Systems & Track: What to Expect

Total Page:16

File Type:pdf, Size:1020Kb

Systems & Track: What to Expect IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central East Open House will feature the following stations and stops: • Eglinton • Mt Pleasant • Leaside • Laird • Sunnybrook Park • Science Centre Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now 70% complete • By the end of 2020, three stations – Mount Dennis, Keelesdale and Science Centre – will be largely complete • 69% of track has been installed • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to • Track installation between Fairbank Station to and Fairbank Station Sloane Stop track split and from Birchmount Laird Station, and Kennedy Station tail tracks • Track installed between East Portal Stop to Kennedy Station (excluding tail tracks) • Traction power cables installation from (Brentcliffe Rd) and Wynford Stop and • Overhead Catenary System (OCS) installation Caledonia Station to Avenue Station and from between Sloane Stop track split and above-grade from O’Connor to Kennedy Mount Pleasant Station to Science Center Birchmount Stop • Overhead Catenary System (OCS) installation Station • Track installed between Sunnybrook Park at Caledonia Station • Traction power systems at Eglinton Station Stop and Ionview Stop • Traction power cables installation from • Overhead Catenary System (OCS) installation • Traction power cables installed from Mount Caledonia Station to Avenue Station and from at Fairbank, Oakwood, Cedarvale, Forest Hill, Dennis Station to Caledonia Station, and from Leaside Station to Kennedy Station Chaplin, Avenue, Eglinton, Mount Pleasant, Science Centre Station to Kennedy Station • Traction power systems at Mount Dennis Leaside, Laird, Science Centre and Kennedy • Tunnel lighting installed from West Portal Station, Keelesdale Station and Science stations (Black Creek Dr) to Chaplin Station and from Centre Station to be operational • Overhead Catenary System (OCS) installation Mount Pleasant Station to Science Center • Installation of jet fans at Laird Station above-grade from East Portal to O’Connor Station • Signaling equipment installation between Stop • Overhead Catenary System (OCS) installed Science Center Station and TPSS 10 • Installation of remaining signaling equipment from Mount Dennis Station to west of Caledonia Station • Signaling equipment operational between Mount Dennis Station and Caledonia Station • Jet fans installed at West Portal, Mount Dennis Station, East Portal, Science Center Station, and Kennedy Station Eglinton Crosstown What to Expect: Eglinton Station 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Re-opened all crosswalks at • Completion of the north tunnel • Continue concrete works intersection of Yonge St and ventilation shaft on Yonge Street • Continue construction of the Eglinton Avenue intersection • Completion of excavation Berwick Portal • Underpinning of TTC’s Eglinton • Continue construction of the • Construction of Eglinton Station Station box complete Berwick Portal entrance • Continue elevator construction in TTC’s Eglinton Station • Continue concrete works EGLINTON STATION Eglinton Crosstown What to Expect: Mount Pleasant Station 2020 Progress to-date Remaining Work in 2020 What to Expect for 2021 • Completed excavation of the • Completion of excavation • Completion of concrete works Secondary Entrance • Completion of waterproofing • Start architectural works • Completed reinstatement of the inside the Station Box storm and sanitary sewers • Completion of station • Continue utility reinstatement construction • Support in place utility works work completed • Road reinstatement and • Continue concrete works landscaping • Begin construction of the • Restoration of the heritage façade Secondary Entrance building at the northwest entrance above ground MOUNT PLEASANT STATION Eglinton Crosstown What to Expect: Leaside Station 2020 Progress to-date Remaining Work in 2020 What to Expect for 2021 • Excavation completed • Continue concrete works • Completion of concrete works. • Completed construction of the • Completion of the concourse • Continue architectural works. Station’s platform walls and slab. level walls