19 91.5 42.8 <10.0 19.5 Kapasara UG 1 1A3 In Garphalbari Near February Second 19-Feb-19 91.6 43.1 <10.0 19.8 Kapasara UG 1 1A3 In Garphalbari Near March First 05-Mar-19 92.7 46.3 <10.0 24.8 Kapasara UG 1 1A3 In Garphalbari Near March Second 18-Mar-19 93.2 50.5 <10.0 21.7 Kapasara UG 1 1A4 In Bharkunrabari village October First 11-Oct-18 86.5 29.5 <10.0 13.2 1 1A4 In Bharkunrabari village October Second 26-Oct-18 86.9 30.2 <10.0 13.5 1 1A4 In Bharkunrabari village November First 05-Nov-18 87.5 30.8 <10.0 13.9 1 1A4 In Bharkunrabari village November Second 17-Nov-18 87.8 30.5 <10.0 14

20

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX No No Sampling 1 1A4 In Bharkunrabari village December First 05-Dec-18 88.9 31.2 <10.0 14.5 1 1A4 In Bharkunrabari village December Second 18-Dec-18 89.2 31.7 <10.0 14.9 1 1A4 In Bharkunrabari village January First 01-Jan-19 89.8 37.6 <10.0 15.1 1 1A4 In Bharkunrabari village January Second 30-Jan-19 89.9 37.3 <10.0 16.8 1 1A4 In Bharkunrabari village February First 01-Feb-19 90.1 40.8 <10.0 17.5 1 1A4 In Bharkunrabari village February Second 19-Feb-19 90.3 40.6 <10.0 20.4 1 1A4 In Bharkunrabari village March First 06-Mar-19 91.5 41.7 <10.0 20.6 1 1A4 In Bharkunrabari village March Second 19-Mar-19 91.8 42.6 <10.0 20.8 1 1A5 In Baraban village October First 11-Oct-18 85.3 29.4 <10.0 13 1 1A5 In Baraban village October Second 26-Oct-18 86 29.8 <10.0 13.2 1 1A5 In Baraban village November First 08-Nov-18 86.8 30.2 <10.0 13.5 1 1A5 In Baraban village November Second 17-Nov-18 87.2 30.5 <10.0 13.7 1 1A5 In Baraban village December First 05-Dec-18 88.4 22.6 <10.0 14.7 1 1A5 In Baraban village December Second 19-Dec-18 88.7 32.9 <10.0 14.8 1 1A5 In Baraban village January First 01-Jan-19 89.3 34.8 <10.0 13.6 1 1A5 In Baraban village January Second 29-Jan-19 89.5 37.8 <10.0 16.3 1 1A5 In Baraban village February First 01-Feb-19 89.6 39.6 <10.0 18.2 1 1A5 In Baraban village February Second 20-Feb-19 89.7 37.8 <10.0 19.8 1 1A5 In Baraban village March First 05-Mar-19 90.6 41.3 <10.0 19.4 1 1A5 In Baraban village March Second 19-Mar-19 91.1 43.6 <10.0 18.7 1 1A6 In Jhukundar village October First 04-Oct-18 86.3 30.2 <10.0 13.4 1 1A6 In Jhukundar village October Second 30-Oct-18 86.5 30.6 <10.0 13.6 1 1A6 In Jhukundar village November First 08-Nov-18 87.2 30.9 <10.0 13.8 1 1A6 In Jhukundar village November Second 21-Nov-18 87.8 31.2 <10.0 13.9 1 1A6 In Jhukundar village December First 03-Dec-18 89 31.8 <10.0 15.1 1 1A6 In Jhukundar village December Second 19-Dec-18 89.2 31.9 <10.0 15.3 1 1A6 In Jhukundar village January First 01-Jan-19 89.7 36.9 <10.0 14.8 1 1A6 In Jhukundar village January Second 29-Jan-19 89.9 36.4 <10.0 15.7 1 1A6 In Jhukundar village February First 01-Feb-19 89.9 40.4 <10.0 17.7 1 1A6 In Jhukundar village February Second 20-Feb-19 90.2 39.8 <10.0 18.7 1 1A6 In Jhukundar village March First 06-Mar-19 91.7 42 <10.0 18.3 1 1A6 In Jhukundar village March Second 19-Mar-19 91.9 42.7 <10.0 19.6 1 1A7 Sanbad village April First 04-Apr-18 88.6 35 <10.0 14.8 1 1A7 Sanbad village April Second 25-Apr-18 88.9 35.4 <10.0 15.2 1 1A7 Sanbad village May First 03-May-18 89.4 36.1 <10.0 15 1 1A7 Sanbad village May Second 26-May-18 90.1 36 <10.0 15.2 1 1A7 Sanbad village June First 12-Jun-18 89.6 35.4 <10.0 14.8 1 1A7 Sanbad village June Second 22-Jun-18 89.2 35 <10.0 14.5 1 1A7 Sanbad village July First 05-Jul-18 87.5 33.1 <10.0 13.6 1 1A7 Sanbad village July Second 27-Jul-18 87 32.3 <10.0 13 1 1A7 Sanbad village August First 04-Aug-18 83.9 30 <10.0 12.3 1 1A7 Sanbad village August Second 28-Aug-18 83.9 30 <10.0 12.3 1 1A7 Sanbad village September First 03-Sep-18 83.2 29.6 <10.0 12.2 1 1A7 Sanbad village September Second 17-Sep-18 83.1 29.3 <10.0 12 1 1A8 Panrra village April First 12-Apr-18 92.6 36.4 <10.0 15.6 1 1A8 Panrra village April Second 30-Apr-18 93.2 36.9 <10.0 15.8 1 1A8 Panrra village May First 11-May-18 94.2 37.2 <10.0 16.1 1 1A8 Panrra village May Second 24-May-18 94.4 37.4 <10.0 15.8 1 1A8 Panrra village June First 08-Jun-18 92.8 36.2 <10.0 14.6 1 1A8 Panrra village June Second 30-Jun-18 91.7 35.6 <10.0 15.2 1 1A8 Panrra village July First 04-Jul-18 88.6 32.8 <10.0 13.4 1 1A8 Panrra village July Second 27-Jul-18 87.3 32 <10.0 12.8 1 1A8 Panrra village August First 13-Aug-18 84.6 30.4 <10.0 12.6 1 1A8 Panrra village August Second 28-Aug-18 84.6 30.4 <10.0 12.6 1 1A8 Panrra village September First 07-Sep-18 84.3 29.5 <10.0 12.4 1 1A8 Panrra village September Second 17-Sep-18 84.2 29.2 <10.0 12.2 1 1A9 Tiltoriya village April First 05-Apr-18 87.8 35.8 <10.0 14.6

