Rådgivertjenester Omformerteknikk Og Kraftsystem

Total Page:16

File Type:pdf, Size:1020Kb

Rådgivertjenester Omformerteknikk Og Kraftsystem Future Railway Power Supply Bane NOR Energi, Planning dept. Nils Grønneberg 2017-02-02 Bane NOR Energi’s assignment Ensure an adequate and stable railway power supply at the correct voltage and frequency. Sounds simple… …but we can’t do it without a lot of help from others! We will see a number of projects in the next few years, which directly affect our railway power supply. 2 Railway network undergoing development The section maps of the future will look different. NTP 2018 – 2029 is aggressive: • More people to travel by train • Environmentally-friendly transport • Significant increase in capacity • Higher frequency of departures • Significant reduction of travel time This means: • More sections • New tracks on the sections • More double track • Electrification 3 Consequences for railway power supply Factors with a direct effect: • Increase in passenger traffic – new timetables • Increase in freight traffic • New rolling stock • Increasing power required • Modernisation of overhead contact line system (with autotransformers) Action by Bane NOR: • New systems must be constructed • Existing systems must be upgraded • Maintenance must be intensified • New studies, master plans and analyses of load flow and stability 4 Bane NOR power system study National overview of the power systems. • Overarching report A shared starting point PSSP Referrals References • Describes the current system • Results and recommendations from section-based studies, simulations, analyses and Section-based studies measurements. • Overall plans 5 Major projects A selection of projects: • New double track for Vestfold Line towards Tønsberg • New double track for Farriseidet – Porsgrunn • Follo Line, Oslo – Ski • Electrification of Trønder and Meråker lines – near Trondheim • Ringerike Line, Sandvika – Hønefoss • New double track for Dovre Line, Kleverud – Sørli • Upgrade of overhead contact line on Kongsvinger Line • Double track for Østfold Line – western route • Upgrade of Østfold Line – eastern route • Upgrade of Dovre Line, north • Introduction of new rolling stock to the Gjøvik Line • Boost with mobile static converters 6 Studies for new major projects A selection of studies: • Double track for Ofoten Line, Narvik – Kiruna • Double track for Sørlandet Line, Nærbø – Sandnes • Double track for Dovre Line, Hamar – Lillehammer • Double track for Vestfold Line, Tønsberg – Larvik • Grenland Line, Porsgrunn – Skorstøl • Double track for Bergen Line, Arna – Voss • Kongsberg Line, Hokksund – Kongsberg • Linking of Gjøvik Line to Dovre Line • Electrification of Røros Line, Hamar – Elverum – Støren • Electrification of Solør Line, Hamar – Elverum – Kongsvinger 7 Typical procurements – Bane NOR Energi Studies and master plans • Calculations and financial uncertainty analyses • Network analyses (stability, resonance) • Concept development • RAMS analyses • Planning processes • Site plans • Noise calculations and noise plan • Surveys, environmental and biological diversity • Risk analyses • Preliminary inspections and site assessments 8 Typical procurements – Bane NOR Energi Detailed planning phase • Concept development, system definition • Tender documents and specifications: - earthwork - building requirements - electrotechnical requirements • Consultancy services • General project assistance • Acquisition of land 9 Typical procurements – Bane NOR Energi Implementation phase/construction phase • EPC contracts for converter stations • Assistance of construction client • Site assessments • Supply (and development) of converters • Supply of transformers • Supply of high-voltage breaker systems • Supply of protection and control equipment • Revisions • Transport, lifting, installation, fitting • Inspections • etc. 10 .
