Venjar–Sørli Project

Total Page:16

File Type:pdf, Size:1020Kb

Venjar–Sørli Project Venjar–Sørli Project Supplier meeting 2017-02-02 Lien - Andersen Venjar – Sørli Project • The project is part of the InterCity section between Oslo and Hamar – construction of new double tracks • Construction completed in 2024 • Venjar – Langset • Kleverud – Sørli 2 Venjar – Langset Project It has been decided to implement the project with the following construction contracts: • An execution contract for substructure/ground works and technical railway installations Venjar – Eidsvoll North • An execution contract for substructure/ground works and technical railway installations Eidsvoll North – Langset • Extension of the interlocking system on the Gardermoen Line • An EPC contract for new signalling system on the Dovre Line 3 IC Venjar – Langset milestones 4 Investments Venjar – Langset Duration Contract Constructio Proj. No: Project name Line section (number of signing n start years) Preparatory work all disciplines Dovre Line ongoing VE Venjar – Eidsvoll Gardermoen/ 2018 2018 5 Dovre lines EL Eidsvoll – Langset Dovre Line 2018 2018 5 Signalling system Eidsvoll – Langset Dovre Line 2021 2021 3 Signalling system Gardermoen Line Gardermoen Line 2017 2020 4 5 Railway power supply & overhead contact line Delivery of the railway power supply including: • New switching post Eidsvoll • Number of switches 7 x 1p and 11 x 2p. Delivery of the overhead contact line system including: • Auto transformers (AT) x 4 • Overhead contact line for all new and temporary tracks, approx. 21 km 6 Electrical power supply 50 Hz 22 kV high voltage distribution network: • Transformers 22 kV x 6 • High voltage switchgear x 6 • High voltage cables approx. 10 km 7 Low voltage power supply 50 Hz system • Equipment in technical buildings, prefabricated kiosks and radio kiosks • Backup power supply and emergency power supply systems • Power supply for signalling system, telecom system • Power supply for disconnector switches • Point heaters • Pumping system • Fire alarm system • Control, regulation and monitoring systems (SRO) • Lighting equipment • Ventilation 8 Telecommunications Several of the installations in the points below are supplied as part of the frame contract with the contractor. • Cable system for transport network, access network, tunnels, external parties and local networks • Radio installation • Radio masts • Transmission system • Telecom room and access control 9 Kleverud – Sørli Project Contract strategy • Preparatory works • EPC contracts • An interdisciplinary EPC contract for Kleverud – Tangen which includes the Hestnes tunnel and Tangenvika railway bridge. Includes technical railway work for the entire Kleverud – Sørli section, excluding signalling. • EPC contract for substructure/ground works for Tangen – Sørli, including the new Tangen Station. • An EPC contract for new signalling system. 10 IC Kleverud – Sørli milestones 11 Investments Kleverud – Sørli Duration Contract Constructio Proj. No: Project name Line section (number of signing n start years) Preparatory work all disciplines Dovre Line 2017 KS-01 EPC contract Kleverud – Sørli Dovre Line 2018 2018 5 KS-02 EPC contract Tangen – Sørli Dovre Line 2019 2019 4 Thales subcontracts under framework Dovre Line 2021 2022 2 agreement 12 Railway power supply & overhead contact line Delivery of the railway power supply includes the following: • Section limitation switch gear x 2 Delivery of the overhead contact line system includes the following: • Auto transformers (AT) x 6 • Overhead contact line/AT for all new and temporary tracks, approx. 36 km • Switch gear, cables and connections to switch gear x 26 13 Electrical power supply 50 Hz 22 kV high voltage power supply : • Transformers 22/11kV x 8 • High voltage switch gear x 7 • High voltage cables approx.18 km 14 Low voltage power supply 50 Hz • Equipment in technical buildings, prefabricated kiosks and radio kiosks • Backup power supply and emergency power supply systems • Power supply for signalling system, telecom system • Power supply for disconnector switches • Point heaters • Pumping system • Fire alarm system • Control, regulation and monitoring systems (SRO) • Lighting equipment • Ventilation • Hestnes Tunnel – emergency lighting and emergency concept 15 Telecommunications Several of the installations in the points below are supplied as part of the frame contract with the contractor. • Cable system for transport network, access network, tunnels, external parties and local network • Radio installation in tunnel • Radio masts • Transmission system • Passenger Information System (PIS system) • Camera surveillance system (CCTV system) • Hearing induction loop • Ticketing system • Telecom room (construction client and external) and access control • Telecom centre at Espa 16 Tangen Station Installations at the new Tangen Station, including parking spaces with electric vehicle charging sockets, lighting, snow melting system, heating system, passenger information system and ticketing system. 17 18 Thank you for your attention! 19 .