21

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of PM10 PM2.5 SO2 NOX No No Sampling 1 1A9 Tiltoriya village April Second 26-Apr-18 88.2 36 <10.0 14.9 1 1A9 Tiltoriya village May First 07-May-18 89.6 36.4 <10.0 15.2 1 1A9 Tiltoriya village May Second 24-May-18 90.2 36.5 <10.0 14.9 1 1A9 Tiltoriya village June First 08-Jun-18 89.8 35.6 <10.0 15 1 1A9 Tiltoriya village June Second 25-Jun-18 88.7 35.2 <10.0 14.6 1 1A9 Tiltoriya village July First 04-Jul-18 86.1 33.3 <10.0 12.9 1 1A9 Tiltoriya village July Second 27-Jul-18 85.5 31.8 <10.0 12.6 1 1A9 Tiltoriya village August First 13-Aug-18 83.8 29.2 <10.0 11.7 1 1A9 Tiltoriya village August Second 17-Aug-18 83.8 29.2 <10.0 11.7 1 1A9 Tiltoriya village September First 01-Sep-18 83.5 29 <10.0 11.8 1 1A9 Tiltoriya village September Second 18-Sep-18 83.1 28.7 <10.0 11.6

AIR QUALITY METAL ANALYSIS Station Station Name Month Fortnight Date of Chromi Arsenic Cadmium Mercury Nickel Lead No Sampling um (ng/m3) (µg/m3) (µg/m3) (ng/m3) (µg/m3) (µg/m3) 1A1 Nayadih village Sept First 01-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Shampur - A 1A1 Nayadih village Sept Second 25-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 near Shampur - A 1A10 Mugma III A near March First 04-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 Railway siding 1A10 Mugma III A near Sept Second 18-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 Railway siding 1A2 Near Mugma March First 06-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 Village 1A2 Near Mugma Sept Second 26-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 Village 1A3 Garphalbari Near March First 04-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 Kapasara UG 1A3 Garphalbari Near Sept Second 17-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 Kapasara UG 1A4 In Bharkunrabari March First 05-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 village 1A5 In Baraban village March First 06-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 1A6 In Jhukundar March First 05-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 village 1A7 Sanbad village March First 06-Mar-19 <0.005 <0.001 <0.01 <0.001 <0.10 <0.005 1A8 Panrra village Sept Second 17-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005 1A9 Tiltoriya village Sept Second 17-Sep-18 <1.0 <0.001 <0.01 <0.001 <0.10 <0.005

Environmental standards: National Ambient Air Quality Standards (NAAQS), 2009 for residential, industrial and rural areas for 24 hourly/yearly samples: Arsenic (As) Cadmium (Cd) Chromium (Cr) Mercury (Hg) Nickel (Ni) Lead (Pb) Heavy Metal (ng/m3) (µg/m3) (µg/m3) (µg/m3) (ng/m3) (µg/m3) Concentration 6 Not specified Not specified Not specified 20 0.5

22

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Annexure – II NOISE LEVEL Cluster Station Station Name Month Fortnight Date of Noise Level No No Sampling dB(A) 1 1N1 Pit-top Hariajam UG April First 04-Apr-18 63.4 1 1N1 Pit-top Hariajam UG April Second 16-Apr-18 62.3 1 1N1 Pit-top Hariajam UG August First 04-Aug-18 66.4 1 1N1 Pit-top Hariajam UG November First 08-Nov-18 64.8 1 1N1 Pit-top Hariajam UG February First 04-Feb-19 65.8 1 1N10 Mugmapull Railway Siding February First 11-Feb-19 67.5 1 1N11 Mugma Workshop February First 11-Feb-19 71.4 1 1N12 Barakar Eng Workshop February First 11-Feb-19 69.8 1 1N2 Pit-top Badjna UG April First 04-Apr-18 67.9 1 1N2 Pit-top Badjna UG April Second 16-Apr-18 61.4 1 1N2 Pit-top Badjna UG August First 04-Aug-18 69.4 1 1N2 Pit-top Badjna UG November First 08-Nov-18 67.3 1 1N2 Pit-top Badjna UG February First 04-Feb-19 66.3 1 1N3 Pit-top Chapapur-II UG April First 04-Apr-18 64.2 1 1N3 Pit-top Chapapur-II UG April Second 16-Apr-18 60.9 1 1N3 Pit-top Chapapur-II UG August First 04-Aug-18 63.8 1 1N3 Pit-top Chapapur-II UG November First 08-Nov-18 65.8 1 1N3 Pit-top Chapapur-II UG February First 04-Feb-19 67.3 1 1N4 Pit-top Khoodia UG April First 06-Apr-18 69.8 1 1N4 Pit-top Khoodia UG April Second 23-Apr-18 69.4 1 1N4 Pit-top Khoodia UG August First 04-Aug-18 70.4 1 1N4 Pit-top Khoodia UG November First 08-Nov-18 71.3 1 1N4 Pit-top Khoodia UG February First 04-Feb-19 69.8 1 1N5 Pit-top Lakhimata UG April First 06-Apr-18 61.5 1 1N5 Pit-top Lakhimata UG April Second 23-Apr-18 62.1 1 1N5 Pit-top Lakhimata UG August First 04-Aug-18 62.5 1 1N5 Pit-top Lakhimata UG November First 05-Nov-18 63.9 1 1N5 Pit top Lakhimata UG February First 01-Feb-19 62.4 1 1N6 Pit-top Shampur-B UG April First 05-Apr-18 60.8 1 1N6 Pit-top Shampur-B UG April Second 23-Apr-18 65.6 1 1N6 Pit-top Shampur-B UG August First 13-Aug-18 61.8 1 1N6 Pit-top Shampur-B UG November First 05-Nov-18 66.2 1 1N6 Pit-top Shampur-B UG February First 01-Feb-19 67.9 1 1N7 Pit-top Mandman UG April First 05-Apr-18 64.3 1 1N7 Pit-top Mandman UG April Second 24-Apr-18 63.2 1 1N7 Pit-top Mandman UG August First 13-Aug-18 62.5 1 1N7 Pit-top Mandman UG November First 05-Nov-18 63.8 1 1N7 Nirsha OCP February First 04-Feb-19 64.2 1 1N8 Workshop Gopinathpur OC Patch April First 05-Apr-18 61.4 1 1N8 Workshop Gopinathpur OC Patch April Second 24-Apr-18 67.4 1 1N8 Workshop Gopinathpur OC Patch August First 13-Aug-18 62.5 1 1N8 Workshop Gopinathpur OC Patch November First 05-Nov-18 67.5 1 1N8 Workshop Gopinathpur OC Patch February First 04-Feb-19 69.4 1 1N9 Workshop Kapasara OC Patch April First 05-Apr-18 60.1 1 1N9 Workshop Kapasara OC Patch April Second 24-Apr-18 69.2 1 1N9 Workshop Kapasara OC Patch August First 13-Aug-18 61.6 1 1N9 Workshop Kapasara OC Patch November First 08-Nov-18 64.8 1 1N9 Workshop Kapasara OC Patch February First 01-Feb-19 63.7

