Development Land

Total Page:16

File Type:pdf, Size:1020Kb

Development Land Development Land Lands Approx. 17 acres (6.9 ha) – Approx. 17 acres Simmonstown, Celbridge, Co. Kildare (6.9 ha) – 10.5 acres Zoned • Substantial greenfield development opportunity extending to Residential plus approx. 17 acres (6.9 ha) a segment – 6.5 • Benefits from Residential Zoning on approx. 10.5 acres acres Community & Educational • The subject land is close to excellent transport links including Hazelhatch train station, M4 Motorway and within walking distance of schools, St. Wolstan’s Shopping Centre and many sporting & leisure facilities. Guide Price: • Excellent development opportunity situated in Celbridge, Co. Kildare e7,000,000 • The surrounding area consists primarily of established residential developments although there are some commercial and hospitality uses nearby Private Treaty coonan.com Description Location Development has occurred to the north of the Liffey, between Main Street and the M4 Motorway. Located approximately 22 kms from Dublin with Development to the south of the Liffey is focused access via the M4 motorway on the Dublin/Galway along the Hazelhatch and Ardclough Roads with route is the very popular town of Celbridge. Due to development over the last ten years taking place its rapid growth over the past 50 – 60 years when in the south of the town, in the areas of Primrose the population was 567 persons in 1951 to the Gate, St. Wolstan’s Abbey, and Hazelhatch Park. current population of 20,288, which has increased With the exception of the Crodaun and Castletown significantly over the past 20 – 25 years, Celbridge housing estates which were constructed in the is fast becoming a major satellite town of the mid-1970’s the historic demesnes of Castletown, greater Dublin area. Donaghcumper and St. Wolstan’s to the east of the town have remained free from development and Celbridge has an abundance of amenities locally retain their open landscape character. that can satisfy the needs of the modern family looking for the right location that offers them an Site Description easy commute to Dublin and its environs. There are excellent employment opportunities in the area, The property comprises a site which extends to first class sporting and leisure amenities, and a wide approx. 17 acres (6.9 ha) and is well positioned range of shops in the town including Tesco, Lidl & on the Ardclough Road adjacent to the existing Aldi. The St. Wolstan’s shopping centre is less than developments of Simmonstown Manor, Callenders 1km from the subject lands. For those looking for Mill and Hazelhatch Park. some retail therapy Liffey Valley Shopping Centre is about a 15 minute drive and Blanchardstown The subject lands are located approx. 600 metres Shopping Centre approx. 30 minutes. The Kildare the from Main Street. Less than 1km away on Village outlet centre is approx. 45 mins drive via the the Dublin Road is the St. Wolstan’s Shopping M7. Centre where the anchor store is SuperValu. Public transport is well serviced locally with the Celbridge is surrounded by countryside and green Hazelhatch Train Station via Simmonstown Manor pastures on all sides and has the magnificent and Hazelhatch Park, the 67 bus route to Merrion Castletown House and Parklands right on the edge Square, Dublin and the 67X route which runs from of the town with access directly off the main street. Celbridge via Dublin City Centre to Belfield Campus at UCD offering commuters easy access to a vast area spanning North Kildare, West Dublin, Dublin City Centre and South County Dublin. coonan.com Description Zoning The LAP also refers to Urban Design & Key Development Areas (KDA). To ensure development The site has two zoning objectives and they are as proposals conform with best practice urban design follows; principles on the basis that well planned and integrated development will enhance the town and Section 1 – approx. 10.5 acres (4.249 ha) is its environs and improve the quality of life of its identified in the Celbridge Local Area Plan 2017 residents. – 2023 (LAP) and is zoned ‘New Residential’ – the purpose of this zoning is to provide new It seeks to establish a framework for the future residential developments that provide a sustainable development of Celbridge. It is proposed to mix of house types, sizes and tenures and that consolidate growth within Key Development complement the existing residential mix. Areas that provide for the expansion of the town centre and the development of new residential Section 2 – approx. 