Recommended publications
  • Measuring the Inaccurate: Causes and Consequences of Train Delays
    Summary: Measuring the inaccurate: Causes and consequences of train delays TØI Report 1459/2015 Author(s): Askill Harkjerr Halse, Vegard Østli and Marit Killi Oslo 2015, 71 pages Norwegian language In this report, we argue that the rich available data on train performance and railway infrastructure should be used to get precise measurements of economic relationships in railway management. As one such exercise, we first show how temporary speed reductions on railway links caused by low infrastructure quality affects running time and delays for Norwegian freight trains. Even though each speed reduction only adds about 44-50 seconds to running time, speed reductions still contribute to delay at the destination. Secondly, we show that delays has a negative effect on demand for passenger and freight trains services. The corresponding demand elasticity is lower than the one implied by willingness-to-pay studies, consistent with evidence from Great Britain. In is widely acknowledged in the transportation economics literature that more reliable transport time constitutes an economic benefit. In the presence of unreliability, individuals and firms adjust by taking costly measures like departing early or keeping a safety stock of goods. The ‘cost’ of train delays is therefore the foregone benefits that could have been achieved if all trains were running on time. Much of the existing literature on railway punctuality is based on optimization and/or simulation, calling for more empirical studies. In the innovation project PRESIS, funded by the Research Council of Norway and the Norwegian National Rail Administration, we have developed methods to survey reliability in the Norwegian rail sector.
    [Show full text]
  • Upcoming Projects Infrastructure Construction Division About Bane NOR Bane NOR Is a State-Owned Company Respon- Sible for the National Railway Infrastructure
    1 Upcoming projects Infrastructure Construction Division About Bane NOR Bane NOR is a state-owned company respon- sible for the national railway infrastructure. Our mission is to ensure accessible railway infra- structure and efficient and user-friendly ser- vices, including the development of hubs and goods terminals. The company’s main responsible are: • Planning, development, administration, operation and maintenance of the national railway network • Traffic management • Administration and development of railway property Bane NOR has approximately 4,500 employees and the head office is based in Oslo, Norway. All plans and figures in this folder are preliminary and may be subject for change. 3 Never has more money been invested in Norwegian railway infrastructure. The InterCity rollout as described in this folder consists of several projects. These investments create great value for all travelers. In the coming years, departures will be more frequent, with reduced travel time within the InterCity operating area. We are living in an exciting and changing infrastructure environment, with a high activity level. Over the next three years Bane NOR plans to introduce contracts relating to a large number of mega projects to the market. Investment will continue until the InterCity rollout is completed as planned in 2034. Additionally, Bane NOR plans together with The Norwegian Public Roads Administration, to build a safer and faster rail and road system between Arna and Stanghelle on the Bergen Line (western part of Norway). We rely on close
    [Show full text]
  • Annual Report 2004
    Annual Report 2004 1 Contents Time for trains 3 What is Jernbaneverket? 4 Organisational structure 5 Safety 6 Finance and efficiency 10 Operations 10 Maintenance 11 Capital expenditure – rail network development 12 State Accounts for 2004 14 Human resources 16 Personnel and working environment 16 JBV Ressurs 16 Competitiveness 18 Train companies operating on the national rail network 18 Infrastructure capacity – Jernbaneverket’s core product 18 Operating parameters 19 Key figures for the national rail network 21 Traffic volumes on the national rail network 23 Punctuality 24 Environmental protection 26 International activities 28 Contact details 30 www.jernbaneverket.no 2 Cover: Jernbaneverket’s celebrations to mark 150 years of Norwegian railways. Photo: Øystein Grue Time for trains The past year marked the 150th anniversary of the railways in Norway and proved a worthy celebration. Punctuality has never been better, rail traffic is growing, and in summer 2004 the Norwegian Parliament took the historic decision to invest NOK 26.4 billion in developing a competitive rail network over the ten years from 2006 to 2015. In other words, the anniversary year not only provided the opportunity for a nostalgic look back, but also confirmed that the railways will continue to play a central role in the years ahead. In line with Parliament’s decision, value our good working relationship with autumn 2005. This brings us one step clo- Jernbaneverket has drawn up an action the trade unions. The railway has a culture ser to our goal of an efficient, modern rail programme which, if implemented, will and a historic legacy which need to be network in the Oslo region.