Recommended publications
  • Botaniske Verdier I Dovrefjell Området, Hedmark
    Rapport nr. 2/98 Botaniske verdier i Dovrefjell­ området, Hedmark av Reidar Elven og Eli Fremstad NB: Dette er et skannet og OCR-behandlet dokument. Teksten er derfor ikke korrekturlest og rettet. Det er bildet av teksten som er korrekt, ikke den kopierbare teksten. Botaniske verdier i Dovrefjell-området, Dato: Hedmark 26.03.98 Forfatter(e): Antall sider: Reidar Elven og Eli Fremstad 34 Prosjektansvarlig: ISSN-nr: Hans Chr. Gjerlaug ISSN 0802-7013 Finansiering: ISBN-nr: Sammendrag: Rapporten oppsummerer botaniske verdier i form av flora og vegetasjonstyper som er kjent innenfor et planleggingsområde i Hedmark som er fastsatt i forbindelse med arbeidet med sikte på utvidelse av Dovrefjell nasjonalpark med eventuelle tilgrensende landskapsvernområder. Området omfatter deler av Tynset og Folldal kommuner, samt mindre deler av Oppdal (Sør-Trøndelag) og Dovre (Oppland) kommuner. Deler av området er dårlig undersøkt, særlig m.h.t. vegetasjon. For Folldalsfjellene foreligger det en vegetasjonsundersøkelse fra 1914. Innerdalen ble grundig undersøkt i 1970-årene. Betydelige botaniske verdier gikk tapt ved oppdemmingen av Innerdalsmagasinet. Planleggingsområdet i Hedmark rommer store botaniske verdier, til dels elementer som er dårlig dekt eller som ikke er representert ellers innenfor det totale vurderingsområdet for verneplanarbeidet i Dovrefjell. Fortsatt beite er viktig for å beholde preget av tradisjonelt drevne kulturlandskap i flere av dalførene. Utvidelsen vil kunne gi et verneområde som strekker seg fra klart oseanisk seksjon (02) til svakt kontinental seksjon (Cl), og som kan bli ett av de mest varierte i Europa med hensyn til klima og naturtyper. Floraen østover er delvis en uttynning av Dovrefjellfloraen. Rapporten gir også et sammendrag av tilleggsundersøkelser i 1996 innenfor det planleggingsområdet som ble behandlet av Elven et al.
    [Show full text]
  • Measuring the Inaccurate: Causes and Consequences of Train Delays
    Summary: Measuring the inaccurate: Causes and consequences of train delays TØI Report 1459/2015 Author(s): Askill Harkjerr Halse, Vegard Østli and Marit Killi Oslo 2015, 71 pages Norwegian language In this report, we argue that the rich available data on train performance and railway infrastructure should be used to get precise measurements of economic relationships in railway management. As one such exercise, we first show how temporary speed reductions on railway links caused by low infrastructure quality affects running time and delays for Norwegian freight trains. Even though each speed reduction only adds about 44-50 seconds to running time, speed reductions still contribute to delay at the destination. Secondly, we show that delays has a negative effect on demand for passenger and freight trains services. The corresponding demand elasticity is lower than the one implied by willingness-to-pay studies, consistent with evidence from Great Britain. In is widely acknowledged in the transportation economics literature that more reliable transport time constitutes an economic benefit. In the presence of unreliability, individuals and firms adjust by taking costly measures like departing early or keeping a safety stock of goods. The ‘cost’ of train delays is therefore the foregone benefits that could have been achieved if all trains were running on time. Much of the existing literature on railway punctuality is based on optimization and/or simulation, calling for more empirical studies. In the innovation project PRESIS, funded by the Research Council of Norway and the Norwegian National Rail Administration, we have developed methods to survey reliability in the Norwegian rail sector.
    [Show full text]
  • Accesrailqr1.Pdf
    Acknowledgement: This document was developed by Galileo International, Training and Development. Customer feedback is important to us. Please take a few minutes to send any questions or comments to us at [email protected] ©2005 Galileo International. All Rights Reserved. Apollo, Galileo, the Globe device, Galileo 360o Learning, Best Buy Quote, Claim PNR, Custom Check, Focalpoint, Front Page News, Galileo 360 o Fares, GlobalWare, Inside Availability, Inside Link, Preview Plus, TravelScreen, Private Fares, PRO-files, Queue Manager, Scriptwriter Plus, Travel Directory, and Viewpoint are either registered trademarks or service marks of Galileo International in the United States and/or other countries. 8/05 GB AccesRail Quick Reference, August 2005 1 Contents AccesRail Products ....................................................................................................................3 AccesRail Facts ..........................................................................................................................4 AccesRail Rail Passes/Rules .....................................................................................................4 BritRail Pass ............................................................................................................................. 4 Eurail Pass (Available U.S./Canada only) ................................................................................. 5 Norway in a Nutshell Pass (Available U.S./Canada only) ........................................................