6.535 acres (2.647 ha) is neighbourhoods. identified in the Celbridge Local Area Plan 2017 – 2023 (LAP) and is zoned ‘Community & Educational’ – the purpose of this zoning is to provide for education, recreation, community and health. coonan.com Description The subject land has been identified in the LAP in 3. Have regard to a Sustainable Development in KDA 5 Simmonstown: New Residential Area. Urban Areas Guidelines of Planning Authorities, DECLG (2009) and is companion document The KDA of Simmonstown is located between Urban Design Manual. Hazelhatch Park and Temple Manor residential 4. Include an appropriate level of community estates to the north east and south west infrastructure to support development. respectively. The lands measure approximately 35 5. Provide public open space at a minimum rate of ha in area and are currently in agricultural use. The 15% of the total site are. lands are accessible from the Newtown/Ardclough Road. An overhead power line traverses the Vision northern portion of the KDA. A residential area including a primary school that consolidates the southern environs of Celbridge, Development in KDA 5 Simmonstown shall establishes an attractive edge to the town and be subject to a masterplan, prepared prior to provides for improved access to the Hazelhatch the commencement of any development. No Road and train station. development shall be permitted in the masterplan area until such time as the masterplan is agreed Connectivity/ Movement with the planning department. Vehicular access to this KDA should comprise a The Masterplan will be required to: link street that connects the Newtown/Ardclough Road to the R405 (Hazelhatch Road) via Callenders 1. Set out a detailed roads and infrastructure Mill. A second point of access off the Newtown/ strategy for the development as a whole Ardclough Road is desirable. Provision should also to include upgrading of existing roads, the be made for a road connection to the Newtown/ construction of new roads and any other traffic Ardclough Road, south of the Chelmsford residential safety measures. This strategy will be informed estate. New streets and spaces should provide for by a detailed traffic assessment to ascertain the a cycle and pedestrian friendly environment with extent of development that could be supported designated cycle routes along arterial streets. A by particular upgrading works. permeable and integrated street network shall be 2. Include detailed phasing proposals and an a key requirement of development proposals. All implementation strategy. roads and streets should be designed in accordance with DMURS. coonan.com Description Built Form Landscape and Spaces The development of this KDA should reflect the It is a key requirement of this KDA that the established pattern of development in the area and site of the ringfort identified on the Record of should protect the amenity of adjoining residential Monuments and Places be integrated into a public estates. Development proposals shall safeguard open space and that an appropriate buffer is the remains of discovered and undiscovered established around the ringfort (Department of archaeology on the lands located within this KDA. Arts, Heritage, Rural, Regional and Gaeltacht Affairs Where overhead transmission cables traverse will advise at detailed design stage). This space the site, proposed layouts shall comply with the will provide a unique focus for this new residential recommended clearance distances identified by area. Development proposals should maintain the the ESB (ref. Section 17.11.2 of the Kildare County established building set back on the Newtown/ Development Plan 2017-2023). A primary school Ardclough Road with areas of public open space site shall be reserved to the centre of this KDA and being provided to the front of the site. A landscaped should be integrated into the site layout of future edge should be provided to the south of the site development proposals. Design proposals for a with a view to integrating new development into new school should make a positive contribution to the landscape. Existing landscape features such as the character of this area. A mix of housing types tree lines should be incorporated into public open that range from two to three storeys in height is spaces. Open space networks that incorporate encouraged. Landmark / feature buildings should pedestrian and cycle routes, provide for passive and be provided along prominent routes and at key active recreation, promote ecology and integrate junctions to provide for variety and legibility in the Sustainable Urban Drainage Systems are promoted. urban environment and to reinforce a hierarchy of streets and spaces. This site will accommodate Planning medium to low-density residential development in There is no planning history connected to the the order of 30 units per hectare. subject lands. coonan.com Description Services Viewing Interested parties are invited to satisfy themselves By prior appointment at any reasonable hour. in relation to the availability and adequacy of services. Title We understand the property is held Freehold. Solicitors Becker Tansey Solicitors, Jubilee House, New Road, Clondalkin, Dublin 22. Freephone 1800 228 328 coonan.com Directions THE PROPERTY Directions From Dublin take the M4 to Celbridge east, junction 5. At the top of the interchange take a left and proceed towards Celbridge. On entering the town the Abbey Lodge pub is on the right hand side. Take the second exit off this junction keeping the river Liffey on your right hand side (sign posted Ardclough).