23

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Annexure – III EFFLUENT WATER QUALITY (5 PARAMETERS) Cluster Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No No Sampling 1 1MW1 Hariajam UG April First 04-Apr-18 7.56 16 800 <2.0 20 1 1MW1 Hariajam UG April Second 16-Apr-18 7.41 20 766 <2.0 24 1 1MW1 Hariajam UG MAY First 03-May-18 7.62 14 738 <2.0 20 1 1MW1 Hariajam UG MAY Second 24-May-18 7.33 10 760 <2.0 16 1 1MW1 Hariajam UG June First 08-Jun-18 7.50 16 532 <2.0 12 1 1MW1 Hariajam UG June Second 21-Jun-18 7.46 10 554 <2.0 16 1 1MW1 Hariajam UG July First 09-Jul-18 8.18 12 596 <2.0 28 1 1MW1 Hariajam UG July Second 17-Jul-18 8.15 14 616 <2.0 20 1 1MW1 Hariajam UG August First 04-Aug-18 8.28 12 620 <2.0 16 1 1MW1 Hariajam UG August Second 17-Aug-18 8.25 16 674 <2.0 20 1 1MW1 Hariajam UG September Second 25-Sep-18 8.16 12 678 <2.0 24 1 1MW1 Hariajam UG October First 01-Oct-18 8.24 16 736 <2.0 20 1 1MW1 Hariajam UG October Second 23-Oct-18 8.37 18 715 <2.0 16 1 1MW1 Hariajam UG November Second 19-Nov-18 8.12 12 722 <2.0 12 1 1MW1 Hariajam UG December First 03-Dec-18 8.73 20 748 <2.0 20 1 1MW1 Hariajam UG December Second 19-Dec-18 8.45 22 194 <2.0 16 1 1MW1 Hariajam UG January First 03-Jan-19 7.76 20 812 <2.0 12 1 1MW1 Hariajam UG January Second 18-Jan-19 8.47 22 800 <2.0 20 1 1MW1 Hariajam UG February First 04-Feb-19 8.36 18 812 <2.0 12 1 1MW1 Hariajam UG February Second 18-Feb-19 8.47 24 780 <2.0 28 1 1MW1 Hariajam UG March Second 16-Mar-19 8.32 26 780 <2.0 16 1 1MW10 Kapasara OC Patch April First 05-Apr-18 7.41 18 698 <2.0 20 1 1MW10 Kapasara OC Patch April Second 24-Apr-18 7.36 22 668 <2.0 16 1 1MW10 Kapasara OC Patch MAY First 07-May-18 7.25 14 684 <2.0 28 1 1MW10 Kapasara OC Patch MAY Second 23-May-18 7.92 14 700 <2.0 20 1 1MW10 Kapasara OC Patch June First 12-Jun-18 7.94 26 614 <2.0 32 1 1MW10 Kapasara OC Patch June Second 30-Jun-18 7.44 16 640 <2.0 24 1 1MW10 Kapasara OC Patch July First 05-Jul-18 8.06 30 656 <2.0 24 1 1MW10 Kapasara OC Patch July Second 27-Jul-18 8.12 24 640 <2.0 28 1 1MW10 Kapasara OC Patch August First 04-Aug-18 8.41 16 616 <2.0 24 1 1MW10 Kapasara OC Patch August Second 17-Aug-18 8.22 22 582 <2.0 28 1 1MW10 Kapasara OC Patch September Second 25-Sep-18 8.36 20 630 <2.0 32 1 1MW10 Kapasara OC Patch October First 09-Oct-18 8.39 18 590 <2.0 28 1 1MW10 Kapasara OC Patch October Second 30-Oct-18 8.12 16 600 <2.0 24 1 1MW10 Kapasara OC Patch November Second 20-Nov-18 8.08 20 574 <2.0 8 1 1MW10 Kapasara OC Patch December First 05-Dec-18 8.24 14 670 <2.0 20 1 1MW10 Kapasara OC Patch December Second 19-Dec-18 7.72 16 516 <2.0 12 1 1MW10 Kapasara OC Patch January First 02-Jan-19 8.21 18 566 <2.0 24 1 1MW10 Kapasara OC Patch January Second 24-Jan-19 8.92 18 592 <2.0 16 1 1MW10 Kapasara OC Patch February First 05-Feb-19 8.19 20 600 <2.0 24 1 1MW10 Kapasara OC Patch February Second 19-Feb-19 8.25 22 576 <2.0 12 1 1MW10 Kapasara OC Patch March Second 18-Mar-19 8.11 20 672 <2.0 16 1 1MW2 Badjna UG April Second 16-Apr-18 8.18 24 778 <2.0 28 1 1MW2 Badjna UG MAY First 03-May-18 8.11 20 742 <2.0 24 1 1MW2 Badjna UG MAY Second 24-May-18 8.45 16 720 <2.0 32 1 1MW2 Badjna UG June First 12-Jun-18 8.25 20 638 <2.0 24 1 1MW2 Badjna UG June Second 25-Jun-18 8.22 12 574 <2.0 16 1 1MW2 Badjna UG July First 09-Jul-18 8.20 14 538 <2.0 20 1 1MW2 Badjna UG July Second 17-Jul-18 8.14 22 520 <2.0 32