    [Show full text]
  • Rebuilding Efforts to Take Years News Officials Estimate All Schools in Oslo Were Evacu- Ated Oct
    (Periodicals postage paid in Seattle, WA) TIME-DATED MATERIAL — DO NOT DELAY News In Your Neighborhood A Midwest Celebrating 25 welcome Se opp for dem som bare vil years of Leif leve sitt liv i fred. to the U.S. De skyr intet middel. Erikson Hall Read more on page 3 – Claes Andersson Read more on page 13 Norwegian American Weekly Vol. 122 No. 38 October 21, 2011 Established May 17, 1889 • Formerly Western Viking and Nordisk Tidende $1.50 per copy Norway.com News Find more at www.norway.com Rebuilding efforts to take years News Officials estimate All schools in Oslo were evacu- ated Oct. 12 closed due to it could take five danger of explosion in school years and NOK 6 fire extinguishers. “There has been a manufacturing defect billion to rebuild discovered in a series of fire extinguishers used in schools government in Oslo. As far as I know there buildings have not been any accidents be- cause of this,” says Ron Skaug at the Fire and Rescue Service KELSEY LARSON in Oslo. Schools in Oslo were Copy Editor either closed or had revised schedules the following day. (blog.norway.com/category/ Government officials estimate news) that it may take five years and cost NOK 6 billion (approximately Culture USD 1 billion) to rebuild the gov- American rapper Snoop Dogg ernment buildings destroyed in the was held at the Norwegian bor- aftermath of the July 22 terrorist der for having “too much cash.” attacks in Oslo. He was headed to an autograph Rigmor Aasrud, a member of signing at an Adidas store on the Labor Party and Minister of Oct.
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Top 10 Countries to See by Rail: Your Guide to Train Travel in Europe *
    TOP 10 COUNTRIES TO SEE BY RAIL: YOUR GUIDE TO TRAIN TRAVEL IN EUROPE Gjøvik Bergen Elverum Vainikkala Lahti Kouvola Gävle Loimaa Thurso Hønefossnefo Roa Rihimäki Kongsvinger Gardermoen Borlänge Hyvinkää Torsby Turku Wick Kerava Kotka Norway Oslo Ludvika 12h Salo Charlottenberg Espoo Northern Europe Drammen Helsinki Kongsberg Arvika Uppsala Maarianhamina Karjaa Narvik Riksgränsen Nordagutu Moss Kil Västeråsterås Hanko 2h Karlstad 18h Kiruna Kyle of Lochalsh StavangerStavanger Sarpsborg Kristinehamn ArlandArlandaa ( 0 100 200 300 Eskilstuna Mallaig Inverness SandefjordSandefjord 15h Tallinn Neslandsvatn Larvik Halden Örebro distances in kilometres Kornsjø Stockholm Lofoten Fort William LaLangesundngesund Laxå 0 50 100 150 200 Bodø Sira Strömstad Vänern Hallsberg Katrinholm distances in miles Kolari Aberdeen Arendal Fauske Egersund Kemijärvi Oban Gällivare KristiansandKristiansand Uddevalla Skövde Motala Estonia Rovaniemi Perth Nyköping TTrollhättanrollhättan Norrköping Mo i Rana Jokkmokk Dundee k Falköping Linköping a Mosjöen Glasgow r Haparanda e r Boden a g Skagen 17h S k Jönköpingng Tornio Kemi Hirtshals Luleå Londonderry Edinburgh Göteborg Hjørring Borås Västervik Frederikshavn avn Nässjö Russia Ballina Sligo 1h45min Northern Thisted K Hultsfred Arvidsjaur CCairnryanairnryan Oulu a Oskarshamn Westport Ireland Great Ålborg SwedeSwedenn Storuman t Varberg Grong a BelfBelfastast Stranraer t Berga i DeDenmarkn e n Kontiomäki Struer Skive Gotland Lycksele Carlisle g h Kajaani Latvia Steinkjer t Viborgorg Halmstad a Riga Republic of Holstebro
    [Show full text]
  • Annual Report 2004
    Annual Report 2004 1 Contents Time for trains 3 What is Jernbaneverket? 4 Organisational structure 5 Safety 6 Finance and efficiency 10 Operations 10 Maintenance 11 Capital expenditure – rail network development 12 State Accounts for 2004 14 Human resources 16 Personnel and working environment 16 JBV Ressurs 16 Competitiveness 18 Train companies operating on the national rail network 18 Infrastructure capacity – Jernbaneverket’s core product 18 Operating parameters 19 Key figures for the national rail network 21 Traffic volumes on the national rail network 23 Punctuality 24 Environmental protection 26 International activities 28 Contact details 30 www.jernbaneverket.no 2 Cover: Jernbaneverket’s celebrations to mark 150 years of Norwegian railways. Photo: Øystein Grue Time for trains The past year marked the 150th anniversary of the railways in Norway and proved a worthy celebration. Punctuality has never been better, rail traffic is growing, and in summer 2004 the Norwegian Parliament took the historic decision to invest NOK 26.4 billion in developing a competitive rail network over the ten years from 2006 to 2015. In other words, the anniversary year not only provided the opportunity for a nostalgic look back, but also confirmed that the railways will continue to play a central role in the years ahead. In line with Parliament’s decision, value our good working relationship with autumn 2005. This brings us one step clo- Jernbaneverket has drawn up an action the trade unions. The railway has a culture ser to our goal of an efficient, modern rail programme which, if implemented, will and a historic legacy which need to be network in the Oslo region.