Recommended publications
  • Chief Executive's Report on Submissions Received to Issues Paper
    KILDARE COUNTY COUNCIL Chief Executive’s Report Submissions received on Strategic Issues Paper Celbridge & Castletown pre-draft Local Area Plan 2016-2022 Forward Planning, Planning Department June 2016 (amended September 2016) Celbridge Local Area Plan 2016-2022 Pre Draft Consultation Contents 1. Introduction .......................................................................................................................................... 3 2. Pre Draft Consultation Phase ................................................................................................................ 3 3. Submissions Received ........................................................................................................................... 4 4. Summary of Submissions ...................................................................................................................... 5 5. Chief Executive’s Response ................................................................................................................ 31 5.1 Plan Boundary and Zoning ................................................................................................................ 31 5.2 Location of Residential Zoned Land .................................................................................................. 31 5.3 Heritage and Tourism........................................................................................................................ 32 5.4 Traffic/Connectivity .........................................................................................................................
    [Show full text]
  • Arthur's Way Heritage Trail
    HERITAGE TRAIL Arthur’s Way is a heritage trail across northeast County Kildare that follows in the footsteps of Arthur Guinness. In just 16 km, it links many of the historic sites associated with Ireland’s most famous brewers – the Guinness family. Visitors are invited to explore Celbridge - where Arthur spent his childhood, Leixlip - the site of his first brewery and Oughterard graveyard - Arthur’s final resting place near his ancestral home. The trail rises gently from the confluence of the Liffey and Rye rivers at Leixlip to the Palladian Castletown House estate and onto Celbridge. It then departs the Liffey Valley to join the Grand Canal at Hazelhatch. The grassy towpaths guide visitors past beautiful flora and fauna and the enchanting Lyons Estate. At Ardclough, the route finally turns for Oughterard which offers spectacular views over Kildare, Dublin and the Province of Leinster. R o yaal l C a MAAYNOOTHYNOOTH nnala l R . L i e y 7 LEIXXLIXLLIP M4 6 5 N4 CELBBRIBRRIDGE DDUBLINUBLIN HHAZELHATCHAZELHAAAZZZELHATCELHHAATCH R . L i e y l a n a C d STRAFFAN n ra G NEWCASTLE 7 ARDCLOUGGHH N THHEE VVILLAGVILLAGEILLAGE AATT LLYONYONS CLLANEANE 4 RATHCOOLE OUGHTEERARDRRARDARD l 5 a nnal a C d nnd 6 a r G N7 y SSALLINSALLINS e 7 i L . R 8 9 NNAASAAS STAGES AND POINTS OF INTEREST STAGE POINTS OF INTEREST LEIXLIP to Arthur Guinness Square, Original Brewery Site, St. Mary’s Church, CELBRIDGE Leixlip Castle, The Wonderful Barn CELBRIDGE to Batty Langley Lodge, Castletown House, 22 Main Street, Oakley Park, HAZELHATCH Malting House, Celbridge Abbey, The Mill HAZELHATCH to Hazelhatch Railway Station, Hazelhatch Bridge, LYONS ESTATE The Grand Canal LYONS ESTATE to Aylmer’s Bridge, Lyons House, The Village at Lyons, OUGHTERARD Henry Bridge, Ardclough Village, Oughterard Graveyard LEIXLIP CELBRIDGE HAZELHATCH ARDCLOUGH OUGHTERARD 5 km 3 km 5 km 3 km 0 km Castletown House 5 km 8 km Lyons Estate 13 km 16 km LENGTH: 16km approx.