    [Show full text]
  • Jernbaneverket
    On track in 2008 A brief look at the activities of Jernbaneverket Director General Elisabeth Enger is preparing for record railway investments and recruiting more and more young people to Jernbaneverket, the Norwegian National Rail Administration ALL ABoard! 155 years of Norwegian Contents railway history All aboard! 155 years of Norwegian railway history 2 1854 Norway’s first railway line opens, linking Kristiania As Jernbaneverket’s new Director General, I see a high level of commitment to Key figures 2 (now Oslo) with Eidsvoll. the railways – both among our employees and others. Many people would like 1890-1910 Railway lines totalling 1 419 km are built in Norway. All aboard! 3 to see increased investment in the railway, which is why the strong political will 1909 The Bergen line is completed at a cost equivalent to This is Jernbaneverket 4 the entire national budget. to achieve a more robust railway system is both gratifying and inspirational. 2008 in brief 6 1938 The Sørland line to Kristiansand opens. Increased demand for both passenger and freight transport is extremely positive Working for Jernbaneverket 8 1940-1945 The German occupation forces take control of NSB, because it is happening despite the fact that we have been unable to offer our Norwegian State Railways. Restrictions on fuel Construction 14 loyal customers the product they deserve. Higher funding levels are now providing consumption give the railway a near-monopoly on Secure wireless communication 18 transport. The railway network is extended by grounds for new optimism and – slowly but surely – we will improve quality, cut Think green – think train 20 450 km using prisoners of war as forced labour.
    [Show full text]
  • Hydrogen and Batteries for Propulsion of Freight Trains in Norway
    Hydrogen and Baeries for Propulsion of Freight Trains in Norway Federico Zenith Steffen Møller-Holst Magnus Thomassen Birmingham, July 4–5, 2016 Outline Non-Electrified Railways in Norway Alternaves for Electrificaon Techno-Economical Analysis 1 Outline Non-Electrified Railways in Norway Alternaves for Electrificaon Techno-Economical Analysis 2 Norwegian Railway Network Focus on non-electrified lines (in red) • Røros and Solør lines (381 km, 94 km) – Catenary officially proposed – “Backup” for Dovre line • Rauma line (111 km) – Scenic line for tourists – Catenary not desirable • Nordland line, 731 km – To be partly electrified (130 km) – Up to 19 ‰ slope • Policians: “Please electrify everything” • Railway authority asked SINTEF 3 Freight on Nordland line Alternaves for Railway Electrificaon in Norway As considered in SINTEF’s study • Alternaves considered: – Biofuels – Natural gas – Hydrogen – Baeries – Diesel – Catenary – Hybrids • Evaluaon criteria – Environment – Technology readiness – Regulatory framework – Economy – Flexibility & robustness 4 Alternaves for Railway Electrificaon in Norway As considered in SINTEF’s study • Alternaves considered: – Biofuels – Natural gas – Hydrogen – Baeries – Diesel – Catenary – Hybrids • Evaluaon criteria – Environment – Technology readiness – Regulatory framework – Economy – Flexibility & robustness Freight on Nordland line 4 • Crosses polar circle • Strong winds (few or no trees) • Ice formaon on infrastructure 10-hour cab rides on Youtube (“Nordlandsbanen minu for minu”) The Nordland Line • Single-track