and slab inside the • Station Box. Continue mechanical electrical • Completed concrete works to and permanent system street level at the Main Entrance. • Begin construction of the Main installations. Entrance building above ground. • Road reinstatement and landscaping. LEASIDE STATION Eglinton Crosstown What to Expect: Laird Station 2020 Progress to-date Remaining Work in 2020 What to Expect for 2021 • Concrete works within the tunnel • Continue mechanical, electrical • Complete all mechanical, are complete and architectural works in both electrical and architectural shafts and tunnel components • Final lining structural concrete works are complete. • Complete Main Entrance • Complete full station structures underground concrete works above ground • Underground concrete works at the Main Entrance are nearing • Track works and installation of • Landscaping works completion overhead catenary system will continue LAIRD STATION Eglinton Crosstown What to Expect: Sunnybrook Park Stop 2020 Progress to-date Remaining Work in 2020 What to Expect for 2021 • Track slab concrete works • Road works between Brentcliffe Road and Leslie Street • Construction of second retaining complete at Sunnybrook Park wall on the north side of Eglinton Stop • Bridge rehabilitation works and Ave E at the West Don River retaining wall construction • Track installation is complete Bridge • Construction of multi-use path • Overhead catenary system cables from Eglinton Ave E north side to • Road works will continue on the Sunnybrook Park have been installed north side of Eglinton Ave E • Installation of new pedestrian • General landscaping stairs on the south side of Eglinton Ave E at Leslie Street • Stop shelter installation • Concrete works for stop ramps and waiting area SUNNYBROOK PARK STOP Eglinton Crosstown What to Expect: Science Centre Station 2020 Progress to-date Remaining Work in 2020 What to Expect for 2021 • All elevators and all escalators are • Mechanical, plumbing, HVAC and • Installation of station signage installed at Science Centre station electrical works continue installation • Drywall installation is complete • Floor and wall tiling works • Glazing will continue continue along with artwork • Masonry works are complete • Electrical and communication installation finishes • Track works are complete • Ceiling installation continues • Remaining civil work landscaping • Jet fans (8) are installed • Civil works continue at the bus • Ornamental fencing installation at terminal and main entrance • Electrical rooms at the station box the bus terminal. complete • Glazing continues SCIENCE CENTRE STATION Eglinton Crosstown Community Benefits • The Eglinton Crosstown LRT Project contractually requires the constructor, Crosslinx Transit Solutions Constructors (CTSC), to embed community benefits in their work, including ensuring that local communities and historically disadvantaged groups benefit directly from the province’s $5.3 billion investment • We are committed to making the pathway to Professional, Administrative and Technical (PAT) roles in the construction industry more accessible to people facing barriers to employment • CTS has hired 209 people in PAT roles to date, as well as 162 apprentices and journey persons from historically disadvantage and equity seeking groups • We are committed to supporting small and medium sized businesses along the Eglinton corridor, businesses impacted by our construction, and social enterprises that create employment and training opportunities for people who face systemic barriers to employment • CTS has spent more than $600,000 on social enterprises and more than $6 million at local businesses` EGLINTON CROSSTOWN .
Recommended publications
  • City of Toronto — Detached Homes Average Price by Percentage Increase: January to June 2016