    [Show full text]
  • EMRA RSES Executive Summary
    Eastern & Midland Regional Assembly Regional Spatial & Economic Strategy (RSES) 2019-2031 Executive Summary Tionól Reigiúnach Oirthir agus Lár-Tíre Eastern and Midland Regional Assembly Regional Spatial and Economic Strategy (RSES) 2019-2031 The Regional Spatial and Economic Strategy is a strategic plan and investment framework to shape the future development of our region to 2031 and beyond. Executive Summary 1 Contents Introduction and Regional Profile ....................... 2 Vision and Key Principles ..................................... 8 Spatial Strategy ..................................................... 12 Dublin Metropolitan Area Strategic Plan .......18 Economic Strategy ................................................. 22 Climate Strategy ....................................................24 Investment Framework ....................................... 26 2 Regional Spatial and Economic Strategy (RSES) 2019-2031 Introduction The Eastern and Midland Regional Assembly (EMRA), one of three Regional Assemblies in the Republic of Ireland, works with key stakeholders at EU, national, regional and local level to enable regional development. Our functions include policy making, monitoring and oversight and promoting enhanced co-ordination in our Region. A key function is the delivery of a Regional Spatial and Economic Strategy (RSES) for our Region, which covers twelve local authorities and is organised into 3 Strategic Planning Areas (SPAs), which have an administrative sub-regional planning remit. Eastern Midland Region Region
    [Show full text]
  • Plans PCD-Schedule 19 Sept Onwards
    Public Consultation Events for Draft Flood Risk Management Plans Draft Flood Risk Management Plans are now being published for consultation on a rolling basis and we would encourage you to view them and to make a submission, setting out your views on the Draft Plans and on the questions being asked as part of the consultation. The Draft FRMPs are/will be available in the principal offices of each Local Authority and also on-line to view and/or download. As each Draft Flood Risk Management Plan is published for consultation, OPW is holding a series of public consultation events, where members of the public can ask questions in relation to the Draft Flood Risk Management Plans that are specific to their particular area. Upcoming public consultation events: Date Time CFRAM Study Area Venue County Areas Covered Galway City, Oranmore, Kinvarra, Gort, Athenry, Galway County Council, Áras an Chontae, Prospect Hill, Galway City, 19 September 2016 3-8pm Western Galway Loughrea, Tuam, Oughterard, Clifden, Co. Galway Roundstone and Corofin 20 September 2016 3-8pm Western Oranmore Community Centre, Dublin Road, Oranmore, Co. Galway Galway Oranmore / Athenry / Kinvarra / Gort / Loughrea Tuam / Ougheterard, Co. Galway /Ballyhaunis, Co. 20 September 2016 3-8pm Western Tuam Area Office, Galway County Council, High Street, Tuam Galway Mayo 21 September 2016 3-8pm Western Clifden Station House, Connemara Galway Clifden / Roundstone Allenwood / Athy /Castledermot / Monasterevin / 26 September 2016 2-7pm South-Eastern The Clanard Court Hotel, Dublin Road, Athy, Co. Kildare Kildare Rathangan / Suncroft Cavan / Ballyconnell, Co. Cavan / Ballinamore, Co. 27 September 2016 2-7pm North-Western/Neagh-Bann Hotel Kilmore, Dublin Road, Cavan Cavan Leitrim Dungarvan / Dunmore East / Tramore & Environ / 27 September 2016 2-7pm South-Eastern The Park Hotel, Dungarvan, Co.
    [Show full text]
  • Eastern CFRAM Study Final Report Unit of Management 09
    Eastern CFRAM Study Final Report Unit of Management 09 DOCUMENT CONTROL SHEET Client The OPW Project Title Eastern CFRAM Study Document Title IBE0600Rp0077_ UoM09 Final Report_F03 Document No. IBE0600Rp0077 DCS TOC Text List of Tables List of Figures No. of This Document Appendices Comprises 1 1 54 1 1 0 Rev. Status Author(s) Reviewed By Approved By Office of Origin Issue Date F01 Final version Various M Brian G Glasgow Belfast Aug 2017 F02 Draft final Various M Brian G Glasgow Belfast Sept 2017 F03 Final Various M Brian G Glasgow Belfast Oct 2017 rpsgroup.com/ireland Copyright Copyright - Office of Public Works. All rights reserved. No part of this report may be copied or reproduced by any means without prior written permission from the Office of Public Works. Legal Disclaimer This report is subject to the limitations and warranties contained in the contract between the commissioning party (Office of Public Works) and RPS Group Ireland. rpsgroup.com/ireland Eastern CFRAM Study UoM09 Final Report TABLE OF CONTENTS ABBREVIATIONS ................................................................................................................................... II 1 INTRODUCTION ........................................................................................................................ 1 1.1 UNIT OF MANAGEMENT 09 ................................................................................................ 1 1.2 OBJECTIVE OF THIS REPORT ...........................................................................................