    [Show full text]
  • 14 09 21 Nordics Gids 200Dpi BA ML
    1 Impressies Oslo Vigelandpark Architecten aan het werk bij Snohetta Skyline in stadsdeel Bjørvika Stadhuis Oeragebouw (Snohetta) Noors architectuurcentrum Gyldendal Norsk Forlag (Sverre Fehn) Vliegveld Gardemoen (N.Torp) Mortensrud kirke (Jensen Skodvin) Ligging aan de Oslo Fjord Vikingschip Museum Nationaal museum 2 Impressies Stockholm Husbyparken Bonniers Konsthalle Royal Seaport Bibliotheek Strandparken Medelhavsmuseet HAmmersby sjostad Riksbanken Markus Kyrkan Arstabridge Terminal building Vasaparken 3 Inhoudsopgave Inhoudsopgave Programma 5 Contactgegevens 7 Deelnemerslijst 8 Plattegronden Oslo 9 Plattegronden Stockholm 11 Introductie Oslo 13 Noorse architectuur 15 Projecten Oslo 21 Introductie Stockholm 48 Projecten Stockholm 51 4 Programma Oslo OSLO, vrijdag 12 september 2014 6:55 KLM vlucht AMS-OSL 9:46 transfer met reguliere trein van vliegveld naar CS (nabij hotel) 10:10 bagage drop Clarion Royal Christiania Hotel, Biskop Gunnerus' gate 3, Oslo 10:35 reistijd metro T 1 Frognerseteren van Jernbanetorget T (Oslo S) naar halte Holmenkollen T 11:10 Holmenkollen ski jump, Kongeveien 5, 0787 Oslo 12:00 reistijd metro T 1 Helsfyr van Holmenkollen T naar halte Majoerstuen T 12:40 Vigelandpark, Nobels gate 32, Oslo 14:00 reistijd metro T 3 Mortensrud van Majorstuen T naar halte Mortensrud T 14:35 Mortensrud church, Mortensrud menighet, Helga Vaneks Vei 15, 1281 Oslo 15:20 reistijd metro 3 Sinsen van Mortensrud naar halte T Gronland 16:00 Norwegian Centre for Design and Architecture, DogA, Hausmanns gate 16, 0182 Oslo lopen naar hotel
    [Show full text]
  • Relocation of Trondheim's Port
    Relocation of Trondheim's port Manuel Cienfuegos Delgado Coastal and Marine Civil Engineering Submission date: June 2014 Supervisor: Tore Øivin Sager, BAT Co-supervisor: Edward McCormack, BAT Norwegian University of Science and Technology Department of Civil and Transport Engineering Relocation of Trondheim's port Manuel Cienfuegos Delgado June 24, 2014 Dedicado a mi familia I II Preface This master thesis is the product of work carried out during the spring semester 2014 from January to June and represents the last element of my Civil Engineering degree; concluding my Civil and Transport Engineering studies period at the Nor- wegian University of Science and Technology (NTNU). The thesis was performed at the Department of civil and Transport Engineering. In the first place, I would like to thank my supervisor, associate professor Ed- ward McCormack for his support, excellent guidance and valuable comments as I developed and finished my ideas throughout the work period in my thesis resarch; Additionally I would like to thanks proffesor Trude Tørset for the time spent teach- ing me how to use the software, and to Christian Steinsland, of "tansportøkonomisk institutt", for providing me the data needed. Finally, this thesis could not be carried out without the special support of my family, specially my parents, Francisco Javier Cienfuegos and Marina Delgado, who have been absolutely essential, not only to finish this thesis, but also to get up here, without their continued support I would never have done it. Additionally, thanks to a very important person, Laura Chico, always encouraging me in my worst moments and rejoicing in my bests.
