Route Period / Service Old New Old New Old New Old

Total Page:16

File Type:pdf, Size:1020Kb

Route Period / Service Old New Old New Old New Old Service Changes Effective Sunday, November 22, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled recovery/layover usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train Miscellaneous Changes 12 Kingston Road Minor service improvement. AM Peak 12D Victoria Pk Stn to UTSC 27' 26'30" 113+22 117+15/16 5B 5B PM Peak 12D Victoria Pk Stn to UTSC 25' 23' 104+21 108+7 5B 5B 34 Eglinton East Trippers removed. AM Peak / S-S Early Morning 34A Eglinton Stn to Kennedy Stn 6' 6' 109+17 109+17 21B 21B 34C Eglinton Stn to Flemingdon Park 12'30" 12' 90+10 90+10 8B 8B Midday / S-S Late Morning 34A Eglinton Stn to Kennedy Stn 9'26" 12' 114+18 114+18 14B 11B 34C Eglinton Stn to Flemingdon Park 10'40" 12' 85+11 85+11 9B 8B PM Peak / S-S Afternoon 34A Eglinton Stn to Kennedy Stn 5'58" 6'30" 123+20 123+20 24B 22B 34C Eglinton Stn to Flemingdon Park 11'22" 12'30" 106+19 106+19 11B 10B Early Evening 34A Eglinton Stn to Kennedy Stn 5'27" 7' 87+11 87+11 18B 14B 34C Eglinton Stn to Flemingdon Park 11'26" 16' 71+9 71+9 7B 5B Late Evening 34A Eglinton Stn to Kennedy Stn 11' 11' 70+7 70+7 7B 7B 34C Eglinton Stn to Flemingdon Park 22' 22' 59+7 59+7 3B 3B 38 Highland Park Construction ends at Scarborough Town Centre Station allowing this route to return to its normal location. 43 Kennedy New peak period service to Village Green Square AM Peak / S-S Early Morning 43A to Steeles 10' 10' 82+8 82+8 9B 9B 43B to STC via Progress 15' 12' 45 52+8 3B 5B 43C to Village Green Square 30' 47+13 2B PM Peak / S-S Afternoon 43A to Steeles 8'30" 8'30" 90+4 90+3/4 11B 11B 43B to STC via Progress 15' 15' 45 54+6 3B 4B 43C to Village Green Square 30' 50+10 2B Service Changes Effective Sunday, November 22, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second partKeele is the Station scheduled Construction recovery/layover Diversions usually End provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train 30 High Park Interline with 80 Queensway ends. Service reverts to February 2020 schedules. AM Peak / S-S Early Morning 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 14+6 1B 1B Midday / S-S Late Morning 20' 20' 14+6 14+6 1B 1B 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B PM Peak / S-S Afternoon 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B Early Evening 20' 20' 13+7 13+7 1B 1B 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 13+7 1B 1B Late Evening 24' 15' 12 12+3 .5B 1B 30' 15' 12 12+3 .5B 1B 30' 15' 12 12+3 .5B 1B 41 Keele Extension to Howard Park ends. See Express Route restoration section below for details. 80 Queensway Interline with 30 High Park ends. Service reverts to February 2020 schedules. AM Peak / S-S Early Morning 20' 30' 70+10 68+22 4B 3B 20' 30' 58+2 56+4 3B 2B Midday / S-S Late Morning 20' 30' 70+10 68+22 4B 3B 20' 24' 72+8 70+2 4B 3B 20' 24' 72+8 70+2 4B 3B PM Peak / S-S Afternoon 20' 30' 77+3 75+15 4B 3B 20' 24' 72+8 70+2 4B 3B 20' 24' 72+8 70+2 4B 3B Early Evening 20' 24' 58+2 56+16 3B 3B 20' 30' 58+2 56+4 3B 2B 20' 30' 58+2 56+4 3B 2B Late Evening 24' 30' 53+7 51+9 2.5B 2B 30' 30' 58+17 56+4 2.5B 2B 30' 30' 58+17 56+4 2.5B 2B 89 Weston Extension to High Park Station ends. AM Peak / S-S Early Morning 8'44" 8'30" 90+6 87+8 11B 10B 10' 10' 62+8 60 7B 6B 10' 10' 60+10 58+2 7B 6B Midday / S-S Late Morning 12'23" 12'23" 92+7 90+9 8B 8B 10 10 72+8 70 8B 7B 10 10 68+12 66+4 8B 7B PM Peak / S-S Afternoon 12'13" 13'45" 104+6 102+8 9B 8B 10' 10' 80+10 78+2 9B 8B 10' 10' 76+14 74+6 9B 8B Early Evening 11'26" 11'26" 74+6 72+8 7B 7B 10' 10' 66+4 64+6 7B 7B 10' 10' 62+8 60 7B 6B Late Evening 