    [Show full text]
  • 6. Movement & Transport
    6. MOVEMENT & TRANSPORT 6 AIM To promote ease of movement within and access to County Kildare, by integrating sustainable land use planning with a high quality integrated transport system; to support improvements to the road, rail and public transport network, together with cycleway and pedestrian facilities and to provide for the sustainable development of aviation travel within the county in a manner which is consistent with the proper planning and sustainable development of the county. 126 Kildare County Development Plan 2017-2023 Kildare County Development Plan 2017-2023 127 6.1 INTRODUCTION It is clear that if current trends in the region in (a) Influenced by the type of place in which the street 6.2.6 Rural Transport Initiative relation to vehicular traffic continue, congestion will is located, and Rural Transport Initiatives are supported by the The transportation system caters for the movement of increase, transport emissions will grow, economic (b) Balance the needs of all users. DTTS under the Rural Transport Programme and part communities and businesses. National and regional competitiveness will suffer and quality of life within financed by the EU through the National Development transport policy recognises that current transport Kildare will decline. trends in Ireland and the GDA, in particular levels Plan. There are currently two companies offering a 6.2.3 National Cycle Policy Framework of car use, are unsustainable and that a transition A major challenge facing Kildare during the lifetime rural transport service within the county. towards more sustainable modes of transport, such of this Plan and beyond is the need to promote and 2009-2020 as walking, cycling and public transport is required.
    [Show full text]
  • Covid-19 Temporary Timetable Monday to Saturday Dublin Heuston Dep
    Covid-19 Temporary Timetable Monday to Saturday Dublin Heuston Dep. .. .. 07:35 .. 09:25 12:45 13:25 .. 16:30 17:10 17:30 .. 18:15 18:30 Hazelhatch & Celbridge Dep. .. .. .. .. .. .. .. .. .. .. .. .. .. .. Sallins & Naas Dep. .. .. .. .. .. .. 13:42 .. .. .. 17:47 .. .. .. Newbridge Dep. .. .. .. .. .. .. 13:50 .. 16:51 17:31 17:55 .. .. .. Kildare Dep. .. .. 08:00 .. .. .. 13:56 .. 16:58 17:38 .. .. .. .. Monasterevin Dep. .. .. .. .. .. .. 14:03 .. .. 17:45 .. .. .. 19:04 Portarlington Dep. .. .. 08:14 .. 10:01 13:23 14:12 .. .. 17:55 18:12 .. .. 19:13 Tullamore Dep. .. .. 08:31 .. 10:18 13:40 14:29 .. 17:26 18:12 18:29 .. 19:07 19:31 Clara Dep. .. .. 08:40 .. 10:26 13:48 .. .. .. 18:22 18:42 .. .. 19:39 Athlone Arr. .. 08:59 .. 10:48 14:05 14:50 .. 17:49 18:45 19:00 .. 19:29 19:54 Dep. 06:50 .. 09:05 .. 10:50 To 14:58 .. 17:49 .. 19:00 .. To 19:54 Ballinasloe Dep. 07:07 .. 09:20 .. 11:05 W’port 15:18 .. 18:08 .. 19:16 .. W’port 20:10 Woodlawn Dep. 07:18 From 09:30 From .. .. 15:28 From 18:18 .. .. From .. 20:22 Attymon Dep. 07:24 Lmrck 09:37 Lmrck .. .. .. Lmrck .. .. .. Lmrck .. .. Athenry Dep. 07:33 07:48 09:48 10:54 11:27 .. 15:40 15:54 18:32 .. 19:38 20:07 .. 20:33 Oranmore Dep. 07:44 08:00 09:59 11:05 11:39 .. .. 16:05 .. .. 19:51 20:18 .. 20:46 Galway (Ceannt) Arr. 07:51 08:10 10:08 11:14 11:48 .. 15:59 16:14 18:50 .
    [Show full text]
  • Iarnród Éireann Strategy 2027 Foundations We Are Building On
    Iarnród Éireann Strategy 2027 Foundations we are building on 4,915 train services Almost 1 million run weekly passengers carried weekly 348,000 629 carriages train-km in our fleet weekly 144 stations 2,200 km over 4,000 employees served countrywide in our network 2 Foreword by Jim Meade, Chief Executive On behalf of Iarnród Éireann, I am pleased to present our Strategy 2027. This document, primarily prepared during 2019 in a world before COVID-19, sets out how our services will be transformed over the life of the National Development Plan 2018-2027 in response to changing customer needs including the key role Ireland’s railway will play in helping to power the nation’s economic and social development towards a sustainable, inclusive and prosperous future. In finalising this document during the COVID-19 pandemic, we recognise that there capacity increases, programmes that included four-tracking of the Hazelhatch & is significantly-increased uncertainty with it likely to be some time before we have Celbridge to Parkwest & Cherry Orchard line, opening the M3 Parkway to a full understanding of the impact on Ireland’s requirements for public transport. Docklands route, re-opening the Phoenix Park Tunnel to facilitate Kildare Line That said, in a post-pandemic world, as with all economic recoveries, the needs of services reaching key districts in the south of the city, opening commuter lines people for mobility and increasing preference for sustainable modes such as rail from Cork to Midleton and bringing passenger services back to the Western Rail will manifest themselves. The Strategy presents a framework for rail development Corridor, in total, a combined investment in sustainable mobility of over €2Bn, that, having considered three demand scenarios, can be suitably flexible in delivered on-time and to budget.