    [Show full text]
  • Norwegian Travel Workshop 2012 Norwegian Travel Workshop 2019
    1 PRE-/POST- TOURS Norwegian Travel Workshop 2012 Norwegian Travel Workshop 2019 View of Ålesund from Aksla. Photo: Arnfinn Tønnesen / VisitÅlesund 2 3 PRICES PRE AND POST TOURS 2019 INDEX NOTE! TOUR NAME/DESTINATION PAGE Participation on pre- and post-tours for NTW 2019 is free of charge apart from costs for domestic flights as specified under each tour. Cancellation of tour after 1st March 2019 will be charged with a fee equal to Pre-tour A Southern comfort - nature and culture in southernmost Norway 4 these costs. If there is no flight cost, the cancellation fee will be NOK 1.000,-. (Sørlandet & Telemark - Munch & Ibsen) Domestic flights will mainly be booked by Innovation Norway. See information under each tour re. which Pre-tour B In Ibsen’s footsteps (Oslo-Gudbrandsdalen-Geiranger) 8 flights will be booked by us and which must be arranged by each participant. Pre-tour C The railway route - a journey through Norwegian culture 12 Participants who wish to use alternative flights must book and pay them on their own. They must also ensure that (Gudbrandsdalen-Dovre-Romsdalen & Munch) departure and arrival times fit with the tour programme. In addition they must inform us, so that we may cancel flights/legs accordingly. Pre-tour D Fjord Norway - off the beaten track (Bergen-Fjordkysten-Loen) 16 Cost for legs cancelled will only be reimbursed if cancellation involves all flights connected with the tour. Pre-tour E Local food tour with World Champions 20 (Molde-Torjulvågen-Averøy-Ålesund) Please reckon with approx. 1,5 hrs for check-in/transfer in Oslo.
    [Show full text]
  • Norwegian Travel Workshop 2012 Norwegian Travel Workshop 2019
    1 PRE-/POST- TOURS Norwegian Travel Workshop 2012 Norwegian Travel Workshop 2019 View of Ålesund from Aksla. Photo: Arnfinn Tønnesen / VisitÅlesund 2 3 PRICES PRE AND POST TOURS 2019 INDEX NOTE! TOUR NAME/DESTINATION PAGE Participation on pre- and post-tours for NTW 2019 is free of charge apart from costs for domestic flights as specified under each tour. Cancellation of tour after 1st March 2019 will be charged with a fee equal to Pre-tour A Southern comfort - nature and culture in southernmost Norway 4 these costs. If there is no flight cost, the cancellation fee will be NOK 1.000,-. (Sørlandet & Telemark - Munch & Ibsen) Domestic flights will mainly be booked by Innovation Norway. See information under each tour re. which Pre-tour B In Ibsen’s footsteps (Oslo-Gudbrandsdalen-Geiranger) 8 flights will be booked by us and which must be arranged by each participant. Pre-tour C The railway route - a journey through Norwegian culture 12 Participants who wish to use alternative flights must book and pay them on their own. They must also ensure that (Gudbrandsdalen-Dovre-Romsdalen & Munch) departure and arrival times fit with the tour programme. In addition they must inform us, so that we may cancel flights/legs accordingly. Pre-tour D Fjord Norway - off the beaten track (Bergen-Fjordkysten-Loen) 16 Cost for legs cancelled will only be reimbursed if cancellation involves all flights connected with the tour. Pre-tour E Local food tour with World Champions 20 (Molde-Torjulvågen-Averøy-Ålesund) Please reckon with approx. 1,5 hrs for check-in/transfer in Oslo.
    [Show full text]
  • Rs 2002 Eng 20 Juni
    Annual Report 2002 Contents Director General’s review .............................. 1 What is Jernbaneverket?................................ 2 Organisational structure ................................ 3 Safety .................................................................. 4 Finance and efficiency.................................... 8 Operations and maintenance Capital expenditure – rail network development State Accounts for 2002 Human resources ............................................ 14 Personnel and working environment Competitiveness .............................................. 16 The Norwegian railway network Map: Line priority Key figures for the national rail network Traffic volumes on the national rail network Punctuality ........................................................ 20 Environmental protection ............................ 22 International activities.................................... 24 Cover: Nina Rognved, construction supervisor, in the tunnel under construction between Jong in Bærum and Asker station. Cover photo: Ole Walter Jacobsen Photo: Rune Fossum, Helge Sunde, Njål Svingheim, Jofri Lunde. www.jernbaneverket.no Director General’s review Director General Steinar Killi Norway’s railways are in transition. Like ing the loading gauge and installing environment. Environmental manage- most other European countries, Norway automatic train control. Capacity on the ment forms an integral part of has signed up to international agree- Vestfold line increased by over 16% Jernbaneverket’s management systems.