    City of Toronto — Detached Homes Average price by percentage increase: January to June 2016 C06 – $1,282,135 C14 – $2,018,060 1,624,017 C15 698,807 $1,649,510 972,204 869,656 754,043 630,542 672,659 1,968,769 1,821,777 781,811 816,344 3,412,579 763,874 $691,205 668,229 1,758,205 $1,698,897 812,608 *C02 $2,122,558 1,229,047 $890,879 1,149,451 1,408,198 *C01 1,085,243 1,262,133 1,116,339 $1,423,843 E06 788,941 803,251 Less than 10% 10% - 19.9% 20% & Above * 1,716,792 * 2,869,584 * 1,775,091 *W01 13.0% *C01 17.9% E01 12.9% W02 13.1% *C02 15.2% E02 20.0% W03 18.7% C03 13.6% E03 15.2% W04 19.9% C04 13.8% E04 13.5% W05 18.3% C06 26.9% E05 18.7% W06 11.1% C07 29.2% E06 8.9% W07 18.0% *C08 29.2% E07 10.4% W08 10.9% *C09 11.4% E08 7.7% W09 6.1% *C10 25.9% E09 16.2% W10 18.2% *C11 7.9% E10 20.1% C12 18.2% E11 12.4% C13 36.4% C14 26.4% C15 31.8% Compared to January to June 2015 Source: RE/MAX Hallmark, Toronto Real Estate Board Market Watch *Districts that recorded less than 100 sales were discounted to prevent the reporting of statistical anomalies R City of Toronto — Neighbourhoods by TREB District WEST W01 High Park, South Parkdale, Swansea, Roncesvalles Village W02 Bloor West Village, Baby Point, The Junction, High Park North W05 W03 Keelesdale, Eglinton West, Rockcliffe-Smythe, Weston-Pellam Park, Corso Italia W10 W04 York, Glen Park, Amesbury (Brookhaven), Pelmo Park – Humberlea, Weston, Fairbank (Briar Hill-Belgravia), Maple Leaf, Mount Dennis W05 Downsview, Humber Summit, Humbermede (Emery), Jane and Finch W09 W04 (Black Creek/Glenfield-Jane
    [Show full text]
  • Noise and Vibration Projects
    Frontop Engineering Limited 101 Amber Street, Unit 1, Markham Ontario, Canada, L3R 3B2 Telephone: (905) 947-0900; Fax: (905) 305-9370 Website: www.frontop.ca; Email: [email protected] List of Our Ongoing Noise and Vibration Monitoring Projects Project 1: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Keelesdale Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed six (6) real-time vibration stations and five (5) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring. Project 2: Name of Project: Geotechnical Instrumentation and Monitoring Plan- Segment 1- Mt Dennis Station Location: Toronto, Ontario, Canada Client: Metrolinx-Eglinton Crosstown Light Rapid Transit (ECLRT) Project Main project features: Geotechnical Instrumentation and Monitoring, Noise and Vibration Monitoring Activities performed: install and monitoring following instrument Prepared and installed four (4) real-time vibration stations and four (4) real-time noise monitoring station. And weekly attendant two (2) noise and two (2) vibration stations monitoring Project 3: Name of Project: TTC Wilson Yard Track and Structure Building Renovation (Contract AW1-3) Location: Toronto, Ontario, Canada Client: TTC Main project features: Track and Structure Building Renovation Activities performed: Prepared and installed the one (1) real-time noise monitoring station and one (1) real- time vibration monitoring station. Project 4: Name of Project: TTC Hillcrest Complex Surface Way Facility Replacement, and Harvey Shop Loading Deck (Contract M7-2 & M1-91) Client: TTC Main project features: Surface Way Facility Replacement Activities performed: Prepared and installed the two (2) real-time noise monitoring station and two (2) real- time vibration monitoring station.
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 SIMC OE L A K E SIMC OE L A K E SIMC OE Allandale Waterfront Newmarket Hwy 404 Yonge-Davis Lincolnville Bloomington Y ORK Unionville Vaughan University of Ontario Metropolitan Institute of Technology Helen Centre Richmond Hill Centre (Langstaff GO) Hwy 407 Finch West Conestoga Downsview Park DURHAM Don Sheppard Leslie Mills W A TERL OO Humber -Yonge McCowan College Oriole Bramalea Kitchener Yorkdale Scarborough Centre Weston TORONT O Pickering Oshawa Bowmanville Science Gateway Terminal Toronto Region of Waterloo Caledonia Cedarvale Eglinton Centre International Airport Pearson International Kennedy Airport Mount Renforth Dennis Fairway Dundas West Lansdowne St. George Bloor-Yonge Pape Main Kipling Bloor Spadina Square WELLING T ON One Danforth Cooksville Gerrard- Osgoode Queen Carlaw Milton PEEL Winston LEGEND Churchill East Harbour Port Credit UNION Subway Ontario Place /Exhibition Billy Bishop Toronto Light Rail Transit (LRT) City Airport HA LT ON Bus Rapid Transit (BRT)/ LAKE ONTARIO Regional Express Bus Aldershot GO Rail - 15-min Two-Way All-Day GORail - Two-Way All-Day HAMI LT ON West Harbour Niagara Falls GO Rail - Peak Only McMaster Hamilton GO Centre UP Express John C.