11'40" 11'40" 60+10 58+12 6B 6B 10' 10' 60+10 58+2 7B 6B 10' 10' 57+3 55+5 7B 6B Service Changes Effective Sunday, November 22, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is theRestoration scheduled of recovery/layover Express Services usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train 29/929 Dufferin AM Peak / S-S Early Morning 29C Wilson Stn to Princes' Gate 6'12" 7'45" 119+5 119+5 20A 16A 929 Wilson Stn to Dufferin Gate Exp 8'45" 91+5 11B Midday / S-S Late Morning 29A Wilson Stn to Dufferin Gate 6' 7'30" 114+6 114+6 20A 16A 929 Wilson Stn to Dufferin Gate Exp 10' 97+3 10B PM Peak / S-S Afternoon 29C Wilson Stn to Princes' Gate 6'31" 7'30" 148+2 148+2 23A 20A 929 Wilson Stn to Dufferin Gate Exp 10' 116+4 12B Early Evening 29A Wilson Stn to Dufferin Gate 5'36" 8' 105+7 105+7 20A 14A 929 Wilson Stn to Dufferin Gate Exp 10' 89+1 9B Late Evening 29A Wilson Stn to Dufferin Gate 7'05" 8'30" 80+5 80+5 12A 10A 35/935 Jane AM Peak / S-S Early Morning 35A Pioneer Village - Jane Stn 7' 9'20" 106+6 106+6 16B 12B 35B PV - Jane Stn via Hullmar 7' 9'20" 110+2 110+2 16B 12B 935 Pioneer Village - Jane Stn 7'30" 87+3 12B Midday / S-S Late Morning 35A Pioneer Village - Jane Stn 7' 7' 102+3 102+3 15B 15B 935 Pioneer Village - Jane Stn 9'30" 82+4 9B PM Peak / S-S Afternoon 35A Pioneer Village - Jane Stn 8'45" 9'30" 120+11 120+10 15B 9B 35B PV - Jane Stn via Hullmar 8'45" 9'30" 126+5 126+4 15B 9B 935 Pioneer Village - Jane Stn 9'40" 105+1 11B Early Evening 35A Pioneer Village - Jane Stn 5' 8'45" 93+12 93+3 21B 11B 935 Pioneer Village - Jane Stn 9' 76+5 9B Late Evening 35A Pioneer Village - Jane Stn 9' 9' 79+2 79+2 9B 9B Service Changes Effective Sunday, November 22, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New 41/941Where runningKeele times are shownSouthern as "A+B", terminus the first partrestored is the to scheduled Keele Station driving following time and construction. the second part is the scheduled recovery/layover usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AMAB: ArticPeak Bus/ S-S T: Early Train Morning 41A Howard Pk to Pioneer Village Stn 14'30" 147+13 11A 14'30" 103+13 8B 25' 98+2 4B 41A Keele Station to Pioneer Village Stn 14'30" 137+8 10A 14'30" 96+6 7B 24' 92+4 4B 941 Keele Station to Finch West Stn 14'30" 94+7/8 7B Midday / S-S Late Morning 41A Howard Pk to Pioneer Village Stn 12' 147+9 13A 10' 126+4 13B 12' 117+3 10B 41A Keele Station to Pioneer Village Stn 12' 137+7 12A 10' 118+2 12B 11'30" 109+6 10B PM Peak / S-S Afternoon 41A Howard Pk to Pioneer Village Stn 15'30" 166+20 12A 8'30" 139+6 17B 11' 128+4 12B 41A Keele Station to Pioneer Village Stn 15'30" 155+16 11A 8'30" 130+6 16B 10'30" 119+7 12B 941 Keele Station to Finch West Stn 14'20" 120+9 9B Early Evening 41A Howard Pk to Pioneer Village Stn 15' 127+8 9A 15'30" 111+13 8B 20' 107+13 6B 41A Keele Station to Pioneer Village Stn 15' 120 8A 15'30" 104+5 7B 21' 100+5 5B Late Evening 41A Howard Pk to Pioneer Village Stn 22' 123+9 6A 20' 99+1 5B 25' 98+2 5B 41A Keele Station to Pioneer Village Stn 22' 110 5A 20' 92+8 5B 24' 91+5 4B 45/945 Kipling AM Peak / S-S Early Morning 45A to Steeles 26' 26' 89+15 89+15 4B 4B 45B to Carlingview 26' 26' 73+5 73+5 3B 3B 945 to Steeles 7' 80+18 14B Midday / S-S Late Morning 45A to Steeles 12' 12' 83+13 83+13 8B 8B 45B to Carlingview 24' 24' 65+7 65+7 3B 3B PM Peak / S-S Afternoon 45A to Steeles 16'30" 16'30" 100+7 100+7 6.5B 6.5B 45B to Carlingview 16'30" 16'30" 77+14 77+14 5.5B 5.5B 945 to Steeles 9'40" 90+16 11B Early Evening 45A to Steeles 15' 10' 81+9 81+9 6B 9B Late Evening 45A to Steeles 18' 11' 70+2 70+7 4B 7B Service Changes Effective Sunday, November 22, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T.