24

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No No Sampling 1 1MW2 Badjna UG August First 04-Aug-18 8.32 16 572 <2.0 20 1 1MW2 Badjna UG August Second 17-Aug-18 8.16 28 596 <2.0 32 1 1MW2 Badjna UG September Second 26-Sep-18 8.32 14 528 <2.0 24 1 1MW2 Badjna UG October First 01-Oct-18 8.31 18 540 <2.0 24 1 1MW2 Badjna UG October Second 23-Oct-18 8.28 20 570 <2.0 28 1 1MW2 Badjna UG November Second 19-Nov-18 8.24 16 734 <2.0 16 1 1MW2 Badjna UG December First 03-Dec-18 8.67 22 582 <2.0 12 1 1MW2 Badjna UG December Second 19-Dec-18 8.22 16 548 <2.0 20 1 1MW2 Badjna UG January First 03-Jan-19 7.82 18 528 <2.0 16 1 1MW2 Badjna UG January Second 18-Jan-19 7.88 14 508 <2.0 24 1 1MW2 Badjna UG February First 04-Feb-19 7.54 20 548 <2.0 16 1 1MW2 Badjna UG February Second 18-Feb-19 8.65 22 560 <2.0 32 1 1MW2 Badjna UG March Second 16-Mar-19 8.41 24 634 <2.0 24 1 1MW3 Chapapur-II UG April First 04-Apr-18 7.65 20 662 <2.0 16 1 1MW3 Chapapur-II UG April Second 16-Apr-18 7.50 16 690 <2.0 16 1 1MW3 Chapapur-II UG MAY First 11-May-18 7.38 12 672 <2.0 28 1 1MW3 Chapapur-II UG MAY Second 22-May-18 7.68 14 692 <2.0 20 1 1MW3 Chapapur-II UG June First 08-Jun-18 7.58 14 862 <2.0 16 1 1MW3 Chapapur-II UG June Second 25-Jun-18 7.37 12 878 <2.0 24 1 1MW3 Chapapur-II UG July First 09-Jul-18 7.76 16 852 <2.0 36 1 1MW3 Chapapur-II UG July Second 17-Jul-18 7.85 20 830 <2.0 24 1 1MW3 Chapapur-II UG August First 04-Aug-18 7.76 10 830 <2.0 12 1 1MW3 Chapapur-II UG August Second 17-Aug-18 7.98 14 860 <2.0 16 1 1MW3 Chapapur-II UG September Second 25-Sep-18 7.56 16 802 <2.0 16 1 1MW3 Chapapur-II UG October First 15-Oct-18 7.82 20 800 <2.0 16 1 1MW3 Chapapur-II UG October Second 30-Oct-18 7.95 22 820 <2.0 20 1 1MW3 Chapapur-II UG November Second 19-Nov-18 7.84 18 768 <2.0 20 1 1MW3 Chapapur-II UG December First 03-Dec-18 7.51 24 802 <2.0 24 1 1MW3 Chapapur-II UG December Second 20-Dec-18 7.58 18 766 <2.0 28 1 1MW3 Chapapur-II UG January First 03-Jan-19 8.36 16 796 <2.0 24 1 1MW3 Chapapur-II UG January Second 18-Jan-19 8.59 28 812 <2.0 32 1 1MW3 Chapapur-II UG February First 04-Feb-19 8.85 22 780 <2.0 24 1 1MW3 Chapapur-II UG February Second 18-Feb-19 7.24 20 812 <2.0 40 1 1MW3 Chapapur-II UG March Second 16-Mar-19 7.38 22 808 <2.0 32 1 1MW4 Chapapur OC Patch April First 04-Apr-18 7.09 22 722 <2.0 28 1 1MW4 Chapapur OC Patch April Second 17-Apr-18 7.18 18 702 <2.0 20 1 1MW4 Chapapur OC Patch MAY First 11-May-18 7.27 14 648 <2.0 12 1 1MW4 Chapapur OC Patch MAY Second 22-May-18 7.50 12 670 <2.0 16 1 1MW4 Chapapur OC Patch June First 12-Jun-18 7.83 18 644 <2.0 12 1 1MW4 Chapapur OC Patch June Second 25-Jun-18 7.58 10 556 <2.0 20 1 1MW4 Chapapur OC Patch July First 05-Jul-18 7.73 18 516 <2.0 24 1 1MW4 Chapapur OC Patch July Second 17-Jul-18 7.69 24 500 <2.0 16 1 1MW4 Chapapur OC Patch August First 04-Aug-18 8.16 12 536 <2.0 08 1 1MW4 Chapapur OC Patch August Second 17-Aug-18 8.41 16 500 <2.0 12 1 1MW4 Chapapur OC Patch September Second 25-Sep-18 8.12 18 500 <2.0 08 1 1MW4 Chapapur OC Patch October First 11-Oct-18 8.43 22 560 <2.0 16 1 1MW4 Chapapur OC Patch October Second 26-Oct-18 8.05 26 530 <2.0 12 1 1MW4 Chapapur OC Patch November Second 19-Nov-18 8.11 20 712 <2.0 8 1 1MW4 Chapapur OC Patch December First 03-Dec-18 8.85 22 846 <2.0 16 1 1MW4 Chapapur OC Patch December Second 20-Dec-18 8.31 14 512 <2.0 12 1 1MW4 Chapapur OC Patch January First 03-Jan-19 8.47 16 490 <2.0 16

25

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No No Sampling 1 1MW4 Chapapur OC Patch January Second 24-Jan-19 8.32 20 460 <2.0 24 1 1MW4 Chapapur OC Patch February First 04-Feb-19 8.23 28 484 <2.0 32 1 1MW4 Chapapur OC Patch February Second 19-Feb-19 8.41 26 452 <2.0 24 1 1MW4 Chapapur OC Patch March Second 16-Mar-19 8.24 28 836 <2.0 12 1 1MW5 Khoodia UG April First 06-Apr-18 7.42 24 758 <2.0 20 1 1MW5 Khoodia UG April Second 23-Apr-18 7.47 22 724 <2.0 12 1 1MW5 Khoodia UG MAY First 03-May-18 7.60 12 680 <2.0 16 1 1MW5 Khoodia UG MAY Second 21-May-18 7.36 14 640 <2.0 24 1 1MW5 Khoodia UG June First 15-Jun-18 7.35 16 1040 <2.0 20 1 1MW5 Khoodia UG June Second 21-Jun-18 7.97 12 990 <2.0 28 1 1MW5 Khoodia UG July First 05-Jul-18 8.25 20 954 <2.0 32 1 1MW5 Khoodia UG July Second 17-Jul-18 8.22 16 934 <2.0 36 1 1MW5 Khoodia UG August First 04-Aug-18 7.64 14 926 <2.0 24 1 1MW5 Khoodia UG August Second 18-Aug-18 7.75 20 904 <2.0 24 1 1MW5 Khoodia UG September Second 26-Sep-18 7.82 20 860 <2.0 16 1 1MW5 Khoodia UG October First 11-Oct-18 7.70 24 870 <2.0 28 1 1MW5 Khoodia UG October Second 26-Oct-18 7.82 28 882 <2.0 32 1 1MW5 Khoodia UG November Second 20-Nov-18 7.34 22 868 <2.0 24 1 1MW5 Khoodia UG December First 03-Dec-18 87.35 18 600 <2.0 24 1 1MW5 Khoodia UG December Second 20-Dec-18 8.68 12 880 <2.0 24 1 1MW5 Khoodia UG January First 02-Jan-19 8.68 14 840 <2.0 24 1 1MW5 Khoodia UG January Second 24-Jan-19 7.51 30 880 <2.0 32 1 1MW5 Khoodia UG February First 05-Feb-19 8.51 20 840 <2.0 20 1 1MW5 Khoodia UG February Second 19-Feb-19 8.08 24 810 <2.0 32 1 1MW5 Khoodia UG March Second 16-Mar-19 8.12 20 664 <2.0 28 1 1MW6 Lakhimata UG April First 06-Apr-18 8.36 26 732 <2.0 36 1 1MW6 Lakhimata UG April Second 23-Apr-18 8.20 28 704 <2.0 28 1 1MW6 Lakhimata UG MAY First 11-May-18 8.31 18 726 <2.0 24 1 1MW6 Lakhimata UG MAY Second 21-May-18 8.41 16 758 <2.0 32 1 1MW6 Lakhimata UG June First 15-Jun-18 8.09 22 700 <2.0 28 1 1MW6 Lakhimata UG June Second 21-Jun-18 8.12 10 680 <2.0 12 1 1MW6 Lakhimata UG July First 04-Jul-18 8.28 22 660 <2.0 20 1 1MW6 Lakhimata UG July Second 27-Jul-18 8.31 16 628 <2.0 16 1 1MW6 Lakhimata UG August First 04-Aug-18 8.36 16 698 <2.0 16 1 1MW6 Lakhimata UG August Second 18-Aug-18 8.03 18 656 <2.0 16 1 1MW6 Lakhimata UG September Second 26-Sep-18 8.18 22 600 <2.0 20 1 1MW6 Lakhimata UG October Second 26-Oct-18 8.19 20 692 <2.0 36 1 1MW6 Lakhimata UG November Second 20-Nov-18 8.28 24 638 <2.0 20 1 1MW6 Lakhimata UG December First 03-Dec-18 8.41 16 352 <2.0 12 1 1MW6 Lakhimata UG December Second 20-Dec-18 8.20 18 668 <2.0 16 1 1MW6 Lakhimata UG January First 02-Jan-19 7.33 16 646 <2.0 8 1 1MW6 Lakhimata UG January Second 24-Jan-19 8.29 14 618 <2.0 12 1 1MW6 Lakhimata UG February First 05-Feb-19 7.24 22 638 <2.0 8 1 1MW6 Lakhimata UG February Second 19-Feb-19 8.60 28 632 <2.0 16 1 1MW6 Lakhimata UG March Second 18-Mar-19 8.38 26 344 <2.0 16 1 1MW7 Shampur-B UG April First 05-Apr-18 7.98 22 815 <2.0 24 1 1MW7 Shampur-B UG April Second 23-Apr-18 7.68 26 846 <2.0 16 1 1MW7 Shampur-B UG MAY First 07-May-18 7.44 16 776 <2.0 32 1 1MW7 Shampur-B UG MAY Second 22-May-18 7.21 10 788 <2.0 16 1 1MW7 Shampur-B UG June First 04-Jun-18 7.90 20 828 <2.0 24 1 1MW7 Shampur-B UG June Second 30-Jun-18 7.34 12 356 <2.0 16