    [Show full text]
  • Resilient City – Preparing for a Changing Climate Status Update and Next Steps
    PE15.2 STAFF REPORT ACTION REQUIRED Resilient City – Preparing for a Changing Climate Status Update and Next Steps Date: November 2, 2016 To: Parks and Environment Committee From: Chief Corporate Officer Wards: All Wards Reference P:\2016\Internal Services\E&E\Pe16012e&e (AFS 22279) Number: SUMMARY Toronto has and is forecast to experience altered patterns of extreme weather as a result of climate change. Enhancing the resilience of Toronto’s infrastructure and services to these changing weather patterns to reduce the risk of damage and associated costs, injury and emergency situations is a priority of City Council. In 2014, City Council adopted the Climate Change Risk Management Policy outlining responsibilities and a governance structure for implementing the policy. Council also directed that staff report back on the status of implementation of the policy in 2016. Implementation of the policy has been guided by use of a Thematic Area High Level Risk Assessment (HLRA) approach, designed by the cross-corporate Resilient City Work Group to: - identify and assess potential risks of climate change and associated extreme weather events; - define the interdependencies between key infrastructure and service providers, both private and public sector; and - outline the actions that could be taken to mitigate priority risks. Over the past year, High Level Risk Assessments (HLRA) have been undertaken in three Thematic Areas: Utilities, Transportation and Water, in close collaboration with City divisions, as well as external private and broader public sector organizations. To date, work has involved City Planning, Environment & Energy, Engineering & Construction Services, Toronto Water, Toronto Public Health, Transportation Services, Toronto Resilient City Update and Next Steps 1 Transit Commission (TTC), Toronto and Region Conservation Authority (TRCA), Toronto Hydro, Metrolinx, Hydro One, Independent Electricity System Operator (IESO), Enwave, Enbridge, and representatives of the telecom sector.
    [Show full text]
  • CROSSTOWN LRT West Open House March 20, 2018
    CROSSTOWN LRT West Open House March 20, 2018 • Metrolinx was created in 2006 by the Province of Ontario to improve the coordination and integration of all modes of transportation in the Greater Toronto and Hamilton Area. • Guided by its Regional Transportation Plan, Metrolinx has worked to plan, design and build a regional transportation network that aims to enhance the quality of life, the environment and the prosperity of area residents. METROLINX’S GEOGRAPHIC MANDATE: THE GREATER TORONTO AND HAMILTON AREA (GTHA) Expansive • 8,242 km2 — 1.5 times the size of Prince Edward Island • Diverse spectrum of urban, suburban and rural land use Fast-growing • 7 million people in 2016 • Over 10 million by 2041 Complex • 4 levels of government • 30 municipalities Certain Metrolinx initiatives reach beyond the GTHA • 9 municipal transit agencies + • Select GO Transit services extend to an outer arc of communities Metrolinx including Peterborough, Barrie, Waterloo and Niagara • PRESTO and Transit Procurement Initiative serve communities across Ontario THE BIG MOVE $30+ BILLION IN INFRASTRUCTURE INVESTMENT OVER $30B IN INVESTMENT IN THE GTHA’S RAPID TRANSIT NETWORK EXPANDING GO 64 KM OF NEW 52 KM OF NEW CONNECTING IT TRAIN SERVICE LIGHT RAIL BUS RAPID ALL TOGETHER TRANSIT TRANSIT . Expanding and . More service on all revitalizing Union lines Under construction: Partially in-service, Station, the heart of . Eglinton with remainder the regional network . Electric trains, Crosstown under construction: every 15 minutes . PRESTO now in use or better in both In procurement: . Viva in York across the Region directions, for most . Finch West Region GO customers . Hurontario . Mississauga . Hamilton Transitway .