    [Show full text]
  • Bergen Kommune Brosjyre.ENG.Indd
    The City is Bergen History • Nature • Industry • Culture Street life • Services City of Water FACTS ABOUT BERGEN With a population of 240.000, Bergen is Norway’s second largest As the capital of Western city and the largest in the county of Hordaland. It is also the capital Norway, Bergen has devel- of Western Norway, which is the leading region for all signifi cant oped close ties with other municipalities in the region, Norwegian export industries. such as joint ownership of the Port Authorities of Bergen is a charming blend of tradition and innovation. Throughout Bergen, the regional waste history Bergen has built a strong reputation as a centre for trade and management company BIR shipping. This is due to its strategic location on the coast. Proximity and the regionally owned power company BKK. to the sea has continued to provide benefi ts for the maritime and marine industries and for tourism. The Bergen region has the most complete maritime environment and is also an international centre of infl uence for fi sheries, aquaculture and seafood. Western Norway produces 80% of Norway’s exports of crude oil, and the Bergen region is home to a leading expertise within oil and gas on a global scale. Bergen has a considerable shipping fl eet, and the city is dominant in the global market of transporting chemicals and other goods. The Bergen region is also home to strong and growing industries within information and communication technology (ICT), media, the arts and education. The municipality supports several network organisations, such as Maritime Bergen, Fiskeriforum Vest, Bergen Tourist Board, Hordaland Oil and Gas, Education in Bergen and Bergen Media City.
    [Show full text]
  • Jernbaneverket
    On track in 2008 A brief look at the activities of Jernbaneverket Director General Elisabeth Enger is preparing for record railway investments and recruiting more and more young people to Jernbaneverket, the Norwegian National Rail Administration ALL ABoard! 155 years of Norwegian Contents railway history All aboard! 155 years of Norwegian railway history 2 1854 Norway’s first railway line opens, linking Kristiania As Jernbaneverket’s new Director General, I see a high level of commitment to Key figures 2 (now Oslo) with Eidsvoll. the railways – both among our employees and others. Many people would like 1890-1910 Railway lines totalling 1 419 km are built in Norway. All aboard! 3 to see increased investment in the railway, which is why the strong political will 1909 The Bergen line is completed at a cost equivalent to This is Jernbaneverket 4 the entire national budget. to achieve a more robust railway system is both gratifying and inspirational. 2008 in brief 6 1938 The Sørland line to Kristiansand opens. Increased demand for both passenger and freight transport is extremely positive Working for Jernbaneverket 8 1940-1945 The German occupation forces take control of NSB, because it is happening despite the fact that we have been unable to offer our Norwegian State Railways. Restrictions on fuel Construction 14 loyal customers the product they deserve. Higher funding levels are now providing consumption give the railway a near-monopoly on Secure wireless communication 18 transport. The railway network is extended by grounds for new optimism and – slowly but surely – we will improve quality, cut Think green – think train 20 450 km using prisoners of war as forced labour.
    [Show full text]
  • Dovre Returns from Harvard Divinity School Artist's Rendering of Missing
    ConverSAtion: an Printed on 100% Fargo Dome has update on student grand opening government recycled paper 10 ^^T"";" The Concordian Concordia College, Moorhead, Minnesota Volume 89, Number 11, December 4,1992 Dovre returns from Harvard Divinity School by Elizabeth Kllnker the changes are very intriguing, to compare Concordia to these participated daily, in a rich array full schedule, his wife Mardeth, especially the discussion other institutions. From this, Dr. of cultural events, public lectures, was involved in a structured news writer concerning multi-cultural Dovre came to the conclusion that symposiums, and concerts. These course that was related to her area Dr. Paul J. Dovre has recently education and what other nations Concordia was, "Right on track," activities were enjoyed of teaching. Thus, the trip was returned from his experience as a are doing. This topic was of which can be attributed to the immensely by both he and his filled with learning experiences visiting scholar at Harvard extreme interest to Dr. Dovre many initiatives and positive wife. He also had the chance to for both Dr. Dovre and his wife. University during the months of because it allowed him to learn energy here. use the library at Harvard, which Overall, Dr. Dovre thought that October and November. His trip more about other education Along With the many classes was quite impressive. While Dr. Cambridge was a wonderful place was filled with many positive systems as well as allowing him he attended. Dr. Dovre Dovre was keeping busy with his to be during an election season. experiences in which he gained a He said there was much greater knowledge of many Norway trip will include Nobel luncheon and Hamar visit excitement all around the East aspects in higher education.