Recommended publications
  • Route Period / Service Old New Old New Old New Old
    Service Changes Effective Sunday, March 29, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled recovery/layover usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train Keele Station Bus Roadway Reconstruction 30 High Park / 80 Queensway Interlined due to construction at Keele Station AM Peak 80 Sherway to Keele Station 30' 68+22 3B 30' 56+4 2B 80 Sherway to High Park Stn via Parkside 20' 70+10 4B 20' 58+2 3B 30 High Park Stn to Runnymede 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 14+6 1B 1B M-F Midday 80 Sherway to Keele Station 30' 68+22 3B 24' 70+2 3B 24' 70+2 3B 80 Sherway to High Park Stn via Parkside 20' 70+10 4B 20' 72+8 4B 20' 72+8 4B 30 High Park Stn to Runnymede 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 16+4 1B 1B 20' 20' 14+6 16+4 1B 1B PM Peak 80 Sherway to Keele Station 30' 75+15 3B 24' 70+2 3B 24' 70+2 3B 80 Sherway to High Park Stn via Parkside 20' 77+3 4B 20' 72+8 4B 20' 72+8 4B 30 High Park Stn to Runnymede 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B Early Evening 80 Sherway to Keele Station 24' 56+16 3B 30' 56+4 2B 30' 56+4 2B 80 Sherway to High Park Stn via Parkside 20' 58+2 3B 20' 58+2 3B 20' 58+2 3B 30 High Park Stn to Runnymede 20' 20' 13+7 13+7 1B 1B 20' 20' 14+6 14+6 1B
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • TTC Typography History
    With the exception of Eglinton Station, 11 of the 12 stations of The intention of using Helvetica and Univers is unknown, however The Toronto Subway Font (Designer Unknown) the original Yonge Subway line have been renovated extensively. with the usage of the latter on the design of the Spadina Subway in Based on Futura by Paul Renner (1928) Some stations retained the original typefaces but with tighter 1978, it may have been an internal decision to try and assimilate tracking and subtle differences in weight, while other stations subsequent renovations of existing stations in the aging Yonge and were renovated so poorly there no longer is a sense of simplicity University lines. The TTC avoided the usage of the Toronto Subway seen with the 1954 designs in terms of typographical harmony. font on new subway stations for over two decades. ABCabc RQKS Queen Station, for example, used Helvetica (LT Std 75 Bold) in such The Sheppard Subway in 2002 saw the return of the Toronto Subway an irresponsible manner; it is repulsively inconsistent with all the typeface as it is used for the names of the stations posted on ABCabc RQKS other stations, and due to the renovators preserving the original platfrom level. Helvetica became the primary typeface for all TTC There are subtle differences between the two typefaces, notably the glass tile trim, the font weight itself looks botched and unsuitable. wayfinding signages and informational material system-wide. R, Q, K, and S; most have different terminals, spines, and junctions. ST CLAIR SUMMERHILL BLOOR DANGER DA N GER Danger DO NOT ENTER Do Not Enter Do Not Enter DAVISVILLE ST CL AIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR The specially-designed Toronto Subway that embodied the spirit of modernism and replaced with a brutal mix of Helvetica and YONGE SUBWAY typeface graced the walls of the 12 stations, progress.