    [Show full text]
  • Route Period / Service Old New Old New Old New Old
    Service Changes Effective Sunday, March 29, 2020 Route Period / Service M-F Saturday Sunday Headway R.T.T. Vehicles Headway R.T.T. Vehicles Headway R.T.T. Veh Old New Old New Old New Old New Old New Old New Old New Old New Old New Where running times are shown as "A+B", the first part is the scheduled driving time and the second part is the scheduled recovery/layover usually provided to round out the trip time as a multiple of the headway. Vehicle Types: F: Flexity B: Bus AB: Artic Bus T: Train Keele Station Bus Roadway Reconstruction 30 High Park / 80 Queensway Interlined due to construction at Keele Station AM Peak 80 Sherway to Keele Station 30' 68+22 3B 30' 56+4 2B 80 Sherway to High Park Stn via Parkside 20' 70+10 4B 20' 58+2 3B 30 High Park Stn to Runnymede 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 14+6 1B 1B M-F Midday 80 Sherway to Keele Station 30' 68+22 3B 24' 70+2 3B 24' 70+2 3B 80 Sherway to High Park Stn via Parkside 20' 70+10 4B 20' 72+8 4B 20' 72+8 4B 30 High Park Stn to Runnymede 20' 20' 14+6 14+6 1B 1B 20' 20' 14+6 16+4 1B 1B 20' 20' 14+6 16+4 1B 1B PM Peak 80 Sherway to Keele Station 30' 75+15 3B 24' 70+2 3B 24' 70+2 3B 80 Sherway to High Park Stn via Parkside 20' 77+3 4B 20' 72+8 4B 20' 72+8 4B 30 High Park Stn to Runnymede 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B 20' 20' 16+4 16+4 1B 1B Early Evening 80 Sherway to Keele Station 24' 56+16 3B 30' 56+4 2B 30' 56+4 2B 80 Sherway to High Park Stn via Parkside 20' 58+2 3B 20' 58+2 3B 20' 58+2 3B 30 High Park Stn to Runnymede 20' 20' 13+7 13+7 1B 1B 20' 20' 14+6 14+6 1B
    [Show full text]
  • Connecting the Region
    EGLINTON CROSSTOWN CONSTRUCTION UPDATE EASTERN WORKS OPEN HOUSE | APRIL 9, 2020 WELCOME Our Eastern Works Open House will feature the following stations and stops: • Science Centre • Aga Khan Park & Museum, Wynford, Sloane, O’Connor • Pharmacy , Hakimi Lebovic, Golden Mile, Birchmount, Ionview • and Kennedy. 2 COVID-19 MANAGEMENT • Crosslinx Transit Solutions (CTS) has been exercising all safety protocols on-site including social distancing. • For more information on CTS’ COVID-19 Management, please visit their website: http://www.crosslinxtransit.ca/wp-content/uploads/CTS_COVID- 19_mobile_v2.png EGLINTON CROSSTOWN LRT PROJECT • A 19-kilometre route separated from regular traffic • 10-kilometres underground; 9-kilometres at surface in east • 15 underground stations and 10 surface stops • A maintenance and storage facility • Transit communications system • Links to 54 bus routes, 3 subway stations, GO Transit, UP Express station PROJECT PROGRESS Maintenance and Storage Facility complete 12 vehicles received 50% of track installed Mining complete at Laird and Oakwood stations Deep excavation underway or complete at all stations 2019 PROJECT HIGHLIGHTS FIRST LIGHT RAIL VEHICLE ON MAINLINE 8 9 10 SCIENCE CENTRE STATION RENDERINGS AERIAL VIEW MAIN ENTRANCE WEST PORTAL LOBBY BUS TERMINAL SCIENCE CENTRE STATION: WHAT TO EXPECT Year What to Expect • Completion of all structural concrete works 2019 Milestones • Completion of support of excavation • Completion of excavation • Interior works at Station Box • Interior and exterior finishes as Main Entrance • Track work and rail installation Remaining Work • Waterproofing and backfill for 2020 • Permanent road restoration • Substantial completion late 2020 SCIENCE CENTRE STATION PROGRESS PHOTOS WALL TILING AT THE MAIN ENTRANCE GLAZING AT THE BUS TERMINAL Aga Khan & Museum Stop to O’Connor Stop (Don Valley Parkway to Victoria Park Ave) Brentcliffe Portal AGA KHAN PARK & MUSEUM STOP RENDERINGS SIDEWALK PLATFORM AERIAL VIEW WYNFORD STOP RENDERINGS SIDEWALK PLATFORM .