26

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Cluster Station Station Name Month Fortnight Date of pH TSS TDS O&G COD No No Sampling 1 1MW7 Shampur-B UG July First 04-Jul-18 8.38 24 332 <2.0 28 1 1MW7 Shampur-B UG July Second 27-Jul-18 8.43 14 312 <2.0 24 1 1MW7 Shampur-B UG August First 04-Aug-18 7.91 18 374 <2.0 20 1 1MW7 Shampur-B UG August Second 17-Aug-18 7.50 28 328 <2.0 32 1 1MW7 Shampur-B UG September Second 25-Sep-18 7.78 20 340 <2.0 28 1 1MW7 Shampur-B UG October First 04-Oct-18 7.91 22 372 <2.0 24 1 1MW7 Shampur-B UG October Second 26-Oct-18 7.67 24 356 <2.0 16 1 1MW7 Shampur-B UG November Second 20-Nov-18 7.59 16 326 <2.0 16 1 1MW7 Shampur-B UG December First 12-Dec-18 7.93 22 310 <2.0 16 1 1MW7 Shampur-B UG December Second 19-Dec-18 7.91 16 402 <2.0 12 1 1MW7 Shampur-B UG January First 02-Jan-19 8.69 20 390 <2.0 20 1 1MW7 Shampur-B UG January Second 24-Jan-19 8.50 12 410 <2.0 16 1 1MW7 Shampur-B UG February First 05-Feb-19 8.39 20 422 <2.0 24 1 1MW7 Shampur-B UG February Second 19-Feb-19 7.76 22 434 <2.0 20 1 1MW7 Shampur-B UG March Second 18-Mar-19 7.84 24 356 <2.0 32 1 1MW9 Gopinathpur OC Patch April First 05-Apr-18 7.62 24 744 <2.0 28 1 1MW9 Gopinathpur OC Patch April Second 24-Apr-18 7.49 28 784 <2.0 24 1 1MW9 Gopinathpur OC Patch MAY First 07-May-18 7.30 20 756 <2.0 16 1 1MW9 Gopinathpur OC Patch MAY Second 23-May-18 7.94 12 732 <2.0 28 1 1MW9 Gopinathpur OC Patch June First 15-Jun-18 7.39 12 692 <2.0 16 1 1MW9 Gopinathpur OC Patch June Second 21-Jun-18 7.24 14 604 <2.0 20 1 1MW9 Gopinathpur OC Patch July First 05-Jul-18 7.64 28 576 <2.0 16 1 1MW9 Gopinathpur OC Patch July Second 27-Jul-18 7.56 20 516 <2.0 12 1 1MW9 Gopinathpur OC Patch August First 04-Aug-18 8.30 14 630 <2.0 16 1 1MW9 Gopinathpur OC Patch August Second 17-Aug-18 8.42 14 604 <2.0 12 1 1MW9 Gopinathpur OC Patch September Second 25-Sep-18 8.24 22 626 <2.0 24 1 1MW9 Gopinathpur OC Patch October First 04-Oct-18 8.28 24 670 <2.0 40 1 1MW9 Gopinathpur OC Patch October Second 30-Oct-18 8.36 20 642 <2.0 32 1 1MW9 Gopinathpur OC Patch November Second 20-Nov-18 8.24 18 614 <2.0 16 1 1MW9 Gopinathpur OC Patch December First 12-Dec-18 7.48 10 980 <2.0 28 1 1MW9 Gopinathpur OC Patch December Second 19-Dec-18 8.12 20 682 <2.0 20 1 1MW9 Gopinathpur OC Patch January First 02-Jan-19 8.27 18 720 <2.0 12 1 1MW9 Gopinathpur OC Patch January Second 24-Jan-19 7.79 16 742 <2.0 8 1 1MW9 Gopinathpur OC Patch February First 05-Feb-19 8.26 24 770 <2.0 16 1 1MW9 Gopinathpur OC Patch February Second 19-Feb-19 8.63 20 742 <2.0 28 1 1MW9 Gopinathpur OC Patch March Second 18-Mar-19 8.56 24 990 <2.0 12 Note: all figures in mg/l unless otherwise specified

Effluent Water Quality Standards (MoEF Schedule – VI Standards) Parameters pH TSS TDS Oil & Grease COD Limit 5.5-9.0 100 Not Specified 10 250