    [Show full text]
  • Naas, Co.Kildare Contents
    NAAS, CO.KILDARE CONTENTS Kildare 4 A NATURAL Naas 6 Amenities 16 ENVIRONMENT Millennium Park 24 Masterplan 26 TO GROW & Quality of Occupiers 30 Connectivity & Telecoms 32 PROSPER The Developers 33 Contacts 36 MILLENNIUM PARK NAAS, CO. KILDARE Ireland’s accessibility, highly educated population, positive tax environment and membership of the EU make it one of the world’s most attractive places to do business. Among many other advantages, the accessibility, affordability and the quality of life that Millennium Park offers businesses and their staff make it a uniquely compelling option. Already, high profile national and international companies including Kerry Group, State Street and Allied Irish Bank benefit from all that Millennium Park offers. As a visionary masterplan is turned into reality over the next decade, they will be joined by many others. 2 3 RUSH & LUSK M3 PARKWAY M2 SWORDS N MILLENNIUM PARK MALAHIDE W E M1 M3 S DART DUBLIN AIRPORT DUNBOYNE PORTMARNOCK BLANCHARDSTOWN C O . M E A T H BAYSIDE SUTTON HOWTH C O . K I L D A R E HOWTH & DONAGHMEDE HANSFIELD KILBARRACK NAVAN ROAD RAHENY KILDARE: CLONSILLA M50 MAYNOOTH PARKWAY HARMONSTOWN COOLMINE KILLESTER BROOMBRIDGE HOWTH LUCAN ASHTOWN GATEWAY TO DRUMCONDRA BULL CLONTARF M4 PHOENIX ISLAND IRELAND PARK CONNOLLY DOCKLANDS HEUSTON THE POINT National and international TARA PARK WEST & CLONDALKIN/ M50 PEARSE CHERRY ORCHARD access is assured ADAMSTOWN FONTHILL GRAND CANAL ST STEPHEN'S GREEN LANSDOWNE DUBLIN SANDYMOUNT BAY HAZELHATCH & CELBRIDGE CLONDALKIN BY CAR SYDNEY PARADE DART DUBLIN Millennium Park to Drive time Km BOOTERSTOWN BLACKROCK Dublin City Centre 40 mins 28 DÚN BLACKWOOD SEAPOINT LAOGHAIRE TALLAGHT DUNDRUM M50 15 mins 20 SALTHILL & MONKSTOWN 4 SAGGART MARLAY GLENAGEARY 5 Dublin Airport 40 mins 40 DALKEY M7 PARK Naas 3 mins 2 N11 M50 Train Station 2 mins 1.5 SALLINS KILLINEY & NAAS SALLINS C O .