    [Show full text]
  • Eglinton Crosstown LRT Interchange Stations – Final Designs
    Report for Action Eglinton Crosstown LRT Interchange Stations – Final Designs Date: March 20, 2018 To: TTC Board From: Chief Capital Officer Summary Metrolinx is currently constructing the Eglinton Crosstown LRT between Weston Road and Kennedy subway station, scheduled to open in 2021. This new LRT line will be operated by TTC and be identified as TTC Line 5. Approximately half of the 19 km LRT line will run underground, and connect to three existing subway stations. These interchange stations are currently under construction and will connect to Line 1 at Eglinton West Station (to be renamed Cedarvale Station) and Eglinton Station, and Line 2 at Kennedy Station. As the owner and operator of the subway system in Toronto, the TTC has a responsibility to ensure that the structural integrity of the existing subway infrastructure is maintained during construction, and that safe and efficient operation of the system is maintained. This report presents the final Metrolinx/Crosslinx Transit Solutions designs of the 3 interchange stations at Eglinton West (Cedarvale), Eglinton and Kennedy. Recommendations It is recommended that the Board: 1. Approve the final designs for Cedarvale, Eglinton and Kennedy interchange stations, as presented in this report. Financial Summary The Master Agreement between Metrolinx, the City of Toronto and the TTC, states that Metrolinx, as owner and developer, is responsible for expenditures related to the delivery of the Eglinton Crosstown Light Rail Transit Project. The Chief Financial Officer has reviewed this report and agrees with the financial impact information. Eglinton Crosstown LRT Interchange Stations – Final Designs Page 1 of 5 Equity/Accessibility Matters The new interchange stations are designed to be accessible, with barrier free paths from street to platform levels.
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central East Open House will feature the following stations and stops: • Eglinton • Mt Pleasant • Leaside • Laird • Sunnybrook Park • Science Centre Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now 70% complete • By the end of 2020, three stations – Mount Dennis, Keelesdale and Science Centre – will be largely complete • 69% of track has been installed • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to • Track installation between Fairbank Station to and Fairbank Station Sloane Stop track split and from Birchmount Laird Station, and Kennedy Station tail tracks • Track installed between East Portal Stop to Kennedy Station (excluding tail tracks) • Traction power cables installation from (Brentcliffe Rd) and Wynford Stop and
    [Show full text]
  • Eglinton Crosstown Light Rail Transit
    The City of Toronto holds public consultations as one way to engage residents in the life of their city. Toronto thrives on your great ideas and actions. We invite you to get involved. Eglinton Crosstown Light Rail Transit (LRT) Transit Project Assessment Study Notice of Commencement and Public Open Houses starting November 23, 2009 Public Consultation We are holding seven Open Houses where you can learn more about this transit project, ask questions, and share your comments. All Open Houses will be held from 6:30pm to 9:00pm. Location and Dates: York Memorial Collegiate, 2690 Eglinton Avenue West Etobicoke Olympium, 590 Rathburn Road Monday, November 23, 2009 Tuesday, November 24, 2009 Northern Secondary School, 851 Mount Pleasant Road Richview Collegiate, 1738 Islington Avenue Wednesday, November 25, 2009 Thursday, November 26, 2009 CNIB Conference Centre, 1929 Bayview Avenue Don Montgomery Community Centre, 2467 Eglinton Avenue East Wednesday, December 2, 2009 Tuesday, December 8, 2009 Beth Shalom Synagogue, 1445 Eglinton Avenue West Thursday, December 10, 2009 Background The Toronto Transit Commission (TTC) and the City of Toronto are planning a new Light Rail Transit (LRT) route along Eglinton Avenue from Kennedy Subway Station to Pearson International Airport. The LRT will link to the Yonge Subway at Eglinton Station and to the Spadina Subway at Eglinton West Station. As part of the Transit City light rail network, this route will connect with the proposed Don Mills LRT, Jane LRT, and Scarborough-Malvern LRT. The Eglinton Crosstown LRT will provide modern, accessible and comfortable light rail transit service. The LRT will operate underground from Laird Drive in the east to Keele Street in the west, as the width of Eglinton Avenue in this area is too narrow to accommodate street level LRT.