27

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Annexure – III EFFLUENT QUALITY (29 PARAMETERS) for September, 2018 Cluster 1 1 1 1 1 1 1 1 1 1 Effluent Station No 1MW4 1MW3 1MW2 1MW1 1MW6 1MW7 1MW5 1MW10 1MW9 1MW4 Water (MOEF Station Chapap Chapap Badjna Hariaja Lakhim Shampur- Khoodia Kapasara Gopinathpu Chapapur Schedule-VI Name ur OC ur-II UG m UG ata UG B UG UG OC Patch r OC Patch OC Patch Standard) Patch UG Month Septem Septem Septem Septem Septem September September September September September ber ber ber ber ber Fortnight First First First First First First First First First First Date of 01- 01- 01- 01- 01- 01-Sep-18 01-Sep-18 01-Sep-18 01-Sep-18 01-Sep-18 Sampling Sep-18 Sep-18 Sep-18 Sep-18 Sep-18 Colour 4 3 4 3 4 3 3 3 4 4 Unobjectionabl e Odour Unobje Unobje Unobje Unobje Unobje Unobjectio Unobjectio Unobjectio Unobjectio Unobjectio Unobjectionabl ctionabl ctionab ctionab ctionab ctionab nable nable nable nable nable e e le le le le TSS 20 16 24 22 20 22 18 18 16 20 100.0 pH 8.24 7.91 8.23 8.12 7.25 8.35 8.76 8.22 8.16 8.24 5.5-9.0 Temperatur 29.3 29.5 28.9 28.6 30.2 29.7 28.5 30.1 29.7 29.3 Shall not e(Deg C) exceed 50C above the receiving water temp Oil & Grease <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 10.0 Total 0.03 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.03 1.0 Residual Chlorine Ammonical 0.76 0.82 0.74 0.78 0.92 0.78 0.86 0.82 0.78 0.76 50.0 Nitrogen Total 1.54 1.74 1.68 1.72 1.64 1.74 1.58 1.79 1.58 1.54 100.0 Kjeldahi Nitrogen Free Amonia <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 <0.4 5.0 BOD 8 6 8 4 8 8 6 10 6 8 30.0 COD 24 20 24 16 28 24 16 28 16 24 250.0 Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.2 Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.1 Hexavalent 0.03 0.04 0.02 0.03 0.04 0.03 0.03 0.03 0.03 0.03 0.1 Chromium Total 0.06 0.08 0.07 0.06 0.07 0.08 0.06 0.06 0.07 0.06 2.0 Chromium Copper 0.04 0.04 0.04 0.03 0.03 0.04 0.03 0.03 0.04 0.04 3.0 Zinc 0.03 0.03 0.03 0.03 0.03 0.04 0.03 0.03 0.04 0.03 5.0 Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.05 Nickel <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 <0.10 3.0 Fluoride 0.36 0.36 0.29 0.36 0.52 0.64 0.48 0.49 0.42 0.36 2.0 Dissolved 1.60 1.77 1.64 1.58 1.68 1.65 1.79 1.67 1.58 1.60 5.0 Phosphate Sulphide 0.006 0.007 0.009 0.008 0.007 0.008 0.006 0.009 0.007 0.006 2.0 Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 1.0 Manganese 0.24 0.30 0.26 0.24 0.24 0.22 0.28 0.22 0.24 0.24 2.0 Iron 0.12 0.16 0.14 0.16 0.16 0.15 0.14 0.15 0.15 0.12 3.0 Nitrate 3.5 4.8 3.9 3.2 4.4 3.9 3.7 3.8 3.4 3.5 10.0 Nitrogen Cadmium <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.003 Total 520 830 504 716 612 330 880 600 654 520 Not Specified Dissolved Solids

28

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

EFFLUENT QUALITY (29 PARAMETERS) for March, 2019 Cluster 1 1 1 1 1 1 1 1 1 Effluent Water Station No 1MW4 1MW3 1MW2 1MW1 1MW5 1MW6 1MW10 1MW7 1MW9 (MOEF Schedule-VI Station Chapap Chapap Badjna Hariaja Khoodi Lakhimata Kapasara Shampur- Gopinathpu Standard) Name ur OC ur-II UG m UG a UG UG OC Patch B UG r OC Patch Patch UG Month March March March March March March March March March Fortnight First First First First First First First First First Date of 01- 01- 01- 01- 01- 02-Mar-19 02-Mar-19 02-Mar-19 02-Mar-19 Sampling Mar-19 Mar-19 Mar-19 Mar-19 Mar-19 Colour 4 5 5 4 5 4 4 5 5 Unobjectionable Odour Unobje Unobje Unobje Unobje Unobje Unobjectio Unobjectio Unobjectio Unobjectio Unobjectionable ctionabl ctionab ctionab ctionab ctionab nable nable nable nable e le le le le TSS 26 22 24 26 28 30 30 24 22 100.0 pH 8.13 8.30 7.73 8.43 7.86 7.30 7.72 8.21 8.41 5.5-9.0 Temperatur 29.1 29.8 30.3 29.6 30.2 30.3 29.6 29.7 28.5 Shall not exceed 50C e(Deg C) above the receiving water temp Oil & Grease <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 <2.0 10.0 Total 0.03 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 1.0 Residual Chlorine Ammonical 0.82 0.86 0.78 0.72 0.89 0.72 0.68 0.72 0.74 50.0 Nitrogen Total 1.64 1.78 1.67 1.58 1.54 1.79 1.46 1.62 1.58 100.0 Kjeldahi Nitrogen Free Amonia 0.03 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 5.0 BOD 2 4 2 5 2 2 4 2 6 30.0 COD 16 32 28 20 32 16 8 28 20 250.0 Arsenic <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.2 Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.1 Hexavalent 0.04 0.03 0.03 0.04 0.03 0.04 0.03 0.04 0.02 0.1 Chromium Total 0.07 0.07 0.06 0.07 0.08 0.07 0.07 0.06 0.08 2.0 Chromium Copper 0.04 0.03 0.03 0.03 0.03 0.03 0.03 0.03 0.03 3.0 Zinc 0.03 0.03 0.04 0.03 0.04 0.03 0.03 0.04 0.04 5.0 Selenium <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 <0.002 0.05 Nickel <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 3.0 Fluoride 0.52 0.28 0.36 0.40 0.38 0.54 0.28 0.46 0.36 2.0 Dissolved 1.92 1.66 1.72 1.68 1.58 1.77 1.50 1.58 1.52 5.0 Phosphate Sulphide 0.007 0.008 0.008 0.006 0.006 0.006 0.009 0.006 0.008 2.0 Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 1.0 Manganese 0.24 0.28 0.24 0.22 0.26 0.22 0.20 0.24 0.26 2.0 Iron 0.16 0.14 0.16 0.14 0.12 0.14 0.16 0.16 0.18 3.0 Nitrate 3.8 4.6 4.0 3.4 4.8 4.2 3.6 4.2 3.6 10.0 Nitrogen Cadmium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 2.0 Total 824 830 612 770 630 326 650 332 1010 Not Specified Dissolved Solids