    [Show full text]
  • Resident Charities and Approved Bodies
    Resident charities authorised under the Scheme of Tax Relief for Donations to eligible charities and other Approved Bodies under the provisions of Section 848A of the Taxes Consolidation Act 1997 30 June 2021 Queries via Revenue's MyEnquiries facility to: Charities and Sports Exemption Unit or telephone 01 7383680 Chy No Charity Name Charity Address 41 Saint Patrick's College Maynooth County Kildare The Congregation of the Holy Spirit Province of Ireland (the 76 Province) under the protection of the Immaculate Heart of Temple Park Richmond Avenue South Dublin 6 Mary 80 Mount Saint Josephs Abbey Mount Heaton Roscrea Co Tiobrad Aran 87 All Hallows College All Hallows College Grace Park Road Drumcondra Dublin 9 106 The Religious Sisters of Charity Provincial House Our Lady'S Mount Harolds Cross Dublin 6 112 Sisters of Charity - Generalate C/O Sr Christina Rankin Caritas 15 Guildford Road Dublin 4 128 Congregation of Sisters of Mercy Northern Province Ardee Co Louth Sr Marie King Mercy Sisters Western Province Stewardship 166 Congregation of the Sisters of Mercy Western Province Office Society Street Ballinasloe Co Galway 186 Saint Clare's Generalate - Harolds Cross Sr Maureen O Dea St Clares Convent Harolds Cross Dublin 6 209 St Patrick's Hospital James'S St Dublin 8 Michael Corcoran Finance Department St Johns Hospital Johns 212 St John's Hospital Square Limerick 220 Wilson Hospital School Company Limited by Guarantee C/O Adrian G Oughton Multyfarnham County Westmeath 233 National Childrens Hospital Appeal Fund Office Tallaght Hospital
    [Show full text]
  • Republic of Ireland Railways & Tramways
    REPUBLIC OF IRELAND RAILWAYS & TRAMWAYS - SL 125 17.09.21 page 1 of 15 PASSENGER STATIONS & STOPS Great Northern (Ireland) Rly (1-5), Great Southern Rly (10- 47), Midland Great Western Rly (50-66) & Dublin & South-Eastern Rly (70-73), Other Railways & Tramways (75-99) and Dublin & Cork Tramways (100-101) Based on various Bradshaws Guides (Brad) 1850, 1858, 1864, 1878, 1885, 1897 (z), 1913, 1934 etc, Red Guide (RG) & company timetables. (date)t – public timetables; (date)w – working timetables. U: unadvertised station/halt with purpose #: Additional information from Johnson’s Atlas & Gazetteer of the Railways of Ireland (1997) and railway histories. Former station & railway company names: [ ] Distances in Miles; Gauge 5’ 3” unless noted; op. opened; cl. closed; rn. renamed; rl. relocated; tm. terminus of service at date shown. Stations open in Bold All points served by passenger trains unless shown ( ) or noted. Bilingual English/Gaelic nameboards are provided at most current stations, but, to my knowledge, the Gaelic names, unless the only name at the time, have never been shown in the public timetables. See Wikipedia on-line entries for current stations for the Gaelic names – not shown in my list. Current operator: Irish Rail (IR); previous operator: Córas Iompair Éireann (CIE); N 1 : Line references in Northern Ireland Rlys list. LUAS Light Rail stops (j) only shown where located on former CIE lines GREAT NORTHERN RAILWAY (IRELAND) [GNI] (Eire-Northern Ireland border) >> DUNDALK – CLONES see N 11 62.8 Adavoyle (N1) >> DUNDALK – OMEATH see N 6 >> INNISKEEN – CARRICKMACROSS see N 12 2. HOWTH BRANCH [GNI] >> BALLYBAY – COOTEHILL see N 13 >> CLONES – CAVAN / BELTURBET see N 9 4.7 Howth Junction & Donaghmede (1) 5.7 Bayside 1.
    [Show full text]
  • Table of Contents
    Table of Contents Introduction 0 2 How is this Environmental Impact Statement structured? 0 4 Where can copies of the Environmental Impact Statement be obtained? 4 4 Who put together the Environmental Impact Statement? 0 4 What is the Kildare Route Project? 0 5 Why is the Kildare Route Project necessary? 0 6 What aspects of the Kildare Route Project have attracted comment? - public consultation. 0 7 Where is the Kildare Route Project to be built?- Alternatives 9 How will the Kildare Route Project operate when built? 11 When is the construction of the project scheduled to start and how long will this last? 11 Who and what will be affected by the Kildare Route Project? 13 Direct and indirect effects resulting from the use of natural resources 17 Direct and indirect effects resulting from the emission of pollutant, the creation of nuisances and the elimination of waste 17 Forecasting methods used to assess the effects on the environment 17 Interactions 17 Figure 10.1 Strategic map showing the Kildare Route Project 0 2 1 Non technical summary Non technical summary This is the non technical summary of the Environmental Impact Statement (EIS) relating to the Kildare Route Project or the KRP for short. The EIS is part of a Railway Order (RO) that will be submitted to the Minister of Transport. The RO will include drawings and maps of the proposals that form this application. The route and extent of the KRP is indicated in the map below. The KRP is a railway improvement project for part of the Dublin • likely significant effects of the proposed railway works on the to Hazelhatch railway line, proposed by Iarnród Éireann.
    [Show full text]