    [Show full text]
  • Revised Recommendations: Eglinton Crosstown LRT Stations Naming
    STAFF REPORT To: Metrolinx Board of Directors From: Leslie Woo, Chief Planning Officer Date: January 14, 2016 Re: Revised Recommendations: Eglinton Crosstown LRT Stations and Stops Naming Executive Summary: Staff is seeking final approval of Eglinton Crosstown LRT station and stop names (Appendix A). The December 3, 2015 report of the Chief Planning Officer recommended Eglinton Crosstown LRT Station and Stop Names based on the Naming Principles and Protocols developed following a 12 month (between late 2014 and late 2015) long engagement process with GTHA local transit operators (Appendix B). The public was encouraged to provide feedback on proposed station and stop names online in October 2015. The Toronto Transit Commission also provided its own recommendations on the proposed names at its meeting of November 23, 2015. At the December 3, 2015 Board meeting, three recommended location names were questioned: Lebovic, Forest Hill and Fairbank and staff were to report back on the basis of this Board feedback. Since the December 3, 2015 meeting staff undertook: • a deeper analysis and exploration of possible alternative names for these three locations; and • sought additional feedback from local councillors and MPPs on the three locations. The revised recommendations are i) to use Hakimi in place of Lebovic; ii) no change be made to Forest Hill; and iii) no change be made to Fairbank. In addition, staff plan to use in-station way-finding to assist customers in navigating between stations and the surface street system. As well, Toronto Councillor Thompson raised the question on the naming of the “Golden Mile” station. No change is being proposed by staff.
    [Show full text]
  • EGLINTON CROSSTOWN RAPID TRANSIT BENEFITS CASE UPDATE June 2012
    EGLINTON CROSSTOWN RAPID TRANSIT BENEFITS CASE UPDATE June 2012 Eglinton Crosstown Rapid Transit Updated Benefits-Case Analysis Multiple Account Evaluation Technical Note June 2012 Prepared for: Prepared by: Metrolinx Steer Davies Gleave Suite 600 1500-330 Bay St 20 Bay Street Toronto, ON Toronto, ON M5H 2S8 M5J 2W3 +1 (647) 260 4861 www.steerdaviesgleave.com Updated Multiple Account Evaluation CONTENTS 1 INTRODUCTION ........................................................................................1 2 DESCRIPTION OF OPTIONS ...........................................................................2 Project Options ........................................................................................ 2 Base Case Definition ................................................................................... 2 Option 1: Eglinton-Scarborough Crosstown LRT ................................................... 2 Option 2: Future Proofing Eglinton-Scarborough Crosstown LRT ................................ 4 Option 3: Transit City Concept ...................................................................... 4 Option 4: Eglinton-Scarborough Subway ............................................................ 5 Summary Statistics .................................................................................. 11 3 TRANSPORTATION ACCOUNT ...................................................................... 12 Introduction .......................................................................................... 12 Ridership .............................................................................................
    [Show full text]
  • Transit City Update
    Form Revised: February 2005 TORONTO TRANSIT COMMISSION REPORT NO. MEETING DATE: JULY 14, 2010 SUBJECT: TRANSIT CITY UPDATE ACTION ITEM RECOMMENDATION It is recommended that the Commission receive this report noting that: • The Transit City Priority Projects Phase 1 consists of: o The Sheppard East LRT from Don Mills Station to Conlins Road to be completed in mid-2014. o The Eglinton Crosstown LRT from Kennedy Station to Jane Street to be started in 2011 and completed in 2020. o The Finch West LRT from Keele Street to Humber College to be started in 2015 and completed in 2019. o The Scarborough RT from Kennedy Station to Sheppard Avenue to be started in 2015 and completed in 2020. • All four Priority Projects have been approved by Toronto Council. The Minister of the Environment has issued the Notice to Proceed for the Sheppard East LRT, Eglinton Crosstown LRT and Finch West LRT. • The contract awarded by Metrolinx to Bombardier for the Transit City Light Rail Vehicles provides for all four Priority Projects Phase 1 to be completed by 2020. • The Transit City Construction Methodology intended to minimize construction time and disruption is on track for the Sheppard East LRT and Eglinton Crosstown LRT contracts. • Significant progress has been made on the design and engineering of the Sheppard East and Eglinton Crosstown LRTs. • Transit City Community Relations and Local Outreach initiatives are establishing constructive relationships with the community and are ensuring that the benefits of the Transit City Projects are understood across communities. • The Metrolinx Investment Strategy is to be proposed by June, 2013.