    [Show full text]
  • Systems & Track: What to Expect
    IT’S HAPPENING, TODAY Forum Eglinton Crosstown LRT Metrolinx’s Core Business – Providing Better, Faster, Easier Service We have a strong connection with our Adding More Service Today Making It Easier for Our customers, and a Customers to Access Our great understanding Service of who they are and Building More to Improve Service where they are going. Planning for New Connections Investing in Our Future MISSION: VISION: WE CONNECT GETTING YOU THERE COMMUNITIES BETTER, FASTER, EASIER 3 WELCOME Our Central Open House will feature the following stations: • Forest Hill • Chaplin • Avenue (Eglinton Connects) • Eglinton • Mount Pleasant Station • Leaside PROJECT QUANTITIES 273.5 km 111 escalators 15.2 million job hours medium voltage/ 38 two-vehicle trains direct current cable 208 overhead 60 elevators 6000 tons of rail 5 new bridges catenary system poles 60 KM/H street level MODEL: Bombardier Flexity Freedom POWER SUPPLY: Overhead Catenary Read more about how Eglinton Crosstown will change Toronto’s cityscape here. Train Testing Video: Click Here Eglinton Crosstown PROJECT UPDATE • The Eglinton Crosstown project is now over 75% complete • Three stations – Mount Dennis, Keelesdale and Science Centre – are largely complete • Over 85% of track has been installed • 45 LRVs have arrived at the EMSF to date • Vehicle testing is now underway Eglinton Crosstown What to Expect: Systems & Track 2020 Progress to-date Remaining Work in 2020 Remaining Work for 2021 • Track installed between Mount Dennis Station • Track installation between Wynford Stop to
    [Show full text]
  • No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx
    2020 No. 5, Eglinton Crosstown LRT, Page 18 Credit: Metrolinx Top100 Projects 2020 One Man Changes the Face of 2020’s Top 10 Top100 Projects — 2020 f not for one individual, this year’s Top100 may have looked An annual report inserted in familiar. ReNew Canada’s I When this year’s research process began, there was little change within this year’s Top 10, as many of the nation’s January/February 2020 issue megaprojects were still in progress. Significant progress has been made on all of the projects we saw grace the Top 10 in our report last year, but completion dates extend beyond the end of the MANAGING Andrew Macklin 2019 calendar year. EDITOR [email protected] Enter Matt Clark, Metrolinx’s Chief Capital Officer, who took GROUP over the position from Peter Zuk. You see, when Zuk was in charge Todd Latham PUBLISHER of publicly expressing capital budgets, particularly in the context of the GO Expansion project, he had done so by breaking down PUBLISHER Nick Krukowski the $13.5 billion spend by corridor. That breakdown led to the full expansion represented by as many as nine projects in the content ART DIRECTOR AND Donna Endacott SENIORDESIGN of the Top100. Clark does it differently. In the quarterly reports made public ASSOCIATE following Metrolinx board meetings, the capital projects for the Simran Chattha EDITOR GO Expansion are broken down into three allotments (on corridor, off corridor, and early works). The result? Six less GO Expansion CONTENT AND MARKETING Todd Westcott projects in the Top100, but two new projects in our Top 10 MANAGER including a new number one.
    [Show full text]
  • CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line
    CROSSTOWN LRT 2 3 4 5 6 Construction of the Eglinton Crosstown LRT Line Background • In September 2008, Metrolinx launched a regional transportation plan – a 25-year, $50 billion plan -- to coordinate and integrate transportation and transit in the Greater Toronto Area • In 2010, City of Toronto approved the project to build the Eglinton Crosstown from Weston Road in the west to Kennedy Station in the east. • Following a competitive process, Crosslinx Transit Solutions (CTS) was awarded a contract in July 2015 to design, build, finance, and maintain the Eglinton Crosstown Light Rail Transit (LRT). Project Players and Roles What Are We Building – a New Modern LRT • 15 underground stations and 10 surface stops – 9 km below ground and 10 km above ground • A maintenance and storage facility • A 19-kilometre route separated from regular traffic • Transit communications system • Links to 54 bus routes, three subway stations, GO Transit, and a new UP Express station Awaiting Safety First – Our #1 Priority feedback from Safety We train and direct staff to: • Always have a site specific safety plan and site specific emergency plan. • Ensure pre-work hazard assessments are complete and understood. • Ensure job hazards analyses are complete and understood. • Do everything possible to protect themselves, co-workers, and members of the public. • Stop work if the safety of themselves, co-workers and members of the public cannot be assured. • Identify and report unsafe behaviour and coach each other to make improvements. • Be prepared and equipped to work safely. Crosstown Design Approach Street Level – Contextual and An International Signature for Entrance – Bright & Secure Inviting Toronto Concourse – Simple & Pristine Concourse – Transparent & Open Platform – Spacious & Animated CTSD Ask designers what key features are Accessibility Ask for existing examples of other projects Station and Stops are designed to be universally accessible, including satisfaction of the Need better visuals AODA, applicable City of Toronto Guidelines, the OBC, and CSA Standards.