29

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Annexure – III GROUNDWATER QUALITY Cluster No 1 1 1 1 1 1 Station No 1GW1 1GW2 1GW6 1GW3 1GW4 1GW5 Station Name Dugwell at Dugwell at Dugwell at Dugwell at Dugwell at Dugwell at Singhpur Nirsha Mugma CISF ground of New Indian village Thana more Mugma Kuwardi primary Drinking Water Standard near 27 no station Camp, village school (IS-10500:2012) Incline road Badjna near Amdangal Colony school (Marma) Month May'18 May'18 May'18 May'18 May'18 May'18 Fortnight Second Second Second Second Second Second Date of 03-May-18 03-May-18 07-May-18 07-May-18 07-May-18 07-May-18 Acceptable Permissible sampling Limit Limit Colour, Hazen 3 2 4 2 2 5 5.0 15.0 unit Max Odour Unobjectio Unobjectio Unobjectio Unobjectio Unobjectio Unobjectio Agreeable Agreeable nable nable nable nable nable nable Taste Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Agreeable Turbidity, NTU 1 1 2 2 1 2 1.0 5.0 Max pH 8.30 8.12 8.16 8.72 8.31 8.14 6.5-8.5 No relaxation Total Hardness 164 84 320 76 136 132 200.0 600.0 Iron 0.07 <0.06 <0.06 <0.06 <0.06 <0.06 0.30 No relaxation Chlorides 29 10 85 13 59 23 250.0 1000.0 Res Free 0.06 0.04 0.06 0.06 0.05 0.04 0.20 1.0 chlorine Dissolved Solids 252 132 496 130 208 200 500.0 2000.0 Calcium 52 32 96 28 56 44 75.0 200.0 Copper <0.03 <0.03 <0.03 <0.03 <0.03 <0.03 0.05 1.5 Manganese <0.02 <0.02 <0.02 <0.02 <0.02 <0.02 0.1 0.3 Sulphate 62 12 106 27 26 19 200.0 400.0 Nitrate 4.72 3.10 10.32 5.20 1.72 3.54 45.0 No relaxation Fluoride 0.90 0.38 0.60 0.36 0.45 0.56 1.0 1.5 Selenium <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.01 No relaxation Arsenic <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.01 0.05 Lead <0.005 <0.005 <0.005 <0.005 <0.005 <0.005 0.01 No relaxation Zinc 0.03 0.03 0.04 0.03 0.04 0.05 5.0 15.0 Total Chromium <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.05 No relaxation Boron <0.01 <0.01 <0.01 <0.01 <0.01 <0.01 0.5 1.0 Coliforms Nil Nil Nil Nil Nil Nil Shall not be detectable in any 100 (MPN) ml sample Phenolics <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.001 0.002 Alkalinity 220 200 140 168 140 182 200.0 600.0 Cadmium <0.001 <0.001 <0.001 <0.001 <0.001 <0.001 0.003 No relaxation

30

Environmental Statement (Form-V) for Cluster No. – 1 (Group of Mines) 2018-19

Annexure – IV GROUNDWATER LEVEL Cluster Station Station Name Month Fortnight Date of Ground No No Sampling Water Level BGL (mtr) 1 1GW1 Dugwell at Singhpur village May First 03-May-18 0.31 near 27 no Incline 1 1GW1 Dugwell at Singhpur village August First 04-Aug-18 0.8 near 27 no Incline 1 1GW1 Dugwell at Singhpur village November First 01-Nov-18 4 near 27 no Incline 1 1GW1 Dugwell at Singhpur village January First 19-Jan-19 2.7 near 27 no Incline 1 1GW2 Dugwell at Nirsha Thana May First 03-May-18 2.85 1 1GW2 Dugwell at Nirsha Thana August First 04-Aug-18 2.5 1 1GW2 Dugwell at Nirsha Thana November First 01-Nov-18 2.8 1 1GW2 Dugwell at Nirsha Thana January First 19-Jan-19 2.6 1 1GW3 Dugwell at CISF Mugma May First 07-May-18 3.45 Camp, Badjna Colony 1 1GW3 Dugwell at CISF Mugma August First 04-Aug-18 3.35 Camp, Badjna Colony 1 1GW3 Dugwell at CISF Mugma November First 01-Nov-18 1.8 Camp, Badjna Colony 1 1GW3 Dugwell at CISF Mugma January First 19-Jan-19 3.95 Camp, Badjna Colony 1 1GW4 Dugwell at ground of May First 07-May-18 1.9 Kuwardi village near school 1 1GW4 Dugwell at ground of August First 04-Aug-18 1.25 Kuwardi village near school 1 1GW4 Dugwell at ground of November First 01-Nov-18 2.25 Kuwardi village near school 1 1GW4 Dugwell at ground of January First 19-Jan-19 1.70 Kuwardi village near school 1 1GW5 Dugwell at New primary May First 07-May-18 2.1 school Amdangal (Marma) 1 1GW5 Dugwell at New primary August First 04-Aug-18 0.7 school Amdangal (Marma) 1 1GW5 Dugwell at New primary November First 01-Nov-18 1.15 school Amdangal (Marma) 1 1GW5 Dugwell at New primary January First 19-Jan-19 2.05 school Amdangal (Marma) 1 1GW6 Dugwell at Mugma more May First 07-May-18 2.5 station road 1 1GW6 Dugwell at Mugma more August First 04-Aug-18 1.9 station road 1 1GW6 Dugwell at Mugma more November First 01-Nov-18 2.5 station road 1 1GW6 Dugwell at Mugma more January First 19-Jan-19 3.60 station road