    [Show full text]
  • Ontario Line Initial Business Case
    MEMORANDUM To: Metrolinx Board of Directors From: Mathieu Goetzke Chief Planning Officer (A) Date: September 12, 2019 Re: Subway Program – Ontario Line Update Resolution RESOLVED, based on the report prepared by the Chief Planning Officer, entitled “Subway Program – Ontario Line Update” and any further amendments directed by the Board at its meeting on September 12, 2019; THAT the Board endorses the results of the Ontario Line Initial Business Case; AND THAT, the Ontario Line project be advanced to the Preliminary Design stage and further evaluated through a Preliminary Design Business Case. Executive Summary In summer 2018, the government directed MTO to “…lead the development of an implementation strategy for provincial ownership of the TTC subway network and other strategic transit/transportation assets in the City of Toronto.” This commitment has since been reiterated in the 2018 Fall Economic Outlook and Fiscal Review, and in the 2019 Ontario Budget. In the 2019 Ontario Budget, the Province announced its plan to build four subway projects, with a total preliminary cost estimate of $28.5 billion. Ontario Line was one of the priority projects announced, along with the Scarborough Subway Extension, the Yonge Subway Extension and the Eglinton West Extension. The budget also included a renewal of the commitment to upload new subway projects and the existing network from the City of Toronto. The Getting Ontario Moving Act, 2019, which received Royal Assent on June 6, 2019, amended the Metrolinx Act to enable the Province to upload responsibility for new rapid transit projects, including subway projects, from the City of Toronto. A regulation made under this act has designated the Relief Line/Ontario Line, the Yonge Subway Extension, and the Scarborough Subway Extension the sole responsibility of the Province, through Metrolinx.
    [Show full text]
  • CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line
    CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line Background • In September 2008, Metrolinx launched a regional transportation plan – a 25-year, $50 billion plan -- to coordinate and integrate transportation and transit in the Greater Toronto Area • In 2010, City of Toronto approved the project to build the Eglinton Crosstown from Weston Road in the west to Kennedy Station in the east. • Following a competitive process, Crosslinx Transit Solutions (CTS) was awarded a contract in July 2015 to design, build, finance, and maintain the Eglinton Crosstown Light Rail Transit (LRT). Project Players and Roles What Are We Building – a New Modern LRT • 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground • A maintenance and storage facility • A 19-kilometre route separated from regular traffic • Transit communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station Awaiting Safety First – Our #1 Priority feedback from Safety We train and direct staff to: • Always have a site specific safety plan and site specific emergency plan. • Ensure pre-work hazard assessments are complete and understood. • Ensure job hazards analyses are complete and understood. • Do everything possible to protect themselves, co-workers, and members of the public. • Stop work if the safety of themselves, co-workers and members of the public cannot be assured. • Identify and report unsafe behaviour and coach each other to make improvements. • Be prepared and equipped to work safely. Crosstown Design Approach Street Level – Contextual and An International Signature for Entrance – Bright & Secure Inviting Toronto Concourse – Simple & Pristine Concourse – Transparent & Open Platform – Spacious & Animated CTSD Ask designers what key features are Accessibility Ask for existing examples of other projects Station and Stops are designed to be universally accessible, including satisfaction of the Need better visuals AODA, applicable City of Toronto Guidelines, the OBC, and CSA Standards.
    [Show full text]
  • Mount Dennis Station
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here 11 Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now over 75% complete. • Most stations will be complete in 2021, beginning with Mount Dennis, Keelesdale and Science Centre stations in the first half of the year. • More than 85% of track has been installed – track installation between EMSF and Cedarvale Station is complete. • 45 LRVs have arrived at the EMSF to date. • Vehicle testing is underway. EGLINTON MAINTENANCE AND STORAGE FACILITY (EMSF) Eglinton Crosstown What to Expect: Systems & Track 2021 Progress to-date Remaining Work for 2021 • Track installed between EMSF and Cedarvale Station, and • Track installation between Avenue Station and Mount between Laird Station and Kennedy Station Pleasant Station • Traction power cables installed from Mount Dennis Station to • Traction power cable installation from Caledonia Caledonia Station, and from Science Centre Station to Station to Avenue Station and from Mount Pleasant Kennedy
    [Show full text]