    [Show full text]
  • Hydrogen and Batteries for Propulsion of Freight Trains in Norway
    Hydrogen and Baeries for Propulsion of Freight Trains in Norway Federico Zenith Steffen Møller-Holst Magnus Thomassen Birmingham, July 4–5, 2016 Outline Non-Electrified Railways in Norway Alternaves for Electrificaon Techno-Economical Analysis 1 Outline Non-Electrified Railways in Norway Alternaves for Electrificaon Techno-Economical Analysis 2 Norwegian Railway Network Focus on non-electrified lines (in red) • Røros and Solør lines (381 km, 94 km) – Catenary officially proposed – “Backup” for Dovre line • Rauma line (111 km) – Scenic line for tourists – Catenary not desirable • Nordland line, 731 km – To be partly electrified (130 km) – Up to 19 ‰ slope • Policians: “Please electrify everything” • Railway authority asked SINTEF 3 Freight on Nordland line Alternaves for Railway Electrificaon in Norway As considered in SINTEF’s study • Alternaves considered: – Biofuels – Natural gas – Hydrogen – Baeries – Diesel – Catenary – Hybrids • Evaluaon criteria – Environment – Technology readiness – Regulatory framework – Economy – Flexibility & robustness 4 Alternaves for Railway Electrificaon in Norway As considered in SINTEF’s study • Alternaves considered: – Biofuels – Natural gas – Hydrogen – Baeries – Diesel – Catenary – Hybrids • Evaluaon criteria – Environment – Technology readiness – Regulatory framework – Economy – Flexibility & robustness Freight on Nordland line 4 • Crosses polar circle • Strong winds (few or no trees) • Ice formaon on infrastructure 10-hour cab rides on Youtube (“Nordlandsbanen minu for minu”) The Nordland Line • Single-track
    [Show full text]
  • 14 09 21 Nordics Gids 200Dpi BA ML
    1 Impressies Oslo Vigelandpark Architecten aan het werk bij Snohetta Skyline in stadsdeel Bjørvika Stadhuis Oeragebouw (Snohetta) Noors architectuurcentrum Gyldendal Norsk Forlag (Sverre Fehn) Vliegveld Gardemoen (N.Torp) Mortensrud kirke (Jensen Skodvin) Ligging aan de Oslo Fjord Vikingschip Museum Nationaal museum 2 Impressies Stockholm Husbyparken Bonniers Konsthalle Royal Seaport Bibliotheek Strandparken Medelhavsmuseet HAmmersby sjostad Riksbanken Markus Kyrkan Arstabridge Terminal building Vasaparken 3 Inhoudsopgave Inhoudsopgave Programma 5 Contactgegevens 7 Deelnemerslijst 8 Plattegronden Oslo 9 Plattegronden Stockholm 11 Introductie Oslo 13 Noorse architectuur 15 Projecten Oslo 21 Introductie Stockholm 48 Projecten Stockholm 51 4 Programma Oslo OSLO, vrijdag 12 september 2014 6:55 KLM vlucht AMS-OSL 9:46 transfer met reguliere trein van vliegveld naar CS (nabij hotel) 10:10 bagage drop Clarion Royal Christiania Hotel, Biskop Gunnerus' gate 3, Oslo 10:35 reistijd metro T 1 Frognerseteren van Jernbanetorget T (Oslo S) naar halte Holmenkollen T 11:10 Holmenkollen ski jump, Kongeveien 5, 0787 Oslo 12:00 reistijd metro T 1 Helsfyr van Holmenkollen T naar halte Majoerstuen T 12:40 Vigelandpark, Nobels gate 32, Oslo 14:00 reistijd metro T 3 Mortensrud van Majorstuen T naar halte Mortensrud T 14:35 Mortensrud church, Mortensrud menighet, Helga Vaneks Vei 15, 1281 Oslo 15:20 reistijd metro 3 Sinsen van Mortensrud naar halte T Gronland 16:00 Norwegian Centre for Design and Architecture, DogA, Hausmanns gate 16, 0182 Oslo lopen naar hotel
    [Show full text]