    [Show full text]
  • Rapid Transit in Toronto Levyrapidtransit.Ca TABLE of CONTENTS
    The Neptis Foundation has collaborated with Edward J. Levy to publish this history of rapid transit proposals for the City of Toronto. Given Neptis’s focus on regional issues, we have supported Levy’s work because it demon- strates clearly that regional rapid transit cannot function eff ectively without a well-designed network at the core of the region. Toronto does not yet have such a network, as you will discover through the maps and historical photographs in this interactive web-book. We hope the material will contribute to ongoing debates on the need to create such a network. This web-book would not been produced without the vital eff orts of Philippa Campsie and Brent Gilliard, who have worked with Mr. Levy over two years to organize, edit, and present the volumes of text and illustrations. 1 Rapid Transit in Toronto levyrapidtransit.ca TABLE OF CONTENTS 6 INTRODUCTION 7 About this Book 9 Edward J. Levy 11 A Note from the Neptis Foundation 13 Author’s Note 16 Author’s Guiding Principle: The Need for a Network 18 Executive Summary 24 PART ONE: EARLY PLANNING FOR RAPID TRANSIT 1909 – 1945 CHAPTER 1: THE BEGINNING OF RAPID TRANSIT PLANNING IN TORONTO 25 1.0 Summary 26 1.1 The Story Begins 29 1.2 The First Subway Proposal 32 1.3 The Jacobs & Davies Report: Prescient but Premature 34 1.4 Putting the Proposal in Context CHAPTER 2: “The Rapid Transit System of the Future” and a Look Ahead, 1911 – 1913 36 2.0 Summary 37 2.1 The Evolving Vision, 1911 40 2.2 The Arnold Report: The Subway Alternative, 1912 44 2.3 Crossing the Valley CHAPTER 3: R.C.
    [Show full text]
  • TTC Typography History
    With the exception of Eglinton Station, 11 of the 12 stations of The intention of using Helvetica and Univers is unknown, however The Toronto Subway Font (Designer Unknown) the original Yonge Subway line have been renovated extensively. with the usage of the latter on the design of the Spadina Subway in Based on Futura by Paul Renner (1928) Some stations retained the original typefaces but with tighter 1978, it may have been an internal decision to try and assimilate tracking and subtle differences in weight, while other stations subsequent renovations of existing stations in the aging Yonge and were renovated so poorly there no longer is a sense of simplicity University lines. The TTC avoided the usage of the Toronto Subway seen with the 1954 designs in terms of typographical harmony. font on new subway stations for over two decades. ABCabc RQKS Queen Station, for example, used Helvetica (LT Std 75 Bold) in such The Sheppard Subway in 2002 saw the return of the Toronto Subway an irresponsible manner; it is repulsively inconsistent with all the typeface as it is used for the names of the stations posted on ABCabc RQKS other stations, and due to the renovators preserving the original platfrom level. Helvetica became the primary typeface for all TTC There are subtle differences between the two typefaces, notably the glass tile trim, the font weight itself looks botched and unsuitable. wayfinding signages and informational material system-wide. R, Q, K, and S; most have different terminals, spines, and junctions. ST CLAIR SUMMERHILL BLOOR DANGER DA N GER Danger DO NOT ENTER Do Not Enter Do Not Enter DAVISVILLE ST CL AIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR EGLINTON DAVISVILLE ST CLAIR SUMMERHILL ROSEDALE BLOOR The specially-designed Toronto Subway that embodied the spirit of modernism and replaced with a brutal mix of Helvetica and YONGE SUBWAY typeface graced the walls of the 12 stations, progress.
    [Show full text]