<<

Revision S May 2002 MISSIONS SUMMARY Page 9 - STS-9 LANDING SITE/ SSME-TL CREW LAUNCH SITE, RUNWAY, NOM-ABORT SRB ORBIT PAYLOAD MISSION HIGHLIGHTS (6) FLT ORBITER LIFTOFF TIME, CROSSRANGE EMERG RSRM FSW WEIGHTS, (LAUNCH SCRUBS/DELAYS, NO. LANDING SITES, LANDING TIMES THROTTLE AND INC HA/HP PAYLOADS/ TAL WEATHER, ASCENT I-LOADS, TITLE, NAMES ABORT TIMES FLT DURATION, PROFILE ET EXPERIMENTS FIRSTS, SIGNIFICANT ANOMALIES, ETC.) & EVA'S WINDS ENG. S.N. STS-9 OV-102 CDR: KSC 39A EDW 17, LAKEBED 104/104 A55/60 57.028° STANDARD OI-2 CARGO: KSC W / D : OPF 82 (2), VAB 12 (3), PAD 34 (2) = 128 days (EDW 8, LKBD 4) 33264 lbs (STS 41-A) Flight 6 John W. Young 332:15:59:59.99Z (107) (1) INSERTION (1) Columbia (FLT 2 - STS-1) 11:00:00 AM EST (P) MTR: LAUNCH POSTPONEMENTS : S/L1 15:47:24 PM PST PAYLOAD P27/R1/V3/M1 11:00:00 AM EST (A) 100/104/ HPM START: INSERTION CHARGEABLE: -10/30/83 Launch postponed 29 days to 11/28/83. Rolled Thursday 1 back from pad and changed SRB nozzles subsequent to SEQ 1 Monday 3 12/8/83 (1) 78/104/65 -58.0° ALTITUDE: 33131 lbs LM (1) PLT: 11/28/83 (3) CASE: STS-8 excessive nozzle erosion. 29-day slip. FLT # 9 PAYLOAD Brewster H. Shaw, Jr. XRANGE: 69 NM 1 = 2011 (1) STD END: POST OMS -2 WEIGHT: LAUNCH SCRUBS : None. KSC 9 OMS PODS P28/R25/M24 LAUNCH WINDOW : 2 = 2018 (1) -79.0° 136.75 X 33,131 lbs LVO1 - 6 14 Minutes ORB DIR : DL (5) 3 = 2019 (1) LWT-4 132.79 NM (includes 870 lbs LAUNCH DELAYS : None. PAD RVO1 - 6 M / S 1 : (TAL Lighting) MAX: cryo tank) AIM PT : NOM 39A-9 FRC2 - 6 Owen K. Garriott ET-11 -79.9° P29/R26/M25 TAL - ZARAGOZA DEPLOYED: TAL WX : Zaragoza no go - winds, Koln-Bonn no go - 0 lbs PLS - EDW MLGTD: 1649 FT ET clouds. 342:23:47:24Z M / S 2 : SLS - NOR BR / UP NON - DEPLOYED : VEL: 200 KGS FLIGHT DURATION CHANGE : Robert A. R. Parker TAL - ZARAGOZA 185 KEAS 199K 32261 lbs P30/R27/M26 IN PLANE TAL - 1:01:00 - Flight extended 1 day for additional science. HDOT: -1.7 FPS MIDDECK: - Landing delay 5 revs after GPC 1 and GPC 2 hard COLOGNE/BONN MET 0 lbs P / S 1 : AOA - NOR TD NORM 195 : failures Byron K. Lichtenberg AOA WX - NONE 749 FT ET RETURNED: - Total extension - 1 day + 5 revs. P31/R28/M27 IMPACT 32394 lbs MAX Q = 676 NLGTD: 5897 FT LAT: FIRSTS: SHUTTLE - First flight with 6 crewmen. P / S 2 : M = 1.52 342:23:47:37Z 59.96°S ACCUMULATED VEL: 146 KGS - First flight of Spacelab after Spacelab only Ulf Merbold HDOT: -9.9 FPS LONG: WEIGHTS : () SRB SEP : 149.9°E DEPLOYED: modifications to OV-102. - First flight with non- (P/S) and first non- P32/R29/M28 2:06.24 MET BRK INIT : 126 KGS 74525 lbs NON - DEPLOYED : Americans. AVE BRK DECEL : 147736 lbs - First use of two shifts of 12 hours (red and blue shifts). MECO: CARGO TOTAL : 8:29.18 MET 6.8 FPS/S - First flight with galley and sleep station. 256318 lbs - First flight with 3 substack fuel cells. WHEELS STOP : ET SEP : 342:23:48:17Z PERFORMANCE 8:47.32 MET MARGINS ( LBS ) : SIGNIFICANT ANOMALIES : 10105 FT FPR: 5404 - GPC SV time tag to S/L incremented by 1 day. FUEL BIAS: 1084 OMS -1 : ROLLOUT: - Ku-band TWT failed to come on (low temp problem). 8556 FT FINAL TDDP: 841 - Spacelab RAU 21/cooling problem. 10:29.3 MET RECON: -411 68.5 Seconds (10105 FROM M 3 EOM - Excessive GH2 in water. THRESHOLD) SPACELAB-1/LM - S-band power amp no. 2 failed. 53 SEC OMS -2 : WEIGHT: - Noises and oscillations reported by crew. SPACELAB 1 - GPC 1 hard failure GPC 2 failure, re-IPL’ed, memory 40:37.4 MET WINDS: 220288 WITH 73 EXP: 101.6 Seconds 0 H/T, O X KNOTS DEORBIT - ASTRONOMY altered, failed again at NLG contact (delayed landing 7- MCC FCR-2 (5) OFFICIAL: 1T, OX X CG: 1085.8 129 X - SOLAR PHYSICS 3/4 hours). 124 NM - SPACE PLASMA - IMU 1 failed (power supply failure). FLIGHT DIRECTORS : DENS ALT : 1900 FT LANDING - ATMOSPHERIC - APU 1 and 2 hydrazine leak/fire shutdown after landing Ascent - J. H. Greene VELOCITY PHYSICS (APU 1 and 2 damaged). FLT DURATION : - EARTH - Right outboard brakes damaged. Ld/Orb 1 - C. R. Lewis 10:07:47:24 WEIGHT: 25696 FPS OBSERVATIONS Orb 2 - J. T. Cox 247:47:24 220027 - LH OMS pod TPS damage during entry. - LIFE SCIENCES - Mission extended one day. 8 hours extension to Orb 3 - L. S. Bourgeois RANGE - MATERIAL Team4/Ent - G. E. Coen S / T : 52:03:46:44 X CG: 1087.1 4349 NM SCIENCES analyze GPC and IMU failures. - LH OMS pod removed for repair after burn-through OV -102 : 5 CRYO TANKS (missing tile). 34:23:50:20 NO RMS RADIATORS DEPLOYED #7 (stowed for 34 hours) DISTANCE: 3,330,000 sm