    [Show full text]
  • On Track GLIMPSES of JERNBANEVERKET's ACTIVITIES in 2015
    On track GLIMPSES OF JERNBANEVERKET'S ACTIVITIES IN 2015 Jernbaneverket is adopting new technology and new working methods in an increasing number of fields. A Norwegian railway tunnel is now being bored for the first time using TBM. Contact us Jernbaneverket units are located at several sites in the country. For more detailed information, visit our website or call our nationwide telephone service: 05280 From abroad (+47) 22 45 50 00 Postal address Jernbaneverket, Postboks 4350, NO-2308 Hamar Email [email protected] www.jernbaneverket.no “The major basic route change from December 2012 has resulted in formidable growth of passenger rail traffic in Eastern Norway, and the final pieces of the puzzle fell into place when Høvik station became fully operational by the time Contents of the timetable change in December 2015.” Editorial 3 Kjell Rune Pettersen Photo: Rail traffic 4 A glimmer of light for freight and rail services 4 12 CargoNet in the black 7 New tender 8 Timber on the increase 8 Punctuality approaching European peak 9 Maintenance and renewals 10 The beginning of a new era 11 Exciting times Firmly raising the standard at many stations 12 Rail initiative employed thousands 14 Hilde Lillejord Photo: A new era for tunnel building in Norway 16 In June 2015, the Parliament of Norway made to pave the way for further ERTMS development a decision to reform the railway sector. Work and digitalised infrastructure monitoring. Groundbreaking 18 relating to that reform has characterised the past year, and will do so to an even greater extent in In December, 17 km of new double track on the Ready for railway technology 18 Herrenknecht AG Photo: From concrete and ballast to steel and cables 19 2016.
    [Show full text]
  • Edvard MUNCH
    THE OFFICIAL GUIDE FOR OSLO AND SURROUNDING REGION OSLO GUIDE2013 WELCOME TO OSLO The experience starts with us at the Tourist Information Offices No one knows Oslo better than us! We know what’s happening and where, and we are committed to make your stay eventful and fun! We have all the brochures and maps you need to find your way around Oslo. We also offer the Oslo Pass, hotel reservations, city bike hire, tickets for public transport or sightseeing trips, train tickets (including Norway in a nutshell®), currency exchange, gift items and more. www.visitoslo.com Here you will find all the latest information about Oslo, as well as useful tips on how to make your stay in Oslo the best possible. Book your hotel accommodation and tickets for sightseeing, etc., in advance. Contact us at: To Holmenkollen Email: [email protected] Ski Jump & Museum Phone: +47 815 30 555 www.visitoslo.com SLOTTSPARKEN Youngstorget AKERSELVA Kristian IV’s gate Royal www.facebook.com/visitoslo Nydalsveien Palace www.twitter.com/visitoslo Storgata Fredriks gate Stortorvet Oslo S National Karl Johans gate Theatre Stortingsgata Train The Tourist Information Office Station Oslo Tollbugata near Oslo CityTo Vigeland Hall (Rådhuset) City Hall Oslo Park Rådhusgata Opera Fr. Nansens plass 5, House Munkedamsveien Entr. from Roald Amundsens gate Akershus Castle & For opening hours see: www.visitoslo.com Fortress Facebook.com/OsloTouristInformation BJØRVIKA 0 250 M 0 250 YARDS CONTENTS FACTS AND HISTORY 08 ACTIVITIES: WINTER 10 ACTIVITIES: CHILDREN 14 ACTIVITIES: SUMMER 14 SIGHTSEEING 18 MUSEUMS & ATTRACTIONS 22 FESTIVALS - CONCERTS - PERFORMING ARTS 38 GAY OSLO 43 SHOPPING 44 RESTAURANTS AND NIGHTLIFE 48 ACCOMMODATION 60 CONFERENCE INFORMATION 65 THE OSLO REGION 68 USEFUL INFORMATION 70 CRUISE 76 PUBLISHER: VisitOSLO as, Grev Wedels pl.
    [Show full text]