31

Plate - 1 India Location of Cluster – 1 mines in Country, State & District

Jharkhand ƒ ϴϲΣϱϬΖ ϴϲΣϱϱΖ Air Quality Monitoring Stations Predominant Wind Direction Barajor Nayadih Garga Polkora Station Code Type of Station Name of Station during October - March (Post - Monsoon) Dumarjor 1A1 Permanent Air Station Nayadih village near Shampur - A Raghunathpur Hikimaral Permanent Air Station Near Mugma Village Rangadih Panjania 1A2 Jodhadih Nutahdih Hospital Permanent Air Station Garphalbari Near Kapasara UG Gunduba Bathanatanr 1A3 Bhojpur Shahraj Asurbandh Bhalpahari Post monsoon Air Station Pahargora 1A4 Bharkunrabari village Gunduba Birgaon Banddih PF 1A5 Post monsoon Air Station Baraban village Bamanbaid Ranjitpur Gugitapa Lekrapahar Chalnpur Post monsoon Air Station Jhukundar village Mohanpur Talberia PF 1A6 Benagaria Bagdudih Dharampur Pre monsoon Sanbad village Mahatanr 1A7 Asna KaritanrSingraidih RF Shibpur Paharpur Bhagabandh Mudidih Angulkata 1A8 Pre monsoon Panrra village Barhadih Chargara N Kurwa Machamahul Bardahi Rangameta 1A9 Pre monsoon Tiltoriya village Kherdanga Talberia Beldih Kendulitar RF Permanent Air Station Metayala Karitar RF Gabhia 1A10 Mugma III A near Railway Siding Gopalnathdih Rampur Barbendya Magurdih Baromasia Hariharpur Ratanpur Gobindpur Kochagora RF Harakatarya Kumardih Tilaboni Dakhinbad Garga Jiramuri ƒ Madandih Jambad PF 1A7 Tulsibhita Marhadih Charkanla Maithan Dam Mine / Effluent Water Kapasora Sanbad Nerodih Gargora Kaladabar Birajbhannarapur Ubchuria Bandhdih Punui Phakirdih Ratanpur Mahlidih Station Code Name of Mine Karmatanr Dambhul Amaghata Kashitanr Murgabani Kashitani Champapur Punnal Bandhdih Poddardih Palhar Hariajam UG Ramchandrapur 1MW1 Bargidih BaraNawatanr Acid Factory Sana Badurdih Khertanr Daldal Udaypur Kumardih PF Kurchi Sidhabari Badjna UG Rengadih Kumthal Gangpur 1MW2 Baghsuma Baruigara Sambandhpur Pathrakhun Devli 1N3 Palarpur Chandudih Phaphuadih Topatanr Banskutia Chapapur-II UG Kasitanr 1N2 Bathandangal 1MW3 Kharikabad Ramkanali Berwa CHAPAPUR-II1MW4 BADJNA Bathanbari Kistopur 1MW3 1A8 1MW2 Badjna Kumar Jajpur Dhanudih Chapapur OC Patch Gortopa Jargari UG UG 1MW4 Bahadurpur Gopinathpur 1GWL3 Bhalahit Jajpur Panrra PF Domandih Tetulia Rangamati Barabal 1GWL1 Madanpur Hadlo 1MW5 Khoodia UG Moranga Mugma 1A10Central Kinudih Hatibari1MW1 1N1 PF Ramdih Bara Baghmara Bhelatanr Chandraidih Sirpuria PF 1MW6 Lakhimata UG Dumdum Dubi Nirsa Shimuldanga (Running) HARIAJAM Mahatodih1GWL4 Gagna Horangadih Kuhuka Haldar Colony Mahespur UG RS Pool Pathrakhun 1GWL2NIRSHA 1N4 Birsingpur 1A9 1MW7 Shampur-B UG Ghoramurga GOPINATHPUR1N8 Mahatadih Shrirampur UG & OC Tiltoriya Belkupa Kalyaneswari Chirobad Panredih 1MW5 Purandih Nekrajuria Dendua 1MW9 Bakardangal Parasi Lakhybad Saharpura Belchuri Kesharkural Maithan Colony Mohubani Chanddih Kadamkanali 1A2 1N5 Nayadih Gopalpur Debipur Gopinathpur OC Patch Narodih Jhirka Kulkunri Mugma 1MW9 1A1 KHOODIA Chandih PF Kadhhito Jamkudar UG Digari SHAMPUR-'A' 1MW6 Beliyad Billi Shyampur 1GWL5LAKHIMATA Duburdih Kapasara OC Patch UG & OC TO DHANBAD Damagaria 1MW10 Fatepur Katajani 1N6 UG 1N7 Damagaria Sabanpur Rajpura Colony 1A4 Churuinala Alladih Barajor Chanptaria MANDMAN Kalimati Barira Bharkunrabari SHAMPUR-'B' Chakarbathan Lalbazar Markora Chhota Ambana UG1GWL6 Satyanarayan Colony Paradih Bara Ambana Elakend Bandarchua 1MW7UG Ramnagar Kayarabank DHANBAD Victoria Kalubathan Bansgajra To Dhanbad Kushiyara Patharkua To Salanpur ƒ Kantajani 1N9KAPASARA UG Lalbazar Tentuljhora Chhatabar Gopinathpur 1A3 Patharkhad Pirrahat Dudhapani Manberia Barira Noise Sampling Stations (Workplace) Simuldan Garphalbari Azadnagar 1MW10 Jaldanga Kewra RS Gusainpara Barakar Kendua Sitalpur Khokrapahari Panchmahali SyaldangaEastern Railway Station Code Name of Station Barakar Lakshipur Bariya Grand Chord Nayadih 1A5 Dalabar Baraban NH-2 Kethardih Dahibari Jhukundar Hariajam UG Salukchapra Dankata 1A6 1N1 Nayadih Jogira Begunia Guliardih Kulti Dhabari Kanadih Dumarkanda Badjna UG Lakhdih Kultora 1N2 Makamahataran Khardanga Jaypur Ledaharia Chunga Santarkuli Bengagoriya Ramchandra Dangal 1N3 Chapapur-II UG Barmuri Urma Eastern Rly. Chanch Br. Boldih Kurargaria Bhaiber Patlabar Chanch 1N4 Khoodia UG Mukundadih Nutangaon Shipur Chhirudih Sanolapur Patlabari Luchibad Belachak Ganyutia Lakhimata UG Dumuriya Khetidih Jasaidi 1N5 Talberiya Beldanga Kusumdaha Narayanchak HarbalaKendua Branch Sodepur Shampur-B UG Daldali South Eastern Railway 1N6 Tentuliya Hatinal Sanctoria Dudhiya PF Sonabad Kalbana Bandrabad Chhottadhemo Salpatra Chapa Dhawra 1N7 Mandman UG Bhalka Rakta Kanjidih Bijra Gopinathpur OC Patch Ankberiya Raghunathpur Sialdanga 1N8 Badalpur Banda Kastabad Shitalpur 1N9 Kapasara OC Patch Baurikulhi Patra

Ghatkul Malancha Deliya Hijuli Debidanga Saltore Harayanpur Kalipathar Tantlai Kalyasota Bhurkundabari Bhagabatidih Bhiringi Barsiodih Predominant Wind Direction Mahishnadih Saltore Bakbari Kumradanga Simuliya Gusaidanga Ranipur during April - September Dubeswari Jamuidanga Nadiha Gobindapur Palnudih Gopalpur Benipur Hirakhun(Pre - Monsoon & Monsoon Period) Kachcha Road Bathanba Khedadanga Bahardardih Chalmara Sulanga Sarbari Chakaltabari Lalpur Road (ECL/NH) Puapur Pothiara Nimdanga Sidpur Manpura Ajodhya Baghmara Paharpur Water Bodies Guniyara Mangram (River, Nala, Dam) Ground Water Level Raybandh Kulbana Protected Forest Asta Station Code Location of Dugwell

Dugwell at Singhpur village near 27 no Incline 2 KMS Reserved Forest 1GWL1 PLATE NO 2 Permanent Air Station 1GWL2 Dugwell at Nirsha Thana JOB NO SAND EASTERN COALFIELDS LIMITED 111653 1GWL3 Dugwell at CISF Mugma Camp, Badjna Colony ENVIRONMENT STATEMENT OF CLUSTER NO. 1 Pre - monsoon Built Up Location of Sampling 1GWL4 Dugwell at ground of Kuwardi village near school Stations CLUSTER NO. 1 Post - monsoon CMPDI 1 OF 1 1GWL5 Dugwell at New primary school Amdangal (Marma) ISO 9001 Company R I E N V X X X X 1 2 0 River/Nalah ƒ ƒ ϴϲΣϰϱΖ1GWL6 Dugwell at MugmaϴϲΣϱϬΖ more station road ϴϲΣϱϱΖ